Grayson County Tollway Routing & Feasibility Study:

Similar documents
SH 34 Corridor Study & Environmental Assessment:

Regional Goods Movement Planning in the Bay Area

SR 417 Extension. June 2003 INTRODUCTION AND HISTORY PROJECT SCOPE AND PURPOSE STUDY OBJECTIVE STUDY PHASES

Sunrise Project South I-205 Corridor Improvement Project

Blacklands Corridor Feasibility Study. Public Meeting March 20, 2014 Fletcher Warren Civic Center Greenville, TX

Blacklands Corridor Feasibility Study

The Metropolitan Transportation Plan for North Central Texas. Regional Transportation Council Chad McKeown, AICP January 14, 2016

Outer Loop/Rail Bypass Study

WELCOME TO THE PUBLIC INFORMATION OPEN HOUSE!

Mobility 2025 Update: The Metropolitan Transportation Plan

The Metropolitan Transportation Plan. Public Meetings January 2016

Goods Movement COLLABORATIVE AND PLAN. Arthur L. Dao, Alameda CTC Executive Director ALAMEDA COUNTY TRANSPORTATION COMMISSION. September 17, 2015

I-10 CONNECT. Public Meeting #1

Lubbock Outer Route Feasibility Study Report Executive Summary

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence.

CENTRAL FLORIDA EXPRESSWAY AUTHORITY. SR 408 Eastern Extension PD&E Study

ROUTE FEASIBILITY STUDY. PUBLIC MEETING January 26, 2010

Neal Campbell (WSDOT) Mike Dahlem (City of Sumner) Kirk Wilcox (Parametrix)

AGENDA COMMITTEE OF THE WHOLE COUNTY OF KANE

PUBLIC HEARING LOOP 9

Commonwealth Transportation Board I-66 Corridor Briefing Outside the Beltway Route 15 to I-495

: value pricing. application of the 10 criteria for the long-term consideration of 5.1 THE UNIVERSE OF FACILITIES IN THE DALLAS- FORT WORTH REGION

CPAC Meeting. April 26, 2017

REGIONAL PLANNING AND POLICY FRAMEWORK A Preferred Approach for our Regional Growth

I-69 OHIO RIVER CROSSING HISTORY AND HYDRAULIC UPDATE

Interstate 73 FEIS: I-95 to the Myrtle Beach Region Chapter 4. Public Involvement and Agency Coordination

1.4 Analysis of Alignment Alternatives

HAMPTON ROADS PASSENGER RAIL STUDY DATA COLLECTION PHASE 2A NORFOLK-RICHMOND CORRIDOR

The Metropolitan Transportation Plan. Public Meetings February 2016

Gateway Corridor Transitway

APPENDIX H NEPA TRANSITION REPORT

I-710 Project Committee Meeting

Trans-Texas Corridor-35 Update

US 27 MULTIMODAL CORRIDOR TREASURE COAST REGIONAL PLANNING COUNCIL SOUTH FLORIDA REGIONAL PLANNING COUNCIL

Welcome to the VRE Gainesville-Haymarket Extension (GHX) Study Community Meeting

West Santa Ana Branch Transit Corridor. Draft EIS/EIR Scoping Meeting June 2017

FTP/SIS Steering Committee Work Plan and PPI Update

D R A F T. SECTION 4(f) EVALUATION. INTERSTATE 73 From I-95 to the Myrtle Beach Region

US 75 Integrated Corridor Management

Travel Time Index: Why All the Fuss? Tim Lomax Texas A&M Transportation Institute

Trinity Parkway. Additional Work Effort for Trinity Parkway Supplemental Draft EIS. Trinity River Committee April 16, 2007 Briefing

TxDOT Public-Private Partnerships Lessons Learned. OMW: Market, Communication, and Policy Trends in Tolling

Portland Area Mainline Needs Assessment Study

Presented to : I 710 Project Committee June 30, 2011

LOOP 9 SOUTHEAST WELCOME TO THE LOOP 9 CORRIDOR/FEASIBILITY STUDY. Presentation 6:30 p.m. to 7:00 p.m.

WTP Phase 2 Implementation & Freight System Plan

Route 7 Corridor Improvements Project Reston Avenue to Jarrett Valley Drive Public Hearing

Interdependence, Resilience and Sustainability of Infrastructure Systems for Biofuel Development

Florida Department of Transportation. Lane Elimination

IH 820 Corridor Improvement Study Randol Mill Road To North SH 121 Interchange. Public Meeting. Thursday April 4, 2013

Proposed SM Wright Project on I-45 / US 175 / SH 310

Derby North Gateway Tax Increment Financing District Redevelopment Project Plan. July 25, 2013

± Legend. Tower 55. Trinity Railway Express Fort Worth & Western Railroad. UP Railroad BNSF Railway

2050 VISION WORKSHOP

SCS Scenario Planning

Economic Development Planning, Summary 30

Dallas Love Field People Mover Connector. Additional Study of Alternatives

House Select Committee on Strategic Transportation Planning and Long Term Funding Solutions. March 28, 2016

2. Guiding Principles, Objectives, and Policies

AIRPORT AREA INFRASTRUCTURE TIF DISTRICT: Public Hearing Presentation Oct 21, 2013

KAW CONNECTS EXECUTIVE SUMMARY

Proposed Work Plan for Seventh Plan Development. October 2, 2014 GRAC Tom Eckman

North Central Texas Council of Governments. Workshop TxDOT Dallas

Minnesota Comprehensive Statewide Freight and Passenger Rail Plan

2004 FEASIBILITY STUDY UPDATE

North Northamptonshire Joint Core Strategy Examination

Orange County Transit

Modifications to the FY2016 and FY2017 Unified Planning Work Program

Public Hearing 2. Highway/Limits SH 121: From IH 30 to FM 1187 CSJ

Developing New Revenue Streams For Transit

Alternatives Identification and Evaluation

Public Information Centre #1. March 2010

Dulles Corridor Enterprise Financial Update Dulles Corridor Advisory Committee Meeting

Longmeadow Parkway Fox River Bridge Corridor. Kane County Board Committee of the Whole July 25, 2007

Sound Transit Transit-Oriented Development (TOD) Policy

MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: PHONE: Recommend to Board. Final Action

Racial Equity Work Plan. Equity Advisory Committee June 20, 2017

Communications Plan Outline for the George Washington Toll Road Authority

6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS

2060 Florida Transportation Plan

DECEMBER UPDATE OF 2018 UTP. December Update of 2018 UTP

SH 121: FM 423 TO SH 121 AT US 75 INTERCHANGE

Technical Briefing Report

SH 35 Public Meeting

Traffic Noise Introduction to Traffic Noise Analysis and Abatement

Modeling Applications for Freight Tennessee DOT Freight Planning

Once known as warehousing and distribution, the process

SECTION III - REGIONAL ARTERIAL SYSTEM. The Regional Arterial System is a subcomponent of a broader regional thoroughfare system.

DECEMBER P R O G R E S S R E P O R T

Appendix A: Project Planning and Development A-1 White Paper on Transit and the Tappan Zee Hudson River Crossing Project

New Mexico Statewide Model

DWR s Sustainable Groundwater Management Implementation Groundwater Sustainability Plan (GSP) & Alternative (Alt) Emergency Regulations

TRANS-TEXAS CORRIDOR-35 REGIONAL/STATE UPDATE

In Support of Route 53/120: Understanding the Transportation, Economic, and Local Impacts of a Modern Roadway

WELCOME. Central Coast Terminal Development Plans. Top 5 Things to Know about the Plan

Appendix C Scoping Meeting Materials

A Presentation to: Project Advisory Group Meeting #7

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

Northeast Georgia Plan 2035

Atlanta BeltLine Corridor Environmental Study. Technical Advisory Committee/Agency Coordination. Kick-Off Meeting

Transcription:

Grayson County Tollway Routing & Feasibility Study: from FM 121 (Gunter) to US 75 (Denison) Public Meeting June 21, 2011

Grayson County s Future Grayson Co. Dallas North Tollway

Project Goals Solutions For 2030 and Beyond Improve Mobility in Grayson County Relieve Truck Traffic on US 75 and SH 289 Minimize Negative Environmental and Socioeconomic Impacts Maximize Positive Socio-economic Opportunities Achieve Affordable and Cost-effective Transportation Solutions

Project Development Process Identify Need Metropolitan Mobility Plan Feasibility & Routing Study Preliminary Design Schematic Environmental Assessment Focus of this stage Final (detailed) Design Right-of-Way Purchasing Construction

Opportunities for Input & Information Community Advisory Group Residents, businesses, institutions, commuters, environmental org s Technical Advisory Committee Technical Staff & Elected Officials from governmental and regulatory agencies Public Meetings Open to All interested parties Public Involvement Public Hearing Open to All interested parties

Identify Need, Purpose, Goals, & Objectives July 2010 Develop & Evaluate Universe of Alternatives August 2010 Develop & Evaluate Conceptual Alternatives September 2010 Work Group Meetings Work Group Meetings Study Process Recommendation for 3 Conceptual Alternatives Oct. Nov. 2010 Work Group Meetings 1 st Public Meeting Detailed Analysis of 3 Conceptual Alternatives Nov. Dec. 2010 Work Group Meeting Next Steps to Complete This Study Phase Recommended Preferred Alignment Determination Apr. - May 2011 Toll Feas, Financials, & Concept Alt Analysis Rpt Jun. Aug. 2011 2 nd Public Meeting

Public Involvement Tools Advisory Group Meetings Public Meetings / Hearing Briefings & Presentations Print & Broadcast Media Web site www.txdot.gov and search: Grayson Tollway Study http://www.dot.state.tx.us/project_information/projects/paris/grayson_tollway/default.htm

Typical Section 2 lane with Passing Ultimate 350 400 Right of Way Controlled Access Minimizes Initial Expense Phased for Future Expansion

Typical Section - 4 Lane Tollway Ultimate 350 400 Right of Way Controlled Access Frontage Road Locations TBD Allows for Inside Expansion to 6 Lanes

The GCT Corridor US 82 Study Area Boundary

Grayson Co. Thoroughfare Plan FM 120 US 82 Tollway FM 902

Households & Growth (2035) FM 120 US 82 SH 56 FM 902 Dallas North Tollway FM 121

No Build Scenarios 2003 2035 FM 120 US 82 SH 56 FM 120 FM 902 FM 121 US 82 SH 56 FM 902 FM 121

Universe of Alternatives (Final)

Comparing Alternatives Engineering and Design Features Safety, Mobility, & Congestion Relief Social & Economic Impacts Environmental Impacts Cost Effectiveness & Affordability Other Features/Impacts Major Negative Effect Some Negative Effect No Effect, Neutral Some Positive Effect Major Positive Effect - - - o + ++

Conceptual Build Alternatives

North Conceptual Alternatives N1S N2 N4W

Public Meeting Survey - North Votes 40 35 30 25 20 15 10 5 0 N1 North Alternatives (best vs. worst) N1S N2 N4W N2 N1N N1S N2S N3 N4 N4W N5 N6 N7 N8 N9 N10 N11 N12 Alternatives N13 Best Alt. Worst Alt

S1 South/Middle Conceptual Alternatives S10 S2EMod

Public Meeting Survey - South South Alternatives (best vs. worst) Votes 35 30 25 20 15 10 5 0 S1 S2-S2E-S2W S10 Best Alt. Worst Alt S1 S1W S2 S2E S2W S3 S4 S5 S6 S7 S8 S9 S10 S11 Alternatives

Summary of Alternatives NORTHERN ALTERNATIVES SUMMARY COST ROW PROPERTY REGIONAL INTERIM ULTIMATE ACQ IMPACTS PLANS N1S O O - - - ALTERNATIVE N2 - - - - - - - NW4 Mod O - - - + ALTERNATIVE SOUTHERN ALTERNATIVES SUMMARY COST ROW PROPERTY REGIONAL INTERIM ULTIMATE ACQ IMPACTS PLANS S1 - - - - - - - + + S2E Mod O - - - + + + + S10 - - - O - -

Current Status

Grayson County Tollway Routing & Feasibility Study: from FM 121 (Gunter) to US 75 (Denison) Public Meeting June 21, 2011