All new construction, mobile home placement & additions.

Similar documents
All new construction, mobile home placement & additions.

Form CITY OF SILVER BAY BUILDING PERMIT APPLICATION INFORMATION SHEET

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

1. Complete Building Permit Application forms on page 2. Include septic system design approval from the Washington County Health Department.

Plainfield Township Building and Zoning Department P.O. Box 247 Hale, MI PH(989) FX(989) Authority: P.A. 230 of 1972 As Amended

City of Kasson Building Permit Process

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

Plains Township Building Permit Application

Lot Size: OWNER OR LESSEE: Name: Telephone: Address: City: State: Zip: ARCHITECT OR ENGINEER: Name: Telephone: Fax #: License #:

PERMIT APPLICATION FOR ALTERATION, BASEMENT FINISH, REMODEL, OR REPAIR

RESIDENTIAL BUILDING PERMIT INFORMATION

RESIDENTIAL BUILDING PERMIT INFORMATION

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

Last Updated March 15, 2016

Square footage times modifier =. Square footage of building:. Modifier type: Monolithic slab: (21.33) $. Utility (footing/foundation)(35.55) $.

BUILDING PERMIT APPLICATION INSTRUCTIONS CITY OF AUBURN

New Single Family/Duplex/Townhome Application

RESIDENTIAL BUILDING PERMIT APPLICATION ( MINIMUM Building Requirements-Page 6)

Zoning Permit Application

City of Lorena 107-A S. Frontage Road Lorena, Texas Phone: (254) Fax: (254)

CITY of COLDWATER. Requirements for Obtaining Building Permits City of Coldwater, Michigan

UCC CONSTRUCTION PERMIT APPLICATION INSTRUCTIONS

Building Permit Checklist

ALAMANCE COUNTY MODULAR HOME PERMIT APPLICATION

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

Residential Building Permit Checklist

CITY OF TROY, MISSOURI Building Permit Application. Type of Permit: Residential Commercial. Company: Contact person: Address # Street Name:

RESIDENTIAL BUILDING PERMIT INFORMATION

C ITY OF D ARIEN Community Development Department 1702 Plainfield Road Phone: (630) Fax: (630)

Town of Orange, New Hampshire Application for a Building Permit

Permit Procedures For New Construction, Additions, and Alterations

The following materials and documents are required in order for you to obtain a Building Permit:

Town of Grantham, NH Building Permit Application Procedures

RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS

RESIDENTIAL BUILDING PERMIT APPLICATION TOWN OF EASTON Easton Valley Road Easton, NH Phone: Revised May 2016

MOBILE HOMES DAWSON COUNTY PLANNING & DEVELOPMENT PHONE FAX

BUILDING PERMIT INFORMATION PLEASE READ CAREFULLY AS IT MAY AFFECT APPROVAL OF YOUR BUILDING PERMIT

PROCEDURE FOR REQUESTING A BUILDING PERMIT

BUILDING DEPARTMEN T

PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME

City of Bullhead City Development Services/Public Works. Permit Submittal Requirements FENCES

meters (16 Inches) Transportation (T)

Pat Preece, Fire Chief Steve Solomon, Fire Chief

CASS COUNTY, MISSOURI BUILDING CODES, ENVIRONMENTAL HEALTH AND ZONING DEPARTMENT S.

BUILDING PERMIT APPLICATION

Residential Building Permit Application Note: Storm Water Permit may be required.

VARIANCE APPLICATION PLEASE PRINT

THIS IS NOT A PERMIT DO NOT START CONSTRUCTION. City of Pell City. Residential Building Permit Application

Town of Kingsville. Building Department

RESIDENTIAL BUILDING PERMIT INFORMATION

City of North Mankato 1001 Belgrade Avenue North Mankato, MN (507)

The following information is required when submitting a building permit application:

BUILDING PERMIT SUBMISSION CHECKLIST NEW SINGLE-FAMILY RESIDENCE NEW TWO-FAMILY RESIDENCE NEW MULTIPLE SINGLE FAMILY (TOWNHOUSE)

PERMIT APPLICATION REQUIREMENTS NEW RESIDENTIAL (SFD) POOL

TOWN OF ROTTERDAM BUILDING DEPARTMENT RESIDENTIAL ACCESSORY BUILDINGS AND STRUCTURE PERMIT APPLICATION Ext 395

District of Ucluelet Building Permit Guide

Boone County Area Plan Commission Residential Structure Accessory, Addition, Remodel, Deck, Porches, Gazebos, Pergolas, Farm Buildings, Swimming Pool

Deck Permit Zoning requirements Adopted Code Submission Requirements Fees Review time Contractor licensing Inspections

PENNSAFE BUILDING INSPECTION SERVICES LLC Deck and Roof Cross Section Submittal

CITY OF PORTLAND BUILDING PERMIT APPLICATION Date:

Commercial Remodel Permit

Lot#_ Subdivision/Land Development: Phase: Section:_. NON-RESIDENTIAL (Commercial)

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

CONSTRUCTION GUIDELINES

Residential Accessory Structure Application Packet (Carport, Shed, Garage, Pool)

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT

TOWN OF GREENVILLE APPLICATION FOR PERMIT

ZONING CLEARANCE PERMIT APPLICATION

BUILDING PERMIT PROCEDURE

HONEY BROOK TOWNSHIP

City of Willow Park 516 Ranch House Road Willow Park, Texas Phone: (817) * Fax: (817)

City of North Mankato 1001 Belgrade Avenue North Mankato, MN (507)

DAMASCUS TOWNSHIP, WAYNE COUNTY, PENNSYLVANIA APPLICATION FOR BUILDING PERMIT ZONING & UCC #

APPLICATION FOR BUILDING PERMIT UCC & ZONING #

COMMERCIAL OR RESIDENTIAL NEW BUILDINGS, REMODELS AND ADDITIONS

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

THE FOLLOWING INFORMATION IS REQUIRED TO OBTAIN A CITY OF OTHELLO COMMERCIAL BUILDING PERMIT:

RESIDENTIAL BUILDING PERMIT APPLICATION

TOWN OF LOUDON OFFICE OF THE BUILDING INSPECTOR P.O. BOX 7032 ~ 8 COOPER STREET LOUDON, NH 03307

BUILDING PERMIT CHECKLIST FOR THE TOWN OF GRAND LAKE

Township of Georgian Bluffs. Building Permit Information

A. GENERAL PROPERTY INFORMATION. Applicant s name Day Phone Installer Name Send permit to installer. B. PROPERTY DESCRIPTION

City of Donnelly. Permit Application Information and Instructions

MONROE COUNTY ZONING OFFICE

Town of Bethlehem BUILDING PERMIT APPLICATION

BUILDING PERMIT PROCEDURE PLEASE READ CAREFULLY AND FILL OUT COMPLETELY TO ASSURE QUICK AND ACCURATE SERVICE

Building Permit Application

If you have any questions, feel free to contact the office of the Planning Commission at

A. GENERAL PROPERTY INFORMATION. Applicant s name Day Phone Installer Name Send permit to installer. B. PROPERTY DESCRIPTION

WEST BRANDYWINE TOWNSHIP 198 Lafayette Road Coatesville, PA Fax PERMIT NO.

Village Of Carthage ZONING AND BUILDING PERMIT PROCESS

PERMIT APPLICATION REQUIREMENTS

BUILDING PERMIT APPLICATION

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

Town of Fredonia. 25 N Main St. * PO Box 217 Fredonia AZ Fax: * Office

DOUGLAS COUNTY BUILDING PERMIT APPLICATION

PERMITS REQUIRED BEFORE OBTAINING A PERMIT

CITY OF VINE GROVE BUILDING PERMIT APPLICATION

Transcription:

Checklist The following activities require a building permit application as per State Building Code: All new construction, mobile home placement & additions. All repair and remodeling involving the strength of a structure, insulation or window replacement. All decks that are attached, or a 30-inch drop down from the deck (setbacks apply to all decks). All porches, gazebos, swimming pools, lean-tos, pergolas and fences over 6 foot. All foundations, anchoring or a retaining wall over 4 feet. All re-shingling, siding, furnaces, unit heaters, air conditioning, water heaters, fireplaces gas lines, wood or corn stoves, green energy and demolition activity. All plumbing not done by the occupant. The only exemptions to the above requirements are: 1. Agricultural related outbuildings used only for agricultural purposes situated on at least 10 acres of active tillable Ag land. A form must be signed and submitted to the Environmental Services Department by the landowner certifying the above information. Forms for this exemption are available from the Zoning Office. 2. Storage (only) sheds less than 120 square feet (including over-hang) Do not start construction before a building permit is issued from this office. Triple charges, court and other fees can be assessed against you and the property. Below is a series of questions that will help speed you through the building and zoning permit process, this checklist is not totally inclusive but touches on the most frequent issues that need to be addressed for a general building permit from Wabasha County. (some townships may be more restrictive) General Regulations Applies to All Building Permits Is your septic outside of a DNR shoreland district? (1000 ft from a lake, the Mississippi River and its backwaters or 300 ft. from a protected stream). If not, a compliance inspection is required. (##) Will the change be void of a sleeping area? If not a septic compliance inspection is required. (##) Will the structure be greater than 10 feet from the septic tank or 20 feet from the drainfield? (##) Will the structure be 30 feet or more from an 18% Bluff slope? Will the structure and its drip-line be greater than 3 feet from the well. (##) Front yard setback for a structure is the road Right of Way + 30 feet for most roads and road Right of Way + 50 feet for some county, and townships roads. Not the centerline or edge of roadway. Is your well outside of a DNR shoreland district? (1000 ft from a lake, the Mississippi River and its backwaters or 300 ft. from a protected stream). If not, a water test for Nitrates and Bacteria is needed unless it passed a test in the last three years or was installed less than 5 years ago. (##) If in a sub-division, does the project comply with covenants it may have? Will the structure comply with back & side setbacks (This distance is measured from the dripline of the eaves.)? Setbacks from: back yard sideyard Zone A-1 50 ft 50 ft Zone A-2 50 ft 50 ft Zone A-3 20 ft 20 ft Zone R-1 40 ft 15 ft (##) for Septic & Water questions contact Public Health @ 651-565-5200 over

Accessory Structure Is this an Accessory building? (not to be lived or slept in) Will the building be attached to the house or greater than 8 ft from the house? Will the structure be 10ft from septic tank & 20ft from drain fields? (##) If your parcel is less than 12,000 sq. ft., will the structure be less than 801 sq. ft? If your parcel is greater than 12,000 sq. ft. and less than 5 acres or in a subdivision, will the structure be less than 1,201 sq. ft. (30x40)? New Dwelling Is the building site over 1,000ft. from a feedlot? (MN State Statutes Section 394.25, Subd. 3C, part d) Do you have a valid 911 services number for this dwelling? If questions call Shawn Gertken 565-5164 Is the dwelling 16 feet or wider on the short side? Will the access drive stay at less than a 14% grade & not cross slopes over 30%? If the access drive is less than 200 ft. long will the drive be at least 12ft wide w/ 4:1 side slopes? If the driveway is longer than 200ft. will there be a minimum width of 16ft, with 4:1 side slopes? Will the curves of the access drive have a minimum of a fifty (50) foot centerline radius? Will the access at the public road be 90 degrees to the road and have 50 feet of flat ground from the center line of the public road? Has the road authority approved the access point onto the public roadway? (agriculture, logging & other accesses may not meet access codes) Has a septic permit been approved by Wabasha County Public Health? (##) If using an existing well, is it less than 5 years old or tested for nitrates and coliform bacteria and passed in the last 3 years? (##) An answer of NO to any of the above questions may require additional permits. Forms we are looking for: Building Permit Application, Township Approval, Site Sketch, Construction Detail (If blue-prints 2 sets), New Energy Code Compliance Certificate form License Waiver (if no general contractor), Septic information - copy of permit or compliance inspection (if needed) Water Test copy of results (if needed) Fill out all forms the best you can. Omissions may delay your application. Do not start construction before a building permit is issued from this office. Additional inspection charges, up to triple charges and court fees can be assessed against you and the property. If you have further questions, our web address is www.co.wabasha.mn.us, once there, go to Departments, then Environmental Services, then Zoning or Zoning Ordinance Downloads or, give us a call. Floyd Riester - Zoning Administrator friester@co.wabasha.mn.us Tracy Pooler Planning and Zoning Officer tpooler@co.wabasha.mn.us GOPHER STATE ONE 1-800-252-1166 call 48hrs before you dig NEW STATE LAW If your activity will disturb 1 acre or more of soil, including septic and driveway, a National Pollutant Discharge Elimination System (NPDES) General Stormwater Permit for Construction Activity may be needed. Contact MN-PCA @ 800-646-6247 for more information. (6-09)

WABASHA COUNTY BUILDING PERMIT APPLICATION INSTRUCTIONS 6-09 1. Applicant must submit application to County jurisdiction. Applicant shall include: a. Site plan showing property boundaries and building(s) locations. Dimensions should show distance from building to all property lines, septic & well. b. Legal description, address of property, and fire number c. Two (2) sets of plans which include footing, foundation, wall & roof details. CMS will release permit after energy calculations, makeup and combustion air calculations (mechanical calculations) and energy compliance certificate are approved. All buildings other than one and two family dwellings require architectural and/or structural engineering certifications. d. On-site and well information. No building permit shall be issued until the individual sewage treatment application permit has been approved by Environmental Health Department. Call 1-651-565-5200 for more information. 2. Building permit review and issuance normally takes fourteen days. 3. Applicant pays all fees when he/she picks up the permit(s) before construction. 4. The owner/builder is responsible for arranging or calling for all inspections. In the typical new home the following inspections would be required: a. Footing/foundation. This is made before the concrete is poured b. Poured foundation walls c. Back Fill d. Plumbing Rough-in - below ground e. Mechanical Rough-in - heat/vent - in-floor & underground heat f. Radon Mandatory with the adoption of the new Energy Code g. Framing Truss specifications to be on site h. Plumbing rough-in - above ground i. Fireplace Rough-in. This inspection is made prior to enclosing unit. j. Insulation k. Finals building, plumbing, mechanical (heat & ventilations & gas lines) 5. Certificate of Occupancy shall be issued upon completion of all work. GENERAL INFORMATION: All structures except storage buildings under 120 sq. ft. require a building permit. Storage buildings under 120 sq. ft. must still comply with all applicable zoning regulations. This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work has commenced.

Permit fees are based on valuation established from State of Minnesota data sheets. Refund Policy: Upon request of cancellation of building permits, refunds will be based on expenses for office time, inspections, and zoning fees that were completed prior to the cancellation notice. Electrical permits and electrical inspections must be arranged through the Minnesota State Electrical Inspector. All building and plumbing contractors must be licensed through the State of Minnesota and their license number must be included on all permit applications. The plumbing plans for all commercial/industrial projects must be approved by the Minnesota Health Department. Inspections are made by the Health Department, however, they often defer these to the local building inspector. A copy of the state approval shall be on file at CMS prior to scheduling plumbing inspections. The Minnesota State Building Code currently consists of the following documents: 1. Chapter 1300 - Administration of State Building Code 2. Chapter 1301 - Certification and Continuing Education of Building Officials 3. Chapter 1302 - Construction Approvals 4. Chapter 1303 - Minnesota Provisions of the State Bldg Code 5. Chapter 1305 - Adoption of the 2006 International Building Code 6. Chapter 1306 - Special Fire Protection Systems 7. Chapter 1307 - Elevators and Related Devices - 2007 8. Chapter 1309 - Adoption of the 2006 International Residential Code 9. Chapter 1311 - MN Conservation Code for existing Buildings 10. Chapter 1315 - Adoption of the 2008 National Electrical Code 11. Chapter 1322 & 1323 Residential Energy Code 12. Chapter 1325 - Solar Energy Systems 13. Chapter 1335 - Flood-proofing Regulations 14. Chapter 1341 - Minnesota Accessibility Code 15. Chapter 1346 - Adoption of the International Mechanical & Fuel Gas Code 16. Chapter 1350 - Manufactured Homes 17. Chapter 1360 - Prefabricated Buildings 18. Chapter 1361 - Industrialized/Modular Buildings - 2007 19. Chapter 1370 - Storm Shelters (Manufactured Home Parks) 20. Chapter 4715 - Minnesota Plumbing Code 2007 CALL 24 HOURS IN ADVANCE FOR ALL INSPECTIONS CONSTRUCTION MANAGEMENT SERVICES 1-800-940-2547 OR 1-507-282-8206 KEEP THIS FOR YOUR INFORMATION

Wabasha County Environmental Services BUILDING PERMIT 625 Jefferson Avenue MANUFACTURED HOME Wabasha, MN 55981 W/ NO BASEMENT Telephone (651) 565-3062 Permit #(issued by CMS) Property ID # (required) Name of Applicant Day Time Phone #: ( ) Mailing Address: City State Zip Property Address: City State Zip Section Township Range Subdivision Lot Block SIZE: X YEAR: BRAND NAME: NUMBER OF BEDROOMS FOUNDATION- Piers Block (attach pier, block and anchor schedule, and/or foundation plan) Plumbing Contractor: License #: Phone: ( ) Installer s Name: License #: Phone: ( ) Gas Piping Test Contractor: Phone: ( ) Park Name (if applicable): Sewer System: new old Year Installed Well: new old Year Installed *This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work has commenced. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with, whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. This permit only covers the manufactured/mobile home placement, you may require other permits. REFUND POLICY: Upon request of cancellation of building permits, refunds will be based on expenses for office time, inspections and zoning fees that were incurred prior to the cancellation notice. / Date Signature of Landowner Print Name FOR OFFICE USE ONLY Zoning District: Shore land: Flood Plain: Site Plan Review: Yes No Site Plan Approved: Yes No N/A Comments: Individual Sewage Treatment System: Conforming Non-conforming/Failed If non-conforming, New Septic Permit Issued: A Zoning Permit is hereby approved to being construction for the above location and structure under existing regulations and is approved for zoning compliance when signed by appropriate official. Date Approved for Compliance: Building Permit Approval: Building Inspector Estimated Value of Home: $ Value of Site Work: $ Environmental Services Staff Signature Date Building Permit: $ Plan Review: $ State Surcharge: $ Plumbing Permit: $ Fee Total: Date Paid: Receipt#: NOTICE: Property owner is responsible for determining location of property lines and public and private utility easements.