Rational IPP Permitting

Similar documents
Local Limit Challenges in the Real World

Surcharge Rate Updates...

Controlling POTW Pass-Through/Interference Due to Compatible Pollutants

INDUSTRIAL PRETREATMENT PROGRAM 101. MWEA IPP Seminar 2017

City of Sturgis WWTP 2101 Treatment Plant Rd. Sturgis, Michigan (269) FAX (269) NPDES Permit Number: MI

Cranston Sewer Use Ordinance

Calculation of Local Limits

Review of Wastewater Quality and Industrial Pretreatment

Mark Kelly, PE Industrial Waste Engineer July 25, 2013

The City of Grand Forks Industrial Pretreatment Program

Sewer Charge & Surcharge Provision Development, Implementation & Benefits

WHERE DO THE PRETREATMENT PERMIT LIMITS COME FROM??? Amy Varinoski City of Mebane

PRETREATMENT PROGRAM LOCAL LIMITS

COMPLYING WITH YOUR INDUSTRIAL PRE-TREATMENT PERMIT INDIANA CHAMBER OF COMMERCE CONFERENCE OCTOBER 24, 2017 PERMIT AGENDA

LOCAL LIMITS METHODOLOGY,, ISSUES,, AND ALTERNATIVES

WASTEWATER PROBLEMS ASSOCIATED WITH SOLVENTS

ATTACHMENT B. FEES AND CHARGES OF RENEWABLE WATER RESOURCES (ReWa) (Effective January 1, 2019) RESIDENTIAL CHARGES (1)(7)(9)

Abu Dhabi Trade Effluent Standards & Regulations Summary

by Keith Kennedy Manager of Environmental Programs North Central Texas Council of Governments

Water Resources Director: Chris Graybeal

Frequently Asked Questions for Permitting

Combined Sewer Overflows July 2012-December 2013

To meet our acceptance criteria, we may require you to pre-treat your wastewater before it is discharged to sewer.

Director of Operations and Compliance Report. October 17, Biochemical Oxygen Demand, 5-Day (Avg lbs/day)

A Class I Permit is issued to any user who meets any one of the following conditions:

Acceptance standards and charging rates for

LAGOONS & HIGH STRENGTH WASTE: DID SOMEONE SAY CRAFT BEER? Elaine Venema, PE Fleis & VandenBrink

Water Monitoring - Teralba Quarry EPA Point No.4 - Adit Overflow

SEWER USER RATE CHARGE STUDY

Using Washington State s Local Limits Spreadsheet. David J. Knight P.E. Environmental Engineer Water Quality Program June 22, 2016

JEDDAH INDUSTRIAL CITY

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012

75 th STREET WASTEWATER TREATMENT PLANT UPGRADES PROJECT

Water Quality Permitting Program Monitoring Matrix 1,2,3

Upper Blackstone Water Pollution Abatement District

Industrial Pretreatment What s it all about? Grace Scott Pretreatment Coordinator Water Division Michigan DNRE michigan.

Wastewater Facility Plan City of Marshall, Minnesota

DERRY TOWNSHIP MUNICIPAL AUTHORITY RATE SCHEDULE

Lessons Learned: How a Small Village Handled a Brewery Expansion

Iroquois Wastewater Treatment Plant 2016 Annual Performance Report

Biosolids Monthly Report

Result data last updated. 10 July Map of Norske Skog Albury Paper Mills Environmental Protection Licence compliance monitoring sites

Wastewater Pretreatment Plant Special Waste Generator Application

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018

Industrial Pretreatment Program Industrial User Guide

Wastewater Pretreatment 101

Sampling and analysis

BRACEBRIDGE WASTEWATER TREATMENT 2016 SUMMARY REPORT

Christchurch Wastewater Treatment Plant

Stop Hauling that Leachate! From Concept to Operation Leachate Management Rick Sapir Hawkins Delafield & Wood LLP

OVERVIEW OF POTW PRETREATMENT PROGRAM REQUIREMENTS

BRACEBRIDGE WASTEWATER TREATMENT

FACT SHEET And NPDES WASTEWATER DISCHARGE PERMIT EVALUATION

QUARTERLY OPERATIONS REPORT 3 rd Quarter, January March 2018 WASTEWATER PERMIT COMPLIANCE. Page 1 EFFLUENT MONTHLY AVERAGE INFLUENT MONTHLY AVERAGE

Application to Discharge Non-Domestic Waste at the Iona Island Wastewater Treatment Plant Trucked Liquid Waste Facility

QUARTERLY OPERATIONS REPORT 4 th Quarter, April June 2018 WASTEWATER PERMIT COMPLIANCE. Page 1 INFLUENT MONTHLY AVERAGE EFFLUENT MONTHLY AVERAGE

COMMISSION ADOPTED POLICY Revenue Policy

Reasonable Potential Analysis & Impacts to Pretreatment Programs. Raj Kapur Clean Water Services

Industrial Wastewater in Oregon

Abbotsford/Mission Water & Sewer Services Utilities Environment Annual Report

Case Study. BiOWiSH Aqua has Positive Long-Term Effects. Biological Help for the Human Race

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be:

Introduction to Industrial User Permitting

PRETREATMENT LOCAL LIMITS WHAT IT MEANS TO INDUSTRIES

Bracebridge Wastewater Treatment 2017 Summary Report

Essential Pretreatment program knowledge and requirements in accordance with 40 CFR 403

CE 370. Wastewater Characteristics. Quality. Wastewater Quality. The degree of treatment depends on: Impurities come from:

NUTRIENT REDUCTION THROUGH THE USE OF ADVANCED BIOLOGICAL NUTRIENT RECOVERY. Rick Johnson Vice President, Market Development

Public Notice. Issuance of Industrial Waste Discharge Permit

AUTHORIZATION TO DISCHARGE UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM

Lisa Knerr

INDUSTRIAL WASTE INFORMATION BROCHURE

2017 Annual Performance Report

Annex 2: National Environmental Quality Standards (Extract from the Gazette of Pakistan applicable to STZ CETP)

Stonecrest Estates Sewage Treatment Plant 2017 Annual Report

SIGNIFICANT USER WASTEWATER DISCHARGE PERMIT. City of Las Cruces, at. Utilities Department Regulatory Environmental Services Section

Public Notice. Issuance of Industrial Waste Discharge Permit

Monitoring Quality of Wastewater and Storm Water Data Dealing with Multiple Permits, States, and Analytical Laboratories

NPDES WASTEWATER DISCHARGE PERMIT EVALUATION

Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information

Cold Weather Ammonia Removal

Notification of Ministry of Industry. Industrial Effluent Standards B.E. 2560

Environmental Management System

Minnesota Pollution Control Agency Municipal Division

Table of Contents. Lewiston-Auburn Water Pollution Control Authority. Application for Industrial Discharge Permit

EGANVILLE SEWAGE SYSTEM 2013 PERFORMANCE REPORT

CITY OF LONDON WASTEWATER TREATMENT OPERATIONS ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT 2013 ANNUAL REPORT ADELAIDE WASTEWATER TREATMENT PLANT

FACT SHEET and NPDES WASTEWATER DISCHARGE PERMIT EVALUATION. Department of Environmental Quality Western Region-Salem Office

Tales from the Field: Troubleshooting Denitrification

Industrial Pretreatment Fact Sheet

Albuquerque Bernalillo County Water Utility Authority

DROGHEDA LANDFILL SITE COLLON ROAD, MELL, DROGHEDA

2018 Schedule of Rates Fees and Charges City of Glens Falls, NY Water & Sewer Department Water Rates: $37.28 per Non-meter rate

Municipal Industrial Pretreatment Program Development from Why to How. Barbara L. Swafford, P.E. Gerken Swafford Engineering Solutions, LLC

Watertown Wastewater Facility Plan. August 11, 2015

Feel free to contact me should you require any additional information regarding the report. I can be reached at

CHAPTER 4 WASTEWATER CHARACTERISTICS WASTEWATER FLOWS

Waste Water (Standards for Discharge of Industrial Effluent into a Waste Water System) Regulations 2004

Transcription:

Rational IPP Permitting Protect POTW/Environment and Promote Local Economy FISHBECK, THOMPSON, CARR, & HUBER INC. Jerald O. Thaler, PE MWEA IPP Seminar October 6, 2016

Rational IPP Permitting? Accurate/Up-to-Date Headworks Loading Evaluation Protect the POTW and its workers Protect the environment Full Significant Industrial User (SIU) Characterization Comprehensive database Average/maximum flows and loads Sensible Permit Conditions Give em what they need attitude (within constraints) Justifiable limits and monitoring frequencies

AGENDA 1. Rapid Review Pollutants of Concern MAHLs, MAILs, & CSLs Local Limits/SALs 2. Permitting Basics The Permit Form Permit Limits Permit Monitoring Frequencies 3. Case Study

PART 1 RAPID REVIEW

Pollutant of Concern (POC) Definition Any pollutant which could cause: Pass-through Exceedance of NPDES permit limit Exceedance of water quality standard Interference Biosolids contamination Operating disruption (e.g., biological inhibition) Collection system hazard

Standard POCs Compatibles Standard POCs Toxics Surchargeable BOD5 (or COD) TSS Total-P NH3-N (or TKN) Not Surchargeable FOG TDS ph The Michigan 12 Arsenic Mercury Cadmium Molybdenum Chromium Nickel Copper Selenium Cyanide Silver Lead Zinc

Nonstandard POCs Worst-case effluent concentration (0% removal), exceeds critical fraction of WQBEL Recommended >50% WQBEL Any significant health/safety risks Regulated by applicable categorical standard Common Nonstandard POCs Hexavalent Chromium Total Phenols VOCs PNAs

MAHLs Max. Allowable Headworks Loading Lowest of: Basis of Design Pass-Through Biosolids Quality Biological Inhibition MAILs Max. Allowable Industrial Loading MAHL Safety factor (10 min.) Background Load Septage Load Compatibles: >50% of MAHL typ Toxics: <10% of MAHL typ

Local Limits Uniform Allocation Method most common MAIL-equivalent concentration for total SIU flow

Special Alternative Limits (SALs) Many wastewater utilities experiencing lower flows, loads, and operating margins All available capacity cannot be accessed Consumed by uniform allocation SALs provide flexibility and opportunity Available capacity is asset for promoting local economy Potential to increase extra-strength surcharge revenues More complex procedures, but simple in concept Rapidly gaining popularity across Michigan, particularly for compatibles

SALs Concept Reserve portion of MAIL Uniformly allocate what remains When SAL assigned, withdraw from reserve

Collection System Limitations (CSLs) Not-to-exceed concentration, even for SALs FOG Flow Obstruction ph, TDS Structural Corrosion Organics Fire/Explosion Toxic Fumes

PART 2 PERMITTING BASICS

Regulation of Industrial Users 1. Identify users to be permitted 2. Characterize discharges 3. Control via permit 4. Observe by random surveillance 5. Enforce where necessary

Key Elements of Permit Form Cover Sheet Permit number User ID/location Effective and termination dates Approval signature Specific Requirements Location of outfall(s) Limits and monitoring frequencies Sample points/types Reporting Special conditions Terms and Conditions General prohibitions Other SUO requirements Penalties

Permit Limits and Monitoring Frequencies Most common permitting issue SUO often contains many local limits What POCs should have limits in permit? How often should these POCs be monitored? Rational permitting: apply reasonable potential for Pass-through/interference Limit exceedance

Reasonable Potential Derived from MDEQ rules and policies Convert sampling data to Potential Effluent Quality Recommended Maximum Concentration* Uncertainty Factor If D>10, uncertainty factor = 1.0 If D<10, uncertainty factor from reasonable potential table:

Permit Limits Not all local limits need to be in permit Can use reference to SUO, where appropriate Select by evaluation of reasonable potential for pass-through/interference or limit exceedance Significant PEQ mass Recommended >5% of MAIL Significant PEQ concentration Recommended > 50% of applicable limit

Monitoring Frequencies Select monitoring frequencies by reasonable potential for limit exceedance Recommended

PART 3 CASE STUDY

The Lakewood Experience WWTP Lakewood Wastewater Authority Village of Lake Odessa Village of Woodland Parts of Berlin Township and Odessa Township Permitted capacity of 1.2 million gallons per day (mgd) Discharge to Little Thornapple River (low flow)

Unusually High Industrial Loads Parameter Influent Background SIUs Flow, mgd 1.132 0.352 0.780 BOD5, lb/day 5,933 508 5,425 TSS, lb/day 2,079 781 1,298 Total-P, lb/day 53.5 15.2 38.3 TKN, lb/day (NH3-N) 434 (121) 114 (90) 320 (31) SIU % of Influent 70 >90 60 70 75 (25)

MDEQ Enforcement Administrative Consent Order (ACO) findings Numerous NPDES permit violations Influent BOD 5 exceeded Basis of Design SIUs causing pass-through and interference Many new requirements, including new IPP User Survey Headworks Loading Evaluation Sewer Use Ordinance Enforcement Response Plan Manual of Procedures SIU Permits

Permitting Challenge SIUs all large food industries Commercial poultry Bulk liquid eggs Fresh-to-frozen vegetables No prior regulation or control Need for support of local economy and jobs

Rational Permit Plan Focus on the problem (compatibles) Seek sensible permit conditions Give em what they need attitude, subject to constraints: MAHL cannot be exceeded MAIL cannot be exceeded

Allocation Options Willing to allocate ~100% of current MAILs Local Limit Option Same concentration limits for all Normal discharge concentration basis for surcharges SAL Option Specific mass limits for each SIU Mass limit basis (less domestic credit) for surcharges After investigating pretreatment feasibility and costs, unanimous agreement on SAL option

Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Discharge BOD5, lb/day Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Discharge BOD5, lb/day 10,000 Potential SALs 7,500 (99th Percentile) Each SIU offered potential SALs 5,000 (95th Percentile) Selection based on percentile of current discharge mass o Adjusted for each POC to not exceed MAHL or MAIL 2,500 0 10,000 7,500 DAILY MAX (86th Percentile) SIU choice of how much to accept o o Economic decision 2,500 SAL-based surcharge cost vs. 0 pretreatment cost 5,000 (99th Percentile) (95th Percentile) DAILY MAX (86th Percentile)

Potential Surcharge Revenues Local Limit Option Basis (discharge concentration) $0.22/lb BOD5 for >300 mg/l $0.25/lb TSS for >350 mg/l $3.90/lb Total-P for >10 mg/l $0.57/lb TKN for >32 mg/l $24,500 monthly $290,00 annually SAL Option Basis (mass limit less domestic credit) $0.22/lb BOD5 $0.25/lb TSS $3.90/lb Total-P $0.57/lb TKN $46,000 monthly +$21,500 $550,000 annually +$260,000

The Goal Mutually Beneficial Agreements

PERSPECTIVE Rational permitting means o Accurate/up-to-date headworks loading evaluation o Full SIU characterization o Sensible permit conditions Reasonable potential can help select permit limits and monitoring frequencies Where appropriate, consider compatible SALs o o o o Help reduce unused WWTP capacity Avoid major pretreatment costs for SIUs Increase strength surcharge revenues Achieve ultimate flexibility and a potential win-win

Thank You For additional information Jerald O. Thaler, PE 248.207.1710 jothaler@ftch.com FISHBECK, THOMPSON, CARR, & HUBER INC.

Definitions & Acronyms ACO administrative consent order BOD5 5-day biochemical oxygen demand COD chemical oxygen demand CSL collection system limitation D number of detectable data points IPP Industrial Pretreatment Program lb pound MAHL maximum allowable headworks loading MAIL maximum allowable industrial loading MDEQ Michigan Department of Environmental Quality mg/l milligrams per liter N number of total data points NH3-N ammonia nitrogen NPDES National Pollutant Discharge Elimination System PEQ potential effluent quality PNA polynuclear aromatic hydrocarbon POC pollutant of concern POTW Publicly owned treatment works SAL Special alternative limit SIU Significant Industrial User SUO sewer use ordinance TDS total dissolved solids TKN total Kjeldahl nitrogen Total-P total phosphorus TSS total suspended solids VOC volatile organic compound WQBEL water quality based effluent limit WWTP Wastewater treatment plant