STATE OF GEORGIA DEPARTMENT OF NATURAL RESOURCES ENVIRONMENTAL PROTECTION DIVISION

Similar documents
FACT SHEET STATE OF GEORGIA DEPARTMENT OF NATURAL RESOURCES ENVIRONMENTAL PROTECTION DIVISION

State of Georgia Department of Natural Resources Environmental Protection Division

State of Georgia Department of Natural Resources Environmental Protection Division

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II

State of Georgia Department of Natural Resources Environmental Protection Division NOTICE OF INTENT. NOI - Version 2012

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

FACT SHEET AND SUPPLEMENTARY INFORMATION FOR GENERAL PERMIT ARR STORMWATER RUNOFF ASSOCIATED WITH CONSTRUCTION SITES IN ARKANSAS

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES

State of Georgia Page 2 of 35 TABLE OF CONTENTS

RULES OF THE TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF WATER RESOURCES

Ohio Environmental Protection Agency (Ohio EPA) Fact Sheet For. National Pollutant Discharge Elimination System (NPDES)

AUTHORIZATION TO DISCHARGE UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM AND THE ARKANSAS WATER AND AIR POLLUTION CONTROL ACT

Fact Sheet Basic Industrial Stormwater General Permit Date of Public Notice: November 15, 2017 Draft Renewal

CHAPTER 20.8 SURFACE MINING AND LAND RECLAMATION REGULATIONS

Re-Certification Course for Level II: Introduction to Design

STORMWATER MANAGEMENT PROGRAM. Table of Contents

NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION SPDES GENERAL PERMIT FOR STORMWATER DISCHARGES. from CONSTRUCTION ACTIVITY

Notice of lni.'9aigil. Tennessee Department ofj nvironment and Conservation Water Quality_Control Board

Chapter 21 Stormwater Management Bylaw

4.0 INDUSTRIAL/COMMERCIAL DISCHARGE PERMITS

Stormwater CGP. CGP Regulatory Overview. CGP Regulatory Overview

City of Watertown, South Dakota Storm Water Management Program. Minimum Control Measure 1: Public Education and Outreach on Storm Water Impacts.

Title 26 DEPARTMENT OF THE ENVIRONMENT

CITY OF FRIENDSWOOD DOCUMENT TPDES REQUIREMENTS

Title 26 DEPARTMENT OF THE ENVIRONMENT

CHAPTER SURFACE MINING AND RECLAMATION PLAN REGULATIONS

DEPARTMENT OF HEALTH, CLEAN WATER BRANCH UPDATES TO HAR AND NPDES PERMITS NOVEMBER 2018

FACT SHEET. Public Comment Period Expiration Date: To be determined Contact: Raymond Bahr

FACT SHEET. Public Comment Period Expiration Date: March 30, 2017 Contact: Raymond Bahr

Erosion and Sediment Control Manual Table of Contents

CITY OF DURANGO Stormwater Quality Permit FACT SHEET - CONSTRUCTION

Federal and State Regulation of Stormwater Discharges From Construction Sites

Permitting Applicability and Renewal of the Phase II MS4 and Construction General Stormwater Permits

Industrial Stormwater

Three copies (one original and two copies) of your completed NOI should be submitted to:

FACT SHEET AND EXECUTIVE DIRECTOR=S PRELIMINARY DECISION

FACT SHEET FOR 2 nd DRAFT GENERAL PERMIT NO. ARG590000, CONCENTRATED ANIMAL FEEDING OPERATIONS (CAFO) IN THE STATE OF ARKANSAS

Check the box below if you are operating mobile tire processing equipment [APC&EC Reg ]: Mobile Tire Processing Equipment

SPECIAL CONDITIONS GENERAL PERMIT NUMBER WMGR089

SUDAS Revision Submittal Form

General NPDES Permit No. ILR40 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM

LAUSD SWPPP Training. Presented By: Joe Zucker

State Water Resources Control Board

2018 Stormwater Construction General Permit (CGP) Renewal TXR150000

PREFACE.

Clean Water Act Industrial Stormwater Applicability Flowchart. July 2009

ARTICLE 14: ADMINISTRATION

Stormwater Construction General Permit CGP-2013

NOTICE OF PUBLIC RULEMAKING HEARING BEFORE THE COLORADO WATER QUALITY CONTROL COMMISSION

Appendix M Framework Stormwater Pollution Prevention Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702

PREQUALIFICATION OF CONTRACTORS FOR EDUCATIONAL FACILITIES CONSTRUCTION 8.502

Checklist for 2013 Draft NH Small MS4 General Permit Requirements

GENERAL PERMIT NCG530000

CCSD#1 Stormwater Standards

CHAPTER 6 - How to Prepare a SWPPP

Ohio Environmental Protection Agency. Fact Sheet for. National Pollutant Discharge Elimination System (NPDES)

TOWN OF BERKLEY ARTICLE 32 STORM WATER BYLAW

Chapter 34 Index. Article V Violations And Penalties Misdemeanor Injunction Civil Damages...

Virginia Department of Transportation Pollutant Discharge Elimination System

TXDOT AND CONTRACTOR PRIMARY OPERATORS AS CO-PERMITTEES SP AND SP

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

Section 4: Managing the Construction Site

RULES OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF AIR POLLUTION CONTROL CHAPTER VISIBLE EMISSION REGULATIONS

Regulatory Requirements

Section 3. Plan Submittal/Review Requirements

CHAPTER AUXILIARY SERVICES. Prequalification of Contractors for Educational Facilities Construction 8.272

City of Grand Junction Illicit Discharge Detection and Elimination Manual

Illinois EPA MS4/ILR10 permit overview & changes

Water Quality Control Permits for Aquatic Herbicides

CITY OF MILTON CONSTRUCTION NOTES

U.S. Army Corps of Engineers, Sacramento District 1325 J Street, Room Sacramento, California

RULES OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF AIR POLLUTION CONTROL CHAPTER VISIBLE EMISSION REGULATIONS

TPDES Program & Effluent Limit Guidelines

CHAPTER 8410 BOARD OF WATER AND SOIL RESOURCES METROPOLITAN WATER MANAGEMENT

Chapter 5:96 with amendments through October 20, Third Round Procedural Rules

City of Santa Clarita. New General Construction Permit June 15, 2010

The Rules and Regulations for Water Quality Control, Chapter September 15, 2003

House Bill 4086 Ordered by the House February 21 Including House Amendments dated February 21

REPUBLIC OF LITHUANIA LAW ON PUBLIC ADMINISTRATION. 17 June 1999 No VIII-1234 Vilnius. (As last amended on 3 June 2014 No XII-903)

Public Notice. Issuance of Industrial Waste Discharge Permit

DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY FACT SHEET

Entities required to comply with the regulations must develop a plan which addresses six Minimum Control Measures (MCMs).

130A Alternative process for wastewater system approvals. (a) Engineered Option Permit Authorized. A professional engineer licensed under

MARCH 2009 TO MARCH 2010 (YEAR 7) REPORTING PERIOD VILLAGE OF PLAINFIELD, ILLINOIS

TPDES Construction Site Inspector Training

Mn/DOT Outstate District SWPPP

KNOX COUNTY HEALTH ORDINANCE ARTICLE IV ONSITE WASTEWATER DISPOSAL

EROSION & SEDIMENT CONTROL/STORMWATER CERTIFICATION: (Rev ) SP1 G180

GENERAL PERMIT PAG-02 FOR COVERAGE UNDER GENERAL NPDES PERMIT FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES FACT SHEET

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2017 H 3 HOUSE BILL 794 Committee Substitute Favorable 6/14/17 Committee Substitute #2 Favorable 6/21/17

Public Notice: Wetland/Waterway/Water Quality Regulations

TRAVIS COUNTY WATER CONTROL AND IMPROVEMENT DISTRICT 17 STORMWATER MANAGEMENT PROGRAM TPDES PHASE II MS4 GENERAL PERMIT (TXR040000)

EMBARGOED UNTIL 2:00 PM TUESDAY, JULY 12, 2011

The Solution to Pollution is Dilution

Mercer County Household Sewage Treatment System Regulations

COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT WATER QUALITY CONTROL COMMISSION REGULATION NO. 22

Sec NPDES Municipal Separate Storm Sewer System (MS4) Program. (Ord HR; )

Purpose

Construction Permit Timeline

APPENDIX C ADEQ CHECKLIST FOR 208 PLAN AMENDMENTS

Transcription:

STATE OF GEORGIA DEPARTMENT OF NATURAL RESOURCES ENVIRONMENTAL PROTECTION DIVISION FACT SHEET NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL PERMIT NUMBERS GAR100001, GAR100002, AND GAR100003 FOR STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY June 26, 2003 The 1972 amendments to the Federal Water Pollution Control Act (FWPCA, also referred to as the Clean Water Act or CWA) prohibit the discharge of any pollutant to waters of the United States from a point source unless the discharge is authorized by a National Pollutant Discharge Elimination System (NPDES) permit. Efforts to improve water quality under the NPDES program have focused traditionally on reducing pollutants in discharges from industrial and municipal wastewater treatment plants. Prior to 1990, efforts to address storm water discharges under the NPDES program have generally been limited to a few industrial categories with storm water effluent limitations. In response to the need for comprehensive NPDES requirements for discharges of storm water, Congress amended the CWA in 1987 to require the U. S. Environmental Protection Agency (USEPA) to establish phased NPDES requirements for storm water discharges. To implement these requirements, USEPA published the Phase I permit application and other requirements for certain categories of storm water discharges associated with industrial activity, including construction activities, on November 16, 1990 (50 FR 47990) and April 2, 1992 (57 FR 11394). In conjunction with the federal regulations, the Georgia Environmental Protection Division (EPD) amended the Georgia Rules and Regulations for Water Quality Control (Rules) in April 1990 to Page 1

allow the issuance of general NPDES permits. In January 1991, USEPA granted authority to EPD to issue general NPDES permits. In September 1992, EPD issued the first of five different general NPDES permits for construction activities. Each of these permits was administratively appealed and did not become effective. The Phase I general NPDES permit developed during the course of settlement negotiations with the participating parties became effective on August 1, 2000, and regulated construction activity disturbing between five and 250 acres. This permit is set to expire on July 31, 2003. The USEPA established the Phase II storm water regulations on December 8, 1999, in order to regulate construction sites that disturb between 1 and 5 acres. In conjunction with the federal regulations, the Georgia Environmental Protection Division (EPD) amended the Georgia Rules and Regulations for Water Quality Control (Rules) in April 2001 to incorporate all Phase II regulations. EPD proposes to issue three NPDES general permits that will authorize the discharge of storm water from three distinct types of construction activity. These permits are expected to become effective on or about August 1, 2003, and will regulate all construction activity disturbing 1 or more acres. The first permit regulates stand-alone construction activity (GAR100001); the second regulates infrastructure (i.e., linear) construction sites (GAR100002); the third regulates common development construction (GAR100003). Each permit will contain significant common language and requirements as well as individual differences specific to each type of activity. In preparing the proposed permits, the Director of the EPD considered the goals, objectives, and public policies embodied in the Georgia Water Quality Control Act, O.C.G.A. 12-5-20 et seq., and the Erosion and Sedimentation Act, O.C.G.A. 12-7-1 et seq., the authority contained therein to promulgate the proposed permits, the methodologies available to insure compliance with the provisions of the proposed permits, and the important public policy of reducing sedimentation in the waters of the State from construction activities. The proposed permits are being issued pursuant to the authority contained in O.C.G.A. 12-5- 27 and 12-5-30. As required, the permits incorporate the applicable provisions of O.C.G.A. 12-7-6. The proposed permits include the requirement that regulated activities perform turbidity Page 2

sampling on all receiving water(s), or all storm water outfalls, or a combination of receiving water(s) and outfall(s). The numbers applicable to the alternative outfall monitoring were established as estimated surrogates for the otherwise applicable in-stream turbidity levels using factors applicable on average basis statewide. The proposed permits define construction activities as those disturbing a land area of 1 acre or greater, or tracts of less than 1 acre that are part of a larger overall development with a combined disturbance of 1 acre or greater (i.e., common plan of development or sale). EPD can require an applicant to submit an NPDES permit application for an individual NPDES permit upon written notification to the applicant. In addition to storm water discharges, the proposed general NPDES permits authorizes certain non-storm water discharges such as fire fighting water and uncontaminated groundwater. The proposed general permits will be valid for a term of five (5) years. The major provisions of the proposed permits are: notification of the facility/site s intent to comply with the permit by submitting a Notice of Intent (NOI); the preparation of an Erosion, Sedimentation and Pollution Control Plan (Plan); and the implementation of this Plan. Coverage under the proposed permits is achieved by submitting a NOI to EPD by the permittee(s). A permittee structure for common develpments remains similar to the previous permit. A primary permittee is the facility/site owner or operator. A secondary permittee is a home builder, a utility contractor, or similar entity conducting land disturbance activities within a common development. Both stand-alone and infastructure construction activities have primary permittees only. NOIs are required to be submitted to EPD by all permittees at least fourteen (14) days prior to the commencement of the construction activity, with certain exceptions specified in the permits. The NOI will include basic information about the facility/site including the specific waters of Georgia where the discharges will occur, except in the case of Blanket NOIs for utility companies and utility contractors that are secondary permittees. Specific forms will be available from EPD and must be used for the NOI. NOIs are required to be submitted to EPD by return receipt certified mail or similar service. Coverage by the general NPDES permit is provided without acknowledgment from EPD. When final stabilization of the facility/site is achieved, the permittee must notify EPD they are terminating coverage under the general NPDES permit by submitting a Notice of Termination (NOT). Page 3

The Plan will detail those best management practices to be used at the facility/site to control erosion, sedimentation and other pollutants. The primary permittee is responsible for developing and implementing the Plan for the entire infastructure, stand-alone, or common development construction site. The Plan must be prepared, on the behalf of the primary permittee, by an individual licensed by the State of Georgia in the field of engineering, architecture, landscape architecture, forestry, geology or land surveying; or by a person that is a Certified Professional in Erosion and Sediment Control (CPESC) with a current certification by the International Erosion Control Association. The Plan is also required to establish procedures to collect and analyze samples from the receiving stream(s) or the storm water outfall(s) based on the methodologies set forth in the proposed permits. Permittees are required to perform sampling of turbidity levels as a means of determining whether an additional violation of the permit terms and conditions has occurred in the event best management practices (BMPs) were not properly designed, installed or maintained. Sampling shall be performed during qualifying rain events following distinct points in the construction process as outlined in the permits. As a result of work done by the Erosion and Sediment Control Overview Council and the stakeholders on the General Permit Advisory Committee during the last two years, House Bill 285 was passed by the Georgia General Assembly and signed by the Governor in 2003. This bill establishes the development of a mandatory education and training program for persons involved in the land disturbance process, and the establishment of an NPDES permit fee system to offset the costs of the state-wide implementation of the NPDES general permits for construction activities. The proposed permits include these provisions, as well as reduced monitoring requirements as compared to the current general permit. Permittees must maintain records of their activities relative to compliance with the terms and conditions of the proposed general NPDES permits. These records include copies of the NOI, Plan, site inspections, sampling results and NOT. For new facilities/sites disturbing more than 50 acres, the Plan must be submitted to EPD with the NOI. For new facilities/sites disturbing Page 4

between one and 50 acres and where there is no local issuing authority pursuant to the Georgia Erosion and Sedimentation Act, the Plan must be submitted to EPD with the NOI. Public notice of the proposed general NPDES permits is being distributed by newspaper and mailing to all those persons who have requested notice of NPDES permits in order to satisfy requirements of the Georgia Administrative Procedures Act and the Georgia Water Quality Control Act. The proposed permits are available on EPD's website at www.dnr.state.ga.us/dnr/environ. Copies of the proposed general NPDES permits will be mailed upon request by calling (404) 675-6240 or by writing the EPD at the address below. Persons wishing to comment on the proposed general NPDES permits are invited to submit same in writing to Mr. Lawrence W. Hedges, Program Manager, NonPoint Source Program, at the address below, no later than 4:30 P.M. on July 29, 2003. All comments received prior to or on that date will be considered in the formulation of final determinations regarding these permits. A public hearing has been scheduled for 10:00 A.M. on July 29, 2003 at the Tradeport Training Facility located at 4244 International Parkway, Suite 116, Atlanta, Georgia. Please refer to EPD Public Notice No. 2003-12 for hearing details. Additional information regarding public hearing procedures is available by writing the Environmental Protection Division at: Georgia Environmental Protection Division 4220 International Parkway, Suite 101 Atlanta, Georgia 30354 Any person who is aggrieved or adversely affected by the issuance or denial of a permit by the Director of EPD may petition the Director for a hearing if such petition is filed in the office of the Director within thirty (30) days from the date of notice of such permit issuance or denial. Such hearing will be held in accordance with the EPD Rules, Water Quality Control, subparagraph 391-3-6-.01. Petitions for a contested hearing must include the following: 1. The name and address of the petitioner; Page 5

2. The grounds under which petitioner alleges to be aggrieved or adversely affected by the issuance or denial of a permit; 3. The reason or reasons why the petitioner takes issue with the action of the Director; and 4. All other matters asserted by the petitioner which are relevant to the action in question. Page 6