Work Practice for Penetrating or Removing Wallboard Systems with <1% Asbestos

Similar documents
APPE NDIX F TY PE 2 ASBE STOS WORK PROCEDURES

DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM

These procedures are to be followed by all persons required to perform the following work:

UI Procedures for Asbestos Management

ATT-TP Section G

University of Toronto Asbestos Management Program PROCEDURAL CHECKLIST FOR TYPE 1 ASBESTOS ACTIVITIES

Asbestos Management Program

LOS ANGELES COMMUNITY COLLEGES OFFICE OF THE CHANCELLOR ADMINISTRATIVE REGULATIONS INDEX NUMBER B-4

Project 6668 Second beach Concession-Stanley Park Drive,Vancouver, BC Division 02080

Project 6668 Kerrisdale Senoirs Centre-5851 West Boulevard,Vancouver, BC Division 02080

Work Plan for Window Removal and Remediation Rooms: 200 Wing classrooms, Cafeteria and Kitchen Thomas Prince School Princeton, Massachusetts

Certification Number: NAT Lead Renovation, Repair and Painting Program

INTRODUCTION TO THE PROGRAM

Asbestos Management Policy University of Wisconsin-Platteville Reviewed 4/2016

Asbestos in the Home

Section Asbestos Removal

A. Illinois Asbestos Abatement Act, as amended through Public Act , effective July 14, 1995.

Certified Renovator Training Hands-On Skills Assessment Date: Address: City & State Student Name: Student Signature:

"ASBESTOS AWARENESS IN THE WORKPLACE"

Lead Safe Practices and Compliance

Asbestos Abatement Standard Procedures Indoor Environment Group, Inc.

Appendix B PROCEDURES FOR REMOVAL OF MOULD-CONTAMINATED MATERIALS

Lead-Safe Weatherization Updates & RRP Similarities/Differences

Asbestos Management Program

Respirable Silica Exposure Control Program

1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:

BARR & CLARK Independent Environmental Testing Asbestos Lead Mold Phase I ASBESTOS REMOVAL SPECIFICATIONS

INSTALLATION INSTRUCTIONS

1.1 SUMMARY.1 Comply with requirements of this Section when performing following work:

Interior Containment: Limit Access and Post Signs

40 CFR 763 THREE-YEAR AHERA ASBESTOS RE-INSPECTION SUMMARY REPORT INDIAN HEAD ELEMENTARY SCHOOL

CLASS I AND II ABATEMENT PROJECT SUBMITTALS

Standard Operating Procedures for the Control of Lead During Building Maintenance and Construction Activities. Type 1 Lead Operations

40 CFR 763 THREE-YEAR AHERA ASBESTOS RE-INSPECTION SUMMARY REPORT

EPA s Lead Program Rule At-A-Glance

Asbestos cement products in your home

SlimLine Single Threshold Base & Q-Wall-5.1 BASE & BACKWALL INSTALLATION INSTRUCTIONS

SECTION 2080 ASBESTOS ABATEMENT

3. Asbestos Handling Program

WALLBOARD TOOL CO., Inc. Catalog #34 Supplement

Asbestos Management Program

Asbestos Awareness Program

Poisonings from Housing. A Regulatory Update

ASBESTOS MANAGEMENT PROGRAM. Carleton University

Chapter 19 - Interior Insulation

LEAD HAZARD CONTROL PROGRAM

Asbestos Exposure. COMMONWEALTH SCAFFOLD Quality Scaffolding Across New England

EPA s New Renovation, Repair and Painting Rule

VERTEX Corporate Headquarters 400 Libbey Parkway Weymouth, MA p: f:

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. RobinsonBrick.com

LOWE S INSTALLER LRRP CHECKLIST FOR RENOVATIONS PERFORMED IN PRE-1978 HOUSING AND CHILD-OCCUPIED FACILITIES

FREEWILL BARRIER FREE ACRYLIC BATH AND SHOWER MODULES

WESTERN CONNECTICUT STATE UNIVERSITY ASBESTOS ABATEMENT PROCEDURE E-101

BASF Corporation Title: ASBESTOS HANDLING, REMOVAL AND DEMOLITION

OAK GROVE SCHOOL DISTRICT LEAD PLAN

SECTION 9700 SPECIAL FLOORING AND FLOORING TREATMENTS DEGREE OF CUT - VISION

STANDARD OPERATING PROCEDURES FOR MOLD REMEDIATION

CHAPTER 34 ASBESTOS. Where is it Found? 34 ASBESTOS. What is Asbestos?

Release: 1. CPCCDE3014A Remove non-friable asbestos

Addendum Number One. USC Preston College Bathroom and Flooring Renovations Part II Project Number: H SG

ASBESTOS ABATEMENT C.O.S. - WASTEWATER TREATMENT PLANT PAGE 1 of 10

Asbestos Management Program

ASBESTOS YOUR QUICK GUIDE DON T BE AN EASY TARGET

Flood / Mold Remediation (FMR) 29 CFR

Lead Plan. Berryessa Union School District 1376 Piedmont Road, San Jose CA

Install & Maintenance Instructions

McMaster University Asbestos Awareness Environmental & Occupational Health Support Services Gilmour Hall Room 304

INSTALLATION INSTRUCTIONS

A Consumer s Guide to the New Lead Paint Regulations

PROCEDURES FOR REMEDIATION OF FUNGI IN INDOOR ENVIRONMENTS LEVEL I:

Developed and Presented by: Wisconsin Healthcare Engineering Association

DRI Asbestos Management Plan TABLE OF CONTENTS

DRI Asbestos Management Plan TABLE OF CONTENTS

MODEL CRYSTALLINE SILICA EXPOSURE PLAN

Installation Data PSL/R, PSML/R, PSTL/R, PSTML/R, PSL/R, PSML/R, PSTL/R, PSTML/R

SURFACE. Countertop Rock Top UV Application Manual

Asbestos Abatement Supervisor Syllabus

(1) Preparing the Platform for Install

Page No.: 1. Subject:

SECTION G -- FLOOR DRILLING AND CUTTING/LIFTING PROCEDURES

SPAN-WORLD Distribution

Steps to LEAD SAFE. Renovation, Repair and Painting LEAD

Risk Management and Safety. Lead Safety for Renovation, Repair, and Painting (RRP) Procedures

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 8

SECTION ASBESTOS CONTAINING MATERIALS REMEDIATION

THE ANN ARBOR HOUSING COMMISSION

Office of Environmental Health and Safety 1.0 INTRODUCTION

Asbestos Elevator Industry Workshop November 25, 2015

Post Abatement Project Report - Sample Draft Form:

SlimLine Neo-Angle Base & Q-Wall-2

In general, the management plan development process consisted of:

Standard Specification for Abatement of Vinyl Asbestos Floor Tile and Mastic Tile Adhesive 2010

Asbestos Abatement Worker Syllabus

A. Prior to commencement of any work, make a complete inspection of all of the facilities listed in this specification

RENOVATIONS SIMPLE FORM FOR APARTMENT ALTERATIONS

Calvin College Asbestos Operations and Maintenance Plan

Construction Indoor Air Quality (IAQ) Management Plan

Tasks estimated to generate a TWA of 50 micrograms per cubic meter of air include:

Lead Management Program for Building Maintenance and Construction Projects. Office of Environmental Health and Safety University of Toronto

McMaster University Asbestos Awareness

Transcription:

University of Washington Facilities Services Maintenance & Alterations 9.5.02 Work Practice for Penetrating or Removing Wallboard Systems with <1% Asbestos These work practices are to be followed whenever drilling or installing nails or screws or cutting through known or assumed asbestos containing joint compound where the wallboard system (wallboard, taping and mud together) contains less than 1% asbestos. This includes activities such as: 1. hanging pictures, 2. coat hooks, 3. installing shelving track, 4. earthquake strapping, 5. removal of wall fixtures or furnishings, 6. attaching modular furniture to walls, 7. installing wiremold, switches or outlets; and 8. patching and painting. These procedures have been reviewed and approved by Environmental Health & Safety and the Facilities Services Asbestos Coordinator (competent person). If other work tasks such as sanding and scraping walls, or specifically cutting along drywall seams, are necessary; they must be done by the asbestos term contractor. Requirements For Workers 2 Hour Awareness Training Respiratory Protection and Respirator Fit Test Hands on training for penetrating <1% asbestos joint compound Know who the competent person is and how to contact them Work Requirements Approval of competent person Wet, non-aggressive methods Prompt clean up of material Supervisor assures all workers have appropriate training. Supervisor verifies current NEA is on record. Supervisor provides contact number for competent person to workers. Equipment HEPA Vacuum (see HEPA Vac for <1% Asbestos Usage) Spray bottle or garden sprayer of amended water

Sponge(s) Plastic waste bag(s) Plastic sheeting Paper towels/absorbent pads Duct tape Blue masking (painters) tape Encapsulant Paint or KillZ Taping Compound Tyvek suit Other tools required to complete task: drill, razor knife, saw, screwdriver etc. ½ face respirator with high efficiency filters during NEA monitoring. Note: When building enclosures, painters tape should be used in all instances where tape will be in contact with finished building materials. Duct tape must not be in contact with finished building materials because of the significant damage that it causes. Work Practices Work Procedure for Drilling Customers can be present in rooms where drilling or nailing is occurring as long as current NEA exists. If obtaining NEA, room cannot be occupied. competent person is aware of the project. Place plastic on the floor next to work area and secure with duct tape. (Written work procedure should suffice. Do we need documentation to verify training, NEA?) Mark the wall where the penetration is needed. Cut a hole in the sponge. Wet the sponge with amended water. Place the sponge over the drill. Place drill on the mark. Hold the sponge firmly against the wall. Drill hole. Keep the sponge firmly in place and remove the drill. Set the drill on the plastic on the floor. Wipe the sponge across the area where the hole was drilled, being careful not to release any dust. Place the sponge on the plastic. Wet some paper towels and wipe the wall to assure all debris is removed. When all drilling is complete, spray the drill with water and wipe with a wet paper towel to assure all dust is removed. Pay special attention to the drill bit. Wrap waste up in plastic sheeting and secure with duct tape, or place in a plastic bag. Dispose of waste in the shop dumpster. Since the material contains less than 1% asbestos, it does not need to be disposed of as a regulated waste or labeled.

Work Procedure for Installing Nails Customers can be present in rooms where drilling or nailing is occurring as long as current NEA exists. If obtaining NEA, room cannot be occupied. competent person is aware of the project. Place plastic sheeting on the floor next to work area and secure with duct tape. Mark the wall where the penetration is needed. Cut a hole through the sponge for the nail. Wet the sponge with amended water. Put the nail through hole in sponge. Place the nail over the mark. Hold the sponge firmly against the wall. Make sure the cut sponge wraps around the nail. Keep the sponge firmly in place, hammer the nail in place. Set the hammer on the paper towels on the floor. Have another person hold the end of the HEPA vacuum to the area and gently pull the sponge down until it is below the nail, being careful not to release any dust. Place the sponge in a plastic bag. Wet some paper towels and wipe the wall to assure all dust is removed. Wet wipe hammer to assure all dust is removed. Wrap waste up in plastic sheeting and secure with duct tape, or place in a plastic bag. Dispose of waste in the shop dumpster. Since the material contains less than 1% asbestos, it does not need to be disposed of as a regulated waste or labeled. Work Procedure for Removal of Sections of Wallboard Customer cannot be present in rooms where sections of wallboard are removed. This is a two person work practice Gather all required tools at the worksite. Ensure awareness training and work procedure training is up to date and the competent person is aware of the project. Place plastic sheeting on the floor next to work area and secure with duct tape. Mark the area of wall to be removed. Spray wall surface with amended water. Begin cutting, having another person periodically spray the area where the blade is penetrating while holding the end of the HEPA vacuum to the area being cut. When cutting is complete, spray amended water around penetration. Gently remove the section of wall system as a whole piece. Set removed wall material on plastic, wrap and duct tape or if small enough place in a plastic bag. Spray edges of remaining wall opening with encapsulant. Wet wipe tools to assure all dust is removed. Wrap waste up in plastic sheeting and secure with duct tape, or place in a plastic bag. Dispose of waste in the shop dumpster. Since the material contains less than 1% asbestos, it does not need to be disposed of as a regulated waste or labeled. Work Procedure for Patching Penetrations Never sand exposed asbestos taping compound. Never conduct any activity which disturbs only the taping compound. When scoring, never cut through all the paint layers. Gather all tools at the worksite. Ensure awareness training and work procedure training is up to date and the competent person is aware of the project. Place plastic on the floor next to the work area and secure with duct tape. Ensure all fixtures have been removed from the wall, exposing holes (wiremold, modular furniture, etc.). Encapsulate affected

area with paint or encapsulant. Use hammer to drive toggle bolt anchor, etc., below surface. Re-encapsulate affected area. Fill hole with patching compound and wet sand area. Let dry and paint. Work Procedure for Patching Glue Damage or Extensive Wall Damage Repairing when sections of wall do not have to be removed. Gather all tools at the worksite. Ensure awareness training and work procedure training is up to date and the competent person is aware of the project. Place plastic on the floor next to the work area and secure with duct tape. Encapsulate affected area with paint or encapsulant. If paper is torn but no taping compound is present on paper to be removed, paper can be cut off. Contact competent person with any questions. If taping compound is present on torn paper, encapsulate area. DO NOT REMOVE PAPER. If paper with taping compound needs to be removed or repairing large holes, refer to Procedure for Removal of Sections of Wallboard (this document). Once this is done, California Patch or other repair can be done. Work Procedure for Label Removal competent person is aware of the project. Place plastic sheeting on the floor next to work area and secure with duct tape. Mist with amended water. Use scraper to remove label, being careful not to penetrate paint layers. If taping compound is damaged, stop work and contact competent person. Supervisor Checklist Current training, 2-hour NEA (One year) Knowledge of work procedure Notify Asbestos Coordinator of date, etc., of project Provide Asbestos Coordinator's contact number to workers 1. Asbestos Awareness Training Required (2 hours) Until a NEA is established. 2. Certified Asbestos Supervisor not required 3. Personal Protective Equipment Safety Glasses Foot Protection Gloves 4. Engineering Controls: One or more of the following must be used Wet Methods HEPA Vacuum Drop Cloths (6 mil) Wet Sponges or Shaving Cream 5. Air Monitoring Negative exposure assessment or objective data

6. Isolate work area from non-essential personnel and notify essential personnel of work 7. Shut down HVAC, if possible 8. Debris is regulated asbestos waste and may be disposed of as general construction waste in Physical Plant dumpster I have reviewed and approve of the Work Practice for Penetrating or Removing Wallboard Systems with 1% Asbestos procedure dated September 5, 2002. Rick Cheney, Director of Maintenance and Alterations Date Susan Alexander, Occupational Health and Safety Manager Date