Installation Instructions

Similar documents
Installation Instructions

Air flue duct for use with ecotec boilers

APPLICATION AND LISTING

6x5. Assembly Manual CAUTION. Sharp Edges PATENTS ARE PENDING. Building Dimensions. Approximate Size. Storage Area. Interior Dimensions

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

Conergy SolarFamulus II

Outer Skin Kit & Flue: IB600, IB850, IB1100 Installation Manual

GREENSTAR OILFIT FLUE EXTERNAL

DuraLiner. Insulated, double-wall masonry relining. UL 1777, ULC S635, and ULC S640.

Chimney Lining Systems

GREENSTAR OILFIT EXTERNAL

Dur aflex stainless steel

Installation Instructions. PolyPro Double-Wall Flex Gas Vent System for Category II & IV Gas-Burning Appliances. PolyPro Flex

DuraFlex. Flexible stainless steel relining for masonry chimney. UL 1777 and ULC S635.

INSTALLATION INSTRUCTIONS

Installation Instructions

Technical and Dimensional Data. Saf-T Vent SC

FLUE KIT INSTALLATION MANUAL


Z-Vent Model SVE Series III

DuraFlex. Flexible stainless steel relining for masonry chimney. UL 1777 and ULC S635.

150MM FREE STANDING WOOD FIRE FLUE KIT MKIII INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS OPERATION AND MAINTENANCE MANUAL Models event SD, event, Event Plus, and event Plus2 (Condensing Boiler Systems)

150MM FREE STANDING WOOD FIRE FLUE KIT MKIII INSTALLATION INSTRUCTIONS

150MM FREE STANDING WOOD FIRE FLUE KIT MKIII INSTALLATION INSTRUCTIONS

Niagara / DLG-85 Shower Cabin Installation and User s guide

INSTRUCTIONS FOR ASSEMBLING NEBS FLOODED RACKS

P36-10 / P36E-10 Gas Fireplace. 11 W.C. (2.74 kpa) 10 W.C. (2.49 kpa) 6.4 W.C. (1.59 kpa) 22,000 BTU/h (6.44 kw) 28,500 BTU/h (8.

Flue gas systems for oil and gas condensing boilers. Flue gas kit DN60 rigid in the duct. Accessories DN60 (additionally available to gas flue kit)

Gas Fireplaces. P33-10/P33E-10 Gas Fireplace P33 DIMENSIONS WITH VIGNETTE FACEPLATE CLEARANCES WITH VIGNETTE FACEPLATE

EXIRA EXPOSED PIPE SHOWER INSTALLATION

FIREPLACE INSERT ENCLOSURE INSTALLATION INSTRUCTIONS

Installation instruction

ASSEMBLY MANUAL FOR LADDERS, SAFETY CAGES, & PLATFORMS FOR THE FOLLOWING TANKS

ROOF MOUNT KIT OWNERS MANUAL

GREENSTAR OILFIT FLUE RS

ROOF MOUNT KIT OWNERS MANUAL

Gas Fireplaces. P36D-10 Gas Fireplace. Unit Dimensions With Vignette Faceplate. *** Important: Framing height requires consideration of the hearth

Light Stainless Flexible Liner

Mounting Screw. Channel Filler. Light Angle Adjustable Screw. LED Board Vertical stud and blocking Locking Nose. Driver.

DLB-23 Shower Enclosure Installation and User s guide

SI T T FST

Simpson Dura-Vent Engineered Excellence

InoxSabiana 25 Flues. Stainless Steel Double Wall

SI T T FSS/FSTT Open Fire

H07 H09. BENCH FUME HOOD with Combination Sash. Fume Hoods. Installation Instructions. 48"- 60"- 72"- 96" long

Installation Instructions

EXCELPrime 18 Clearance Stove Pipe INSTALLATION AND MAINTENANCE INSTRUCTIONS

H50. DYNAMIC BARRIER Bench Fume Hood. Fume Hoods. Installation Instructions. 48"- 60"- 72"- 96" long

Bravo Platform Unpacking Guide

TRAPEZOIDAL SHEET METAL RAIL LIFT/VARIO for trapezoidal sheet metal roofs

40CDi conventional. RD 537i. Installation Instructions for Flue Duct Kit AZB 873/1 Vertical Flue Terminal Assembly Ø 60/100 mm Ø135

Installation Instructions

INGLEBEAMS. Our Inglebeam range is available in either solid aggregate versions or hollow light weight version.

On-roof system Tau Installation manual

Exterior System installation instructions

Concentric Vent/Air System Supplement

INGLEBEAMS. Our Inglebeam range is available in either solid aggregate versions or hollow light weight version.

INGLEBEAMS. Our Inglebeam range is available in either solid aggregate versions or hollow light weight version.

Liner Replacement Instructions:

Concentric Vent/Air System Supplement

Cornerview Shower Enclosure & Base

Installation Instructions. High-Temperature, Factory Insulated Double-Wall Masonry Relining system 5" Round 6", 8" Round and Oval.

RIGID SOLAR INSTALLATION MANUAL

Flue Accessories & Fitting Guide Ø 60/100 Flue Systems Ø 80/125 Flue Systems Ø 80/80 Twin Flue Systems Plume Displacement Kit (Ø 60/100 Flue Systems)

HORSE SHELTERS 6, 12, 15, 18, & 24 SHELTERS ASSEMBLY MANUAL

A. ASTM C190 - Test Method for Tensile Strength of Hydraulic Cement Mortars

INSTALLATION MANUAL CO-AXIAL HORIZONTAL FLUE KIT FOR SEELEY INTERNATIONAL BRAEMAR ECO-SUPERSTAR SH18, SH25 & WF25 HEATERS

Gas Fireplaces. P33 Zero Clearance Direct Vent Gas Fireplace. *** Important: Framing height requires consideration of the hearth

Platform stair lift PLG7

Absco Premier Garden Shed Assembly Instructions Model: 30232G

INSTALLATION GUIDE. 4-Post Lift. Model United States. United Arab Emirates. Egypt.

Installation instructions. LORO-ATTIKASTAR siphonic drains

Operator s Manual for Morse Mobile-Karrier for 55-Gallon Plastic or Steel Drum

Multi-Piece Shower with Trench Drain

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS

Universal Elevator Mount Owners Manual

METALWorkS. RH200 Custom Hook-on Panels. General Installation Instructions. Ceiling 1.0 GENERAL Site Conditions Product Description

30mm Height Linear Drain Shower Trays

B41XTCE Gas Fireplace

B36XTCE Gas Fireplace

YOUR SPLASH PAD RESOURCE

P36 / P36E Gas Fireplace. 11 W.C. (2.74 kpa) 10 W.C. (2.49 kpa) 6.4 W.C. (1.59 kpa) 22,000 BTU/h (6.44 kw) 28,500 BTU/h (8.35 kw)

Installation and Maintenance Instructions For. Installation and Maintenance Instructions For

Exceptionally strong and flexible Proven durability and long life 20 year warranty CE marked and HETAS approved

INSTALLATION MANUAL MOSER STAINLESS STEEL KITCHEN FAUCET MODEL MANCHESTER

OWNER S MANUAL SERIES MDS-96-BK, SM, DR

Valance Installation. For Units with Beam Style Coils

STP Mount Series. Installation Manual. STP-LSCR-MAN 2017 Edition v1.0. For models: STP-SCR/045 STP-SCR/060 STP-SCR/070 STP-LCR/090 STP-LCR/120

ON-ROOF ATTACHMENT FLAT COLLECTOR HELIOSTAR

ATTENTION INSTALLING PERSONNEL

Installation and Maintenance Instructions

MODEL IPIC SERIES 4G GREASE DUCT

Installation instructions

Maelstrom. Installation and Specification Guide

Multi-Piece Shower with Trench Drain

Pre-Fabricated Roof Curbs

Transcription:

Installation Instructions Flue Gas System Basic Kit GA-K - Chimney Flue Gas System for GB125 Oil Condensing Boiler For trained and certified installers Please read carefully prior to installation. 6 720 616 921-09/2007 US/CA

Contents Contents 1 General information 3 1.1 Standards, regulations and directives 3 1.2 System certification 3 2 Safety 4 2.1 About these instructions 4 2.2 Intended use 4 2.3 Layout of the instructions 4 2.4 Please follow these instructions 4 2.5 Tools, materials and accessories 4 2.6 Disposal 4 3 Product description, scope of delivery and technical data 5 3.1 Basic kit GA-K (DN125/80) 5 3.2 Technical data 6 4 Notes on installation and operation 7 4.1 Installation requirements for the boiler room 7 4.2 Condensate drain 7 4.3 Installation in an existing chimney shaft 7 4.4 Safety distances to combustible material 7 4.5 Instructions for inspection and clean-out sections 8 5 Installing the flue gas system 9 5.1 General installation notes 9 5.2 Installing the basic kit GA-K 10 5.3 Installing the flue pipe 11 5.4 Establishing chimney connection 13 5.5 Appliance connection 13 6 Inspecting the flue gas system 14 2 GA-K - Chimney Flue Gas System for GB125 Oil Condensing Boiler - Technical specifications are subject to change without prior notice.

General information 1 1 General information 1.1 Standards, regulations and directives It is the responsibility of the installer to ensure that the system corresponds to all current regulations and rules. This flue gas system is only approved for the GB125. Use with other boilers is not permitted. Only use parts of this flue gas system and do not combine it with other systems. 1.2 System certification For Logano plus GB125 oil condensing boilers: The GB125 is system-certified with this flue gas system for the USA and Canada. An individual approval of the flue gas system is not required. The flue gas system must be installed in accordance with these installation instructions. The maximum permissible overall length and the number of changes of direction are specified in the "Technical data" section. GA-K - Chimney Flue Gas System for GB125 Oil Condensing Boiler - Technical specifications are subject to change without prior notice. 3

2 Safety 2 Safety 2.1 About these instructions These installation instructions contain important information for the safe and appropriate installation and start-up of the flue gas systems. These installation instructions are designed for specialists, who through their vocational training and experience are knowledgeable in the handling of heating systems and oil installations. 2.2 Intended use The basic kits GA-K may be used as flue gas systems for the Buderus oil condensing boilers with maximum flue gas temperatures of 248 F (120 C). Suitable are, e.g. boilers of the types: Logano plus GB125-22/30/35 2.3 Layout of the instructions Two levels of danger are identified and signified by the following terms: RISK OF FATAL INJURY Identifies possible dangers emanating from a product, which might cause serious injury or death if appropriate care is not taken. RISK OF INJURY/SYSTEM DAMAGE Indicates a potentially dangerous situation that could cause minor or moderately serious injuries or to damage to property. Additional symbols for identification of dangers and user instructions: USER NOTE User tips for optimal use of equipment and adjustment as well as other useful information. 2.4 Please follow these instructions 2.5 Tools, materials and accessories For the installation of the boiler, you will require the standard tools used for central heating and oil and water systems. The following may also be necessary: Safety equipment for work on the roof Mounting cable at least 3 m longer than the chimney 2.6 Disposal Risk of fatal injury FROM FLUE GAS POISONING. Insufficient ventilation or leaky flue gas lines may cause dangerous flue gas leaks. Make sure that air intake or exhaust air vents are not closed off or their size reduced. The boiler must not be operated until the obstruction has been removed. Inform the system user in writing of the fault and its associated dangers. Risk of fatal injury DUE TO FALLS AND FALLING PARTS. Take appropriate action to prevent accidents during all work on roofs. Take all necessary precautions against a possible fall while working on the roof. Only use original Buderus spare parts. Damage caused by the use of parts not supplied by Buderus is excluded from the Buderus warranty. Dispose of the packaging of the flue gas system in an environmentally responsible manner. Dispose of components of the flue gas system that are replaced through an authorized agent in an environmentally responsible manner. 4 GA-K - Chimney Flue Gas System for GB125 Oil Condensing Boiler - Technical specifications are subject to change without prior notice.

Product description, scope of delivery and technical data 3 3 Product description, scope of delivery and technical data 3.1 Basic kit GA-K (DN125/80) The air flue gas line is a concentric pipe-in-pipe system of plastic or steel. The outer concentric pipe is a combustion air pipe, the inner pipe is a flue gas pipe. Only one boiler may be connected to the flue pipe. In the vertical part of the flue gas line, plastic pipes or flexible plastic corrugate pipe ÜB-Flex can be used. Before starting any installation work, check that all listed items are present. Contents (Fig. 2) 1 Concentric inspection T-joint 1 2 Concentric pipe, DN125/80, 39" (1000 mm) 1 3 Cover plate, DN125, white 1 4 Concentric wall penetration, DN125/80, 1 white 5 Load bearing elbow, 87, DN 80, with bracing and support rail 1 6 Chimney spacer (2 piece) 6 7 Termination, DN80, L = 20" (500 mm) 1 8 Concentric flue gas connector 1 9 Concentric boiler adapter 1 CENTROCERIN anti-seizing compound (not shown) 1 Fig. 1 Basic kit GA-K Purchase additional extension pieces to complete the installation. For chimneys with an offset a flexible liner for parts or the complete length of the chimney is available as an accessory. (UB-Flex, Part-# 8709 4036) Fig. 2 Scope of delivery basic kit GA-K GA-K - Chimney Flue Gas System for GB125 Oil Condensing Boiler - Technical specifications are subject to change without prior notice. 5

3 Product description, scope of delivery and technical data 3.2 Technical data Flue system Logano plus Minimum chimney flue size GB125 suitable as chase for pipe 22 30 35 GA-K 51 ft. (17 m) 64 ft. (21 m) 71 ft. (23 m) DIA 5-1/2" (Ø 130 mm); 5" x 5" (120 mm 120 mm) Tab. 1 Maximum overall lengths and minimum chimney flue diameters Pipe changes of direction The overall lengths apply for systems with one elbow. Every additional elbow (accessory) reduces the maximum vent length by 3 ft (1 m). 6 GA-K - Chimney Flue Gas System for GB125 Oil Condensing Boiler - Technical specifications are subject to change without prior notice.

Notes on installation and operation 4 4 Notes on installation and operation 4.1 Installation requirements for the boiler room 4.1.1 Balanced flue operation (GA-K) The GB125 is designed for balanced flue operation only. All combustion air is taken in from outside. 4.2 Condensate drain The flue gas line has an integrated condensate drain in the boiler connector. The condensate from the flue gas line flows directly into the boiler's trap (siphon). Follow local rules when draining condensate into municipal sewage systems. It is not recommended to drain untreated condensate in septic systems. In any case follow local codes and regulations. Consult the boiler installation instructions for details on installing a condensate neutralizer. 4.3 Installation in an existing chimney shaft The chimney must be cleaned by the chimney sweep before installing the flue gas system if the combustion air is taken in via an existing chimney shaft oil fireplaces or fireplaces for solid fuels were connected or if a dust accumulation due to brittle chimney gaps is anticipated. If during operation, an ongoing dust accumulation is anticipated or if there are remainders of oil of solid fuel fireplaces, the basic kits GAL-K or DO-S can be used instead of the basic kit GA-K. 4.4 Safety distances to combustible material The design of the concentric venting system allows installation with zero (0", 0 mm) clearance. Therefore, no particular protective measures or safety distances are required for combustible material or furniture. GA-K - Chimney Flue Gas System for GB125 Oil Condensing Boiler - Technical specifications are subject to change without prior notice. 7

4 Notes on installation and operation 4.5 Instructions for inspection and clean-out sections 4.5.1 Inspection and clean-out sections Local codes and regulations may require an inspection and clean-out section to be installed close to the boiler. Inspection and clean-out sections allow inspecting and cleaning the venting system without dismantling sections of it. 4.5.2 Arrangement of the lower inspection and clean-out section The lower inspection and clean-out section must be installed sideways in the horizontal section of the flue gas pipe as the first section after the boiler adapter (Fig. 3, Item 1). Keep area of at least 3 ft. x 3 ft. (1 m x 1 m) clearance in front of the inspection section for easy access. 3" (1 m) 4.5.3 Upper inspection and clean-out sections An upper inspection is needed if there are any changes in direction of the vertical flue gas pipe, e.g. when elbows are used to create an offset. Install the inspection and clean-out section above the change in direction. Keep an area of at least 1-1/2 ft. x 1-1/2 ft. (0.5 m x 0.5 m) clearance in front of the inspection section for easy access. Fig. 3 Lower inspection and clean-out sections 8 GA-K - Chimney Flue Gas System for GB125 Oil Condensing Boiler - Technical specifications are subject to change without prior notice.

Installing the flue gas system 5 5 Installing the flue gas system 5.1 General installation notes Trimming pipes RISK OF INJURY from sharp edges. Wear work gloves. With concentric pipes, pull the inner pipe out of the outer pipe. Trim pipes at a right angle to the required length x (Fig. 4). With concentric pipes, trim flue gas and air intake pipe to the same length. Carefully remove the burrs from cut edges. Put the flue gas and air intake pipes together again. Fig. 4 Trimming pipes Installing the pipe connection Assemble the pipes so that the sleeve points in the direction of the flue gas stream. Only use original Buderus flue gas pipe gaskets! Coat the gaskets (Fig. 5, Item 1) with CENTROCERIN anti-seizing compound. Push the flue gas pipes into one another (Fig. 5, Item 2) with a slight turning motion until the stop. With concentric pipes, push the air intake pipe (outer pipe, Fig. 5, Item 3) again. Make sure that the gaskets do not shift. Loosening the pipe connection Pull the pipes out of one another while turning slightly. 2 3 Fig. 5 Installing the pipe connections 1 Gaskets 2 Flue gas pipes (inner pipes) 3 Air intake pipe (outer pipe) 1 Flue gas GA-K - Chimney Flue Gas System for GB125 Oil Condensing Boiler - Technical specifications are subject to change without prior notice. 9

5 Installing the flue gas system 5.2 Installing the basic kit GA-K 5.2.1 Determining position of the chimney penetration Cut a penetration into the chimney allowing the vent pipe to run at a 3 slope. The size the opening must be sufficient to install the support rail as shown in 5.2.2. 5.2.2 Installing the support rail Fig. 6 Determining position of the chimney penetration Drill a 3/8" (10 mm) hole in the rear wall of the chimney, 1-3/8" (35 mm) above the bottom of the chimney penetration (Fig. 7). Shorten support rail (Fig. 7, Item 1) if necessary and carefully insert the rod into the hole. Lay the near end of the rail onto the bottom of the penetration. It will later be mortared in place together with the pipe connecting from the boiler. 1 1-3/ 8 " (35 mm) Fig. 7 1 Support rail Installing the support rail (dimensions in mm) 10 GA-K - Chimney Flue Gas System for GB125 Oil Condensing Boiler - Technical specifications are subject to change without prior notice.

Installing the flue gas system 5 5.3 Installing the flue pipe RISK OF FATAL INJURY due to falls or falling parts. Take appropriate action to prevent accidents during all work on roofs. Take all necessary precautions against a possible fall while working on the roof. 5.3.1 Materials and tools needed Flue gas pipe in appropriate length, with gaskets Chimney spacer (consists of 2 pieces each) Load bearing elbow Termination Chimney cover CENTROCERIN anti-seizing compound Mounting cable at least 9 ft. (3 m) longer than the chimney Hammer drill with masonry drill bit 1/4" (6 mm) 4 wall anchors 1/4" (6 mm) and wood screws Screwdriver, nut driver Tape measure 2 13" (330 mm) L 5.3.2 Measure out pipe lengths Place load bearing elbow (Fig. 8, Item 1) in the middle on the support rail in the chimney. Determine pipe length L between sleeve of the load bearing elbow and termination (Fig. 8, Item 2) with the help of the mounting cable. Fig. 8 Measure out pipe length (dimensions in mm) 1 Load bearing elbow 2 Termination GA-K - Chimney Flue Gas System for GB125 Oil Condensing Boiler - Technical specifications are subject to change without prior notice. 11

5 Installing the flue gas system 5.3.3 Insert flue gas pipe into the chimney Place the two halves of the spacer (Fig. 9, Item 3) on both sides around the pipe and put them together. Attach a spacer at least every 6 ft. (2 m). Install an extra spacer within 3 ft. (1 m) of the chimney top. Coat gasket in the load bearing elbow and all flue gas pipes (Fig. 9, Item 4) with CENTROCERIN antiseizing compound. Turn slightly while assembling the pipes. 4 3 2 1 Fasten mounting cable on the pipe or load bearing elbow. Insert flue gas pipe from above into the chimney (Fig. 10), until the pipe sleeve is a little above the upper edge of the chimney. Fasten the spacer on the next flue gas pipe. Coat the gasket with CENTROCERIN anti-seizing compound and insert pipe into the sleeve. Lower flue gas line into the chimney. Repeat the procedure for all other pipes. Insert termination (without sleeve) into the last pipe with sleeve. Fig. 9 Installing spacer RISK OF DAMAGE TO SYSTEM due to UV radiation. Use only the included UV-resistant black pipe as the termination. Place load bearing elbow in the middle on the support rail in the chimney. When using the flexible liner UB-Flex for parts or the complete length of the chimney, install spacers at every rigid section. Fig. 10 Insert flue gas pipe into the chimney 13" (330 mm) 1 3" (75 mm) 2 5.3.4 Installing the chimney cover Remove the upper part of the chimney cover (Fig. 11, Item 1). Push the lower part of the chimney cover over the terminating pipe. The chimney cover can be trimmed to size by cutting along the lines (Fig. 11, Item 2). Set cover on the chimney and mark 4 drill holes. Drill holes and insert wall anchors. Screw on chimney cover and caulk around the perimeter to prevent water from entering the chimney. Push upper part of the chimney cover over the flue gas pipe and press down until it snaps in. Fig. 11 Installing the chimney cover (dimensions in mm) 1 Upper part of the chimney cover (rain cap) 2 Cut lines 12 GA-K - Chimney Flue Gas System for GB125 Oil Condensing Boiler - Technical specifications are subject to change without prior notice.

Installing the flue gas system 5 5.4 Establishing chimney connection 5.4.1 Install concentric wall penetration Coat gasket in the sleeve of the flue gas pipe (Fig. 12, Item 2) of the concentric wall penetration with CENTROCERIN and insert flue gas pipe into the load bearing elbow. Shorten the penetrating pipe and flue gas pipe so it extends beyond the chimney wall by 2" (50 mm) (Fig. 12). Carefully remove the burrs from cut edges. Verify that all parts in the chimney are properly assembled. Mortar the penetrating pipe in place. Slide on the cover plate (Fig. 12, Item 1), mark and drill mounting holes, insert wall anchors, and screw on cover plate. 5.4.2 Establishing the connection to the boiler 2" (50 mm) 2 1 Fig. 12 Establishing chimney connection (dimensions in mm) 1 Cover plate 2 Flue gas pipe of the concentric wall penetration Connect the inspection and clean-out pipe to the boiler adapter. Then measure the remaining distance to the chimney penetration, cut a concentric pipe to length, deburr, and install via concentric pipe with the concentric wall penetration (Fig. 13). When covering longer distances, support the pipe at least every 6' (2 m) (Fig. 13, Item 1). 5.5 Appliance connection Fig. 13 Connecting boiler with chimney connection 1 Fastening clamps with standoff To install the appliance connector on the boiler identify the gasketed connection in the bottom right corner on the back of the boiler. Apply CENTROCERIN anti-seizing compound on the gasket of the secondary heat exchanger, and push the adapter on with a slight turning motion. The combustion air pipe should be oriented in a 10-o'clock position with all 3 predrilled screw holes visible. Use the 3 brackets and self tapping screws in the predrilled screw holes to attach the adapter to the rear boiler panel. Connect the combustion air hose to the adapter and secure with the provided hose clamp. Fig. 14 Installing the boiler adapter GA-K - Chimney Flue Gas System for GB125 Oil Condensing Boiler - Technical specifications are subject to change without prior notice. 13

6 Inspecting the flue gas system 6 Inspecting the flue gas system To make sure that no leaks occur during operation, the heating system must be checked for leaks before startup. RISK OF FATAL INJURY from flue gas poisoning. Leaky flue gas lines may cause dangerous flue gas leaks. Take the boiler out of operation until the leak in the flue gas line has been eliminated. The flue gas line is sufficiently tight if the combustion air intake at the boiler adapter measures no higher than 0.2% CO 2, or a minimum of 20.6% O 2 (ring gap test). Carry out the measurement over several minutes in order to avoid measurement errors. If the measurement produces a higher CO 2 value or a lower O 2 value, then a pressure test is required. 14 GA-K - Chimney Flue Gas System for GB125 Oil Condensing Boiler - Technical specifications are subject to change without prior notice.

Notes GA-K - Chimney Flue Gas System for GB125 Oil Condensing Boiler - Technical specifications are subject to change without prior notice. 15

United States and Canada Bosch Thermotechnology Corp. 50 Wentworth Avenue Londonderry, NH 03053 Tel. 603-552-1100 Fax 603-584-1681 www.buderus.net Products manufactured by Bosch Thermotechnik GmbH Sophienstrasse 30-32 D-35576 Wetzlar www.buderus.de Bosch Thermotechnology Corp. reserves the right to make changes without notice due to continuing engineering and technological advances.