METHOD STATEMENT First Fix Joinery

Similar documents
North West Facilities Ltd

METHOD STATEMENT SCREEDING OF FLOOR

North West Facilities Ltd

ACT Scaffolding Services LTD METHOD STATEMENT Scaffold erection

BROCHURE # 108 CONSTRUCTION PLAN COMPONENTS

Risk Assessment & Safe Working Practice

K.Construction Scotland LTD

SECTION WOOD FRAMING. A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents.

MMM MASONRY, INC. Employee Safety Guidelines

Safe Work Method Statement Perimeter and Balcony Fallguard (0003)

ThermaSteel Corporation ASSEMBLY MANUAL

SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE:

Safe Work Method Statement

Example Only. Outline Health and Safety Plan. Introduction. Project Brief. Appointments. Introduction. Description of Project. Location.

HANDING-OVER CERTIFICATE - SCAFFOLDING

LUXURY LOG CABINS. Built under caravan regulations act 1960, 1968 Amendment 2006 BS VAT Zero rated 701/20

PREMIER V Bucko Cast In Place

FrameSAFE Site-Specific Fall Protection Plan Template. Instructions for Use DO NOT INCLUDE THIS PAGE IN YOUR MANUAL SAMPLE

Carpentry/Carpenter CIP Task Grid

SECTION WOOD FRAMING. A. Includes But Not Limited To: 1. Furnish and install wood framing and blocking as described in Contract Documents.

Health Safety, & Environment

CARPENTRY WORKPLACE TASKS - CHECK LIST (Note: for employer reference only)

APPLICATION FOR FINISHED BASEMENT PERMIT

Void Platform Inspection Handbook V1.1

Lonsdale Building Inspections Department 415 Central Street W. PO Box 357 Lonsdale, MN (507) fax (507)

SAFE WORK METHOD STATEMENT

HEALTH AND SAFETY CONTRACT BETWEEN EMPLOYER AND MANDATORY (CONTRACTOR) SECTION 37(2) OF THE OHS ACT, ACT 85 OF 1993

Safety Documents > Safety Manual > Scaffolds

Incremental Change 2015

Interiors Sources Decor LLC. Method Statement BLOCK WORK. Civil Works 6/26/2016

Residential fall protection. Presented by Minnesota OSHA

Site check The timber frame pocket guide

* RESIDENTIAL PLAN REVIEW *

206 Basic Construction Management

RESIDENTIAL BASEMENT ALTERATIONS GUIDE

2003 International Residential Building Code

Chapter 13 - Finish Framing

Scaffolding. Safety Guide. STOP! Before you climb

TYPICAL SCHEDULE OF COMPONENTS

Practice Notes For Construction Managers PNCM 7: Timber Formwork First Issue, January 2006

EASY STAIR - EASY - SAFE

2014 CATALOGUE

Building Guide. Colorado Chapter of the International Conference of Building Officials. Building Guide

Building Construction Occupations

WORKING AT HEIGHT. The company will comply with the Work at Height Regulations 2005, its schedules and Codes of Practice.

INSPECT DIRECT Pty Ltd

Supported Scaffold Inspections

Reliant Holdings Ltd Safety Management System

SAFE WORK METHOD STATEMENT

Level 2 NVQ Diploma in Wood Occupations (Construction)

Level 2 NVQ Diploma in Trowel Occupations (Construction) Qualification Specification

(Insert Company Name)

City of Rohnert Park Building Department Inspection Descriptions

RISK ASSESSMENT As exhibitions and events are deemed as hazardous environments, it is a legal requirement that all exhibitors and contractors

Unit Standard 497 Demonstrate knowledge of workplace health and safety requirements Version 7 Level 1 3 Credits. Student Checklist & Instructions

-SQA-SCOTTISH QUALIFICATIONS AUTHORITY. Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR

Safe Work Procedure for installation of

References. EM , Sections 22 OSHA 29CFR (Subpart L ) UFGS [Latest] ANSI A

Typical Deck Details. Albemarle County, Virginia. Based on the 2012 Virginia Residential Code

NSC North Star Contracting, l.l.c

INSPECTOR GROUP PTY LTD

UCC Permit Application Procedures

OSH5063EP(PRS3607) Workplace and Work Equipment Hazard. Session 9. Working at Height

Perkins Statewide Articulation Agreement. Documentation item: Secondary Competency Task List Coversheet

TABLE OF CONTENTS. 1.0 INTRODUCTION 1.1 Greenstone Structural Engineered Panels 1.2 Drawing and Element Numbers

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

Level 2 NVQ Diploma in Trowel Occupations (Construction) (QCF) Qualification Specification

BP OIL -- TOLEDO REFINERY

Building Construction Occupations

Fall Protection Safety Program and Training Materials

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

TECHNICAL GUIDANCE XXXX 2015 EXXON QUESTION ANSWER. page 1 of 9

HONG KONG REGULATIONS

SCAFFOLDING PROCEDURE

Steps in Building a Shed

2010 HSC Construction Sample Answers

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018)

HEALTH AND SAFETY POLICY

Savard Labor & Marine Staffing, Inc. Fall Prevention Program Rev3/14

KORA_Req._for_Eng._Studies_on_Stouffer_Apts. KU Reference No

Plan Check No. Checked by: An Appointment Is Required for Verification

Administrative Changes

DOUBLE SLIDE RAIL INSTALLATION METHOD. Double Slide Rail August

HSE Priorities for Construction Designers April 2007

Maintenance and Refurbishment Works of Quarters Two (2) at FEA s National Control Center, Vuda. Tender Number: MR 334/2017

SAFETY METHOD STATEMENT

Chapter 14 - Air Sealing

Mr. A Sample Foxes Cottage Bolton Road Bury St Edmunds IP32 2DB 6th January 2014

SC Construction Area

User Guide for New and Altered Commercial Buildings

Quality Inspection 8618 London Heights San Antonio, TX Phone: (210)

Intermediate Mapping Grid: CPC30211 Certificate III in Carpentry

Construction Method Statement

STANDARD PRACTICE INSTRUCTION

ARTICLE 12 INTERNATIONAL RESIDENTIAL CODE 2012 International Residential Code Modification Summary (Statutory Authority: 1976 Code Section )

SCAFFOLD PLAN SWMS & JSA also known as job safety analysis worksheet or scope of works

Chapter 32 - Garage. June 2015 Garages 32-1

Transcription:

North West Facilities Ltd 17-18 Gaerwen Industrial Gaerwen Isle of Anglesey LL60-6HR Tel: 01248-422555 Fax: 01248-422556 Mobile: 07891-557581 Project/Contract CCG Contractor Apollo Property Services Group Site Address Various sites across Gwynedd Project Start Date 14 th November 2011 Expected Duration As per Apollo s program Projected Completion Date As per Apollo s program Document Author Authorised by Authorised by Authorised by (for Client) Name Title Signature Date David Hartley Director 14/11/11 Harriette S Hartley General Manager 14/11/11 Stephen Brazier Site Manager 14/11/11 Emergency Contact Details Contact Tel Mobile Harriette S Hartley 01248-422555 07891-557581 Data Protection Statement The information and data provided herein shall not be duplicated, disclosed or disseminated by the recipient in whole or in part for any purpose whatsoever without the prior written permission from North Wales Facilities Ltd, or North West Facilities Ltd. Revision Number DC/04 Revision Date 30 TH October 2011 Page 1 of 7

Staff Information Sheet The following method statement has been developed to provide a safe system of work and must be adhered to at all times, any significant deviation from this system must first be authorised by your manager or safety representative. Please read the entire sheet before beginning the procedure, if you have any questions please contact your manager or safety representative. The main hazards to your safety and health are; a) Falling from height b) Injury from incorrect Manual handling. c) Injury from slips trips and falls. d) Contact dermatitis from exposure to wet concrete and dust. e) Disease from standing/stagnant water. f) Injury from the incorrect actions of other contractors on site. g) Injury to members of the public during operations. h) Injury from machine hazards Preventative Measures you must take; a) You must be competent to carry out the task. b) You must NOT carry out this task alone c) Barriers erected at entrances and around the work area if deemed necessary by the foreman or safety officer to protect tenants. d) You must not lift beyond your capabilities, get help if necessary. e) Visitors and other members of staff are prohibited from entry unless accompanied by competent person, all visitors issued with personal protective equipment f) You must read and be familiar with the Safety Data Sheets for concrete which contains first aid, fire fighting, and accidental release measures. Personal Protective Equipment you must wear; a) Safety Glasses b) Dust mask c) Overalls d) Gloves e) Safety boots Revision Number DC/04 Revision Date 30 TH October 2011 Page 2 of 7

Environmental Protection Measures you must take; a) You must dispose of waste and spoil to the designated area or skip provided for waste. Quality Control; a) Adhere strictly to the following procedure to ensure quality of service b) If in doubt contact your manager for clarification before proceeding. Task Description 1 This method statement describes the work process for the removal of existing guttering, facia, soffit board and barge board, the inspection and making good of any damaged areas found during dismantling, and the replacement of same in new materials. 2 This Method statement describes the work process for the installation of new kitchens and Bathrooms and the refurbishment and flooring preparation, installation of new skirting boards In the kitchens and bathrooms, It also deals with any minor joinery fixes and installations of new, doors and casings, removal and replacement of rotten timber floor and ceiling joists, and the inspection and making good of any damaged areas found during dismantling, and the replacement of same in new materials. Staff & Training The projects will be carried out by staff from NWF. All members of staff are experienced and hold the following qualifications; List Qualifications. A site manager will be appointed to each contract who will be responsible for quality and safety. Apprentices and young workers will be supervised and are not allowed to carry out tasks for which they have not been trained Revision Number DC/04 Revision Date 30 TH October 2011 Page 3 of 7

PPE All site workers will wear Safety boots Hi Visibility Vests, Hard Hats, If required and protective clothing at all times, other items of PPE such as eye protection, and gloves are available to be worn as and when necessary. Preparation & Induction A risk assessment will be carried out for all tasks which will be discussed with members of staff and the sub contractors, any queries or concerns will be raised with the contract manager who will ensure it is dealt with. Staff and sub contractors will be inducted onto site by the principle contractor and will follow all site rules and safety procedures. Welfare The principle contractor is responsible for providing adequate washing, toilet, drying and refreshment facilities for NWF staff and sub-contractors, Apollo Property Services Group staff and contractors are responsible for ensuring that such welfare facilities are maintained in a clean and wholesome manner. First Aid It is the responsibility of all sub contractors to ensure adequate first aid provision for its staff. Adequate means provision of a trained first aider, suitable first aid equipment and/or the provision of an appointed person at the minimum. A trained first aider will be a suitable person who has attended an HSE approved course of at least four days' duration and he/she will re-train at least every three years on a course of not less than two days. An Appointed Person is a person provided by the employer to take charge of the situation (e.g. to call an ambulance) if a serious injury/illness occurs in the absence of a first aider. The Appointed Person can render emergency first aid if trained to do so. Often principle contractors will ensure sufficient first aid cover for sites under their control Revision Number DC/04 Revision Date 30 TH October 2011 Page 4 of 7

Background and preparation Inductions PPE required Permits to work Machinery shutdown and lock off procedures Site Access and Egress Material Handling Manual Handling Scaffold & Access to height Welfare and first aid Work at Height Working from ladders and steps Safety of other contractors and members of the public Step by step procedure FLOOR JOISTS 1. Measure up number & lengths of floor joist required 2. Collect lengths of wood from storage area and take to cutting area 3. Check joists for straightness, do not use bowed joists 4. Cut joists to required lengths 5. Fit joist hangers in position as per contract drawings (if to be used) 6. Level joists using spirit level or theodolite 7. Lay temporary platform for use as work area or lay weather protective safedeck boards as per drawings 8. Lift the first floor joists into position using the telescopic handler if available, if Not ensure good manual handling techniques are observed 9. Level joists using spirit level or theodolite 10. Lay first floor temporary platform for use as work area or lay weather protective safedeck boards as per drawings ROOF TRUSSES Revision Number DC/04 Revision Date 30 TH October 2011 Page 5 of 7

1. Bolt timber 100x100 timber wall plate to inside of party parapet wall as per architect drawings using m12 Rawl-bolts at 600mm ctrs 2. Lift roof trusses up the outside of the scaffolding using a crane of telehoist and place in the centre of the wall plates, manually distribute to the point of use 3. Fix roof trusses to 100x100 timber wall plate using supplied cleats by screwing into timber 4. Work from centre of roof to both gable ends ensuring trusses are level and at correct centres 5. Fit storm bracings and cross ties to roof trusses 6. Measure and cut the barge boards and fix to the end truss with proprietary fixings 7. Measure and cut the facia boards & fix to the rafter feet with proprietary fixings 8. Measure and Cut the Soffits to size and fix STAIRCASE 1. Ensure staircase in position ready for fitting 2. Cut bottoms of strings square to sit on floor 3. Cut top strings over trimmer joists to hold stairs in position 4. Fix though strings into the wall to secure stairs using supplied fixing screws 5. Fix under third tread from bottom using small stud frame to give support 6. Check stairs for strength and fully test before handover WINDOW / EXTERIOR DOOR FRAMES 1. Ensure damp proof membrane is in position 2. Test fit the frame and shave down if necessary 3. Fit the frame, test for level sill 4. Temporary wedge the frame in place in preparation for fixing and check for plumb 5. Drill the fixing holes and screw fix with raw plugs or frame fixings 6. Cut the interior sill to size and fix with propriety fixings Revision Number DC/04 Revision Date 30 TH October 2011 Page 6 of 7

STUD WALLS 1. Mark out the position of the internal walls as per the site plan 2. Measure and cut the Ceiling Plate 3. Nail fix the Ceiling Plate through into the joists 4. Measure and cut the Sole Plate 5. Nail fix the Sole Plate ensuring they are plumb with the Ceiling Plate 6. Mark out the position of the Studs on both the Ceiling Plate & Sole Plate 7. Measure each stud and mark up in case of any variation 8. Skew nail each stud both top and bottom and check for vertical with the spirit level 9. Mark out the position for the horizontal noggins as per site plan 10. Nail fix the horizontal noggins 11. Measure and cut to size the interior door frames 12. Nail to stud frame ensuring frame is square and plumb 13. Ensure area is left safe at end of each shift 14. Remove all waste and dispose of as per local authority guidelines Kitchen Install 1. Mark out all position fixes as per site drawings 2. Measure and cut TBC Revision Number DC/04 Revision Date 30 TH October 2011 Page 7 of 7