LNG Experience. Owner & Investor Project Management

Similar documents
Alaska South Central LNG (SCLNG) Project

Alaska LNG Concept Information. Alaska LNG. Overview. October

International Construction Consulting, LLC. Modularization Overview.

Introduction. FLNG: Costs and Cost Drivers. What is FLNG (and what isn t) FLNG Project Costs

APPLICATION OF A RISK-BASED ASSURANCE PROCESS TO A MEGA LNG LIQUEFACTION PROJECT

Kitimat LNG Pacific Trail Pipeline

NOT FOR PRINT DISTRIBUTION

Identification Selection Definition Execution. Schedule.

Developing efficient and reliable LNG infrastructure to support Indonesia s fast-growing energy demand

Project Production Institute Challenges and Myths of Offsite Fabrication for Mega Projects

member of the TSAKOS GROUP of companies

SHELL FLNG TECHNOLOGICAL BREAKTHROUGH AND INNOVATIVE APPLICATION OF EXISTING TECHNOLOGIES

Meeting the Challenge of EPC Project Proposal Schedules. Project Proposal Schedules

The LNG Leader. Spring Curtis Island LNG Projects Queensland, Australia INFRASTRUCTURE MINING & METALS NUCLEAR, SECURITY & ENVIRONMENTAL

LNG Import Facility Infrastructure Options

Stepping Stones to FLNG The Tassie Shoal Project Australasian FLNG/FPSO Forum Perth, September 2009

LNG market update. Surge in LNG supply creates opportunities to open new markets

LNG as a marine fuel in BC. West Coast Marine LNG Workshop 26 th June 2012

Doseo Pipeline Project Modularization Overview Advantages/Disadvantages & Drivers

OFF-THE-SHELF MID-SMALL-MINI-SCALE LNG PLANT CASE STUDYFOR APPLICATION

Onshore terminal plants

17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)

Floating LNG Business A breakthrough in offshore gas monetization

On Board Regasification for LNG Ships. 22 nd World Gas Conference WS 3-2 Tokyo 2003 Wayne Perry


17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)

Mega Project Management

Liquefied Natural Gas Limited

XXX Development. Facility Feasibility & Option Selection Plan

Status of first generation of FLNG and trend and perspective for the next generation

Mozambique LNG Project - in Detail

Performance Improvement

Techlift International Limited Capability Statement

Engineering Company Role on Energy Projects

ECC ENGINEERING MANAGEMENT STRATEGY WORKSHOP

Growth Leadership: Vopak s LNG growth strategy

LIQUEFIED NATURAL GAS LIMITED

Modularization in Total Systems Integration. Rudi Roeslein May 11, 2015

Owner perspective on immigrant labor for industrial construction projects

The Technical & Practical challenges of FLNG

Freeport LNG Liquefaction Project

Chevron Australasia Overview

Growth through Innovation and Integration

Advanced Work Packaging An Owner s Perspective

LNG Projects Development of the Future

Exploring the benefits of modularization

Top 10 Areas for Productivity Improvement on Alberta Mega Oil Sands Construction Projects

LNG a generational opportunity for British Columbia. Madeline Whitaker President BG Canada ITA Youth Conference 26 November 2014

Project Management Consultancy Services. Ensuring safe and successful execution of your projects

Disclaimer. Confidential. Property of GNL Québec Inc All rights reserved.

CB&I Investor Presentation March 2017

For personal use only

Sakhalin Energy utilizes Thermo Fisher SampleManager LIMS Software for largest Russian LNG project ever

Offsite modular construction

Processing LNG Offshore: Maximizing Reliability, Performance & Safety. By Inga Bettina Waldmann at KANFA Aragon FLNG World Congress 28 th June 2016

Floating LNG What are the key business development risks and mitigation strategies in a FLNG project?

Gorgon Project Briefing Rick Robinson Director Perth Operations Kellogg Joint Venture. Karratha, Feb

Gorgon Project Activity at the AMC

John Paul Broeders Chairman of the Executive Board. Analyst Meeting 3 July 2009

Agility (Abu Dhabi) PJSC Subject: Modules Transport Agility Value added

Pluto LNG Development Industry Briefing. 21 st November 2006

ABC Oil and Gas. Aug 19 th, Report No: SMP-0002 Budgetary Plant Estimate. Powered by Solaris-MCI

LNG Impact on U.S. Domestic Natural Gas Markets

IPTC MS The Outlook for LNG Supply to Asia. Stuart Traver, Lalitha Seelam and Nick Fulford Baker Hughes Inc. and Gaffney, Cline & Associates

Liquefied Natural Gas Terminals Services and solutions

Customer Conference --Infrastructure Development in the South African Ports

Domestic seaborne distribution systems in Asia

BURNING BRIGHTER, BURNING GREENER. Accenture capabilities for global gas and LNG organizations

Project Management Consultancy Services. Ensuring safe and successful execution of your projects

Sydney, September, STS PRESENTATION for an ASX Listed Miner

Dominion Cove Point Export Project Platts 16 th Annual Liquefied Natural Gas February 9, 2017

LNG Import Terminals: Challenges and Opportunities

Engineering solutions to eliminate waste. Offshore Services

We deliver gas infrastructure

Quality Assurance When Outsourcing: Risk Management to Ensure Quality of Overseas Engineering and Fabrication

CAPITAL INVESTMENT SYSTEMS MAKING THE RIGHT INVESTMENT DECISIONS

TOC Europe Delivering Major Port Projects. Martin Mannion, AECOM and Finlo Paish, MPS Ghana

FUGRO GROUP LNG FIELD DEVELOPMENT AND FACILITIES. TACKLING your complex challenges. UNDERSTANDING your operational objectives

The Maltese Connection

Positions Job Description Requirement

SPECTRA ENERGY CORP. Experience, Engagement, Execution

SPE Intelligent Strategies in LNG Darrell Rangnow, Resources2 Energy, Delfina Govia, Resources2 Energy

LNG LIQUEFIED NATURAL GAS TECHNOLOGIES

Small Scale LNG From Concept to Reality. Chris Johnson, General Manager, LNG New Markets, Shell

BLUEPRINT FOR FOOD LOGISTICS

// Achieving the Unachievable

World s first LNG from Queensland, Australia A precursor to US LNG exports

An Economic Solution to Small Mid Scale Liquefaction. Paul Emmitt New Technology Manager Brian Songhurst Director of LNG

TEMPO AUSTRALIA INVESTOR PRESENTATION

LNG SERVICES GETTING ANSWERS FROM FIELD TO FUEL SOLUTIONS FOR INVESTORS, PRODUCERS, OPERATORS, CONTRACTORS, SUPPLIERS, TRADERS

US LNG Export Growth and the Benefits to Midstream

INVESTMENT OPPORTUNITIES IN PORT FACILITIES

Leading the Second Wave of US LNG Exports & Challenging the Traditional LNG World Paradigm

INVESTMENT POTENTIAL INVEST IN PORT TERMINALS AT THE PORT OF WALVIS BAY NORTH PORT PROGRAM DATE: 29 AUGUST 2016 REVISION: 1

Audit of Weighing Services. Audit and Evaluation Services Final Report Canadian Grain Commission

Global LNG-based natural gas trade: The role of the US and Louisiana

KOGAS s Technical Capability and Plan on Off-shore Plant Business

GLADSTONE TO JAPAN: EXPORT LNG PROJECT. December 2007

Northern Iron. Investor Update March 2010

Transcription:

LNG Experience Owner & Investor Project Management

Project Management (Operator / Investor) Most mega projects fail to meet FID Cost & Schedule Contracting Strategies are not meeting the challenges Regulatory Permitting Activities are often under-estimated Tighter labor market coming Even for Co-Investor, governance entails similar liabilities and responsibilities and therefore requires a spectrum of capabilities similar to an operated business.

LNG : Plan the Work and Work the Plan First LNG Cargo Delivered in 1964 2017 29 Importing Counties and 19 Exporting Countries supplying 250 mtpa 2020 Forecast 40 Importing Countries and 24 Exporting Countries supplying 350 mtpa 2025 LNG Demand Forecast 400 mtpa Typical LNG Project Pre Final Investment Decision 3 to 7 years Planning Feasibility Studies and Approval Process Pre FID Evaluations FERC Approval & Permit required in the US Plan the Work Project Execution 4 to 5 Years

FERC Status

Owner Management Where we can Help Feasibility and Approval Process Pre FID Evaluations Contractor Selection Evaluations Scope Validation Execution Strategy Modularization vs. Stick Build Cost Validation Schedule Validation Team size, structure and content (staffing both competency assessment and sourcing) Risk Identification Execution Progress Monitoring and Control Risk Mitigation

DRL CAPABILITIES v v v v v v v v v v v v v v v PROJECT MANAGEMENT PROJECT DUE DILIGENCE COST REDUCTION METHODS EXECUTION PLANNING REGULATORY PLANNING CONTRACTING STRATEGY TENDER PACKAGE DEVELOPMENT FID ESTIMATE & BENCHMARKING SCHEDULE & BENCHAMARKING COST CONTROL & FORECASTING DEVELOPMENT OF WBS WORKPACKS SAFETY & RISK MANAGEMENT PLANS FACILITIES COMPLETION METHODS MOC PLAN COMMISSIONING & S/U PLANNING OWNER PROJECT MANAGEMENT SUPPORT WE HAVE MANAGED 110 JOBS IN USA

FEASIBILITY and APPROVAL PROCESS

Feasibility & Approval Progress Feasibility and Approval Process Establishing a Value Chain Commerciality Supply Demand Permits Risk and Opportunity Assessments

Project Management Key Risk mitigation & Predictable Outcomes are established in the early stages.. You have to KNOW what is coming down the track thru EXPERIENCED PMT.

Project Assurance Types of Assurance Activities Audits Reviews Participation at Stage Gates (Value Assurance, Estimate and Schedule Reviews) Activity Health Checks Project Execution Plan Review Assists (Peer Assists, Senior Discipline Counsel) Value Improving Practices Technology System Selection Process Simplification Constructability Review Lessons Learned Benchmarking Quality Assurance

Examples of Review Activities

LNG PLANT : Pre Final Investment Decision CONTRACTING and CONTACTOR SELECTION & EVALUATIONS What scope breaks/splits minimize execution risks? What Contractors fit the different scopes of work? What contracting approaches minimize the Owner s commercial exposure? Tender Evaluations

LNG PLANT Cost and Main Contractor

LNG PLANT : Pre Final Investment Decision SCOPE VALIDATION Contractor Scope Validation Identification of Risks and Opportunities

LNG PLANT Equipment Weight vs Capacity

LNG PLANT Total Weight vs Capacity

LNG PLANT : Pre Final Investment Decision MODULARIZATION vs. STICK BUILD EVALUATIONS Stick Build? Modularization Percentage?

Onshore Plant Construction Onshore Plant Construction decision on Modularization vs. Stick Build has many variables and for each individual project the answer is not always the same. Modularization introduces multiple construction locations and consequently required early decision making and good management. Challenges associated with Large scale Modularization Engineering & Design Needs to be Completed Earlier and with higher manhours relative to Stick Build Increased Steelwork Increased Temporary Facilities Earlier Procurement Significant Shipping Requirements (More Complex Logistics) Increased Interfaces Planning and Control Challenging

Onshore Plant Construction - Modularization Positive Features of Modularization for Unique site specific conditions include: Higher Labor Productivity Mitigation of Weather Related Delays. Seasonal concerns limiting suitable periods for stick build construction (related factors such as excessive mud or ice) Lower Labor Costs when compared to remote or expensive locations or with limited labor supply Mitigation of Schedule Risk by shifting construction work to a controlled manufacturing environment Potential Safety Risk Reduction from building in a controlled manufacturing environment

Onshore Plant Construction STICK BUILD FAVOURED WHEN Availability of labor at low all-in cost Suitable Site without large site preparation works Suitable Climate conditions for outdoor works all year Stick Building Enables Low Construction Cost Schedule Flexibility Use of large unskilled work force Local Content MODULAR FAVOURED WHEN Local labor costs high Indirect resources are high cost & have to be imported Remote location Site Preparation is significant Climate conditions are challenging Restrictions on use and availability of land Modular Construction Enables Reduced Plant Footprint Reduced Construction Area Onsite manhour reduction Superior Fabrication Conditions Delay to Early Works BUT INDIVIDUAL PROJECT ASSESSMENT REQUIRED AT PRE FEED STAGE TO DETERMINE THE APPROPRIATE EXECUTION STRATEGY. THIS MUST REALISTIC COST and SCHEDULE ESITATION. HISTORICAL PERCIEVED BENEFIT OF MODULAR CONSTRUCTION SCHEDULE (and COST) MAY HAVE BEEN OVERSTATED

Onshore Plant Construction There are circumstances where Modularization offers significant benefits, but realization of these benefits requires early management and planning to ensure that the required Execution Strategy is embedded through out all project phases Selective Modularization may provide a more cost and schedule effective result Each Onshore Project should develop it s OWN UNIQUE Execution Strategy and associated level of planning and management.

Early Planning for Modularization 22

LNG PLANT : Pre Final Investment Decision COST VALIDATION Contractor Cost Evaluation Identification of Risks and Opportunities

LNG PLANT Cost per tpa

LNG PLANT Cost per tpa

LNG PLANT Cost per tpa

LNG PLANT Cost per tpa

LNG PLANT Cost Drivers Major Cost Drivers include: Scope is the Biggest Driver Capacity / Functionality / Process Selection / Layout Location Labor Availability / Weather Execution Strategy Legislation / Regulatory Market Conditions Performance

LNG Plants : All Plants are Not Alike Minimum Process LNG Plant Some Differences :- Plant Location Cost of Labour Feed Gas Composition Product Specification a feed gas handling and treating section a liquefaction section a refrigerant section a fractionation section an LNG storage section a marine and LNG loading section a utility and offsite section Maximum Process LNG Plant

LNG PLANT Cost Differences

Sabine Pass LNG Project Comparison to Gorgon LNG Sabine Pass LNG Gorgon LNG

Comparison Sabine Pass vs. Gorgon GORGON LNG PLANT Gorgon LNG 3 x 5.2 mtpa. Train (15.6 mtpa) Remote Location Australia (Nature Reserve) Acid Gas Removal and Inlet Facilities Jetty 2.1 km in length Estimated Equip & Bulk Weight 270k tonnes Execution Duration to First LNG 80 months FID 13 September 2009 First LNG Export March 2016 Cost US$33.5 billion SABINE PASS LNG PLANT Sabine Pass LNG 4 x 4.5 mtpa. Train (18 mtpa) USA Gulf Coast Industrial Heartland No Acid Gas Removal Facility Two Unloading Docks Estimated Equip & Bulk Weight 180 k tonnes Execution Duration to First LNG 46 months FID June 2012 First LNG Export May 2016 Cost US$12.2 billion (incl. LNG Terminal) Cost Difference US$21.3 billion Indicative Reasons for Cost Difference Difference in Process / Layout / Infrastructure US$4.00 Billion Site Labour Unit Costs US$6.00 Billion Duration Related Costs US$2.20 Billion Company Owner Cost Unit Rates US$2.00 Billion Site Labour Productivity US$1.75 Billion Equipment / Bulk Procurement Unit Rates US$1.50 Billion Remote Location US$2.85 Billion Addition Weight due to Module Build US$1.00 Billion

Comparison Sabine Pass vs. Gorgon

Comparison Sabine Pass vs. Gorgon

Comparison Sabine Pass vs. Gorgon

LNG PLANT : Pre Final Investment Decision SCHEDULE VALIDATION

LNG Plant Execution Duration vs. Capacity

LNG PLANT DATA LNG PLANT DATA

LNG PLANT DATA