Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH

Similar documents
STORMWATER MANAGEMENT REPORT DRAFT PLAN OF CITY OF GUELPH

Stantec Consulting Ltd Hagey Boulevard, Waterloo ON N2L 0A4

Functional Servicing Report. Winston Park West Proposed Business Park Development Project. Infrastructure Ontario (IO) September MU1

Mofan Holdings Inc. 249 Bayview Drive

FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY 405 TWEEDSMUIR AVENUE

SITE GRADING (LOT GRADING) - CITY OF TORONTO In Compliance with Sentence B of the Ontario Building Code, every site is to be graded so that w

STANLEY FARM SUBDIVISION

TERMS OF REFERENCE PROJECT EDINBURGH ROAD FROM SPEEDVALE AVENUE TO LONDON ROAD

10 LOUISA STREET - THORNBURY

Design Specifications & Requirements Manual

Design Specifications & Requirements Manual

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan

Design Specifications & Requirements Manual

WESTMINISTER WOODS EAST PHASE 10 (CLAIR/VICTORIA), GUELPH FUNCTIONAL SERVICING REPORT

New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario

7.00 INTRODUCTION... 1

Section H - Site Plan Guidelines

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

DEVELOPMENT ENGINEERING MANUAL VERSION 1.0 NOVEMBER City of Guelph Engineering and Capital Infrastructure Services

TABLE OF CONTENTS 2 TITLE PAGE 1

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER

LITTLE CREEK WEST LANDS MUNICIPALITY OF CENTRAL ELGIN PRELIMINARY SERVICING REPORT

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

August 1, 2013 Reference No S048 Page 1 of 5

OHM Groups. FUNCTIONAL SERVICING REPORT 33 Arkell Road City of Guelph August 5, Prepared By:

STORMWATER DRAINAGE ASSESSMENT. 479 Line 1 Road, Niagara-on-the-Lake, Ontario

Functional Servicing Report. Sorensen Court Townhouses. 25 Sorensen Court, Niagara-on-the-Lake, Ontario

GRADING, EROSION AND SEDIMENTATION CONTROL

Chapter 3: Permit Procedures and Requirements

Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing

215 Sanders Street, Unit 1 (613) Prescott Street, Unit 1 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613)

Yorkton Rona Commercial and Industrial development. Concept Plan and Serviceability Report

210 Prescott Street, Unit 1 (613) P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) May 5,

STORM WATER REPORT. Proposed Row House Complex Clare and Hilson 566 Hilson Ave. & 148 Clare St. Ottawa, Ontario PREPARED FOR:

215 Sanders Street, Unit 1 (613) Prescott Street, Unit 1 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613)

B M CIVIL ENGINEERS CLIENT: Warramunda Aged Care

TOWN of LAKESHORE SUBDIVISION DEVELOPMENT PLAN CHECKLIST

APPENDIX I. Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer

Kollaard File # Page 1

STORM WATER MANAGEMENT REPORT

UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report

Marianneville Developments Ltd.

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT

Blackstone Community Phase 4-8 Functional Servicing Report

PROPOSED ONE-STOREY WAREHOUSE BUILDING SITE FOR SLAVKO INC. PART OF BLOCK 6 REGISTERED PLAN 4M-351 GREELY INDUSTRIAL PARK McKEOWN DRIVE

Longfields Subdivision, Block 7, City of Ottawa

ENGINEERING REVIEW CHECKLIST City of Mount Clemens

Appendix H. Storm Water Management

GEOTECHNICAL INVESTIGATION PROPOSED STONEBROOK RESIDENTIAL DEVELOPMENT 105 MARGARET ELIZABETH AVENUE MARKDALE, ONTARIO FOR ONTARIO INC.

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA

patersongroup Phase I - Environmental Site Assessment Vacant Land, Strandherd Drive at Kennevale Drive Ottawa, Ontario Prepared For Regional Group

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING

TOWNSHIP OF TINY LOT GRADING/DRAINAGE PLAN PROCEDURE

SITE ALTERATION PERMIT INFORMATION PACKAGE FOR LAND OWNERS

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies

Central Region GeoHazard Assessment H597:02, km Slide May 2011 Site Inspection and Instrumentation Monitoring Report

Ordinance No Lot Surface Drainage

CITY UTILITIES DESIGN STANDARDS MANUAL

PUBLIC NOTICE PROFESSIONAL ENGINEERING SERIVCES: DESIGN OF TURF FIELD

B M CIVIL ENGINEERS 19/10/2016. CLIENT: Summit Group. JOB DESCRIPTION: Provide limited site investigation & site classification for the allotment.

JOHNSTON ROAD LAND USE STUDY

APPENDIX F: DRAINAGE AND STORMWATER MANAGEMENT

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004

1. INTRODUCTION 1.1 Contents of Engineering Specifications The Engineering Specifications contains the following sections:

i) The northerly remainder identified as All of Parts 1, 4 & 5 and Part of Parts 2, 3 & 6, Plan 53R be zoned as OSC, Open Space Conservation;

4.8. Subsurface Infiltration

SITE SERVICING PRELIMINARY DESIGN BRIEF

Orleans Gardens Starbucks Drive Through Servicing and Stormwater Management Design Brief

New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario

A Stormwater Management Plan and Sediment Control Plan are required for all proposed developments within the City of Richmond.

GENERAL PLAN OF SERVICING

SCHAEFFERS FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT LAKESHORE ROAD WEST TOWN OF OAKVILLE

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

Construction Inspection Checklists

February 12, 2013 Calibre File No.: J

APPENDIX A. 2. That the road allowances included in this draft plan shall be shown and dedicated as public highways.

4.8. Subsurface Infiltration

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.

LOT GRADING GUIDELINES FOR LOW DENSITY RESIDENTIAL PROPERTIES

The Homeowner s Building Application Checklist for Constructing a Residential Addition

OAK MARSH PHASE II FEASIBILITY REPORT CITY OF MANKATO MINNEOSTA. January 20, 2015 Project No

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

Appendix D. Erosion Management Sub- Plan

CITY OF SASKATOON DESIGN AND DEVELOPMENT STANDARDS MANUAL SECTION FOUR WATER DISTRIBUTION SYSTEM

CHAPTER 3. Grading Standards

Julia Bahen, Urban Strategies Inc.

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements

November 9, Tredyffrin Township Stephen Burgo, PE Township Engineer 1100 Duportail Road Berwyn, PA

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA

Appendix F: Geotechnical Investigation

Appendix E: Geotechnical Investigation

Flood-Resilient Community Design: Disaster Mitigation, Best Practices for Building New Residential Subdivisions

City of Toronto s Climate Change Adaptation Strategy to Address Urban Flooding

Transcription:

JULY 2013

DOCUMENT CONTROL Client: Project Name: Report Title: IBI Reference: 25528 Cityview Drive Version: JULY 2013 Digital Master: Originator: Reviewer: Authorization: [File Location] Scott MacDonald, P.Eng. Odete Gomes Scott MacDonald, P.Eng. Circulation List: History: JULY 2013 Page 1.

I B I G R O U P F U N C T I O N A L S E R V I C I N G R E P O R T TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1 Site Location and Description... 1 1.2 Proposed Development... 1 2. FUNCTIONAL SERVICING DESIGN... 2 2.1 Background Information... 3 2.2 Preliminary Grading... 4 2.3 Proposed Sanitary Sewer Servicing... 4 2.4 Proposed Watermain Servicing... 5 2.5 Proposed Storm Sewer Servicing and Stormwater Management... 5 3. CONCLUSIONS... 6 DRAWINGS (INCLUDED IN BACK) Draft Plan Preliminary Grading Plan Preliminary Sanitary Servicing Plan Preliminary Watermain Servicing Plan Preliminary Storm Servicing Plans JULY 2013 Page i.

1. INTRODUCTION IBI Group was retained by to prepare this Functional Servicing Report in support of two planning applications an application to amend the City of Guelph Zoning By- Law, and an application for approval of a Draft Plan of Subdivision. These applications are intended to facilitate a municipally serviced subdivision containing 250 325 residential units in the form of single detached, semi-detached, street townhouse, cluster townhouse and stacked townhouses. 1.1 Site Location and Description These applications involve two separate properties that have a total area of 15.21 hectares under the ownership of 55 Cityview Drive and 75 Cityview Drive. 55 Cityview Drive, 14.977 ha in size, is legally described as Part of Lots 25, 31, and 32, Registered Plan 53 and Part of Lot 4, Concession 3, Division C City of Guelph, Former Township of Guelph; and 75 Cityview Drive, 0.233 ha in size, is legally described as Part of Lots 25, 31, and 32, Registered. Plan 53, and Part of Lot 4, Concession 3, Division C, City of Guelph, Former Township of Guelph. The subject lands are located on the east side of Cityview Drive, north of the Railway and across from Cedarvale Avenue within the City of Guelph. The Tivoli (UP0601) subdivision is located to the north, the proposed Cityview & Watson subdivision to the south, and the Valleyhaven subdivision and existing residential development is located to the east. 55 Cityview is currently vacant and it is our understanding that it has been for a considerable amount of time. There are no buildings or structures existing on the property. The lands were formerly used for agricultural purposes but have been left fallow for some time. A Provincially Significant Wetland is located in the southeast area of the property. 75 Cityview is currently a residential property with an existing single detached dwelling. The property is covered with scattered trees and weed growth. Approximately 10% of the site is topographically lower and heavily treed. The existing site grades are relatively level in the western half, with gentle slopes, and then steep slopes drop quickly to a treed area at the eastern limit of the site. 1.2 Proposed Development The proposed development is a mixed residential subdivision. The Draft Plan of Subdivision has been designed to ensure existing natural features are protected from development to the greatest extent possible and to provide a greater housing mix in the Eastview Community in an effort to meet required density targets. As such, the Draft Plan of Subdivision is reflective of the cumulative planning, engineering, and environmental work completed for this property, as well as adjoining existing and proposed subdivisions. JULY 2013

As well as the residential lots and blocks, the subdivision contains park blocks, an open space block, future development blocks, and roads. Table 1 provides a summary of the land uses and number of residential units and a copy of the Draft Plan is included in the back of this report. Table 1: Land Use Summary Lots/Blocks Proposed Land Use Area (ha) Units 1-25, 40-47, 62-71, 86-145 Single Detached Dwellings 4.197 103 26-39, 48-61 Semi-Detached Dwellings 0.683 28 72-85 Street Townhouse Dwellings 0.320 14 146-148 Multiple Dwellings Cluster 2.506 105-180 149-150 Townhouse and Stacked Townhouse (maybe apartment) Parkland 0.325 N/A 151-152 Open Space 4.234 N/A 153-157 Future Residential 0.348 11 Development Road and Reserves 2.597 N/A Total 15.210 ha 250 325 2. FUNCTIONAL SERVICING DESIGN A functional servicing design is required in support of the planning applications. The objective of this FSR is to determine a functional servicing design for the proposed subdivision. The recommended servicing outlined in this report will provide the basis for detailed engineering design. This section provides the analysis and the accompanying preliminary drawings present a functional design to show how municipal services can be provided for the proposed subdivision. The proposed development is defined as being in Phase I and Phase IIa of the Eastview Secondary Plan within the City of Guelph Official Plan. The Eastview Secondary Plan outlines phasing policies in which to stage development with respect to servicing. The following engineering review is based on the sequence outlined within the phasing of development guidelines within the Eastview Secondary Plan. The following methodology was used: Obtained and reviewed relevant background information that was available; Consulted with City of Guelph engineering staff; Consulted with other engineering consultants working on adjacent developments; Prepared a functional servicing design for the subdivision; and Made conclusions and recommendations for detailed design. JULY 2013 Page 2

2.1 Background Information Available background information was reviewed and the relevant information was used in preparing the functional servicing design for the proposed subdivision. The following is a summary of the information that was reviewed: Geotechnical Investigation, Proposed Residential Subdivision, Cityview Drive Chung & Vander Doelen Engineering Ltd. was retained to undertake a geotechnical investigation of 55 Cityview Drive in July 2006, in support of the previously proposed subdivision. Ten (10) boreholes were drilled and sampled in mid-july. Through the investigation, the following was determined with respect to the existing conditions of the site: The site is covered by a relatively thin topsoil veneer which is underlain by a silt till deposit, with silt to sandy silt found at the lower eastern limit of the site; Surficial topsoil has a measured thickness varying between 300mm and 900mm at borehole locations, however the thickness of the topsoil layer could vary drastically across the site from those reported at borehole locations; Topsoil was underlain by a major deposit of glacial sandy silt till which extended to the maximum depths of borehole exploration, with some boreholes exhibiting silt till underlain by grey, saturated silt or sandy silt; The sandy silt till contains a trace of embedded gravel and a trace of clay; Within the sandy silt till, natural moisture contents were measured at a range of 5% to 18%, indicative of typically damp to moist condition; and Boreholes located in the higher areas of the site remained dry and open throughout the sampling operation, and groundwater was observed at depths between 2.1m and 4.5m below existing grades in boreholes located at the edge of the heavily treed eastern limit of the site. With respect to site grading, the report recommended that site grading should be undertaken during the drier summer months as sandy silt soils will be difficult to handle when they are wet, and fill materials should be suitably compacted in order to support future roadways, buildings and houses. With respect to underground services, it was anticipated that the trench excavation will intersect native and/or re-compacted sandy silt till throughout the site, and wet soils and groundwater conditions would be encountered in the lower eastern part of the site unless grades are raised. As a result of the field work the following was recommended with respect to installing underground services: Trenching can be carried out using conventional open cut procedures; Minor groundwater seepage should be adequately controlled during excavation and backfilling although no major problems due to groundwater were expected within the excavations; Generally, no bearing problems are anticipated for flexible and rigid pipes; It is expected that some loss of moisture will take place during the process of excavation and backfilling, facilitating backfilling and compaction with overly wet materials being mixed with drier materials excavated from the upper portion of the trenches to achieve a more compactable soil mixture; and JULY 2013 Page 3

Backfilling operations should follow closely after excavation so only a minimum length of trench slope is exposed at any one time to minimize potential problems. With respect to building foundations, the investigation concluded that the sandy silt till is competent to support building foundations which can be founded on these soils or well-compacted engineered fill. Footing subgrade inspections were recommended to verify the bearing capacity of the soil prior to placement of the forms and concrete for the building foundations. The full report has been submitted in support of the proposed plan of subdivision. Slope Stability Assessment for Proposed Subdivision, Cityview Drive Chung & Vander Doelen Engineering Ltd. was retained to review the condition of the site specifically related to the relatively steep slope comprising the east half of the property in 2007. Based on the Assessment and the anticipation that the site grades would be moderated by the use of cut and fill, careful planning in carrying out the site grading was advised as the native sand silt till soil is susceptible to erosion caused by surface runoff during rainfall events. It was recommended that the on-site sandy silt till cut from the higher part of the site could be used to construct engineered fill over the existing slope compacted to at least 95% along the future roadway and 98% under future houses, with all reconstructed slope surfaces topsoiled and seeded/sodded to prevent surface erosion. 2.2 Preliminary Grading The existing topography of the site is fairly steep with a drainage divide splitting the site into an east and west drainage area. Flatter grades are located in the southwest portion of the site, with steep grades located in the southeast portion of the site sloping down into the wetland area. In order to provide adequate grades for the roads and lots/blocks in the subdivision, significant cut and fill will be required after the stripping of topsoil. The roadways will need to be cut or filled to design subgrade elevations. Lots will be cut or filled to a sufficient subgrade level, with engineered fill placed where required to support building foundations. It is recommended that an area grading operation be completed prior to servicing construction. Also it is recommended that a sufficient amount of the stripped topsoil be stockpiled on site for landscaping purposes on the residential lots/blocks, in the park, and on the roadway boulevards. The Geotechnical Investigation completed by Chung & Vander Doelen Engineering Ltd. has a section on site grading which should be reviewed prior to final grading design and any grading operations. A preliminary grading plan for the proposed subdivision is included in the back of the report. Preliminary road grades vary from 0.5% to 5.0%, which are suitable for this type of development. The preliminary grading has been designed to match in with the adjacent roads and lots. It is recommended that a cut and fill analysis be completed as part of the detailed grading design with the goal of achieving a cut and fill balance for the site. 2.3 Proposed Sanitary Sewer Servicing The proposed site is contained within the City of Guelph sanitary servicing boundary. Sanitary sewers exist on Starwood Drive, Keating Street and Silurian Drive. The eastern portion of the subdivision will drain to the east, outletting in the existing 450mm sanitary sewer on Starwood Drive. Refer to the preliminary sanitary servicing plan included in the back of this report. The western portion of the site will be serviced by the extension of a sanitary sewer from the existing 200 millimetre sanitary stub located adjacent to the CPR. The sanitary sewer will be extended northerly on Cityview Drive to the intersection of Cityview Drive and Street A. Discussions JULY 2013 Page 4

have taken place with the engineering consultant for the lands adjacent to the CPR and the lands to the south of the Debrob subdivision. From those discussions it is our understanding that the sanitary sewer will be extended along Cityview Drive in order to service the lands south of the Debrob subdivision, so the sanitary sewer will have to be extended the additional distance to Street A. It is assumed that as the existing 200 millimetre sanitary sewer stub at the CPR was intended to service the subject lands that this outlet has sufficient capacity. Gravity sewers will be extended along the proposed subdivision s internal roads. The proposed sanitary will be sized to accommodate flows from the development using the City of Guelph urban design standards (200 millimetre diameter sewers is the minimum). As the proposed sanitary sewer on Cityview Drive will service multiple properties, cost sharing of the external sanitary works should be explored, and cost sharing agreements implemented. 2.4 Proposed Watermain Servicing The proposed site is contained within the City of Guelph water servicing boundary. Watermains exist in the existing roadways surrounding the subject lands except Cityview Drive and the future Stockford Road. Connections will be made to these existing watermains. Where there are no existing watermains to connect into, stubs will be left for future connections to eliminate dead ends in the system. Refer to the preliminary watermain servicing plan included in the back of this report. The proposed size of the internal watermains is 150 and 200 millimetre diameter and the watermain system will be designed as per the City of Guelph design standards. 2.5 Proposed Storm Sewer Servicing and Stormwater Management A Preliminary Stormwater Management Report has been prepared by IBI Group for the proposed Draft Plan of Subdivision and thus the details regarding necessary Stormwater Management for the proposed development will not be repeated here. The Preliminary Stormwater Management Report has been submitted under its own cover. In general terms, stormwater up to the minor storm (i.e., 5 year local storm event) will be conveyed via an underground storm system designed to City of Guelph design standards. Major storm events will be conveyed overland within road right-of-ways and easements where necessary. Refer to the preliminary storm servicing plans included in the back of the report. While the eastern portions of the site will outlet to the existing storm sewer at Starwood Drive, the western portion of the site will outlet to a proposed storm sewer to be extended from the CPR stormwater management pond located west of Cityview Drive. As the proposed storm sewer on Cityview Drive will service multiple properties, cost sharing of the external storm sewer works should be explored, and cost sharing agreements implemented. The Preliminary Stormwater Management Report was completed to establish the preliminary design for stormwater management, and to satisfy the criteria of the agencies. The proposed development is subject to the criteria set out by the City of Guelph, the Grand River Conservation Authority, and the Ontario Ministry of the Environment Stormwater Management Planning and Design Manual (MOE 2003). Existing stormwater management facilities have been constructed to the southeast and southwest of the proposed development. These facilities have been sized to provide both quantity and quality control of the stormwater runoff generated by the proposed development. The conclusions from the Preliminary Stormwater Management Report are as follows: JULY 2013 Page 5

It has been confirmed that both water quantity and quality control will be provided in existing off-site SWM facilities for both the east and west draining portions of the proposed development; Runoff from the east-draining portion of the development will be routed to the existing storm sewer system on Starwood Drive; Runoff from the west-draining portion of the development will be routed to an upgraded storm drainage system on Cityview Drive, and then to the Valleyhaven Subdivision SWM pond through an easement (or block) adjacent to the Railway lands; Water balance calculations for existing and proposed conditions have been prepared for the wetland area; Runoff from roof areas and the back of lots adjacent to the wetland, and treated road runoff will continue to provide surface water flow toward the wetland on the property; Based on preliminary information provided by the GRCA, the Clythe Creek floodline does not encroach onto the subject lands; and Preliminary erosion and sediment control features have been identified and will be finalized at the detailed design stage. Based on these conclusions, it was recommended that the Preliminary Stormwater Management Plan be accepted by all review agencies in support of the Draft Plan of Subdivision with appropriate conditions. 3. CONCLUSIONS This Functional Servicing Report has outlined a servicing strategy that provides adequate municipal services for the subdivision as well as protecting the environmental features on the site. The following can be concluded: An existing sanitary sewer located on Starwood Drive will provide a sanitary sewer connection for the eastern portion of the subdivision, and for the western portion of the subdivision a sanitary sewer has to be extended up Cityview Drive to the subdivision; Existing watermains are located adjacent to the proposed subdivision that will provide the domestic water and fire fighting requirements for the subdivision; and Existing stormwater management facilities to the southeast and southwest of the proposed subdivision have been sized to provide both quantity and quality control for the stormwater runoff generated by the proposed subdivision, and internal and external storm systems will be constructed to convey the stormwater to these existing facilities. JULY 2013 Page 6

Based on these conclusions, it is recommended that this Functional Servicing Report be accepted by all review agencies in support of the Draft Plan of Subdivision with appropriate conditions. Furthermore this report, and the preliminary drawings included in it, should be used as the basis for detailed design once the Draft Plan is approved. Respectfully Submitted, Scott M. MacDonald, P.Eng. JULY 2013 Page 7

N 15 0 10 20 40 1:1000 (m) LEGEND: WATERMAIN VALVE HYDRANT N KEY MAP - N.T.S. UNIT 17 - DEARBORN BUSINESS PARK 105 LEXINGTON ROAD WATERLOO, ONTARIO N2J 4R7 (519) 585-2255 www.ibigroup.com TITLE: JANET DEVELOPMENTS INC. CITYVIEW DRIVE PRELIMINARY WATERMAIN SERVICING DATE: SCALE: FILE NO. 2013 05 01 1:1000 25528 DESIGNED BY: DRAWN BY: CHECKED BY: DRAWING NO. FIGURE 9

N 15 0 10 20 40 1:1000 (m) LEGEND: SANITARY MANHOLE FLOW DIRECTION N KEY MAP - N.T.S. UNIT 17 - DEARBORN BUSINESS PARK 105 LEXINGTON ROAD WATERLOO, ONTARIO N2J 4R7 (519) 585-2255 www.ibigroup.com TITLE: JANET DEVELOPMENTS INC. CITYVIEW DRIVE PRELIMINARY SANITARY SERVICING DATE: SCALE: FILE NO. 2013 05 01 1:1000 25528 DESIGNED BY: DRAWN BY: CHECKED BY: DRAWING NO. FIGURE 9

N 15 0 10 20 40 1:1000 (m) LEGEND: STORM MANHOLE FLOW DIRECTION N KEY MAP - N.T.S. UNIT 17 - DEARBORN BUSINESS PARK 105 LEXINGTON ROAD WATERLOO, ONTARIO N2J 4R7 (519) 585-2255 www.ibigroup.com TITLE: JANET DEVELOPMENTS INC. CITYVIEW DRIVE PRELIMINARY STORM SERVICING DATE: SCALE: FILE NO. 2013 05 01 1:1000 25528 DESIGNED BY: DRAWN BY: CHECKED BY: DRAWING NO. FIGURE 9

N 15 0 10 20 40 1:1000 (m) LEGEND: PROPOSED GRADES EXISTING GRADES PROPOSED SLOPE PROPOSED 3:1 SLOPE N KEY MAP - N.T.S. UNIT 17 - DEARBORN BUSINESS PARK 105 LEXINGTON ROAD WATERLOO, ONTARIO N2J 4R7 (519) 585-2255 www.ibigroup.com TITLE: JANET DEVELOPMENTS INC. CITYVIEW DRIVE PRELIMINARY GRADING PLAN DATE: SCALE: FILE NO. 2013 05 01 1:1000 25528 DESIGNED BY: DRAWN BY: CHECKED BY: DRAWING NO. FIGURE 9