Mangalam Cement Ltd.(Unit I)

Similar documents
Mangalam Cement Ltd. (Unit-II) Stack No.

Mangalam Cement Ltd.

J-11011/45/2009- IA II (I)

Telefax: 011: Dated:10 th May, 2013

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL-2016 TO SEPTEMBER F. No. J-11011/309/2011-IA-ll (I)

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

Environmental Clearance Compliance Half Yearly Report

Environment protection measures / technology

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

Janki Corp. Ltd., Six Monthly Compliance Report

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx

Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013

Environmental Clearance Compliance Half Yearly Report

M/s Deccan Cements Limited, Bhavanipuram,Janaphad, Palakeedu, Suryapet. Telangana MoEF No: J-11011/572/2007-IA II(I) Dated

Calcom Cement India Limited

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

Environmental Clearance Compliance Half Yearly Report

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

Compliance of Conditions laid down by MoEF for Expansion of Cement Plant (2.0 MTPA to 2.6 MTPA Clinker) at Village Suli April 2017 to September 2017

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

(A) Specific Conditions

COMPLIANCE STATUS REPORT

Mangalam Cement Ltd. Clearance Letter No. :- F NO. J / 30/ IA II (I), dtd 17/07/2007

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018)

BRGD Ingot Private Limited 4, D.L. Khan Road, Block-C, Flat No. 201, 2 nd Floor, P.S. Kalighat, P.O. Bhowanipur, Kolkata

Shri Gurudatt Sugars Ltd., Gat No. 61/A, Akiwat - Takaliwadi Road, Takaliwadi , Taluka - Shirol, Dist Kolhapur, Maharashtra

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

SreeJayajothi Cements Limited (100% Subsidiary of M/s. My Home Industries Private Limited), Srinagar, Yanakandla , Kurnool Dist, Andhra

High efficient ESP s has been provided to maintain an emission level below 100mg/Nm 3 in CPP. Modification of ESPs and.

Cement Manufacturing Company Ltd. Page 1

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013.

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

Telefax: 011: Dated: 8 th March, 2013

Name of the Project:- J&K Mineral Development Corporation Limited.

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: OCTOBER 2014 TO MARCH 2015.

iii Continuous stack monitoring facilities to monitor gaseous emissions from the process stack shall be provided. After expansion, limit of PM shall b

Ref: Environment Department, MS, SEIAA Letter SEAC 2010/CR.824/TC-2 Dated 2 nd Nov 2011

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

J.K. Cement WORKS, NIMBAHERA (RAJ)

HALF YEARLY COMPLIANCE REPORT 14 15) ENVIRONMENTAL CLEARANCE (CLINKER 2.48 MTPA TO 2.78 MTPA AND CEMENT 3.30 MTPA TO 3.90 MTPA)

COMPLIANCE REPORT TO THE CONDITIONS LAID IN THE ENVIRONMENTAL CLEARANCE

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

From : April 2015 To : October 2015 Status of conditions stipulated in Environmental and CRZ clearance. Adani Vizag Coal Terminal Private Limited

A. SPECIFIC CONDITION COMPLIANCE

SHREE CEMENT LIMITED, Compliance Status of 300 MW (2x150 MW) Thermal Power Plant. At Village Andheri Deori, Tehsil-Masuda, District Ajmer (Rajasthan)

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Ministry of Environment and Forests Telefax : 011: M/s Posco India Private Limited

MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I

My Home Industries Private Limited Srinagar, Mellacheruvu (V & M) , Suryapet Dist., Telangana State

My Home Industries Private Limited Srinagar, Mellacheruvu (V & M) , Suryapet Dist., Telangana State

Subject: Half yearly Report for the period of 1 st April 2013 to 30 th Sept., 2013 for Indmax Project

Project Code: Clearance Letter No. : MoEF vide letter No: - J-11015/423/2005-IA-II (M) Dated 18 th May 2006

Six Monthly Compliance Status Report

Project Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005

Environmental Clearance Compliance Report

COMPLIANCE TO THE CONDITIONS LAID BY MoEF VIDE CRZ CLEARANCE No.11/32/2009-IA.III dated

Mill Expansion Cum Augmentation Project Compliance

Sr.No Condition Status A. SPECIFIC CONDITIONS:

Date: M/S Desh Bhakt Ratnappa Kumbhar Panchaganga SSK Ltd, Inchalkaranji, Kolhapur.

M/s Balasore Alloys Ltd

Manufacture of Products like Phthalic Anhydride, Benzoic Acid and Power.

SREE RENGARAAJ ISPAT INDUSTRIES (P) LIMITED MM1,2 &5 SIPCOT Industrial Growth Center, Perundurai, Erode district

Hind Energy & Coal Beneficiation (India) Ltd.

F. No. J-11011/196/2007- IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road

6 th MONTHLY COMPLIANCE REPORT OF DIBRUGARH-BHOGPARA AREA

COSMOS CEMENTS LIMITED

Your letter ref. no. J-11011/131/2005-IA.II (I) dated A. SPECIFIC CONDITIONS

TNPL Mini Cement Plant (LSFM) EC Compliance Status Report as of 30/09/2015

Six Monthly Compliance Status Report

Compliance Report of EC : Compliance Status

SHREE CEMENT LIMITED, Compliance Status of 300 MW (2x150 MW) Thermal Power Plant. At Village Andheri Deori, Tehsil-Masuda, District Ajmer (Rajasthan)

MIEL/NP/EMD/ 303/2015 Date:

BHILAI JAYPEE CEMENT LIMITED

PART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION

Hope you will find the same in order. Thanking You, For EMAMI PAPER MILLS LTD. Authorized Signatory

F. No. J-11011/28/2007- IA II (I)

COMPLIANCE OF ENVIRONMENTAL CLEARANCE MINISTRY S LETTER NO.: J-11011/1048/2007-IA II (I), DATED: 07/04/2008 OCTOBER 2013 MARCH 2014

Deccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II

NMDC Iron and Steel Plant, Nagarnar, Dist-Bastar, (C.G.) Six Monthly Progress Report

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL 2013 TO SEPTEMBER M/s. Subham Planners Ltd.

BHUSHAN STEEL LIMITED

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

Hind Energy & Coal Beneficiation (India) Ltd.

NOC GRANTED FOR THE EXPANSION OF KASHLOG LIMESTONE MINES OF AMBUJA CEMENTS TIMITED

Health and safety norms of CPWD should be followed during construction.

BHUSHAN STEEL LIMITED

Deccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II

COMPLIANCE TO EC CONDITIONS [1x 67.5 MW (UNIT # I)]

Transcription:

Mangalam Cement Ltd.(Unit I) Name of the Project :- Expansion of cement Project Code :- grinding capacity from 1.3 MTPA to 1.7 MTPA Clearance Letter No. : - F NO. J - 11011 /119 /2012 - IA II (I), dtd 22.03.2013 Month of Compliance Report :- April-17 to Sept-17 SPECIFIC CONDITIONS S. No Conditions i. Particulate emissions shall be controlled within 50 mg/nm3 by installing adequate air pollution control system viz. Bag filters and stacks of adequate height etc. Data on ambient air, fugitive and stack emission shall to be Ministry s Regional Office at Lucknow, State Pollution Control Board (SPCB) and CPCB regularly. Compliance Status The Particulate emissions from all units are within the norms as per prescribed by state pollution control board. Every six monthly data are being sent to Regional office at Lucknow, Rajasthan pollution control board at Jaipur and Central Pollution control board, Delhi. Stack No. Mangalam Cement Ltd. (UNIT-I) Details of Stack Particulates Matter Concentration 1 Kiln Main Stack 22.68 2 Clinker Cooler Stack 31.97 3 Cement mill Stack 20.72 4 Vertical Coal mill stack 21.88 17.5 MW Captive Power Plants - I (M/s Mangalam Cement Ltd.) Details of Stack Particulates Matter Concentration Stack No. 1 Main Stack Captive Power Plant - I 34.86 2 Coal Crusher 19.89 3 Coal Vibrating 15.37 4 Coal Transfer 13.80 5 Coal Bunker-I 18.52 ii The National Ambient Air Quality Standard issued by the Ministry vide G.S.R. No. 826 (E) dated 16 th November, 2009 should be followed. We are following National Ambient Air Quality Standard issued by Ministry of Environmental and Forest. (GSR 826(E) OF 16-11-2009)

iii Gaseous emission levels including secondary fugitive emissions from all the sources shall be controlled within the latest permissible limits issued by the Ministry and regularly monitored. Guidelines/Code of practice issued by the CPCB should be followed. Gaseous emission levels and fugitive emission level is controlled and under the latest permissible limits. We shall follow guidelines / code of practice issued by the CPCB.( All are within 50 mg/nm3) Stack No. Sr No Mangalam Cement Ltd. (UNIT-I) Details of Stack Particulates Matter Concentration 1 Kiln Main Stack 22.68 2 Clinker Cooler Stack 31.97 3 Cement mill Stack 20.72 4 Vertical Coal mill stack 21.88 Mangalam Cement Ltd. (UNIT-I) Ambient Air Quality Monitoring Results Location Paramet ers Norms (µg/m3 ) Railway Gate Securit y Gate Rack Loading Area Work Shop 1 PM10 100 65.93 73.60 64.51 69.56 2 PM2.5 60 33.91 37.02 33.97 34.46 3 So 2 80 08.01 09.06 08.37 08.57 4 NOx 80 17.94 18.90 21.94 19.93 5 CO 4000 490 480 550 530 17.5 MW Captive Power Plants - I (M/s Mangalam Cement Ltd.) Stack No. Details of Stack Particulates Matter Concentration 1 Main Stack CPP - I 34.86 2 Coal Crusher 19.89 3 Coal Vibrating 15.37 4 Coal Transfer 13.80 5 Coal Bunker-I 18.52 Mangalam Cement Ltd. (UNIT-I) Results of Fugitive Emission S.No. Location SPM (500 µg/m³) 1 Coal Storage area 442.83 2 Cement Mill 430.06 3 Raw material storage area 462.43 4 Stacker & Reclaimer 415.41 5. Packing Plant 483.32 6. Time Office 390.17 7. Crusher 430.70 8. Additive Storage 453.00

iv v The company shall install adequate dust collection and extraction system to control fugitive dust emissions at various transfer points, raw mill handling (unloading, conveying, transporting, stacking), vehicular movement, bagging and packing areas etc. All the raw material stock piles should be covered with GI sheets. Covered sheds for storage of raw materials and fully covered conveyers for transportation of materials shall be provided besides coal, cement, fly ash and clinker shall be stored in silos. Pneumatic system shall be used for fly ash handling. Asphalting/concreting of roads and water spray all around the stockyard and loading/unloading areas in the cement plant shall be carried out to control fugitive emissions. Regular water sprinkling shall be carried out in critical areas prone to air pollution and having high levels of SPM and RSPM such as haul road, loading and unloading points, transfer points and other vulnerable areas. It shall be ensured that the ambient air quality parameters conform to the norms prescribed by the Central Pollution Control Board in this regard. We have installed adequate ESP / Bag filters at all transfer point s, raw material handling for control fugitive dust emissions and regularly spraying water at plant roads, hoppers and raw material storage areas for control fugitive emission by vehicular movements. All raw material Storage and belt conveyors are covered by GI sheets. Cement is stored in silos. Fly ash is stored in silos and pneumatic system is available for fly ash handling. Mangalam Cement Ltd. (UNIT-I) Results of Fugitive Emission S.No. Location SPM (500 µg/m³) 1 Coal Storage area 442.83 2 Cement Mill 430.06 3 Raw material storage area 462.43 4 Stacker & Reclaimer 415.41 5. Packing Plant 483.32 6. Time Office 390.17 7. Crusher 430.70 8. Additive Storage 453.00 Concrete roads and floors are provided in the plant to improve the ambient air quality. Regularly water spray systems are provided at plant roads, hoppers and raw material storage areas for control fugitive emission. Two sweeping machine is available for cleaning of plants roads. Our ambient air quality parameters are within the norms prescribed by the Central pollution control board. Sr No Location Parameters Mangalam Cement Ltd. (UNIT-I) Ambient Air Quality Monitoring Results Norm s (µg/m 3) Railway Gate Securit y Gate Rack Loadin g Area Work Shop 1 PM10 100 65.93 73.60 64.51 69.56 2 PM2.5 60 33.91 37.02 33.97 34.46 3 So 2 80 08.01 09.06 08.37 08.57 4 NOx 80 17.94 18.90 21.94 19.93 5 CO 4000 490 480 550 530 Mangalam Cement Ltd. (UNIT-I) Results of Fugitive Emission S.No. Location SPM (µg/m³) 1 Coal Storage area 442.83 2 Cement Mill 430.06 3 Raw material storage area 462.43 4 Stacker & Reclaimer 415.41 5. Packing Plant 483.32 6. Time Office 390.17 7. Crusher 430.70 8. Additive Storage 453.00

vi Efforts shall be made to reduce impact of the transport of the raw materials and end products on the surrounding environment including agricultural land. All the raw materials including fly ash should be transported in the closed containers only and should not be overloaded. Vehicular emissions should be regularly monitored. All raw materials are stored in covered yard. Fly ash is coming from Kota and other place in the closed containers. Water spray system is available to control vehicular emissions. Vehicular emissions are regularly monitored and record maintained. Water Spraying Material Transporting Belt Covered vii viii Total water requirement shall not exceed 642 m 3 /day. Efforts shall be made to further reduce water consumption by using air cooled condensers. All the treated wastewater should be recycled and reused in the process and/or for dust suppression and green belt development and other plant related activities etc. No process wastewater shall be discharged outside the factory premises and zero discharge should be adopted. Efforts shall be made to make use of rain water harvested. If needed, capacity of the reservoir shall be enhanced to meet the maximum water requirement. Only balance water requirement shall be met from other sources. We shall not exceed water requirement. We have used treated wastewater in green belt development within the factory premises and maintained Zero wastewater discharged. Making use of rain water harvested, capacity of reservoir is sufficient to meet the water requirement. Rain Water Harvesting Mangalam Cement Ltd. Details Of water Harvesting S.No. Location Roof Area (m 2 ) 1. Engineering Building 725 2. Load Center Building 1458 3. Store Building 1620 4. Captive Power Plant-I 1200

ix x xi All the bag filter dust, raw meal dust, clinker dust and cement dust from pollution control devices should be recycled and reused in the process used for cement manufacturing. Spent oil and batteries should be sold to authorized recyclers/ reprocesses only. Green belt shall be developed in at least 33% area in and around the cement plant as per the CPCB guidelines to mitigate the effects of air emissions in consultation with local DFO. At least 5% of the total cost of the project shall be earmarked towards the Enterprise Social Commitment based on locals need and item-wise details along with time bound action plan should be prepared and submitted to the Ministry s Regional Office at Lucknow. Implementation of such program should be ensured accordingly in a time bound manner. All bag filters and ESP dust totally recycled and reused in our plant process. We are following guideline given by Pollution Control Board. We are developing 33 % green belt area in & around of our cement plant, as per the CPCB guidelines. Mangalam Cement Ltd. Unit I Year Wise Tree Plantation Sr. No. Year Plant Names Numbers 1 08-09 10000 2 09-10 Neem, Karanj, 11000 3 10-11 Sheesam, Sirus, 8000 4 11-12 Bad, Peepal, 9000 5 12-13 Palash, Khejri, 9000 6 13-14 Chareel, Mango, 1031 7 14-15 Jamphaletc 4589 8 15-16 900 9 16-17 747 10 Upto Sept-17 903 We are following the condition as per guidelines. CSR Expenditure for the periodfromapril-17 to Sept-17 S.No. Particulars of CSRActivities AMOUNT 1. Morak Gram Panchayat 295600 2. HiriayaKhedi Gram Panchayat 80000 3. Budhkan Gram Panchayat 200000 4. Chechat Gram Panchayat 100000 5. Vocational Skill Development 139000 6. program (Tailoring Classes) Vocational Skill Development 238500 Program (Driving ) Total Amount Rs. 1053100/-

xii The company shall provide housing for construction labour within the site with all necessary infrastructure and facilities such as fuel for cooking, mobile toilets safe drinking water, medical health care, crèche etc. The housing may be in the form of temporary structures to be removed after the completion of the project. We have maintained two colonies along with all facilities. It is not applicable us as we are undergoing for construction in existing plant. For existing labour s we have marked colony with all facilities. Colony ViewGarden General Conditions :- i The project authorities must strictly the stipulations made by the Rajasthan State Pollution Control Board and the State Government. ii No further expansion or modification in the plant shall be carried out without prior approval of this Ministry of Environment and Forests. iii At least four ambient air quality monitoring stations should be established in the downward direction as well as where maximum ground level concentration of PM10, SO2 and NOx are anticipated in consultation with the SPCB. Data on ambient air quality and stack emission shall be regularly submitted to this Ministry including its Regional Office at Lucknow and the SPCB/CPCB once in six months. We shall strictly the stipulations made by the Rajasthan State Pollution Control Board and the State Government. For expansion or modification of the plant we shall take prior approval of the Ministry. Four ambient air qualities monitoring stations are provided at the periphery of our factory premises for the monitoring of ambient air quality. The locations of these stations were decided in consultation with RO Kota. We are submitting data on ambient air quality and stack emissions to Regional office at Lucknow and RPCB, CPCB once in six months. Sr N o Location Parameter s Mangalam Cement Ltd. (UNIT-I) Ambient Air Quality Monitoring Results Norm s (µg/ m3) Railway Gate Security Gate Rack Loading Area Work Shop 1 PM10 100 65.93 73.60 64.51 69.56 2 PM2.5 60 33.91 37.02 33.97 34.46 3 So2 80 08.01 09.06 08.37 08.57 4 NOx 80 17.94 18.90 21.94 19.93 5 CO 4000 490 480 550 530

iv Industrial wastewater shall be properly collected, treated so as to conform to the standards prescribed under GSR 422 (E) dated 19 th May 1993 31 st December 1993 and as amended from time to time. The treated wastewater shall be utilized for plantation purpose. v The overall noise levels in and around the plant area shall be kept well within the standards (85 dba) by providing noise control measures including acoustic hoods silencers, enclosures etc. on all sources of noise generation. The ambient noise levels should conform to the standards prescribed under EPA Rules, 1989 viz. 75 dba (daytime) and 70 dba (nighttime). Industrial waste water is being collected and treated as per GSR 422 (E) dtd. 19th May 1993 guidelines and used for plantation purpose after treatment. Noise is being checked on regularly basis as per standard& limited within the prescribed standards. Mangalam Cement Ltd. (Unit-I) Results of Noise Ambient Air Noise Results Sr. Location (db) No. Day Night 1 Security Gate 65.30 59.10 2 Railway Gate 3 Rack Loading Area 4 Work Shop 68.00 61.85 70.00 62.45 70.65 61.75 vi Occupational health surveillance of the workers shall be done on a regular basis and records maintained as per the Factories Act. We are maintaining Occupational health checkup of the workers regular basis as per the factories act. Chest X-Ray : 74 No s Eye Testing : 85 No s Silicosis Examinations : 28 No s Periodical Health Examination & general medical & health examination of Staff -236 No s & Workers 299 No s

vii The company shall develop rain water harvesting structures to harvest the rain water for utilization in the lean seasons besides recharging the ground water table. We have developed rainwater harvesting system at our plant buildings. Rain water Harvesting Mangalam Cement Ltd. Details Of water Harvesting S.No. Location Roof Area (m 2 ) 1. Engineering Building 725 2. Load Center Building 1458 3. Store Building 1620 4. Captive Power Plant-I 1200 viii The project proponent shall also comply with all the environmental protection measures and safeguards recommended in the EIA/EMP report. Further, the company must undertake socioeconomic development activities in the surrounding villages like community development programmes, educational programmes, drinking water supply and health care etc. ix Requisite funds shall be earmarked towards capital cost and recurring cost/annum for environment pollution control measures to implement the conditions stipulated by the Ministry of Environment and Forests as well as the State Government. An implementation schedule for implementing all the conditions stipulated herein shall be submitted to the Regional Office of the Ministry at Lucknow. The funds so provided shall not be diverted for any other purpose. Earmarked capital for environmental projects will be used exclusively for its implementations as maintained in EIA / EMP Reports. We shall implement this condition as per Enterprise Social Commitment scheme. CSR Expenditure for the periodfromapril-17 to Sept-17 S.No. Particulars of CSRActivities AMOUNT 1. Morak Gram Panchayat 295600 2. HiriayaKhedi Gram Panchayat 80000 3. Budhkan Gram Panchayat 200000 4. Chechat Gram Panchayat 100000 5. Vocational Skill Development program 139000 6. (Tailoring Classes) Vocational Skill Development Program 238500 (Driving ) Total Amount Rs. 1053100/- We agree the condition. Compliance report will be sent to the all authorities regularly. Mangalam Cement Ltd Environmental expenditure incurred during the period from April-17 to Sept-17for environment protection measures. (Unit I S. No. Department Total Cost (In Rs.) 1. Total Expenditures (Rs.) 3,02,98,510.91

x A copy of clearance letter shall be sent by the proponent to concerned Panchayat, ZilaParishad/Municipal Corporation, Urban Local Body and the local NGO, if any, from whomsuggestions/representation s, if any, were received while processing the proposal. The clearance letter shall also be put on the web site of the company by the proponent. xi The project proponent shall upload the status of compliance of the stipulated environment clearance condition, including results of monitored data on their website and shall update the same periodically. It shall simultaneously be sent to the Regional Office of the MOEF at Lucknow. The respective Zonal Office of CPCB and the SPCB. The criteria pollutant levels namely; PM10, SO2, NOX (ambient levels as well as stack emissions) or critical sectorial parameters, indicated for the projects shall be monitored and displayed at a convenient location near the main gate of the company in the public domain. xii The project proponent shall also submit six monthly reports on the status of the compliance of the stipulated environmental conditions including results of monitored data (both in hard copies as well as by e-mail) to the Regional Office of this Ministry at Lucknow/CPCB/SPCB shall monitor the stipulated conditions. xiii The environmental statement for each financial year ending 31 st March in Form-V as is mandated to be submitted by the project proponent to the concerned State Pollution Control Board as prescribed under the Environment (Protection) Rules, 1986, as amended subsequently, shall also be put on the website of the company along with the status of We have put the clearance letter on the website of the company. We are uploading every six monthly report of plant monitoring results and compliance report of Environmental clearance condition time to time at our web site and same data are being send to the RO, Lucknow, CPCB, RPCB and Zonal office. The resulting monitoring data are being submitted, six monthly reports in the month of June and Dec. every year and same copy being sent to the Regional office Lucknow, RPCB and Central Pollution Control Board. We are submitting Environmental Statement before 30 th September in every year and same data available at web site and one copy being sent by e-mail to the Regional office of the MoEF at Lucknow.

compliance of environmental conditions and shall also be sent to the respective Regional Office of the MOEF at Lucknow by e-mail. xiv The Project Proponent shall inform the public that the project has been accorded environmental clearance by the Ministry and copies of the clearance letter are available with the State Pollution Control Board may also be seen at Website of the Ministry of Environment and Forests at http:/envfor.nic.in. This shall be advertised within seven days from the date of issue of the clearance letter at least in two local newspapers that are widely circulated in the region of which one shall be in the vernacular language of the locality concerned and a copy of the same should be forwarded to the Regional office at Lucknow. xv The project authorities shall inform the Regional office as well as the Ministry, the date of financial closure and final approval of the project by the concerned authorities and the date of commencing the land development work. We had advertised information of Environmental clearance letter in two local newspapers in local language of the locality concerned and same copy sent to the Rajasthan Pollution Control Board, Jaipur and the Regional office at Lucknow. We will inform the regional office as well as to the ministry the date of financial closure and final approval of the project. (This project is completed over on Oct.-2013

MANGALAM CEMENT LIMITED (Unit I) S. No. Stack Attached with 1. Kiln Hybrid Bag House 2. Clinker cooler ESP 3. Cement mill Bag House 4. Vertical Coal mill Bag House M/s MANGALAM CEMENT LIMITED 17.5 MW Captive Power Plant (CPP I) S. No. Stack Attached with 1. CPP Main ESP Stack ESP 2. Coal Transfer Stack Bag House 3. Coal Crusher Stack Bag House 4. Coal Vibrating Screen Stack Bag House 5. Coal Bunker I stack Bag House

EXISTING PLANT CAPTIVE POWER PLANT CCR BUILDING PACKING PLANT AREA

RAIN WATER STORAGE AT MINES GARDEN CPP PLANT VIEW NEAR PLANT VIEW COLONY VIEW CENTRAL GARDEN VIEW

PLANTATION IN MANDIR AREA RAIN WATER HARVESTING PLANTATION IN MINES AREA PLANTATION NEAR CRUSHER PLANTATION NEAR CRUSHER WATER SPRINKLING ON ROAD

CRUSHER MATERIAL TRANSFER BELT COAL TRANSFER BELT COVER RACK LOADING AREA CLINKER TRANSFER BELT GYPSUM YARD RAW MATERIAL TRANSFER BELT

Annexure-I Mangalam Cement Ltd. (UNIT-I) Particulates Matter Stack No. Details of Stack Stack Attached with Height (Mtrs.) Dia (Mtrs.) Concentration (mg/nm 3 ) April-17 to July-17 to June-17 Sept-17 1 Kiln Main Stack Hybrid Bag house 145.00 4.00 23.97 21.40 22.68 2 Clinker Cooler Stack ESP 35.00 3.30 28.44 35.50 31.97 3 Cement mill Stack Bag house 30.00 1.20 20.18 21.26 20.72 4 Vertical Coal mill stack Bag house 53.00 1.15 22.57 21.20 21.88

17.5 MW Captive Power Plants - I (M/s Mangalam Cement Ltd.) Annexure-I Stack No. 1 Details of Stack Main Stack Captive Power Plant - I Stack Attached with Height (Mtrs) Dia (Mtrs.) Particulates Matter Concentration (mg/nm 3 ) April-17 to June-17 July-17 to Sept-17 ESP 77.0 2.5 34.73 35.00 34.86 2 Coal Crusher Bag House 30.0 0.85 24.78 15.00 19.89 3 Coal Vibrating Bag House 30.0 1.00 16.95 13.80 15.37 4 Coal Transfer Bag House 30.0 0.5 12.80 14.80 13.80 5 Coal Bunker-I Bag House 30.0 0.6 19.05 18.00 18.52

Mangalam Cement Ltd. (UNIT-I) Annexure-II Ambient Air Quality Monitoring Results Railway Gate Security Gate Rack Loading Area Work Shop Sr No Location Parameters April-17 to June-17 July-17 to Sept-17 April-17 to June-17 July-17 to Sept-17 April-17 to June-17 July-17 to Sept-17 April-17 to June-17 July-17 to Sept-17 1 PM10 (µg/m3) 76.66 55.20 65.93 86.00 61.20 73.60 75.92 53.10 64.51 77.83 59.30 69.56 2 PM2.5 (µg/m3) 33.93 33.90 33.91 37.65 36.40 37.02 35.85 32.10 33.97 33.82 35.10 34.46 3 So 2 (µg/m3) 06.63 09.40 08.01 08.33 09.80 09.06 07.68 11.20 08.37 06.94 10.20 08.57 4 NOx (µg/m3) 13.78 22.10 17.94 16.51 21.30 18.90 17.68 26.20 21.94 15.67 24.20 19.93 5 CO (µg/m3) 300 680 490 290 670 480 340 760 550 340 720 530

Mangalam Cement Ltd. (UNIT-I) Annexure-III Results of Noise Ambient Air Noise Results (db)a Sr. No. Location April-17 to June-17 July-17 to Sept-17 Day Night Day Night Day Night 1 2 Security Gate Railway gate 65.20 57.40 65.40 60.80 65.30 59.10 68.80 60.30 67.20 63.40 68.00 61.85 3 Rack loading area 71.30 64.30 68.70 60.60 70.00 62.45 4 Work Shop 70.50 62.60 70.80 60.90 70.65 61.75

Mangalam Cement Ltd. (UNIT-I) Annexure-IV Results of Fugitive Emission S.No. Location April-17 to June-17 SPM (µg/m³) July-17 to Sept-17 1 Coal Storage area 487.66 398.00 442.83 2 Cement Mill 432.13 428.00 430.06 3 Raw material storage area 490.86 434.00 462.43 4 Stacker & Reclaimer 429.82 401.00 415.41 5. Packing Plant 477.64 489.00 483.32 6. Time Office 479.34 301.00 390.17 7. Crusher 473.40 388.00 430.70 8. Additive Storage 453.00 453.00 453.00

Year Wise Tree Plantation Sr. No. Year Plant Names 1 08-09 Neem, Mangalam Cement Ltd. Unit I Numbers Survival Rate Location Annexure-V Area (hector) Total Plant Area Total 33 % Plantation area to be developed 10000 70% Plant & Colony 36 12 Karanj, 2 09-10 11000 70% Plant & Colony 36 12 Sheesam, 3 10-11 Sirus, Bad, 8000 70% Plant & Colony 36 12 Peepal, 4 11-12 9000 70% Plant & Colony 36 12 Palash, 5 12-13 Khejri, 9000 70% Plant & Colony 36 12 Chareel, 6 13-14 1031 70% Plant & Colony 36 12 Mango, 7 14-15 Jamphaletc 4589 70% Plant & Colony 36 12 8 15-16 900 70% Plant & Colony 36 12 9 16-17 747 70% Plant & Colony 36 12 10 Upto Sept-17 903 70% Plant & Colony 36 12

Annexure-VI MANGALAM CEMENT LIMITED CSR Expenditure for the period from April-17 to Sept-17 S.No. Particulars of CSR Activities AMOUNT 1. Morak Gram Panchayat 295600 2. HiriayaKhedi Gram Panchayat 80000 3. Budhkan Gram Panchayat 200000 4. Chechat Gram Panchayat 100000 5. Vocational Skill Development program (Tailoring 139000 Classes) 6. Vocational Skill Development Program (Driving ) 238500 Total Amount Rs. 1053100/-

Annexure-VII

Annexure- VIII Mangalam Cement Ltd. Details of Water Harvesting Sr. No. Location Roof Area (m 2 ) 1. Engineering Building 725 2. Load Center Building 1458 3. Store Building 1620 4. Captive Power Plant I 1200

Annexure-IX Mangalam Cement Ltd Environmental expenditure incurred during the period from April-17 to Sept-17 for environment protection measures. (Unit I & CPP I)j S. No. Department Total Cost (In Rs.) 1. Total Expenditures 3,02,98,510.91/-