WEST VIRGINIA DIVISION OF FORESTRY STATE FOREST STANDARDS for LOGGING ROADS AND SKID TRAILS HAUL ROADS

Similar documents
WEST VIRGINIA DIVISION OF FORESTRY STATE FOREST STANDARDS for LOGGING ROADS AND SKID TRAILS HAUL ROADS

BMP No. 1 Access Roads, Skid Trails, and Landings

No. 6 December, Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads

Mixed Conifer Working Group Meeting April 15, 2011 Water and Soil Resource Management Considerations

TEXAS FORESTRY BEST MANAGEMENT PRACTICES

ALABAMA S BEST MANAGEMENT PRACTICES. Protection of Water Quality During Timber Harvesting

Note: Deviations from these recommendations may be appropriate depending upon the nature of the road surface material and its tendency to erode.

Erosion and Sediment Control Plan for a Timber Harvesting Operation

Alabama s Best Management Practices

Training on Roads for Water and Resilience

TEXAS FORESTRY BEST MANAGEMENT PRACTICES

Best Practices for Building High-Performance Resource Roads. Road Drainage. Developed by: The Roads and Infrastructure Group

Virginia Department of Forestry Water Resources Program. Chesapeake Bay Forestry Workgroup Meeting April 8, 2014

PACIFIC REGION LOGGING PRACTICES

DEPARTMENT OF NATURAL RESOURCES STATE OF MICHIGAN TIMBER SALE PROSPECTUS #6188

Minnesota Logger Education Program s Minnesota Master Logger Certification Program

SOIL EROSION AND SEDIMENTATION

Managing Forests for Water Quality: Forest Roads Barbara Daniels, Darren McAvoy, Mike Kuhns, Ron Gropp

Erosion and Sediment Control (E&S) Plan Template for a Timber Harvesting Operation

3.0 Road and Driveway Standards

Are you, as a woodland owner, expected

Are you, as a woodland owner, expected

Exhibit D. Basic Road Maintenance Specifications. for the. Thunder Basin National Grassland

902 TEMPORARY EROSION AND SEDIMENT CONTROL SECTION 902 TEMPORARY EROSION AND SEDIMENT CONTROL

Section 3 Guidelines for Forest Roads

Water Resources Program.

Slash Water Bar Video

Details of the Proposed Action

Notice is hereby given that bids will be received by the Unit Manager, BARAGA MANAGEMENT UNIT, for certain timber on the following described lands:

Chapter 7 Transportation Operations

SECTION GENERAL EXCAVATION

Notice is hereby given that bids will be received by the Unit Manager, BARAGA MANAGEMENT UNIT, for certain timber on the following described lands:

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE

CHARLES SOIL CONSERVATION DISTRICT COMPLIANCE AGREEMENT FOR THE STANDARD EROSION AND SEDIMENT CONTROL PLAN FOR FOREST HARVEST OPERATIONS

(605) Key Principles of Gravel Road Maintenance:

MOTI -- Five Strand Barbed Wire & Paige Wire Fence Specifications

Home Manage Your Forest Protect Your Forest Help Your Community Kids, Teachers & Everyone Site Map. Arkansas Forestry Commission BMP Review

Cost of Retiring Skid Trails and Haul Roads

Operating and Reclamation Plan

Larimer County Land Use Code Section 5.8: Rural Land Use Process

W. Goodrich Jones State Forest. Best Management Practices Virtual Demonstration Tour

Notice is hereby given that bids will be received by the Unit Manager, BARAGA MANAGEMENT UNIT, for certain timber on the following described lands:

APPENDIX E. CONSTRUCTION SPECIFICATIONS FOR ACCESS ROADS (January 2005)

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

Section 208. SOIL EROSION AND SEDIMENTATION CONTROL

WISCONSIN MASTER LOGGER FIELD AUDIT FORM - CERTIFICATION (Three Sales) Updated: 8 February 2017

BMP REHAB AFTER THE PINNACLE MOUNTAIN FIRE

SECTION EMBANKMENT

Notice is hereby given that bids will be received by the Unit Manager, ESCANABA MANAGEMENT UNIT, for certain timber on the following described lands:

Best Management Practices

MINNESOTA MASTER LOGGER FIELD AUDIT FORM Revised October 19, 2010

ARKANSAS FORESTRY BEST MANAGEMENT PRACTICES FOR WATER QUALITY PROTECTION

Notice is hereby given that bids will be received by the Unit Manager, ESCANABA MANAGEMENT UNIT, for certain timber on the following described lands:

Uinta-Wasatch-Cache National Forest Service. 857 W South Jordan Parkway MEMO

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

Timber Sale Appraisal More Cow Bell Sale FG W

378 - POND NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE SPECIFICATION I. SCOPE

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

D EROSION AND SEDIMENT CONTROL. Table of Contents

Case Study 5. Willow Creek Concrete Plank Ford

Notice is hereby given that bids will be received by the Unit Manager, NEWBERRY MANAGEMENT UNIT, for certain timber on the following described lands:

Wildfire Recovery PROTECTING YOUR PROPERTY FROM SOIL EROSION

SECTION 603 SEEDING I. GENERAL 1.1 DESCRIPTION OF WORK

Notice is hereby given that bids will be received by the Unit Manager, BARAGA MANAGEMENT UNIT, for certain timber on the following described lands:

WV DIVISION OF FORESTRY. West Virginia Silvicultural Best Management Practices for Controlling Soil Erosion and Sedimentation from Logging Operations

WV DIVISION OF FORESTRY. West Virginia Silvicultural Best Management Practices for Controlling Soil Erosion and Sedimentation from Logging Operations

SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004

Diversion Dikes. Fe=0.95

Notice is hereby given that bids will be received by the Unit Manager, GLADWIN MANAGEMENT UNIT, for certain timber on the following described lands:

Packwood Hydroelectric Project. Summary of Engineering Needs for Roads Preliminary Results

PART 1 GENERAL REQUIREMENTS

Oregon Department of Forestry

Properly constructing and maintaining a road drainage system is the most effective ways to reduce flood damage

FOREST ROAD DESIGN TO MINIMIZE EROSION IN THE SOUTHERN APPALACHIANS. Lloyd W. Swift, Jr. PROCEEDINGS

METROPOLITAN UTILITIES DISTRICT No Page: 1 of 10

ROADS AND STREAM CROSSINGS

Case Study 1 Red Clover Rock Ford

STANDARD SPECIFICATIONS FOR CONSTRUCTING UTILITY FACILITIES DIVISION III - CONSTRUCTION SPECIFICATIONS SECTION 11

STANDARD SPECIFICATIONS FOR CONSTRUCTING UTILITY FACILITIES DIVISION III - CONSTRUCTION SPECIFICATIONS

UPPER REPUBLICAN NRD ROCK CREEK Drop Structure #1 DUNDY COUNTY, nebraska

North Carolina. Forestry Best Management Practices Manual. To Protect Water Quality

ANNE ARUNDEL SOIL CONSERVATION DISTRICT EROSION AND SEDIMENT CONTROL PLAN FOR FOREST HARVEST OPERATIONS CHECKLIST (Check attached items)

Figure Inlet protection (Source: Minnesota DOT)

SECTION 14 EMBANKMENT

SECTION EROSION AND SEDIMENTATION CONTROLS

Appendix E. Best Management Practices

Notice is hereby given that bids will be received by the Unit Manager, GWINN MANAGEMENT UNIT, for certain timber on the following described lands:

Appendix B - Best Management Practices (BMPs)

Chapter 3 Dispersion BMPs

Rock Sock (RS) Rock Sock height.

MACHINE AND LABOR TIMES REQUIRED TO IMPLEMENT KENTUCKY'S SKID TRAIL EROSION CONTROL AND REVEGETATION BMPS

Suggested Stormwater Management Practices For Individual House Lots

Typical Local Erosion Control Requirements (Storm Water Management Authority, Inc.)

Tips with Creation of your Erosion and Sediment Control Plan

Comparison of Southern State Best Management Practices Used to Protect Water Quality during Forestry Operations

PART III: EXHIBITS. TIMBER SALE OPERATIONS PLAN (See Page 2 for instructions)

ROAD AND STREAM CROSSING DESIGN

GRADING, EROSION AND SEDIMENTATION CONTROL

Transcription:

WEST VIRGINIA DIVISION OF FORESTRY STATE FOREST STANDARDS for LOGGING ROADS AND SKID TRAILS HAUL ROADS The objective of these specifications is to provide the construction requirements for haul roads and skid trails which would be constructed by private individuals or concerns on state forest land, under special use, permit or agreement. In most cases, these standards will exceed the silvicultural Best Management Practices outlined under the WV Logging Sediment Control Act of 1992. LOCATION: All locations shall be approved in advance by the Forester in Charge and construction shall be at the expense of the private individual or concern. GENERAL: Fit roads to topography, keeping grades as low as possible, especially where uphill hauling is involved. AVOID: (a) road paralleling a stream without a vegetated strip 100 to 150 feet wide between; (b) steep side hill slopes; (c) heavy cuts and fills; (d) long unbroken grades; (e) sharp curves and switchbacks on grades more than 5%; (f) locations where it may be possible for a stream to break over and flow down the roadbed. WIDTH: The width of the main haul road shall be a minimum of 12 feet and a maximum of 16 feet with turnouts provided at passing and loading points. Where turnouts are required, additional width will be cleared as designated by the Forester. TURNOUTS: Turnouts shall have a total width of 21 feet, for a distance not to exceed 60 feet in length. (See turnout plan attached.) GRADING: Roads may be insloped (Sketch A), crowned (Sketch B) or outsloped (Sketch C). Roads shall be constructed so as to slope outward throughout its entire length if at all possible. In instances such as through cuts, or on sharp curves where outsloping will be impractical and sometimes dangerous, ditches will have to be provided, and cross drainage installed to carry the ditch water across the road. GRADE: Grades shall be held as low as practicable and the maximum allowable shall not exceed 12%, without the approval of the Forester in Charge. E-1

Clearing WIDTH: Shall be approximately 13 feet from the centerline of roads (Sketch A). Width may be increased where needed. All timber shall be removed from haul and skid road right-of-way before final excavation begins. DISPOSAL: Buck and deck all merchantable timber. Lop and scatter tops, brush, and debris outside road clearing. Keep slash and debris from clearing out of fill area and stream bed. Grading BACKSLOPES: Construct cut slopes to 1:1 ratio or as steep as the soil formation or material will allow. Under cutting of slopes is prohibited. DRAINAGE: Install proper gauges aluminum culverts or equivalent where required to carry side streams. Install sufficient broad based gravel dips (Sketch D), or cross drain culverts to control road surface drainage. The following standards shall govern the frequency of broad based dips or cross drains. ROAD GRADE (PERCENT) MAXIMUM SPACING (FEET) 2 to 5 300 to 500 6 to 10 200 to 300 11 to 15 100 to 200 16 to 20 100- Cross drain culverts shall be placed at an angle of at least 30 to 45 degrees to the center line of the road on a grade that is at least 2% steeper than the road grade and they shall be deep enough to prevent overflowing. Installation of all culverts shall be in accordance with the manufacturer s specifications. DITCHES: Construct ditches where necessary, holding the maximum depth to one foot. Maintenance Keep drainage structures open and functioning. Keep road bed graded and crowned. Spread clean three inch (3"), gravel to a depth of 5" and a width of 12' for a distance of 100' on either side of stream crossings and for a distance of 30' in broad-based dips.. Gravel shall be spread on intercepting dips which become subject to washing. Remove slides and grade road surfaces as required to prevent water from running in the wheel tracks. Loose boulders and slide material shall be removed from roadway and side ditches. It may be required to stockpile a quantity of 3" gravel for road maintenance. E-2

Erosion Control Measures Immediately upon retirement or abandonment of a cutting block or any part thereof, provide for permanent drainage by removing fenders and sections of high outside shoulders. Surface of roads shall be graded to eliminate any wheel ruts. All haul roads, skid trails, and landings shall be treated during the seeding dates and with the lime, fertilizer, and seed mixtures recommended by the Forester in Charge. Fertilizer, seed mixture and mulch shall be applied to the haul road system using hydro-seeder equipment or other method approved by the Forester. Acres per mile for roadways and road banks are listed in the State Forest Log Road and Skid Trail Standards. Areas to be reclaimed and the required seeding materials will be determined after each logging unit is completed. SKID ROADS AND TRAILS The location of skid roads shall be selected by the Buyer, subject to approval by the Forester in charge of sale. Skid road intervals shall be approximately 300 feet. Any change in or addition to the agreed upon location must be approved by the Forester in Charge. AVOID: (a) excessive grades, more than 15%; (b) frequent creek or branch crossings; (c) emptying skid roads or trails directly into stream courses; (d) stream crossings without sufficient dips to prevent streams from following skid roads or trails. Removable metal culverts, satisfactory to the Forester in Charge, shall be installed to carry water from springs, seeps, or streams. Water turnouts shall be installed and maintained regularly at least as frequently as indicated in the standards for logging roads. Erosion Control Measures Immediately upon a seasonal shut-down or on abandonment of a branch or spur, or at the close of operations, provide for turning water out of skid roads or trails permanently by placing dozer constructed water bars (Sketch E) at approximately the intervals listed in the table below, and the removal of metal culverts and stream obstructions. E-3

GRADE (PERCENT) APPROXIMATE DISTANCE BETWEEN WATERBARS (FEET) Less than 10 100 10 80 15 60 20 45 25 40 30 35 Revised July 2001 10' wide road - 1.2 acres per mile 12' wide road - 1.5 acres per mile ACRES PER MILE Acres per mile for seeding cut and fill slopes Percent Side Slope 10' Wide Road 12' Wide Road 0-10.3.3 10-20.4.5 20-30.8.9 30-40 1.3 1.6 40-50 2.2 2.6 50-60 4.2 5.1 60-70 5.4 6.5 70-80 10.3 12.7 E-4

CLEARING FOR CUT AND FILL ROAD GRADING INSLOPE ROAD 1. Construct the road so that hauling will be on solid ground, not fill. 2. Inslope from fill to cut shall have a fall of not less than 1/4" and not more than 3/8" per foot. 3. Drainage water shall be carried across the road to fill slopes by intercepting dips or culverts, as required by Forester. Sketch A E-5

GRADING CROWNED HAUL ROAD TURNOUT FOR HAUL ROAD E-6

TYPICAL OUTSLOPE SECTION Outsloping is beveling the entire width of the road toward the fill bank to divert the water from the road surface. Outslope only enough to divert the water - generally about 1/4 inch and not more than 3/8 inch to the foot. If the slope is apparent to the eye, it is ordinarily too great. Sketch C E-7

BROAD-BASED DRAINAGE DIP Diagram showing how to properly construct a broad-based drainage dip. Approximately 20 tons of 3" gravel is required per dip. Sketch D E-8

Sketch E E-9