APPLICATION FOR AUTHORITY TO CONSTRUCT/OPERATE

Similar documents
STATIONARY SOURCE APPLICATION INSTRUCTIONS

YOLO-SOLANO AIR QUALITY MANAGEMENT DISTRICT 1947 Galileo Court, Suite 103; Davis, CA Phone (530) ; Fax (530)

"LIST AND CRITERIA" INDEX INTRODUCTION Section 1 - General Application Information... 5

OPERATING AIR PERMIT APPLICATION FORM (4 NNR 11-2H)

State of New Hampshire Department of Environmental Services Air Resources Division. Temporary Permit

SWCAA Emission Inventory Instructions

SECTION 2.0 PERMIT BY RULE: Asphalt Plants

ROCK CRUSHING PLANT APPLICATIONS ADVICE

CONSTRUCTION PERMIT. PERMIT NO: 09LP0202F Final Approval

APPLICABILITY DETERMINATION APPLICATION GUIDE FORMS & INSTRUCTIONS

AIR PERMITS FORM 805 APPLICATION

ARKANSAS DEPARTMENT OF POLLUTION CONTROL AND ECOLOGY DIVISION OF AIR POLLUTION CONTROL. Summary Report Relative to Permit Application

GUIDANCE DOCUMENT April 6, Guidance on Estimating Condensate and Crude Oil Loading Losses from Tank Trucks

Eastern Kern Air Pollution Control District

CONSTRUCTION PERMIT. DATE ISSUED: January 7, 2015 ISSUED TO: Martin Marietta Materials, Inc.

Guidance for Filling Out An Application for an Earth Moving Permit / Dust Control Plan. Section 1 Applicant Information

Mailing Instructions and Information:

Guidance for Filling Out An Application for an Earth Moving Permit / Dust Control Plan. Section 1 Applicant Information

RELEASE POINT TYPE Enter or select one of the following stack/emission point release orientation: downward

State of New Hampshire Department of Environmental Services Air Resources Division. Temporary Permit

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT AIR DIVISION INSTRUCTIONS FOR COMPLETION OF MANUFACTURING OR PROCESSING OPERATION ADEM FORM 105

ARKANSAS DEPARTMENT OF POLLUfION CONTROL AND ECOLOGY DIVISION OF A1R POLLUfION CONTROL

Application for Air License to Operate Air Pollution Source Not to be used for a State of Florida Air Permit Application

Guidance for Filling Out An Application for an Earth Moving Permit / Dust Control Plan. Section 1 Applicant Information


NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION AIR QUALITY PERMITTING

Fugitive Dust Management Plan

RULE Federally Enforceable Limits on Potential to Emit - Adopted 1/25/96

February 21, Permit: APC-82/1209-CONSTRUCTION (Amendment 5) Petroleum Coke Storage and Handling Complex

POTENTIAL TO EMIT LIMITATIONS FOR PART 70 SOURCES. (Adopted 6/15/1995, revised 1/18/2001 and 1/20/2011)

CITY OF CARLISLE APPLICATION FOR BUILDING PERMIT

GENERAL APCD PERMIT INFORMATION REQUIREMENTS LIST

ADEQ MINOR SOURCE AIR PERMIT

INSTRUCTIONS FOR AIR QUALITY COMPLIANCE PLAN APPLICATION

Arkansas Department of Environmental Quality NPDES PERMIT APPLICATION FORM 1

Iowa Department of Natural Resources Title V Operating Permit

SECTION 3.0 PERMIT BY RULE: Small Animal Incinerators

Michigan Department of Environmental Quality - Air Quality Division ADDITIONAL TECHNICAL INFORMATION FOR BOILERS

TITLE V PERMIT APPLICATION APPLICATION COMPLETENESS CHECK LIST

CONCRETE BATCHING PLANT

APPENDIXG FUGITIVE DUST CONTROL PLAN

Guidance on Estimating Condensate and Crude Oil Loading Losses from Tank Trucks

RULE Federally Enforceable Limits on Potential to Emit - Adopted 1/25/96, Amended 1/12/12 (Effective 3/8/12)

RULES OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF AIR POLLUTION CONTROL CHAPTER VISIBLE EMISSION REGULATIONS

ARCHITECTURAL CONTROL COMMITTEE NEW CONSTRUCTION AND EXISTING HOMES RULES AND REGULATIONS

EC-09 Printing Operations Calculation Form

RULES OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF AIR POLLUTION CONTROL CHAPTER VISIBLE EMISSION REGULATIONS

STATE OF MICHIGAN JENNIFER M. GRANHOLM, Governor. MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY STEVEN E. CHESTER, Director

Woodford County Health Department 1831 S. Main Street, Eureka, IL Phone: (309) Fax: (309)

Modeling Parameters. Exit Velocity Exit Temp. Location longitude

CH-13 Applicability Of State Rules Air Quality Permit Program

Asbestos Dust Mitigation Plan Application 1. ADMINISTRATIVE INFORMATION

City of Memphis Code Section Visible Emissions

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

General Permit (GP-016A) for Manufacturing and Materials Handling Equipment

A. TYPE OF AUTHORIZATION REQUESTED (Applies to all applicants) NEW RENEWAL MODIFICATION DISCHARGE IMPOUNDMENT

Pierce Fittings, Inc. Page 1 of 7. Lane Regional Air Protection Agency Simple Low Air Contaminant Discharge Permit REVIEW REPORT

Coating Processes. Internal Use Only App# APCD2015 APP

15A NCAC 02Q.0102 is amended with changes as published in 30:07 NCR as follows:

ADEQ MINOR SOURCE AIR PERMIT

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) Existing Wood Coating Operations

WIRELESS COMMUNICATIONS FACILITY (WCF) ADMINISTRATIVE APPROVAL APPLICATION

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. January 26, NEW SOURCE REVIEW PERMIT TO INSTALL No.

New Source Performance Standards (NSPS) 40 CFR 60 Subpart OOOO for Storage Tanks (Part 1)

Asbestos Dust Mitigation Plan Application 1. ADMINISTRATIVE INFORMATION

I. Site Name and Location

Southwest Clean Air Agency Page 1 of NE 99 th Street, Suite 1294, Vancouver, WA Voice: (360) Fax: (360)

CCR COMPLIANCE FUGITIVE DUST CONTROL PLAN. Prepared for: Tucson Electric Power Company Springerville Generating Station Springerville, Arizona

Michigan Guide to Air Use Permits to Install

POLLUTION PREVENTION TEAM MEMBER ROSTER. Leader: Members: (1) Title: Worksheet #1 Completed by: Title: Date: Title: Office Phone: Responsibilities:

PERMIT APPLICATION REVIEW SUMMARY

NSPS Applicability Worksheet Hot Mix Asphalt Plant Example

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION MARCH 16, 2004 NEW SOURCE REVIEW PERMIT TO INSTALL 25-03A

COUNTY: MUNICIPALITY: DPW LOCATION: STREET ADDRESS: PROPERTY OWNER: MAILING ADDRESS:

Prepared for: IPA OPERATIONS, INC. Coleto Creek Power, LLP Fannin, Texas. Prepared by:

ENGINEERING CALCULATION SHEET AIR RESOURCES DIVISION

PUBLIC SERVICE COMPANY OF OKLAHOMA (PSO)

EMISSIONS ACTIVITY CATEGORY FORM AGGREGATE PROCESSING PLANTS

MEMORANDUM June 30, Phillip Fielder, P.E., Permits and Engineering Group Manager

Marquette General Health System December 11, 2001 Permit No B Page 1 of 8. Table of Contents

DRAFT Air Individual Permit Part 70 Permit

Willamette Valley Sandblasting Page 2 of 10 Permit No Expiration Date: February 8, 2024

APPLICATION FOR A PERMIT TO CONSTRUCT A WATER WELL IN THE LOWER PLATTE NORTH NATURAL RESOURCES DISTRICT

EMISSIONS ACTIVITY CATEGORY FORM IRON PRODUCTION

APPLICATION FOR INDUSTRIAL WASTEWATER DISCHARGE PERMIT

Emissions Calculations Joshua Kalfas. Emissions Inventory Workshop February 3 rd, 2015 Tulsa, OK

ADEQ MINOR SOURCE AIR PERMIT

Pierce Fittings, Inc. Page 2 of 10 Permit No Expiration Date: November 19, 2023

FUGITIVE DUST CONTROL PLAN

Boise Municipal Code. Chapter 4-06 SOLID FUEL HEATING APPLIANCE REGULATION

Mailing Instructions and Information:

WIRELESS COMMUNICATIONS FACILITY (WCF) ADMINISTRATIVE APPROVAL APPLICATION

NSPS for Dc Boilers Burning Residual Oil

SUBMITTED APPLICATION REPORT APPLICATION FOR AIR PERMIT - LONG FORM I. APPLICATION INFORMATION

PERMIT TO INSTALL. Table of Contents

For more information, visit our web site at: h2o.enr.state.nc.us/ndpu/

Elements of a completeness review

TECHNICAL FACT SHEET September 24, 2018

Adhesive Material Application Operation

Technical Support Document for Draft Air Emission Permit No

Transcription:

OFFICE USE ONLY CHECK NO.: CHECK AMOUNT: $ PERMIT # CHECK RECD: CHECK DATE: APPROVED BY: APPLICATION FOR AUTHORITY TO CONSTRUCT/OPERATE As set forth in the Kansas City, Missouri Code of Ordinances, Section 8-20(b)(1)a., each company that submits and application to be issued a construction permit shall be sent an invoice for the technical review hours of any reviewer at an hourly rate of $50.00, but in no case shall exceed $10,000 for any one permit construction. Applicable sections/forms must be filled out entirely. Incomplete applications will result in a written request for additional information (Deficiency Letter) and increased time for permit issuance. Minimum number of Forms required with every application: Main Page, Project Description Page, Form 1.1, Form 1.2, Form 1.3, and Form 2.0. 1.) INSTALLATION NAME 2) INSTALLATION STREET ADDRESS 3.) INSTALLATION MAILING ADDRESS 4.) FINAL PRODUCT / PRINCIPLE ACTIVITY 5.) NAICS CODE 6.) SIC CODE 7.) PARENT COMPANY 8.) PARENT COMPANY MAILING ADDRESS 9.) PARENT COMPANY CITY STATE ZIP CODE 10.) CONTACT PERSON CONTACT PERSON S TITLE 11.) CONTACT PERSON S MAILING ADDRESS 12.) CONTACT PERSON S CITY STATE ZIP CODE 13.) CONTACT PERSON S TELEPHONE NUMBER 14.) CONTACT PERSON S FAX NUMBER 15.) CONTACT PERSON S EMAIL ADDRESS 16.) THIS APPLICATION IS FOR Modification or Addition to an Existing Installation or New Installation Amendment to Existing Permit: Permit No. New Installation Temporary / Pilot Plant 17.) Plant ID Number 18.) PROJECTED DATE TO COMMENCE CONSTRUCTION 19.) PROJECTED DATE OF OPERATION STARTUP APPLICANT S CERTIFICATION STATEMENT: I certify that I have personally examined and I am familiar with the information in this application and believe that the information submitted is accurate and complete. I am aware that making a false statement or misrepresentation in this application is grounds for denying or revoking the construction permit. I may also be guilty of a misdemeanor and upon conviction, may be punished by fine or imprisonment. 20.) SIGNATURE OF RESPONSIBLE OFFICIAL 21.) DATE 22.) PRINT NAME OF RESPONSIBLE OFFICIAL 23.) RESPONSIBLE OFFICIAL S TELEPHONE NUMBER 24.) OFFICIAL TITLE OF RESPONSIBLE OFFICIAL Revised Nov 2014 Page 1 of 16

25.) PROJECT DESCRIPTION AND NARRATIVE Enter a description and/or narrative of the project included with this application. Your description should give a clear understanding of the processes and equipment involved. Also, any production increases or limitations that are desired should be included in this description. The description/narrative should follow the processes listed on Form 1.1, Process Flow Diagram. Revised Nov 2014 Page 2 of 16

Form 1.1 Process Flow Diagram for Facility According to Proposed Application (a.) INSTALLATION NAME: For a new installation, show the entire installation. For an addition to an existing installation, show only the new processes/equipment/emission points and begin the ID numbering where the existing EIQ emission point numbers leave off. If the application is for a modification or an addition to an existing emission point or unit, show the upstream and downstream point(s) or the equipment that this modification will affect (b.) PLANT # Revised Nov 2014 Page 3 of 16

Form 1.2 Summary of Emission Points Affected by this Application (duplicate this form as needed) (a.) INSTALLATION NAME (b.) PLANT NO. (c.) POINT NO. (I.E. EP-01, EP-02, ETC.) (USE same point no. from form 1.1) (d) POINT DESCRIPTION (USE same description on FORM 2.0) (e.) Enter additional worksheets (if any) used in addition to form 2.0 for that emission point. (I.E. form 2.3, 2.7, ect.) Revised Nov 2014 Page 4 of 16

Form 1.3 Plant Layout Diagram (a) INSTALLATION NAME (b) PLANT NO. Please use this page or a separate sheet to provide a Plant Layout Diagram Your property lines must be clearly identified. The length of property lines must be indicated. Indicate distance from buildings to each property line. All buildings must be correctly located on the diagram with length, width and height shown for each building. If there are stacks or vents with pollutant emissions, the locations and heights above the ground must be on the diagram. If you have any haul roads, paved and/or unpaved, draw them in. The length to show on the diagram is the length inside your property. Public roads on your property, even if unpaved, must be shown. Open storage piles must be shown. If a fence or fence-line is located on your property, show the fence on the diagram. Revised Nov 2014 Page 5 of 16

Form 2.1 Fuel Combustion Information (duplicate this form as needed.) (a) INTALLATION NAME: (b) PLANT NO.: POINT IDENTIFICATION POINT NO. (c.) POINT DESCRIPTION (d.) SOURCE CLASSIFICATION CODE (SCC) (e.) MAKE (f.) MODEL (g.) YEAR (h.) STACK/VENT PARAMETERS STACK NO. (i.) HEIGHT (FT) (j.) DIAMETER (FT) (k.) TEMPERATURE (F) (L.) VELOCITY (FT/MIN) (m.) FLOW RATE (STANDARD CUBIC FT/MIN) (n.) OPERATING RATE/SCHEDULE EXPECTED ANNUAL THROUGHPUT (o.) UNITS (p.) MAXIMUM HOURLY DESIGN RATE (q.) UNITS/HR (r.) HOURS/DAY (s.) DAYS/WEEK WEEKS/YEAR AIR POLLUTION CONTROLS DEVICE NO. (t.) CONTROL DEVICE DESCRIPTION (u.) Control Device Destruction/Removal Efficiency % (v.) DEVICE NO. DESCRIPTION OF COLLECTION/SUPPRESSION SYSTEM (w.) CALCULATION SECTION (x.) * If emission factor source is Engineering Calculation please provide calculations on separate page POLLUTANT EMISSION FACTOR EMISSION FACTOR SOURCE * EMISSION FACTOR UNITS OVERALL CONTROL EFFICIENCY EMISSION RATE (LB/HR) POTENTIAL EMISSIONS (TONS/YR) Revised Nov 2014 Page 6 of 16

Form 2.1 Fuel Combustion Information (duplicate this form as needed.) INSTALLATION NAME (a.) PLANT NO. (b.) COMBUSTION EQUIPMENT INFORMATION POINT NO. (c.) SCC (d.) (e.) EQUIPMENT DESCRIPTION (MAKE/MODEL) (f.) YEAR PUT IN SERVICE (g.) MAXIMUM DESIGN RATE (MILLION BTU/HR) FUEL INFORMATION (h.) FUEL TYPE Sum of Total Maximum Hourly Design Rates Oil Gas Coal Other Distillate (Fuel Oil 1-4) Natural Gas Anthracite Refuse Residual Fuel Oil (5-6) LPG/Propane Bituminous Trade Wastes Waste Oil Lignite Other (specify) FUEL (i.) ANNUAL THROUGHPUT (j.) UNITS (k.) % SULFUR BY WEIGHT (L.) % ASH BY WEIGHT (m.) FUEL TOTALS AND WEIGHTED AVERAGES Comments: Revised Nov 2014 Page 7 of 16

Form 2.3 Uncontrolled VOC Emission Information (duplicate this form as needed) INSTALLATION NAME (a.) PLANT NO. (b.) POINT NO. (c.) SCC CODE (d.) APPLICATION RATE APPLICATION METHOD (e.) MATERIAL TYPE (f.) APPLICATION RATE (GALLONS/HOUR) (g.) % BY WEIGHT OF VOC IN MATERIAL (h.) DENSITY (LBS/GAL (i.) LBS OF VOC PER UNIT (j.) TOTAL (SCC UNITS) (k.) Comments: NOTE: Attach Material Safety Data Sheets (MSDS) for Verification Enter Total amount calculated above in Expected Annual Throughput under Operating rate/schedule on Form 2.0, Emission Point Information. Revised Nov 2014 Page 8 of 16

Form 2.4 Petroleum Liquid Loading Information (duplicate this form as needed) INSTALLATION NAME (a.) PLANT NO. (b.) NOTE: This form should be filled out to provide information to calculate the emissions from loading organic liquids into tank trucks, rail tank cars and barges. From 2.5 should be filled out to calculate the Load In - Load Out emissions from storage tanks. LOADING INFORMATION POINT NO. (c.) SCC CODE (d.) ANNUAL THROUGHPUT OF LIQUID (1,000 GALLONS) (e.) CONTROL DEVICE TYPE (f.) CONTROL EFFICIENCY (%) (g.) (h.) TYPE OF LOADING Splash Loading Bottom Loading CHEMICAL INFORMATION BULK LIQUID TYPE (i.) Submerged Loading Other (specify) TRUE VAPOR PRESSURE OF BULK LIQUID (PSIA) (j.) MOLECULAR WEIGHT OF MATERIAL LOADED (LB/LB-MOLE) (k.) SATURATION FACTOR (L.) TEMPERATURE OF LIQUID (DEG F) (m.) Comments: Revised Nov 2014 Page 9 of 16

Form 2.5 Organic Liquid Storage. A. Fixed Roof Tank Information (duplicate this form as needed.) INSTALLATION NAME (a.) PLANT NO. (b.) For use with 500 gallons or greater capacity liquid storage tanks. Please include all organic liquids, petroleum products or fuels. TANK INFORMATION POINT (TANK IDENTIFICATION) NO. (c.) CAPACITY (IN THOUSANDS OF GALLONS) (d.) DIAMETER (FT) (e.) HEIGHT (FT) (f.) LENGTH (FT) (g.) COLOR (SHELL) (h.) COLOR (ROOF) (i.) TYPE OF ROOF: (j.) Cone Dome Other (specify) YEAR PLACED IN SERVICE (k.) AVERAGE LIQUID HEIGHT (FT) (L.) ROOF HEIGHT (FT) (m.) VENT PRESSURE SETTING (n.) VENT VACUUM SETTING (o.) THROUGHPUT (IN THOUSAND OF GALLONS PER YEAR) (p.) CHEMICAL INFORMATION CHEMICAL* (q.) CAS NUMBER (r.) VAPOR MOLECULAR WEIGHT (s.) AVERAGE LIQUID SURFACE TEMPERATURE (F) (t.) VAPOR PRESSURE AT AVERAGE LIQUID SURFACE TEMPERATURE (PSIA) (u.) *MIXTURE - PROVIDE DOCUMENTATION FOR MULTIPLE COMPONENT MIXTURE B. Floating Roof Tank Information (duplicate this form as needed.) Please provide all the following information for liquid storage tanks with capacities greater than 500 gallons. Please include all organic liquids and petroleum products or fuels. TANK INFORMATION POINT (TANK IDENTIFICATION) NO. (D.) YEAR PLACED IN SERVICE (E.) CAPACITY (IN THOUSANDS OF GALLONS) (F.) DIAMETER (FT) (G.) LENGTH OF SEAM (FT) (H.) NUMBER OF COLUMNS (I.) EFFECTIVE COLUMN DIAMETER (FT) (J.) TYPE OF CONSTRUCTION (K.) Riveted Welded TYPE OF ROOF (L.) Internal External PRIMARY SEAL (M.) Metallic Shoe Vapor Mounted Liquid Mounted AREA OF DECK (SQ FT) (O.) DECK (P.) Bolted Welded SECONDARY SEAL (N.) None Rim Mounted Shoe Mounted Weather Shield SHELL CONDITON (Q.) Light Rust Dense Rust Gunite Lined THROUGHPUT (IN THOUSANDS OF GALLONS PER YEAR) (R.) CHEMICAL INFORMATION CHEMICAL (S.) CAS NUMBER (T.) VAPOR MOLECULAR WEIGHT (U.) LIQUID DENSITY (LB/GAL) (V.) VAPOR PRESSURE AT STORAGE TEMPERATURE (PSIA) (W.) Revised Nov 2014 Page 10 of 16

Form 2.7 Haul Road Fugitive Emission Information (duplicate this form as needed) INSTALLATION NAME (a.) PLANT NO. (b.) HAUL ROAD INFORMATION POINT NO. (c.) SCC (d.) SURFACE MATERIAL OF ROAD (e.) LENGTH OF ROAD (MILES) (f.) SILT CONTENT (%) (g.) TYPE OF DUST CONTROL (CHOOSE ONE)(h.) Surfactant Spray Water Spray Other (specify) Water Spray Documented No Controls (Enter the dust control method and appropriate efficiency, if applicable, in the corresponding boxes on Form 2.0 for this emission point) HAUL TRUCK INFORMATION UNLOADED TRUCK WEIGHT (TONS) (i.) AVERAGE WEIGHT OF MATERIAL PER LOAD (TONS) (j.) AVERAGE LOADED TRUCK WEIGHT (TONS) (k.) NUMBER OF WHEELS (L.) AVERAGE TRUCK SPEED (MPH) (m.) MATERIAL HAULED INFORMATION TYPE OF MATERIAL(S) HAULED (n.) ANNUAL AMOUNT HAULED (TONS) (o.) MAXIMUM HOURLY AMOUNT HAULED (TONS) (p.) Comments: Form 2.8 Storage Pile Information (duplicate this form as needed.) STORAGE PILE INFORMATION POINT NO. (d.) SCC (e.) TYPE OF MATERIAL STORED (f.) MOISTURE CONTENT (%) (g.) AREA OF STORAGE PILE (ACRES) (h.) STORAGE DURATION (DAYS) (i.) SILT CONTENT (%) (j.) ANNUAL AMOUNT STORED (TONS) (k.) MAXIMUM HOURLY AMOUNT STORED (L.) RAW MATERIAL LOADING METHOD (CHOOSE ONE) (m.) BARGE RAIL TRUCK CONVEYOR OTHER (SPECIFY) RAW MATERIAL UNLOADING METHOD (CHECK ONE) (n.) BARGE RAIL TRUCK CONVEYOR OTHER (SPECIFY) Comments: Revised Nov 2014 Page 11 of 16

Form 2.T Hazardous Air Pollutant Information (duplicate this form as needed) INSTALLATION NAME (A.) PLANT NO. (b.) Use this form to report any hazardous air pollutant (HAP) expected to be handled in amounts greater than 20 pounds per year. The instructions for this form provide a list of the HAPs regulated under the Clean Air Act. The amount emitted should be reported before control equipment reductions are applied. Be sure to include the MSDS for any material containing HAPs. POINT NO. (c.) SCC (d.) HAP CHEMICAL (e.) CAS NUMBER (f.) AMOUNT USED OR EXPECTED TO BE HANDLED (LBS/YEAR) (g.) UNIT S (h.) NOTE: Attach Material Safety Data Sheets (MSDS) for Verification Comments: Revised Nov 2014 Page 12 of 16

Form 3.0 Comment Sheet (duplicate this form as needed.) INSTALLATION NAME (a.) PLANT NO. (b.) EMISSION POINT NO. (c.) COMMENTS: Revised Nov 2014 Page 13 of 16

OFFICE USE ONLY DATE RECEIVED FEE PAID: CHECK NO.: APPROVED BY: DATE APPROVED: PORTABLE SOURCE RELOCATION REQUEST NAME OF INSTALLATION/COMPANY INSTALLATION/COMPANY STREET ADDRESS INSTALLATION/COMPANY MAILING ADDRESS FROM CURRENT LOCATION TO PROPOSED LOCATION ESTIMATED LENGTH OF TIME AT NEW LOCATION [NOT TO EXCEED TWO YEARS] Years Months PROJECTED DATE TO COMMENCE RELOCATION: Month Date Year PROJECTED DATE TO COMMENCE OPERATION: Month Date Year NAME OF PROPERTY OWNER OF NEW LOCATION ADDRESS CITY STATE ZIP NAME OF INDIVIDUAL RESPONSIBLE FOR OPERATION OF PORTABLE EQUIPMENT AT NEW LOCATION: PHONE NUMBER/CONTACT INFORMATION: ENGINE SPECIFICATIONS HORSEPOWER TYPE OF FUEL BURNED : DIESEL GASOLINE OTHER MAXIMUM PRODUCTION VOLUME (CUBIC YDS/HOUR) TOTAL AREA OF SITE (ACRES) DISTANCE FROM PORTABLE EQUIPMENT TO NEAREST OFF-SITE BUILDING (FEET) KANSAS CITY PERMIT # FOR EQUIPMENT TO BE RELOCATED: CONTROL EQUIPMENT: DUST CONTROL IS REQUIRED AT ALL TIMES, SPECIFY TYPE OF DUST CONTROL: EQUIPMENT MANUFACTURER: EQUIPMENT MODEL NO.: Is this a new site for this equipment? YES NO Will other air contaminant sources not listed in this request be operating concurrently at this same location? YES NO (Check one only) Please attach a map of the area showing property boundary, distance and direction to the nearest off-property area. Show locations and orientation of all portable equipment. Show haul roads and storage piles. APPLICANT S CERTIFICATION STATEMENT: I certify that I have personally examined and am familiar with the information in this application and believe that the information submitted is accurate and complete. I have read and understand the following statement: It is a violation of 10 CSR 10-6.170 Restriction of Particulate Matter to the Ambient Air Beyond the Premises of Origin to operate a commercial or industrial installation without applying reasonable measures as may be required to prevent, or in a manner which allows or may allow, fugitive particulate matter emissions to go beyond the premises of origin in quantities that the particulate matter may be found on surfaces beyond the property line of origin. It is a violation to cause or allow to occur any fugitive particulate matter emissions to remain visible in the ambient air beyond the property line of origin. Non-compliance may result in monetary penalties. SIGNATURE OF RESPONSIBLE MEMBER OF THE COMPANY DATE TYPE OR PRINT NAME OF PERSON SIGNING TITLE OF PERSON SIGNING TELEPHONE NUMBER Revised Nov 2014 Page 14 of 16

RELOCATION APPLICATION INSTRUCTIONS/PROCEDURES 1. Please provide all of the information requested in the application. 2. Each application must be signed by a responsible member of the organization that will operate the installation, or by a responsible member of the organization that owns the installation. 3. The owner must hold a valid, original air construction permit for the portable installation. Even equipment, for which a permit originally was not required, must be permitted to move. 4. Portable equipment approval may continue for a maximum operational time of 24 consecutive months without an intervening relocation. 5. If the portable equipment is to be moved to a site not listed on the original permit, the owner or operator must submit a Permit Amendment Application. The amendment will be approved under the following conditions: a. The facility is in compliance with the original permit conditions and all applicable regulations; b. The plant is not expected to cause air quality problems at the new location; c. The request is received at least 21 days prior to the proposed move; and d. The equipment will be at the new location no longer than 24 consecutive months. 6. Complete Form 2.7, Haul Road Fugitive Emission Worksheet, and Form 2.8, Storage Pile Worksheet, as applicable to this installation. These forms are included with the application package. 7. Return completed application to: KCMO Health Department Air Quality Program Kansas City, MO 64108 Revised Nov 2014 Page 15 of 16

PORTABLE SOURCE RELOCATION REQUEST Attachment A - Equipment List List of All Portable Equipment Involved in the Relocation as per Categories Below (duplicate as needed): EQUIPMENT ITEM APCP PERMIT NUMBER MODEL NUMBER SERIAL NUMBER Revised Nov 2014 Page 16 of 16