THE QUADRO 2017 MANUAL PART 1 ECONOMIC CONCEPTS IN QUADRO. Contents. Chapter. 1. The QUADRO Method. 2. Defining the Options for Appraisal

Similar documents
THE QUADRO 2017 MANUAL PART 0 THE APPLICATION OF THE QUADRO MANUAL. Contents. Chapter. 1. Detailed Contents of the QUADRO Manual. 2.

THE COBA 2017 USER MANUAL PART 8 INDEX AND ABBREVIATIONS. Contents. Chapter. 1. Index. 2. Abbreviations

Project Appraisal Guidelines for National Roads Unit CBA Audit Checklist

HIGHWAY STRUCTURES: APPROVAL PROCEDURES & GENERAL DESIGN DOCUMENTS PART 2 BA 28/92

TAG UNIT Values of Time and Vehicle Operating Costs. October Department for Transport. Transport Analysis Guidance (TAG)

The Greenhouse Gases Sub-Objective

THE COBA 2017 USER MANUAL PART 4 TRAFFIC INPUT TO COBA. Contents. Chapter. 1. Network Description. 2. Compatibility Between the Traffic Model and COBA

Cambourne to Cambridge Better Bus Journeys: Strategic Outline Business Case Economic Case City Deal Partners. 28 September 2016

UK Road Pricing Feasibility Study: Modelling the Impacts Elizabeth Cox 1 UK

TUBA: General Guidance and Advice

27th Australasian Transport Research Forum, Adelaide, 29 September 1 October 2004

Please complete this checklist by referencing locations where the relevant material can be found in the OBC document

For this reason, Phase 1 contains a brief review of the climate change context within which transport needs to work, addressing issues such as:

TOWN AND COUNTRY PLANNING ACT

Assessing the benefits The Joint Air Quality Unit (JAQU) have identified three key benefits to capture:

Use of Certain Departmental Standards in the Design and Assessment of Trunk Road Schemes

VALUES ADOPTED FOR SOME IMPORTANT VARIABLES

Transport User Benefit Calculation

HIGHWAYS AGENCY NETWORK MANAGEMENT MANUAL PART 10 PROGRAMME PLANNING & SCHEME DEVELOPMENT CONTENTS Scheme Development

EXHIBIT LIST No Exhibit Name Page 1 P5 Traffic Presentation.pdf (P5) 2-20

Performance Measures for Highway Structures

PAVEMENT MANAGEMENT SYSTEM

Project Appraisal Using PRISM Simon Hubbard 28 th September 2004

Improving economic evaluation of urban transport projects in Australia

Transport Model for Scotland. Kevin Lumsden MVA

Consultation on Integrated Transport Block Funding FINAL. March Consultation Response. pteg Support Unit

Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018

Business Rules. Incremental Proposal

Asset Delivery Working together to bring Highways England closer to our customers. Pic to be the same as used on PowerPoint presentations

ACCURACY OF TRAFFIC COUNT DATA USED FOR CALIBRATION AND VALIDATION OF HIGHWAY MODELS

Multimodal Sustainable Transport: which role for the internalisation of external costs?

13. Traffic and Transport

9. Asset Management. 9. Asset Management. 9.2 Asset Management and the Shared Priorities. 9.1 Introduction. Headline Targets

Conception Design Construction Operation.

NATIONAL TRANSPORT MODEL DEVELOPMENT RELATING TRANSPORT FORECASTS TO ECONOMIC PERFORMANCE

STREET LIGHTING POLICY Draft for approval

COST BENEFIT ANALYSIS OF WATER QUALITY IMPROVEMENT IN RIGA WATER DISTRIBUTION

Road maintenance planning using network flow modelling

OPTIMUM CAPACITY EXPANSION Prepared by: Ioanna Boulouta under the supervision of Professor Richard de Neufville

THE CONTINUING ROLE OF THE STRATHCLYDE TRANSPORTATION AND LAND-USE MODEL IN STRATEGIC PLANNING. Paul Emmerson and Dr Andrew Ash TRL

Surrey Pay for Support Staff in Schools

Gravity Model Formulation

BENEFIT-COST ANALYSIS FOR ANAHEIM TIGER APPLICATION

Economics of climate change adaptation and risks Final report

Consumer responses: how quick are they?

7.0 Benefit/Cost Analysis

DSM Benefit-Cost Tests The Next Generation

Commission for Travel Demand Submission from Transport for London March 2017

CHAPTER 1 INTRODUCTION

Why the ETS will not succeed

Operation and supply chain management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology Madras

ESD.71 / / 3.56 / Engineering Systems Analysis for Design

Seacourt P&R Extension- Economics Response. RMD, Minerva Chambers. October 2017

12.0 TRANSPORT AND ACCESS...

150Intr Transport and Strategic Regeneration Welsh Assembly Government New M4 Project Magor to Castleton WelTAG Appraisal Report Stage 1 DRAFT 3 WORKI

CHAPTER 8 TRAFFIC ASSIGNMENT

***I POSITION OF THE EUROPEAN PARLIAMENT

Executive Summary ma. White. Black. paving blo. ving blocks. 0 mm wide

Appraisal Summary Table (AST)

Nehemiah UCHA (N.UCHA) Value for Money (VfM) Strategy 2016

Project Appraisal Guidelines

Bristol City Council Clean Air Local Plan: Transport and Air Quality Compliance Timescales, Assumptions and Calculations

Traffic Operations Centres Contents. Traffic Operations Centres New Zealand Transport Agency

The Transportation dividend

E-TRAINING ON COMPILATION OF SUT

ECONOMIC ANALYSIS. A. General

Economic, Social and Environmental Impacts of Changing Road Maintenance Spend: ScotlandCase Study

METRO VANCOUVER MOBILITY PRICING INDEPENDENT COMMISSION FINAL TERMS OF REFERENCE. Revised - June 30, 2017

APPENDICES APPENDIX 1 LETTER FROM THE GREATER MANCHESTER LOCAL ENTERPRISE PARTNERSHIP

Optimal decision making in daily life

Network Rail s response to ORR s 2018 Periodic Review (PR18) consultation on charges recovering fixed network costs.

Broughton Bypass. Monitoring and Evaluation Plan Draft. August 2015

INTERIM ADVICE NOTE 103/08. Advice Regarding the Assessment of Sites for Ramp Metering

Mark Scheme (Results) Summer 2007

Procurement Guide Part 1

A Preliminary Assessment of the Economic Benefits of Project Aqua

Cultural Exchange Program between Egypt and Bulgaria Fayoum University

REPORT No. 24 An appraisal of The CLIMATE CHANGE Act Carbon Tax Inflation and Transport Logistics.

Highways England s Regional Traffic Models Challenges over the past year Saturn User Group 2 nd November Alison Cox

PLS 304 Introduction to Public Policy Analysis Mark T. Imperial, Ph.D. Topic: Cost-Benefit Analysis

ECONOMIC ANALYSIS. Table 1: Background Information of States in the National Capital Region GSDP Population below poverty line FY2000 a (%)

Hilary Holden, City Access Programme. City Access congestion reduction proposals: Consultation Responses and Next Steps

FORM OF APPOINTMENT AS CONSULTANT (CDM CO-ORDINATOR) (FOAC

Written Evidence. Strategic Road Network. Response from:

Propane. A game changer for a low-emission Canada now. Affordable and accessible now. Ontario Access to Natural Gas Act, 2018 (Bill 32)

Benefit Cost Analysis Narrative

BCEO TRAFFIC IMPACT STUDY GUIDELINES

Oxford to Cambridge Expressway Corridor Assessment Report Appendix C: Growth and Economic Assessment Report

Template Framework Freight Track Access Agreement and HS1 Freight Access Terms: Conclusions Document. Date: June

Chapter 11 ECONOMIC ANALYSIS

Life Cycle Cost Analysis Pavement Options May 2002 Materials Division / Virginia Transportation Research Council TABLE OF CONTENTS

IPSWICH NORTHERN ROUTES STUDY. Stage 1 Progress

THE APPLICATION OF SCOTTISH TRANSPORT APPRAISAL GUIDANCE TO THE ROAD TRAFFIC REDUCTION ACT. Paul Finch FaberMaunsell

Net Impacts of Travel Efficiency Benefits I-49 South Economic Impact Analysis Eric McClellan, CDM Smith

Road Safety Impact Assessment Guidelines

REPORT OF THE COMPTROLLER AND AUDITOR GENERAL ON THE ACCOUNTS OF HIGH SPEED TWO (HS2) LIMITED

Towards the Use of Emission Taxes in Canada

Retour au sommaire. Back to menu

Long-term Plan Transport Proposal. 29 October 2014

South Bristol Link Major Transport Scheme Bid

Transcription:

THE QUADRO 2017 MANUAL PART 1 ECONOMIC CONCEPTS IN QUADRO Contents Chapter 1. The QUADRO Method 2. Defining the Options for Appraisal 3. Discounting, the Price Basis and Treatment of Taxation 4. Single Year and 60 Year Appraisals July 2017

Part 1 Chapter 1 The QUADRO Method 1. THE QUADRO METHOD 1.1 QUADRO can be used to appraise an individual maintenance task that is being planned in the near future or it can be used to appraise maintenance strategies over the whole life of an existing or new road. These could involve not only different sequences and types of work on the carriageway, but also alternative methods for handling the traffic, appropriate to the requirements of the work. 1.2 It might be helpful at the outset to define a number of terms that are used throughout this manual: Maintenance job: a maintenance job is defined as a maintenance activity in a particular year, at a particular site, and with particular traffic management arrangements. The principal types of maintenance job for which QUADRO is relevant are; reconstruction, overlay, resurfacing, carriageway repairs, surface dressing and major patching. These tasks are described in Chapter 9 of the COBA User Manual (Ref 0.6) under the heading of Traffic Related Maintenance. A task which extends from one year to the next, or which involves different phases each with significantly different provision for traffic, or different levels of traffic, will need to be modelled as two or more jobs. Maintenance profile: this is the total major maintenance expenditure on a defined stretch of an existing or new road over the economic appraisal period, usually 60 years. It takes the form of a series of maintenance jobs over time. Only maintenance jobs as defined above should be included. Cyclic maintenance such as verge maintenance, sweeping and gully emptying, should be excluded, as should routine maintenance works which do not cause a significant traffic delay and which are generally low cost. Alternative maintenance profiles: alternative maintenance profiles for any given stretch of road are different profiles of maintenance expenditure that are all consistent with meeting the highway authorities maintenance obligations. For example, alternatives might be 10 yearly resurfacing of a road, compared with reconstruction every 20 years. Do-Minimum scheme: the Do-Minimum is the existing road(s) that exist without the new road scheme. Do-Minimum maintenance profile: this is the profile of major maintenance jobs that are expected on the existing road(s) if the new road is not built. Note that there may be alternative Do-Minimum maintenance profiles. If QUADRO is being used by maintenance engineers to optimise maintenance works for an existing road where there is no new road under appraisal, they will be interested in alternative Do-Minimum maintenance profiles only. Do-Something scheme: the Do-Something scheme is the new road proposal that is being evaluated. Note that there will often be more than one Do-Something option. Do-Something maintenance profile: this is the maintenance profile of major maintenance jobs that are expected on the new road and the existing road(s) in the network if the new road is built. Note that there may be alternative Do-Something maintenance profiles for each Do-Something option. 1.3 The basic building block in QUADRO is the individual maintenance job. QUADRO is essentially a program that costs, in total works and road user terms, individual jobs and then sums the series which forms the maintenance profile. The items of cost of an individual maintenance job are illustrated in Table 1/1. July 2017 The QUADRO Manual 1/1

Chapter 1 Part 1 The QUADRO Method TYPE OF COST FALLS ON Works cost Delay time cost Accident costs Vehicle operating costs Central or Local Government Road users Road users and Government Road users Table 1/1: Costs Arising from Road Maintenance 1.4 The QUADRO user supplies the data on the works cost of the maintenance job. The user also specifies the road network, including the diversion route and works site layout during maintenance works, and the traffic flows on the network without the maintenance works. When considering new schemes it is essential that these traffic flows are compatible with those used elsewhere in the economic assessment. The program calculates any diversion of the traffic flow during the works from the route being maintained to the diversion route, and then costs the total extra time, vehicle operating cost and accidents on both the main route and the diversion route during the works. This extra cost is calculated as the difference between the total user cost with and without the maintenance job. The costs associated with delays resulting from breakdowns and accidents in the work site are also estimated. QUADRO assumes a fixed trip matrix with and without the maintenance works. That is to say, it assumes that no journeys will be suppressed or redistributed during the maintenance period. 1.5 The program calculates delays and accidents in units such as vehicle-hours or numbers of accidents, and then converts these into monetary costs using the same values of time, vehicle operating costs and accident costs as used in COBA 11 User Manual. 1.6 The program adds the extra road user costs imposed by the maintenance job to the works cost, all defined in average 2010 prices, and then discounts them from the year of the maintenance job to a common base year (normally 2010). 1.7 This same procedure is applied to each maintenance job in a maintenance profile. Of course, the works cost will differ for each job, and so will the traffic flows (due to traffic growth), duration of works, site layout during maintenance, etc. Having calculated the total works and user cost for each of the jobs in the profile, the program then sums the profile to give a total discounted cost over the economic assessment period. Where there are alternative profiles, the program calculates the total discounted cost of each profile. The optimum profile for the Do-Minimum and each of the Do-Something options can then be identified and is that profile which has the minimum discounted total cost. 1.8 The size of the network evaluated with QUADRO can vary according to the user's needs. Each individual job is related to a particular stretch of road and, of course, a sequence of jobs over the economic assessment period can be analysed for that particular stretch. However a longer route can be assessed by specifying a number of jobs, one for each subsection of the route, and for each of these jobs a QUADRO network will be defined by the user. These subsections are independent however; QUADRO cannot model any interactions that might take place between a series of contemporary maintenance jobs on a long length of road. For new schemes the assessment should normally be restricted to that length of old road which is directly replaced by the new road (for example, distance between terminal junctions), together with the new road. 1/2 The QUADRO Manual July 2017

Part 1 Chapter 2 Defining the Options for Appraisal 2. DEFINING THE OPTIONS FOR APPRAISAL 2.1 The first stage in a QUADRO appraisal is to define the options that are to be appraised. This varies according to whether QUADRO is being used to evaluate individual maintenance jobs or maintenance profiles; and according to whether it is being used to evaluate maintenance work in its own right, or maintenance work as it affects the appraisal of new trunk road schemes. 2.2 The most simple level of use is the evaluation of individual jobs, for example, when one is assessing proposals for a maintenance contract in the near future. The alternative options may differ in terms of duration of contract, traffic arrangements (for example, length of site, hours of working), and so on, or may differ more radically in terms of comparing a full scale maintenance contract with a more modest proposal which would involve further maintenance works at a later date. The general rule when evaluating individual jobs is to start with the cheapest possible option consistent with minimum maintenance requirements, and then compare this with higher cost solutions. The highest cost solution may turn out to be preferable when all costs are taken into account, because it avoids a further round of maintenance works and delays at a later date. 2.3 It can be seen that in assessing an individual job, the maintenance engineer may well be drawn into considerations of a life-cycle nature. The next stage of complexity in the use of QUADRO is the explicit comparison of alternative maintenance profiles for an existing stretch of road. This will normally be carried out at an earlier stage in the maintenance planning for a trunk road, when the engineer is comparing the merits of, for example, frequent but low cost jobs with infrequent but high cost jobs. Once again the general rule is to start with the maintenance profile that meets minimum requirements at lowest works cost. 2.4 The discussion so far in this section has been directed at maintenance engineers who use QUADRO to evaluate maintenance jobs per se. The other main use of QUADRO is in scheme appraisals where traffic-related maintenance costs of the Do-Minimum and Do-Something options are compared. This can be for two reasons: because it has a bearing on the overall justification for the Do-Something, or because it may affect its standard. Before embarking on such an analysis, the user should consider carefully whether a detailed assessment of traffic-related maintenance costs is worthwhile. It might be fairly obvious that maintenance works and delays in the Do-Minimum and Do-Something are not likely to be significantly different, or that the standard proposed is robust for a wide variety of conditions. Where this is not the case, the user should consider the Do-Minimum and Do-Something options in turn. For each option, the user should specify the likely alternative profiles of major maintenance works. QUADRO can then be used to assess for each of the Do-Minimum and Do-Something options, which profile has the least cost in overall delay and works cost terms. These minimum overall cost profiles will normally be the preferred profiles, one for each of the Do-Minimum and Do-Something options. They are then input to the economic evaluation as part of the overall assessment of the new scheme. In some cases there may be only one feasible profile per Do-Minimum and Do-Something option for QUADRO to cost. 2.5 When the maintenance implications of the Do-Minimum and Do-Something networks are being considered, only those parts of the network which have changes in traffic flow which are sufficiently large to affect significantly the level or timing of traffic-related maintenance works or traffic delays at maintenance works need to be assessed. When traffic flow changes are smaller, there is unlikely to be any change in the traffic-related maintenance requirements or delays. Thus where QUADRO is used as part of the economic evaluation, the QUADRO analysis will usually be restricted to a small number of links in the total road network. July 2017 The QUADRO Manual 2/1

Chapter 2 Part 1 Defining the Options for Appraisal 2/2 The QUADRO Manual July 2017

Part 1 Chapter 3 Discounting, the Price Basis and Treatment of Taxation 3. DISCOUNTING, THE PRICE BASIS AND TREATMENT OF TAXATION 3.1 This section briefly reviews the principles of discounting, prices and the treatment of taxation used in QUADRO. 3.2 When evaluating maintenance works which occur at different periods of time it is necessary to take account of the fact that people generally put a higher value on having benefits today rather than next year, and similarly they prefer to defer costs where possible. This is expressed in formal terms in economic appraisal by the use of a technique called discounting. This process can be thought of as the opposite of compound interest. Consider a maintenance profile for a particular stretch of road. The maintenance engineer has estimated that three major maintenance jobs will be necessary, that is, resurfacing costing X in 10 years time, reconstruction costing Y in 20 years time and a further resurfacing costing Z in 40 years time, X, Y and Z being at current day prices. The sum of these in undiscounted terms is ( X + Y + Z). However, as society generally puts a lower value on later costs, the costs have to be discounted to form what is called the present value of the cost stream, as follows: X Present Value of Costs(PVC) (1 r) 10 Y (1 r) 20 Z (1 r) 40 where r is the discount rate, expressed as a fraction. 3.3 The Green Book (HM Treasury, 2003) gives the guidance for public sector bodies on how to appraise proposals before committing funds to a policy, programme or project. The book defines a discount rate of 3.5%, plus the change to a 3% discount rate 30 years after the current year. In order to carry out the discounting process, it is necessary to define the current year (2016 by default in QUADRO) and a base year to which costs are discounted. This latter year is known as the Present Value Year and is 2010 by default in QUADRO. 3.4 When comparing costs incurred at different points in time, it is also necessary to express costs in constant prices. In QUADRO all costs (both user and works) are expressed in average 2010 prices. The present value of a maintenance job or profile is thus said to be in average 2010 prices discounted to 2010. 3.5 However, if the user wants to express QUADRO results in up-to-date prices, the costs should be adjusted using the Treasury's GDP Deflator series from the WebTAG databook. The updating should be done manually in the following way. Suppose the submission is in 2013 and the latest GDP deflator for 2013: i) QUADRO PVC = 2.0m in average 2010 prices and discounted to 2010; 2.0m 105.55(2013 GDP deflator) ii) at 2013 prices, PVC = 2.11m, discounted to 2010 100 (2010 GDPdeflator) iii) at 2013 prices and discounted to 2013, PVC = 2.11 1.035 3 = 2.34m. 3.6 Where undiscounted works or delay costs are quoted in submissions, they should be updated similarly by multiplying the undiscounted costs at average 2010 prices in QUADRO by the ratio of the latest GDP deflator divided by the 2010 GDP deflator as at ii) in paragraph 3.5 above. July 2017 The QUADRO Manual 3/1

Chapter 3 Part 1 Discounting, the Price Basis and Treatment of Taxation Treatment of Taxation 3.7 In order to take account of the impacts of a project across different modes of travel, it is necessary to describe the impacts using a calculus of willingness-to-pay (WTP), as opposed to a calculus of social costs and benefits (SCB). In addition, the values placed on impacts can be reported in the perceived costs, factor costs and market prices unit of account, converted as appropriate from factor costs using the indirect tax correction factor. These methods and unit of accounts merely affect the presentation of results and not the fundamental principles of appraisal. In particular, the results using a WTP calculus show clearly how different groups are affected by the project, whilst previously resource costs and benefits were aggregated and consequently masked transfer payments. A fuller discussion of the conversion between the factor cost and market price units of account is given in TAG Unit A1.1 (Ref 0.7). 3.8 To ensure compatibility, an adjustment must be made for indirect taxes in the economy. These are transfers between members of society (for example, consumers to Government), rather than costs to society as a whole. QUADRO works in the factor cost unit of account (for time and VOC). However, it gives outputs (for time and VOC) in factor costs and also presents them in market prices. Further information can be found in the COBA 11 user manual) (Ref 0.6). 3/2 The QUADRO Manual July 2017

Part 1 Chapter 4 Single Year and 60 Year Appraisals 4. SINGLE YEAR AND 60 YEAR APPRAISALS 4.1 Where QUADRO is used to appraise maintenance profiles, the appropriate time span for the profile is normally 60 years, starting at the opening year of the new road scheme under appraisal. When maintenance profiles are being considered outside the context of a new road scheme, then the time span usually starts from the date of the first maintenance job. This time horizon is consistent with that used in other economic appraisal methods. 4.2 Historically QUADRO used the 'low' set of traffic and economic growth assumptions by default. 'High' growth was selected by using KEY 003. In the latest version of QUADRO, the low and high defaults are the same and are consistent with the central traffic growth in the DfT Road transport forecasts 2015 (Ref 5.6). KEY 003 is therefore no longer relevant. In addition, the economic parameters, namely the values of time, vehicle operating costs and accident costs are common to both growth assumptions and are based on those recommended in the TAG Unit A1.1. July 2017 The QUADRO Manual 4/1

Chapter 4 Part 1 Single Year and 60 Year Appraisals 4/2 The QUADRO Manual July 2017