OPEN SEASON second capacity enhancement. 03 february 2011

Similar documents
LNG TERMINALLING PROGRAMME

LNG TERMINALLING PROGRAMME.

LNG TERMINALLING PROGRAMME.

ZEEBRUGGE LNG TERMINAL: FROM REGAS TERMINAL TO VERITABLE LNG HUB IN NORTH-WESTERN EUROPE

Press release 11 May Interim statement. 1. Customer invoicing. Regulated information: interim statement

CALL FOR MARKET INTEREST NOTICE

The benefits and role of LNG in Europe. Providing Europe s Energy Today and in the Future

LNG Terminal on the Island of Krk OPEN SEASON PROCESS PAPER BINDING PHASE

Regasification N. Atlantic

SNAM ACTIVITIES REGASIFICATION

Consultation on the ZIGMA Model and Implementation of the Capacity Allocation Mechanism and Balancing EU Network Codes

HISTORY

Evolution of the ATM5 offer Proposals from Elengy and Fosmax LNG

Fluxys natural gas transport services in Belgium Indicative Conditions & Tariffs

LNG Truck Loading. Revised/proposed business model. Info session LNG Truck Loading 27/05/2013 Non-binding - for information purposes only

TENP JOINT INFORMATION MEMORANDUM FOR THE DEVELOPMENT OF SOUTH-NORTH GAS TRANSMISSION CAPACITY FROM ITALY TO GERMANY AND BELGIUM THROUGH SWITZERLAND

FRENCH REGULATED LNG TERMINALS

LNG ACCESS CODE FOR THE ZEEBRUGGE LNG TERMINAL. Based on version approved by CREG on December 14 th 2017 Applicable as of December 20 th /193

Questions on the LNG Rulebook published by LNG Croatia on January 17, 2018.

North West Europe Gas System Performance Report

North West Europe Gas System Performance Report

Nerijus Strazdauskas Senior Coordinator Bergen, 2018 THE BUSINESS CASE OF KLAIPEDOS NAFTA

FLUXYS STORAGE SERVICES : ISP - SC

LNG Markets in Transition : Will East meet West?

Improving LNG logistics in Spain

THIRD PARTY ACCESS TO LNG TERMINALS. GIIGNL Commercial Study Group Topic 8

Christophe Liaud GLE Member, Gas Infrastructure Europe. Greece as a Southeastern Europe & East Med Energy Gas Hub, 27 September 2017 Athens, Greece

SUEZ LNG NA: A Leading Player in the U.S. LNG Market. Clay Harris, CEO of SUEZ LNG NA LLC May 30,2007

Fluxys Belgium press release 26 September 2018 Regulated information

Monitoring report on the security of supply on the Belgian natural gas market. Year (based on article 5 of the directive 2009/73/EC)

IUK Access Agreement Summary. 10 Oct 2013

ASX/MEDIA RELEASE 23 APRIL 2015 MAGNOLIA LNG PROJECT TOLLING AGREEMENT UPDATE WITH MERIDIAN LNG

Gate terminal Gas Access To Europe

EFQM Good Practice Competition 2014

The Snam Group. Company profile GNL ITALIA SNAM RETE GAS STOGIT ITALGAS

Executive Summary. Engineering Report of the: Adaptation of jetties and LNG transfer facilities for loading of bunker vessels in Fos Tonkin

LNG Terminal in Świnoujście. Mutual Joint Visit Workshop for Seveso Inspections 26 September 2017, Nicosia, Cyprus

Deliberation. 1. Context The regulatory framework applicable to third party access exemptions

Gas Access To Europe

ANNUAL FINANCIAL REPORT 2016 FLUXYS BELGIUM

Gas Natural Fenosa comments to ERGEG Public Consultation on Existing transparency requirements for natural gas

OLT Offshore LNG Toscana Alessandro Fino CEO

European Gas Price, Volatility & Security of Supply

Removing LNG barriers on gas markets CEER report

DEVELOPMENT OF A REGIONAL GAS MARKET IN THE BALTIC AND CEE REGIONS

RECEIVING, STORAGE AND REGASIFICATION OF THE LNG

INTEGRATION OF LNG TERMINAL IN THE LITHUANIAN GAS SYSTEM 22 ND MAY, Mantas Šabanas Project Analytics Manager

PERP Program LNG Receiving Terminals New Report Alert

LNG TERMINAL IN ŚWINOUJŚCIE AS A LNG GATE TO THE BALTIC SEA

LNG IN EUROPE An Overview of LNG Import Terminals in Europe

PUBLIC VERSION WORKING LANGUAGE This document is made available for information purposes only. Brussels, 22-V-2007 SG-Greffe(2007) D/203046

IUK is key infrastructure in physically connecting pipeline systems and markets

Best Practice Policy Guidance for Liquefied Natural Gas (LNG)

Extraction The gas is extracted from fields by drilling wells and installing extraction pipes

BORDER STATIONS WITH ULTRASONIC & TURBINE METERS IN SERIES Laurent Cordier Quality & Metrology (Fluxys Belgium)

GRAIN LNG Challenges & benefits for the deployment of LNG in ports. October 2017 BPA Conference, Poole, UK

Deliberation. I - The Context. 1. The European regulatory framework: Directive 2003/55/CE

Transportation and regasification infrastructures

LNG Import Facility Infrastructure Options

Shippers Day LNG. 13 April Jean-Paul PINON Director Gas Market Commission for Electricity and Gas Regulation (CREG)

Small scale LNG developments from the perspective of an infrastructure player

Strengthen leading position as cross-border gas infrastructure company in Europe.

RIM LNG Trade Annual 2010 Edition

INTERNATIONAL CONVENTION ON LIABILITY AND COMPENSATION FOR DAMAGE IN CONNECTION WITH THE CARRIAGE OF HAZARDOUS AND NOXIOUS SUBSTANCES BY SEA

Gas Infrastructure Development in CEE: building basis for a major shift in energy-mix

IMPLEMENTATION OF ARTICLE 33 and ARTICLE 41 OF DIRECTIVE 2009/73/EC regarding Gas Storage

European Union House, Tallinn, March 6, Mikhail Korchemkin, East European Gas Analysis, USA

8.1. GENERAL RULES OF CAPACITY BOOKING

Small Scale LNG From Concept to Reality. Chris Johnson, General Manager, LNG New Markets, Shell

The Eastern Mediterranean and European Energy Landscape: Trends and Opportunities

Tariff Network Code. An Overview

Greece the New Energy Hub of South Eastern Europe: The evolving new Pipeline Projects in the region & their importance

Changes in Dynamics and Pricing of LNG in the Atlantic Basin

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

Shippers meeting Maintenance Schedule

Table 1 Trade movements 2004 LNG (Bcm)

17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)

Green Gas Initiative of European gas transmission operators Energinet.dk, Fluxys Belgium, Gasunie, GRTgaz, Swedegas, Gaznat and ONTRAS

THE DYNAMICS of LNG INDUSTRY. Prof. Valeria Termini AEEGSI Commissioner - MEDREG Vice President

Mastering the Challenges of the Nord Stream Project

Large-scale and small-scale LNG infrastructure in Europe: Status and Outlook Wim Groenendijk, GLE President

Operator of LNG terminals since 1965 PIONEERING THE LNG INDUSTRY

National Grid Grain LNG Ltd. Third Party Access Arrangements. Guide for prospective Secondary Capacity customers 2017/18

Discover a proven way! Arturas Drungilas. Marketing and Corporate Affairs Director

LNG Business In India

ACCESS CODE FOR TRANSMISSION. Attachment B: Subscription & Allocation of Services

The Nabucco Pipeline Project Fourth Corridor to Europe

Small-Scale LNG Market Trends in Europe

LME POLICY ON THE APPROVAL AND OPERATION OF WAREHOUSES, REVISED [1 JUNE 2015]

DISCUSSION PAPER ON ACCESS TO SERVICE FACILITIES AND RAIL RELATED SERVICES. Article 1. Subject matter

INTEGRATION OF A NEW CCGT PLANT AND AN EXISTING LNG TERMINAL AT BARCELONA PORT Abstract ID Number: 155

GLOSSARY OF DEFINITIONS

LNG Market Outlook and Development Pierre Cotin. 3 rd Annual LNG Shipping Forum 2013, Lillestrøm, 6 June 2013

New England s Energy Mix: Clean, Diverse, Responsive and Getting Even Better

ERGEG Guidelines for Good Practice on Open Season Procedures (GGPOS) Ref: C06-GWG-29-05c 21 May 2007

LNG R&D for the Liquefaction and Regasification Processes

Singapore s Import of LNG

Tadas Matulionis LNG Terminal Director April 26th, 2017 THE TRANSFORMATIVE POWER OF LIQUID GAS

LNG REGASIFICATION SERVICES TARIFF

Transcription:

OPEN SEASON second capacity enhancement of the Zeebrugge LNG terminal BINDING PHAse: OFFER DESCRIPTION 03 february 2011

Contents 1. The Project 7 2. Services offer 13 3. REGULATION AND TARIFF 16 4. Allocation process 19 5. Creditworthiness 19 6. Indicative timetable 20 7. Disclaimer 20 ATTACHMENT 1: NON BINDING CAPACITY FORM ATTACHMENT 2: CONFIDENTIALITY AGREEMENT Fluxys LNG 3

EXECUTIVE SUMMARY In December 2007 Fluxys LNG launched a market consultation (the Open Season ) to assess the interest for additional terminalling capacity at the Zeebrugge LNG Terminal. In response, multiple shippers active in the LNG business have marked their non-binding interest for a variety of services: discharging LNGRV ships, loading and unloading LNG ships of different types and sizes, additional flexibility and throughput capacity. Starting from this spectrum of demand Fluxys LNG outlined a capacity enhancement project (the Project ), including following facilities: a second jetty for berthing of LNG ships with a capacity from approximately 3 500 m³ LNG up to 217 000 m³ LNG, one additional storage tank with a capacity of 160 000 m³ LNG, send-out capacity of 450 000 m³(n)/h. The preliminary studies for the Project are co-financed by the European Union (Trans European Energy Networks TEN-E)*. It is expected that additional berthing capacity would be available in the course of 2014 and additional storage and sendout capacity in the course of 2016. Fluxys LNG now wishes to close the non-binding phase of its Open Season and enter into the Binding Phase, during which we offer the following services: slots equal to a capacity of 2-3 bcm per year, additional storage flexibility up to 90 000 m³ LNG and additional send-out capacity, loading of LNG carriers (of various sizes) and/or ship-to-ship transfers. All services are offered in a transparent and non-discriminatory manner and at highly competitive, regulated tariffs. * The sole responsibility of this publication lies with the author. The European Union is not responsible for any use that may be made of the information contained therein. 4 Fluxys LNG

The Project represents a highly attractive opportunity for companies active in the LNG sector to secure access to terminalling capacity on a long-term basis with an experienced capacity provider in the strategically located Zeebrugge area. As it goes, the LNG terminal is not only a gateway for supplying LNG into expanding markets across a major part of Continental Europe and in the United Kingdom but also a flexibility tool. The Zeebrugge LNG terminal has the advantage of offering optimum destination flexibility: the additional LNG volumes can either be traded on the Zeebrugge Hub, delivered into the Belgian market, or redelivered at the border for onward transmission throughout North-Western Europe: onward delivery throughout North-Western Europe via the East/West transmission route providing access to the UK, the Netherlands and Germany and which recently has increased in capacity, onward delivery throughout North-Western Europe via the North/South transmission route providing access to France and Southern Europe and which is to increase in capacity following a recently closed market consultation (indicative timing 1 December 2013), by using ZEE Platform Service, terminal users can exchange gas between the LNG Terminal, the Interconnector Terminal, the Zeepipe Terminal, and the Zeebrugge Hub without any capacity limitations and at a very attractive tariff. By means of this Binding Phase of the Open Season, Fluxys LNG invites bona fide expressions of interest through the submission of a binding capacity request. The commitment process and indicative timetable is described in more detail in section 6 below. Interested companies that did not participate in the non-binding phase can still submit a non-binding capacity request ( Non-Binding Capacity Form Attachment 1 to be filled out and signed) but will first be required to execute the Confidentiality Agreement (Attachment 2 to be filled out and signed) by 11 March at the latest. Fluxys LNG 5

Fluxys LNG The LNG Terminal is owned and operated by Fluxys LNG, a subsidiary of Fluxys SA. The Zeebrugge LNG Terminal facilities provide for loading and unloading LNG ships. LNG is stored in storage tanks and can be regasified and sent-out into the Fluxys transmission grid or loaded back onto LNG ships. Fluxys LNG also offers the service of loading LNG trucks at its Zeebrugge LNG Terminal. Fluxys SA is the owner and operator of the Belgian natural gas transmission network comprising more than 3900 kilometres of pipeline and of the natural gas storage facility in Loenhout. Fluxys SA s majority shareholder is Fluxys G (89.97%), the remainder of shares being listed on the First Market of Euronext Brussels and the Belgian State holding 1 golden share. Fluxys G As a transmission infrastructure company operating on the North-Western European natural gas market, Fluxys G wishes to enhance security of supply and the functioning of the market by promoting cross-border natural gas flows and transfers in that region, In Belgium, Fluxys G builds and operates infrastructure for natural gas transmission, natural gas storage and liquefied natural gas terminalling. Fluxys and Fluxys LNG are for that purpose appointed independent system operators by the Belgian government. As their activities are of general economic interest, both companies aim to set competitive tariffs and continuously strive to reinforce the role of the Fluxys grid as a natural gas crossroads with a view to safeguarding security of supply and improving the functioning of the market, To foster the integration of the North-Western European natural gas market, Fluxys G develops a profitable set of stakes in and industrial partnerships with companies in the business of natural gas transmission and storage, LNG terminalling and facilitating spot markets, Safety, efficiency, sustainability and profitability are at the centre of Fluxys G s approach. 6 Fluxys LNG

1. THE PROJECT The existing LNG Terminal In operation since 1987, the LNG Terminal is located in the outer port of Zeebrugge on a site of some 30 hectares. It comprises efficient reception facilities, four state-of-the-art LNG storage tanks, vaporisation and send-out facilities for injection of regasified gas into the high-pressure gas network and related facilities. The LNG Terminal can handle almost all different types of LNG carriers from 7 500 m³ LNG up to Q-flex vessels with a capacity of up to 217 000 m 3 LNG. Currently the acceptance procedure for Q-Max vessels is ongoing. It is expected that such vessels can berth and unload before the end of 2011. More than seventy different LNG carriers have in aggregate unloaded more than 1 200 LNG cargoes at the LNG Terminal. Its jetty consists of four LNG 16" unloading arms and one vapour return arm, with an unloading capacity of up to 14 000 m³ LNG/hour. Three of the existing storage tanks have a workable capacity of 80 000 m³ LNG each, while the fourth LNG storage tank has a workable capacity of 140 000 m³ LNG. The firm send-out capacity of the LNG Terminal amounts to 1 700 000 m³(n) per hour. The vaporizers installed are submerged combustion vaporizers (SCV): hot water heated by submerged combustion gas burners is used to vaporize LNG in a stainless steel tube heat exchanger. Most of the vaporizers also have another independent heat source: a Combined Heat & Power unit. This configuration enables to significantly decrease fuel gas consumption by the submerged combustion burners in the regasification units. In 2009, Fluxys LNG decided to build an Open Rack Vaporizer (ORV). ORVs heat LNG using heat from seawater and their use will lead to a further significant reduction in fuel gas consumption. Within the framework of the Project, Fluxys LNG intends to use additional ORV capacity for the increase of the send-out. Fluxys LNG 7

The LNG Terminal is located in a sheltered area, meaning that during berthing and unloading there are no sea water currents. In addition, the construction of the dockyard has reduced the height of the waves to a minimum and the port authority guarantees a depth of 13 m clearance for ships at low tide in the dock. The LNG infrastructure at Zeebrugge has currently an annual throughput capacity of 9 billion m³(n) of natural gas. Following an open season conducted in 2003, all this primary capacity was allocated to 3 terminal users on a long-term ship-or-pay basis: Qatar Terminal Limited/ Zeebrugge LNG Trading Company Limited (QTL/ZLNG), Suez LNG Trading and Distrigas. Currently, all capacities at the LNG Terminal are commercialized by means of unloading slots. Under such slots, terminal users are allowed to: arrive and berth their LNG vessel within a window of approximately 24 hours and unload within approximately 24 hours, use a basic storage capacity of 140 000 m³ LNG, linearly decreasing over approximately 10 days, use a basic send-out capacity of approximately 360 000 m³(n)/h during the abovementioned 10 days. Moreover, additional (flexibility) storage and send-out capacities are available. The Project The Project will potentially include the construction of following facilities: a second berthing jetty allowing ships from approximately 3 500 m³ LNG up to a capacity of 217 000 m³ LNG, 1 additional LNG storage tank with a capacity of 160 000 m³ LNG, additional regasification capacity of approximately 450 000 m³(n)/h. The preliminary studies for the Project are co-financed by the European Union (Trans European Energy Networks TEN-E)*. The Project will increase the throughput capacity of the LNG terminal by 2-3 bcm/year. No downstream investments from the LNG terminal to the grid are required to provide the additional take away capacity in the Zeebrugge area. Companies interested in becoming users of the Zeebrugge LNG Terminal s second capacity enhancement will be required to enter into a binding agreement with Fluxys LNG and to subscribe for capacity and services at the LNG Terminal on a ship-or-pay basis. * The sole responsibility of this publication lies with the author. The European Union is not responsible for any use that may be made of the information contained therein. 8 Fluxys LNG

A strategic location As Europe s reliance on gas imports increases, the role of LNG has become increasingly important. Because of its characteristics, LNG represents a key part of any diversified gas portfolio, serving base load, spot and peak requirements. The Zeebrugge area is considered to be one of the most important natural gas landing points in the EU27. Connecting to a variety of pipe gas and LNG sources, the Zeebrugge area has an overall throughput capacity of about 48 bcm/y. This corresponds with roughly 10% of the border capacity needed to supply the EU27. 5 th storage tank 2 nd Jetty Fluxys LNG 9

Optimum destination flexibility The Zeebrugge LNG terminal has the advantage of offering optimum destination flexibility: the additional LNG volumes can either be traded on the Zeebrugge Hub, delivered into the Belgian market, or redelivered at the border for onward transmission throughout North-Western Europe: onward delivery throughout North-Western Europe via the East/West transmission route providing access to the UK, the Netherlands and Germany and which recently has increased in capacity, onward delivery throughout North-Western Europe via the North/South transmission route providing access to France and Southern Europe and which is to increase in capacity following a recently closed market consultation (indicative timing 1 December 2013), trading on the Zeebrugge Hub, with a trading community of 75 members showing a balanced mix of physical and financial traders and an annual net traded volume of 62 bcm (2010), the Zeebrugge Hub (operated by Huberator SA, a Fluxys G company) is one of the leading spot gas markets in Continental Europe, delivery into the Belgian market with an annual consumption of approximately 19 bcm (2010), using the ZEE Platform Service, terminal users can exchange gas between the LNG Terminal, the Interconnector Terminal, the Zeepipe Terminal and the Zeebrugge Hub without any capacity limitation and at a very attractive tariff, through the LNG truck loading service, the Zeebrugge LNG Terminal also offers the opportunity to transport LNG by road as a particularly useful alternative for supplying natural gas to industrial sites in Europe where no pipeline supplies are available. Accordingly, Fluxys can offer a fully integrated transmission service to terminal users. 10 Fluxys LNG

NORWEGIAN GAS FIELDS UNITED KINGDOM THE NETHERLANDS ZEEBRUGGE GERMANY LNG SOURCES LUXEMBOURG FRANCE Fluxys LNG 11

The Zeebrugge Hub (operated by Huberator SA, a Fluxys G company), one of the leading spot gas markets in Continental Europe. In 2010, 75 members were active on the Zeebrugge Hub, trading 62 billion cubic metres of natural gas, corresponding to 3.4 times the annual consumption on the Belgian market. GWh/day 2500 2000 1500 1000 500 0 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 Daily Average Physical Throughput Daily Average Net Traded 12 Fluxys LNG

2. Services offer Within the framework of this Binding Phase, all products and services are commercialised in accordance with the currently applicable regulation. The current commercial model, implemented in the context of the first capacity enhancement of the Zeebrugge LNG Terminal, consists of 110 slots per year made available at one jetty on a long-term basis. In function of the interest expressed hereunder, the commercial model will be optimized within the framework of the new code of conduct (Cfr. section 3) in order to provide the services offered. 1. Products Within the framework of this binding phase, Fluxys LNG offers different products in order to provide a flexible service to new users of the Zeebrugge LNG terminal and to optimize the existing services available to the current terminal users. Each of the products can be contracted and used stand-alone, but combining different products can create major advantages for terminal users, such as a rateable send-out, unloading larger LNG carriers, ship-to-ship transfers,... The products related to the construction of the new storage tank will indicatively be available in the course of 2016 (products 1 to 3). Loading of ships (product 4) will be offered when the second jetty becomes operational, indicatively in the course of 2014. Product 1: Unloading Slots Product 1 offers terminal users the opportunity to subscribe to combined capacities for berthing different types of LNG carriers, unload and regasify LNG: unloading slots offered within the framework of this Open Season will be similar to the existing unloading slots, as described above, at the second jetty to be built, approximately up to 40 unloading slots are offered to the market, representing an annual throughput of approximately 3 bcm/year, the unloading slots can be subscribed for a period of at least 10 years up to a maximum of 20 years and with a minimum of 12 slots per year (approximately 1 bcm/year). Fluxys LNG 13

Product 2: Additional Storage Product 2 offers terminal users the opportunity to subscribe to additional storage capacity: additional storage, used in combination with unloading slots, allows terminal users to unload LNG carriers of more than 140 000 m³ LNG or can serve to secure rateable send-out, in total, up to 90 000 m³ LNG storage will be offered as additional storage. Additional storage capacities can be subscribed for periods up to a maximum of 20 years. Product 3: Additional Send-out Product 3 offers terminal users the opportunity to subscribe to additional send-out capacity: additional send-out, used in combination with unloading slots, allows terminal users to regasify unloaded LNG at higher flow rate, approximately 100 000 m³(n)/h additional send-out capacity will be offered to the market. Extra infrastructure can be constructed upon long-term demand, additional send-out can be subscribed for periods up to a maximum of 20 years. Product 4: LNG Loading Slots for LNG ships Product 4 offers terminal users the opportunity to subscribe to combined berthing rights and LNG loading capacity: LNG ships from approximately 3 500 m³ LNG up to a capacity of 217 000 m³ LNG will be accepted for loading at the second jetty to be built, LNG loading slots can be subscribed for periods up to a maximum of 20 years. 14 Fluxys LNG

2. SERVIces Rateable Send-out Current users of the Zeebrugge LNG terminal and parties subscribing to unloading slots (product 1) within the framework of the second capacity enhancement can optimize the use of their capacity in the LNG terminal by subscribing additional storage (product 2). Combining the rights of both products allows terminal users to have a rateable send-out, even with a limited amount of slots per month. For terminal users wishing to benefit optimally from price variations at the Zeebrugge Hub or wishing to have downstream flexibility, Fluxys LNG allows to vary their send-out profile on an hourly basis. By using the Zeeplatform Service, terminal users have unlimited access to the Zeebrugge Hub at very limited costs. LNG in Storage Storage Capacity 140 000m 3 LNG Up to 90 000m 3 LNG 10 days 10 days Unloading of Q-flex & Q-max vessels To unload carriers of more than 140 000 m³ LNG, like for example Q-flex or Q-Max vessels, terminal users can combine unloading slots. Terminal users can also combine additional storage and/or additional send-out with one or more unloading slots to optimize the unloading, buffering and regasification of such LNG carriers. Loading of LNG carriers Loading of LNG carriers can be performed by either using loading slots (product 4), or by using unloading slots in combination with LNG loading capacity, which can be reserved separately on a short-term basis. Ship-to-ship transfer An LNG carrier can be loaded directly from another LNG carrier berthed at the other jetty. To perform such a ship-to-ship transfer, unloading and loading services have to be combined. Fluxys LNG 15

3. REGULATION AND TARIFF The marketing of LNG capacities is regulated by EU Directive 2009/73, previously EU Directive 2003/55, which provides for a regime of regulated tariffs and third party access. The EU Directive is to be enacted into Belgian national law in the existing Gas Act of 1965. The regulated system is designed to guarantee all shippers access to the Zeebrugge LNG terminal at regulated tariffs and conditions, and on a non-discriminatory and transparent basis. In order to develop additional capacities, all necessary arrangements will be made to fully incorporate these into the applicable operational- and commercial model and services, and capacity contracts and access conditions will be submitted for approval to the Belgian federal regulatory authority for electricity and gas (CREG). Discussions with CREG in this respect are already ongoing. Tariffs for the Project will be determined in line with applicable regulation for the existing infrastructure. New code of conduct On 23 December 2010, a Royal Decree on the code of conduct was published establishing the rules for access to the transmission grid, storage facilities and LNG installations, replacing the previous code of conduct of 2003. As the new code of conduct is now in force, Fluxys LNG will develop a new access guide and submit it to CREG for approval. For long term bookings hereunder, Fluxys LNG will establish regulated long-term standard contracts within the framework of this open season related to the Zeebrugge LNG Terminal and submit said standard contracts to CREG for approval. Specific regulated tariff regime New investments with national or European importance can benefit from a specific regulated regime (Royal Decree on long term tariffs for special projects dd 8th June 2007) which offers the possibility for long-term agreements, corresponding long-term tariffs and an adequate return on investment: all existing capacities at the Zeebrugge LNG terminal benefit from this specific regulated regime, whereby tariffs are established for a 20-year period until 2027, subject to CREG approval, Fluxys has the intention to apply the same tariff regime for the proposed services during the Binding Phase of this Open Season. 16 Fluxys LNG

Attractive tariffs with long-term visibility Long-term tariff visibility is a major advantage for parties interested in using the Zeebrugge LNG Terminal. In addition, the current tariff for unloading LNG carriers is amongst the lowest tariffs at regulated terminals in Europe. Indexed at 35 % of the Belgian consumer price index, the slot price since 2003 has increased a mere 5%. The slot tariff includes the services to berth an LNG vessel within a window of approximately 24 hours and unload the ship within approximately 24 hours, to use a basic storage capacity of 140 000 m³ LNG, linearly decreasing over approximately 10 days, and to use a basic sendout capacity of approximately 360 000 m³(n)/h during the abovementioned 10 days. /slot 790 000 780 000 770 000 760 000 750 000 Tariff Unloading Slot Zeebrugge LNG Terminal 740 000 730 000 Juiy.-03 Feb.-04 Sept.-04 Apr.-05 Nov.-05 June-06 Jan.-07 Aug.-07 March-08 Oct.-08 May-09 Dec.-09 July.-10 Source : Fluxys, February 2011 Fluxys LNG 17

5,24 /MWh 1,74 1,04 1,24 1,28 1,00 0,99 1,17 0,90 Panigaglia Italy Rovigo Italy Barcelona Spain Cartagena Spain Sines Portugal Montoir France Fos-Tonkin France Fos-Cavaou France Zeebrugge Belgium Source : Fluxys, November 2010 18 Fluxys LNG

4. ALLOCATION PROCESS Fluxys LNG will inform interested parties about the detailed allocation rules to be applied together with the contractual documentation, expected by the end of March 2011. Priority will be given to terminal users requesting throughput capacity for the longest term. 5. Creditworthiness Fluxys LNG may request from interested parties to subscribe to long-term commitments in order to underpin the necessary investments. It would then be required from the interested parties to demonstrate sufficient financial standing to underwrite these commitments under the applicable agreements to be entered into with Fluxys LNG. Indeed, the interested parties may be requested to provide Fluxys LNG with financial guarantees to cover their commitments in respect of the capacity requested under the Binding Phase of this Open Season. Fluxys LNG will inform interested parties about the detailed creditworthiness requirements together with the contractual documentation, expected by the end of March 2011. Fluxys LNG 19

6. Indicative timetable 3 February 2011 Launch of Binding Phase. 11 March 2011 Deadline for parties that have participated in the Non-Binding Phase to confirm their interest based on the products and services as described herein. Deadline for parties interested in the Binding Phase and not having participated in the Non-Binding Phase to submit their Confidentiality Agreement and Non Binding Capacity Form. End March 2011 Distribution of contractual documentation to participating companies. 30 June 2011 Participating companies to submit their Binding Capacity Form. 20 Fluxys LNG

7. DISCLAIMER This document (the Offer Description ) sets forth certain information regarding the new loading and unloading capacities, and related services which Fluxys LNG might create to increase the LNG throughput and loading possibilities through a second capacity enhancement of the Zeebrugge LNG Terminal. The Offer Description is publicly disclosed to the market for information purposes only and without any commitment whatsoever from Fluxys LNG so as to offer a product, capacity, any service and/or develop any infrastructure. Any and all interested parties, in their capacity as professional operators, shall be responsible for seeking to obtain the accurate and relevant information needed for their own assessment and decision to respond to the invitation to subscribe contained in this Offer Description. Fluxys LNG hereby disclaims all responsibility for changes to the implementation of the development as presented in the Offer Description. Such changes may result from amongst others financial and regulatory constraints defined by the competent regulatory authority or Fluxys LNG s board of directors. Additionally, the information contained in this Offer Description is for indicative purposes only and should not be considered to give rise to any contractual relationship between Fluxys LNG (or any of its affiliated entities) and any interested party. Fluxys LNG 21

POINT Of CONTACT Any request for additional information or questions in relation to the Project and/or this Service Offer should be addressed to: Fluxys LNG Commercial Department For the attention of Mr. Pieterjan Renier Guimard Street, 4 1040 BRUSSELS BELGIUM phone: +32 (0)2 282 74 33 e-mail: info.lng@fluxys.com Fluxys LNG SA - Registered office Rue Guimard 4 - B-1040 Brussels - www.fluxys.com VAT BE 0426.047.853 - RLP Brussels - D/2011/9484/1 February 2011 Responsible publisher: Bérénice Crabs - Avenue des Arts 31 B-1040 Brussels Photography : Emmanuel Manderlier, Patrick Henderyckx Graphic design : bbs-gc