ELECTRICAL INSPECTION BULLETIN (Effective )

Similar documents
ELECTRICAL BULLETIN

SECTION SECONDARY UNIT SUBSTATIONS

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES

INDEX. Page SECTION 1.0: SCOPE Toronto Hydro Requirements Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1

ELECTRIC METERING GENERAL

ELECTRICAL BULLETIN

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

Unit Substation Transformer Construction Checklist (under 500 kva)

ELECTRICAL SAFETY Information Bulletin

SECTION SECONDARY UNIT SUBSTATIONS

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

B. Provide liquid-filled secondary substation transformers as indicated on drawings.

LIGHTING RETROFIT CONFORMANCE REPORT

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING NETWORK SYSTEMS SECTION

A. Section includes busway and fittings including plug-in units.

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

SERVICE ENTRANCES. OPPD S Electrical Service Designer (ESD) shall designate the Point Of Entrance.

SECTION BUSWAYS

SECTION SECONDARY UNIT SUBSTATIONS SECONDARY LESS THAN 1000 V

Low Voltage Switchgear Construction Checklist (under 500 kva)

FIELD TEST AND OPERATIONAL CHECK SECTION A. Refer to Section 16010, Electrical General Requirements.

Technical Guideline for. Section 8. Inspection and Approval of Construction

Houston First Corporation Package 1 SECTION MEDIUM VOLTAGE FUSED SWITCH INTERRUPTER

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

Manitoba Electrical Code

ELECTRICAL INSPECTION BULLETIN B Installation and Inspection Requirements for Street and Roadway Lighting Systems. (Effective 2015/11/15 )

Important Considerations for Specifying MV Mining Switchgear Western Mining Electrical Association Edmonton, Canada June 13, 2008

Point Eight Power, Inc. Switchgear Specification Low Voltage UL 1558 Metal-Enclosed Switchgear

4. GENERAL REQUIREMENTS

4. GENERAL REQUIREMENTS

Municipality For the purpose of this bulletin, municipality means: a town, village, county, district or a regional municipality.

NEC 2017 Code Changes Chapter 1 - General

BULLETIN SUBJECT: GENERAL BULLETIN, 2015 SASK INTERPRETATIONS CORRECTIONS, AND ELECTRIC SERVICE REQUIREMENT CHANGES OR ADDITIONS

PRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE SECTION SECTION

SERIES 800 / 810 SPECIFICATION 15KV & 25KV PADMOUNTED LIQUID-INSULATED VACUUM LOAD INTERRUPTER ASSEMBLIES

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents

MATERIAL SPECIFICATION FOR POWER SUPPLY EQUIPMENT

SECTION LOW-VOLTAGE TRANSFORMERS

16300 HIGH VOLTAGE DISTRIBUTION

Duke Energy Carolinas Distribution Construction Standards Reference Guide

Metering Requirements 750 Volts or Less

LOW-VOLTAGE SERVICE ENTRANCE SWITCHBOARDS SECTION D

1.0 In addition to the requirements previously presented herein, each specification shall contain the following general information:

Standard of Practice - Campus Electrical Distribution System

MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POWER SUPPLY EQUIPMENT

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES...

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Medium Voltage Switchgear. Basis of Design.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION to 5000 AMPERE PLUG-IN AND FEEDER BUSWAYS - SPECTRA. A. Low-Voltage Plug-in Busway to 5000 ampere, 600 VAC

METERING INSTALLATION

SECTION ENCLOSED BUS ASSEMBLIES

Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan)

Reference Information:

Metering Requirements 750 Volts or Less

SERVICES - SERVICE EQUIPMENT- PANELBOARDS

SECTION LOW-VOLTAGE SWITCHGEAR

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Ontario ENGINEERING STANDARD SPECIFICATION 1/10 REV. ELECTRICAL DISTRIBUTION HIGH VOLTAGE SUBSTATION GROUNDING AND BONDING. Approved by.

56-SDMS-01 REV. 01 SPECIFICATIONS FOR

OVERHEAD SERVICES - SECONDARY

a) Line and load compartments must be separated by a stable barrier.

SECTION GROUNDING

Pre-commissioning Requirements for Independent Connection Providers Requiring New Assets to be Connected to the 11/6.6kV Network

Electric Service Requirements. Residential Overhead. Engineering Specification T002. February

METERING INSTALLATIONS (GENERAL REQUIREMENTS)

Section 7: Specifications

EFFECTIVE DATE: November 1, 2011, unless a later date is cited at the end of a section. [ NMAC - Rp,

SECTION FIELD PANELS

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999

ENMAX POWER CORPORATION. Requirements for Distribution Wires Access

8.1.2 Under no circumstances shall a service entrance be left unmetered. Notify the Company if an unmetered service is encountered.

EFFECTIVE DATE: July 1, 2008, unless a later date is cited at the end of a section. [ NMAC - Rp,

INFORMATION BULLETIN

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist

SECTION METAL-ENCLOSED BUS MEDIUM VOLTAGE

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

CITY & COUNTY OF DENVER COMMUNITY PLANNING & DEVELOPMENT BUILDING PERMIT POLICY

Delaware State University

Indianapolis Power & Light Company

Capital Projects Group Transfer Switch Specification

SECTION PART 1 GENERAL

UNIFIED FACILITIES GUIDE SPECIFICATIONS. Use for Southeast projects only **************************************************************************

SECTION MEDIUM VOLTAGE TRANSFORMERS

OPERATING PROCEDURE NO. 310

SECTION BASIC ELECTRICAL REQUIREMENTS

8. REVENUE METERING. Operational Excellence Model. 8.1 Introduction

Small Scale Solar Permit Application

NOVA SCOTIA POWER INC. UTILITY SERVICE REQUIREMENTS

UNDERGROUND SERVICES SECONDARY

NY State Unified Solar Permit

Metering Requirements 750 Volts or Less

NY State Unified Solar Permit

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement

POWER TRANSFORMER INSTALLATION

SECTION ENCLOSED BUS ASSEMBLIES

Northern Powergrid Appendix B for ENA Engineering Recommendation G81 Part 4: Design and Planning

Transcription:

ELECTRICAL INSPECTION BULLETIN (Effective 2009-02-01) Rule 36-000 Customer Owned High Voltage Installations With the increase in customer own high voltage equipment there appears to be confusion over which standards should be followed and as to if this work is required to be performed under a Wiring Permit and be inspected. The Nova Scotia Electrical Code Regulations requires that all electrical installation, unless exempted, must be performed under a wiring permit and be inspected by the Inspection Department before the equipment is energized. These requirements apply to all customer owned high voltage installations (voltages operating in excess of 750V). In addition to permit and inspections requirements, electrical drawings for high voltage installations must be submitted for review in accordance to Electrical Inspection Bulletin B-2-014. Documentation must be provided to support cable ampacity ratings by a P.Eng of Record. Request for deviations along with the rationale for the request must be submitted in writing to the Inspection Department at the time drawings are submitted. Customer owned high voltage installations may include but are not limited to overhead and underground cables and conductors, pad mount transformers, transformer banks, outdoor and indoor sub-stations, grounding, enclosed switching cubicles, switchgear, sub-station fences, and other equipment operation in excess of 750 volts. NSPI supply authority must be consulted in all cases prior to any customer s high voltage system being connected or interconnected to NSP s utility system. In addition to meeting the requirement of NSP s supply authority, customer owned installations must comply with the Canadian Electrical Code, Part 1(CEC) and other applicable CSA standards. NSPI utility standards should not be used in designing customer high voltage installations as NSPI utility standards may differ from that of the CEC. Designers and installers must ensure the installation complies with the minimum requirements of the CE Code. Example of one difference is the requirement for disconnecting means for a 3-phase transformer. Utility practice is to install 3 single gang cutouts however CEC rule 36-204 requires a gang operated switch. High voltage electrical equipment must be approved by a recognized certification agency provided the certification agency has a program to certify the equipment to the appropriate CAN/CSA standard. If the certification agency does not have a program to certify the equipment, the equipment must be built to a recognized CAN/CSA standard. The CSA standards require the equipment to be labeled to the standards it was built to. However electrical equipment built to CAN/CSA C88 does not require the equipment to be labeled. In this case the customer must provide the Inspection Department written documentation from the manufacture indicating the applicable CAN/CSA standard it was built to, and the customer shall install a label on the equipment noting the applicable standard(s). Where a CAN/CSA standard does not exist other standards may be acceptable as would be the case with equipment operating in excess of 46 kv. The customer/ agent shall provide documentation as to the type of equipment and applicable standard it was built to. In addition to the requirements of CEC, installations of overhead and underground systems shall also conform to applicable CSA Part 3 standards. The following table indicates applicable standards for specific high voltage equipment. Prepared by: David Clements Approved by: David Clements Page 1 of 7 New Bulletin February 2009 B-36-000

High Voltage Equipment Application Equipment Standard (see note 1) Enclosed Switchgear up to Indoors or Outdoors within a Certified to C22.2 No.31-04 46KV fenced station Enclosed Switchgear up to 46KV Outdoors Certified to C22.2 No.31-04 (Tamperproof Design) Air Cooled Distribution Transformer(Dry Type) up to 46kV Indoors or Outdoors Certified to C22.2 No.47-M90 (R2007) Oil/Liquid Filled Power Transformer Single and Three Phase Oil/Liquid Filled Distribution Transformer (Up to 3MVA) ONAN only Single and Three Phase Liquid Filled Distribution Transformer (Up to 3MVA) LNAN only Low Profile, Single Phase Tamper Resistant Pad Mount Transformer with Separable Insulated Connectors (Up to 27.6/16.8 kv) (Up to 167 KVA) Three Phase Tamper Resistant Pad Mount Transformer with Separable Insulated Connectors (Up to 27.6/16.8 kv) (Up to 3000 KVA) Three Phase, Live-Front, Pad Mounted Distribution Transformer Tamper Resistance Oil/Liquid Filled Tamper Resistant Pad Mount Transformer ONAN and LNAN only Transformer Designation Outdoors within fenced in station, or indoor within a vault Outdoors within fenced in station, or indoor within a vault Outdoors within fenced in station, or indoor within a vault Built to CAN/CSA C88-M90 (R2004) Built to CAN/CSA-C2.1-06 Built to CAN/CSA-C2.1-06 Outdoors ( no fence required) Built to CAN/CSA-C227.3-06 Outdoors ( no fence required) Built to CAN/CSA-C227.4-06 Outdoors ( no fence required) Outdoors ( no fence required) ONAN- Oil Filled Natural Cooling LNAN- Flame-retardant Liquid filled natural cooling Built to CAN/CSA C227.5-08 Built to CAN/CSA C88-M90 (R2004) and built to tamperproof requirements in C227.4 Note 1: The information indicated in the equipment standard column shall appear on the equipment. Station Ground Resistance Page 2 of 7 New Bulletin February 2009 B-36-000

Testing/Commissioning of High Voltage Stations and Unit Substations In order to ensure compliance with Section 36 of the CEC and in particular rule 36-304(4), (Station ground resistance) after completion of construction equipment shall not be energized until a testing/commissioning report on the complete installation is provided to NSPI s Chief Electrical Inspector, an electrical inspection has been completed by the Inspection Department and all applicable checklists (attachments 1-3) have been submitted with the commissioning report. The testing /commissioning report is to be completed by an acceptable independent agency other than the installing electrical contractor. The report submitted by the agency must indicate that the High Voltage installation has been successfully tested in accordance with requirements of Section 36 of the CEC and that the installation is ready to be energized. Where an installation falls under the station exemption rule (36-306), the consultant must demonstrate to the Inspection Department that the potential rise of the station shall not exceed the values specified in Table 52 during the lifetime of the station. The testing / commissioning report must include (but not limited) to the following: (1) Operation of all isolating and disconnecting means; (2) Operation of all required interlocks between fuse compartments, load breaking or isolating means; (3) CAN/CSA standard that transformer(s) are built to; (4) Calculation of step and touch voltages and ground resistance test; (5) Protection coordination study; (6) Visual inspection of grounding conductors and ground connections (7) Confirmation that that all test are completed and the complete installation complies with the CEC and station is ready to be energized. (8) Indication that all equipment is rated to withstand the maximum available fault levels The design of the station ground electrode can be found in CEA Report 249 D541 Simplified Rules for Grounding Customer-Owned High Voltage Substations or IEEE Standard No. 80 Guide for Safety in AC Substation Grounding Acknowledgements: References to equipment standards provide by Canadian Standards Association (CSA) Information contained in checklist provided by City of Vancouver Electrical Inspection Department Page 3 of 7 New Bulletin February 2009 B-36-000

ATTACHMENT #1 to NS Power Electrical Inspection Bulletin 36-000 Note 1: To be completed by the Professional Engineer of the Testing/Commissioning Agency GENERAL CHECKLIST FOR H.V. UNIT SUBSTATION Project Name: Plans Review Number: ITEM NO. DESCRIPTION REFERENCES Conformance to (Applicable CEC Rules, NS the referenced Power Electrical Inspection requirements Bulletins, NS Power Authority Directives) Yes No 36-304 1 (a) H.V. Station Ground Resistance Report (See Attachment 2) 2 H.V. Equipment approval 2-024 3 Clearance and spacing of live parts 36-108; 36-110; 36-212; Tables 30, 31,32,33,34 & 35 4 Operation of H.V. switches 36-212; 36-214 5 Interlocks 36-208; 36-214 6 Switch, fuse, and breaker ratings 36-202; 36-204; 14-402 7 8 Transformer overload and overheating protection (a) Relay and tripping device settings (b) Transformer core temperature device Installation integrity: (a) Insulation (b) Torqued as per installation spec. s (c) Stand-off supports and bushings 9 Interconnection between pieces of electrical equipment assembled on site is in conformance with the shop drawings and in accordance with the CE Code Part I 10 Tested H.V. Station (Unit Substation) is ready to be energized Additional Comments: 26-252 As per shop drawings Shop drawings of unit substation; CE Code, Part I NS Power Bulletin 36-000 Testing Agency: Name: Signature: Address: Telephone: Facsimile: Email: P.Eng. Affix Professional Seal Page 4 of 7 New Bulletin February 2009 B-36-000

ATTACHMENT #2 to NS Power Electrical Inspection Bulletin 36-000 Note 1: To be completed by the Professional Engineer of the Testing/Commissioning Agency or by the Professional Engineer responsible for the design of the H.V. installation. (P.Eng. of record) Note 2: Completed report to be provided as part of Attachment 1 (Item 1) GENERAL CHECKLIST FOR H.V. SERVICE Project Name: Plans Review Number: HIGH VOLTAGE STATION GROUND RESISTANCE REPORT Testing Agency: Item Requirements of Table 52 1 Type of Soil (specify): 2 Measured Resistance of the station Ground Electrode 3 Calculated Step Voltage at the HV station 4 Calculated Touch Voltage at the HV station Conformance with applicable requirements of Table 52 Yes No Company Name: (if other than the testing agency): Name: P.Eng. Signature: Date: Address: Telephone: Affix Professional Seal Facsimile: Email: Page 5 of 7 New Bulletin February 2009 B-36-000

ATTACHMENT #3 to NS Power Electrical Inspection Bulletin 36-000 Note 1: To be completed by the Professional Engineer responsible for the design of the H.V. installation (P.Eng. of record) GENERAL CHECKLIST FOR H.V. SERVICE Project Name: Plans Review Number: Item No. 1 DESCRIPTION Horizontal clearance of H.V. conductors from adjacent structures; guarding 2 Service raceways, including drainage and pull box facilities 3 Working space; entrance to and exit from 4 Space for service and distribution equipment REFERENCES (applicable CEC Rules, NS Power Inspection Bulletin and Supply Authority Directives, Dept. of Labour & Workforce Development Bulletins) 36-004; 36-110; Table 33 2-320; 6-300; 12-942; 36-100 2-308; 2-310; Table 56 6-206; 26-352; 36-200 5 Access to nameplates and parts requiring maintenance 2-118 6 Presence of other than electrical equipment 2-120 7 (a) Dielectric liquid-filled equipment, indoors 26-012; 26-242; 36-212 (b) Dielectric liquid-filled equipment, outdoors 26-014; 26-242; 36-212 8 Illumination of equipment 2-314; 26-356 9 Warning notices 36-006 Electrical equipment service room/vault 26-012 (a) Location 36-200 10 11 (b) Construction 3.6.2.1/3.6.2.7 (c) Door Swing 3.6.2.6 (d) Fire alarm system devices (Smoke detectors if not sprinklered) 3.6.2.7 (3)(b) (e) Adjacent Hazardous Areas 20-102(5) (f) If sprinklered, adequate protection for electrical 26-008; 26-248(5) equipment Ventilation (a) Proof that the system is adequate and suitable for the 3.6.2.7(6); 2-318; purpose Appendix B (b) Intake location 6.2.3.12 Conformance to the referenced requirements Yes No N/A Page 6 of 7 New Bulletin February 2009 B-36-000

Item No. DESCRIPTION REFERENCES (applicable CEC Rules, NS Power Inspection Bulletin and Supply Authority Directives, Dept. of Labour & Workforce Development Bulletins) Conformance to the referenced requirements Yes No N/A Grounding and bonding requirements CEC Section 10 (a) Station ground electrode 36-300; 36-302 (b) Connections to the station ground electrode 36-104(5); 36-308; Appendix B (i) Method of connection (as specified by the design professional) 36-300; 36-308; Appendix B (ii) Conductor sizes (as specified by the design CEC Table 51 professional) (c) If a ground bus (pad) for testing purposes is installed: (i) Accessibility 2-312 12 (ii) Conductors marked for testing purposes 36-308(7); 2-100 (d) If a gang-operated switch is installed: (i) Operating shaft grounded 36-310(1)(a) or (b) (ii) 1.2 m x 1.8 m gradient control mat (iii) positioned for vertical or horizontal operation (iv) connection of the mat by two separate conductors (size and method of connection as specified by the design engineer) (e) If a metallic fence is installed: 36-312 (i) located minimum 1 m inside perimeter of station ground electrode area (ii) connections to the fence L.V. breakers and fuses: Section 14 13 (a) Size/trip setting Accepted Plans and Specifications (b) Interrupting capacity 14-012; 14-014; 14 Ground Fault protection or indicator 14-102; 10-106(2) 15 L.V. metering sockets NS Power Metering Standards 16 Other (Please specify) Additional Comments: Company Name: Name: Signature: Address: Telephone: Facsimile: Email: P.Eng. Affix Professional Seal Page 7 of 7 New Bulletin February 2009 B-36-000