INSTRUCTIONS FOR PREPARING YOUR QUALITY PLAN SUBMITTAL

Similar documents
Janitorial Essentials QA/QC Plan Sample

Janitorial Essentials QA/QC Plan Sample

Flooring Contractor QA/QC Plan Sample Selected pages (not a complete plan)

FTA-DOT QA/QC Plan Sample Selected pages (not a complete plan)

Essentials QA/QC Plan Sample

Communications Contractor QA/QC Plan Sample

Fire Protection Contractor QA/QC Plan Sample

Earthworks QA/QC Plan Sample

Selected pages (not a complete plan)

DOT-FHWA QA/QC Plan Sample Selected pages (not a complete plan)

Oil and Gas Contractor QA/QC Plan Sample Selected pages (not a complete plan)

ISO 9001: 2008 Engineering Design Construction Quality Management System Sample - Selected pages (not a complete plan)

Janitorial QA/QC Manual Sample

Essentials QA/QC Plan Sample for Ericsson Qualifications

Master Specifications for Microcotta November 2017

Excavation QA/QC Manual Sample

SECTION Vitrified Clay Wall Coping 2014

Landscape Services QA/QC Manual Sample Selected pages (not a complete plan)

USACE NAVFAC Design Sample QA/QC Plan

Selected pages (not a complete plan)

Welding ASME Quality Manual Sample - No Field Installation Selected pages (not a complete plan)

California Architectural Pavers for Mortar-Set Concrete Tiling Installations

Asphalt Paving Essentials QA/QC Plan Sample

SECTION TILT-UP PRECAST CONCRETE. A. Work includes, but is not limited to, the following:

SECTION CONCRETE. B. ACI 318 Building Code Requirements for Structural Concrete and Commentary

for Mortar-Set Concrete Tiling Installations

REINFORCED CONCRETE MASONRY SECTION

SECTION MASONRY GROUTING

MASONRY MORTARING

SECTION MANUFACTURED MASONRY VENEER

SECTION PRECAST CONCRETE COVER SYSTEM


SECTION BRICK FLOORING

Narrow Modular Pavers (NMP) for Mortar-Set Concrete Tiling Installations

MANUFACTURER S SPECIFICATION

Conditions of the Contract and Division 1 General Requirements are a part of this section.

SPECIAL INSPECTION AGREEMENT

Narrow Modular Pavers (NMP) for Sand-Set Installations

Essentials Pipe Fabrication Quality Plan Sample Selected pages not a complete plan

USACE NAVFAC Sample QA/QC Plan 20 selected pages (out of )

SPECIAL INSPECTION AND TESTING AGREEMENT

2012 VIRGINIA TECH SCHEDULE OF SPECIAL INSPECTIONS

SECTION CONTRACTOR QUALITY CONTROL

Facilities Planning and Construction (FP&C)

***************************************************************************************************************

Special Inspector Examinations (continued)

SUPPLY AND INSTALLATION OF TURBINES AND GENERATORS CONTRACT SCHEDULE 8 QUALITY MANAGEMENT TABLE OF CONTENTS

SECTION MORTAR

SECTION BRICK MASONRY ASSEMBLIES

BUILDING ENCLOSURE COMMISSIONING PLAN PROJECT NAME

Quality Manual. Specification No.: Q Revision 07 Page 1 of 14

There is an inspection report prepared after the Digester cleaning was carried out.

SECTION MISCELLANEOUS METAL FABRICATIONS

PROGRAM COMMENT FOR DEPARTMENT OF DEFENSE REHABILITATION TREATMENT MEASURES

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410

Stonecraft Industies 8300 County Road Holmesville, OH

1.2 RELATED SECTIONS 1.4 DEFINITIONS

Patrick Malloy Communities Quality Assurance System

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION ALUMINUM WINDOWS

Utility Construction Contractor QA/QC Plan Sample Selected pages (not a complete plan)

Reinforced California Architectural Roof Pavers, Pedestal Supported

CTP STITCH-TIE AGAIN! Quick and easy way to re-anchor existing veneers to back-up structures.

FRP Classic TM Cast Stone Fiberglass Fabrications Architectural Specification

WOOD FLOORING WOOD FLOORING

1. Decks, balconies, and sun porches 2. Walkways, ramps, and stairways 3. Patios and courtyards

SECTION CERAMIC and QUARRY TILE

INTEGRALLY COLORED CONCRETE [DECORATIVE CONCRETE PAVING]

Aluminum Component Pipe Railings

MANUFACTURER S SPECIFICATIONS Section ST. ASTIER LIME PLASTER (NHL) MASONRY [BLOCKS] [BRICKS] [STONE]

SECTION LOW-VOLTAGE TRANSFORMERS

SECTION US Patent 8,857,130 B1 CAST-IN-PLACE CONCRETE WITH ARDEX CONCRETE MANAGEMENT SYSTEMS (ACMS ) EARLY MC APPLICATION

SPECIFICATION GUIDELINE

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

Paragraph Description Page No General Materials Concrete Masonry Work Altitude Valve Vault Cover 25-4

P-196 MARINE CORPS RESERVE VEHICLE MAINTENANCE FACILITY NWS CHARLESTON, SC SECTION DESIGN AND CONSTRUCTION QUALITY CONTROL 11/07

MANUFACTURER S SPECIFICATIONS Section LIMESTONE PLASTER

SECTION TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:

ROOF BALLAST MATERIALS ARCHITECTURAL CONCRETE PAVING SLABS SRS LEVELING BLOCK SYSTEM INSTALLATION PART GENERAL 1.

STRUCTURAL STEEL FRAMING

HAMPTON ROADS AREA STATEMENT OF SPECIAL INSPECTIONS

MANUFACTURER'S SPECIFICATIONS Section ST. ASTIER LIME PLASTER (NHL) PLASTER ON CONCRETE

UNIFIED FACILITIES GUIDE SPECIFICATIONS

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA.

COPING and STOOLS - EXTERIOR CUBIC STONE COPING AND WALLS DATA SHEET 1.0 INTRODUCTION 2.0 DESIGN CRITERIA EXTERIOR CUBIC STONE COPING AND WALLS

Contract Specs Version 1 Project XXX. SECTION xxxx STRENGTHENING OF MASONRY WITH FRCM (FABRIC REINFORCED CEMENTITIOUS MATRIX) PART 1 - GENERAL

SPECIAL INSPECTION AND OBSERVATION PROGRAM City of Walnut Creek Building Division. Project Address:

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

STATEMENT OF SPECIAL INSPECTION FORM

UNIFIED FACILITIES GUIDE SPECIFICATIONS

TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:

SECTION EMBEDDED CMU/SPLIT FACE ARCHITECTURAL PRECAST/SITECAST CONCRETE. A. Site Cast or Tilt-Up CMU/Split Face Concrete Panels.

SECTION QUALITY CONTROL

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION FACILITY LIGHTNING PROTECTION

SECTION INTERIOR STONE INTERIOR STONE

Florock Seamless Flooring Systems

North / Garage Door Side of Building: Complete grind, top to bottom and re-mortar.

SECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course.

Effective Mortar Specifications. Jamie Farny PCA Market Manager Buildings June 24, 2015

Transcription:

INSTRUCTIONS FOR PREPARING YOUR QUALITY PLAN SUBMITTAL SAVE A COPY OF YOUR TEMPLATE Save a copy of your template under a different name. Keep one master copy for future use and save project specific copies separately. COMPLETE FORMS IN THE PROJECT-SPECIFIC SECTION Complete the applicable forms in the Project-Specific Quality Plan section by inserting project-specific information on the form. You can complete the form on the computer or print it out and write in the information by hand during the final preparations. Forms may include (but are not limited to) the following: Complete the Point of Contact list Complete the Communications Plan (or remove if not necessary) List major subcontractors and suppliers on Source of Supply form List tasks on the Quality Controlled Task form List inspections and tests on the Inspection and Tests Plan form Copy contract special quality requirements into the Special Requirements form. SEE ATTACHED EXAMPLES FOR ADDITIONAL HELP When additional forms are necessary, copy the form from the Standard Operating Procedures section at the back of your master template and paste it into the appropriate section of the project-specific Quality Assurance/Quality Control Plan. Tip: You can always insert extra rows into forms by placing the curser where you want to insert a row, right click the mouse, and select insert. To check boxes: If you d like to electronically check boxes on the forms, Place your cursor next to the box you want to check, and then double click. A dialogue box will appear like the one shown to the left. Under Default value click Checked, then click OK. An X should now appear in the box on your form. You always have the option of completing forms by hand during final preparations (see below). INSERT RESUMES Insert resumes in the Names and Qualifications Section. You can use the resume form or replace it with your own information.

ADD PROJECT SPECIFIC INFORMATION REPLACE PLACEHOLDER TEXT Your document contains placeholder text so that you can change the project-specific information for different contracts. For Bid/Pre-Qualifications, you can leave the placeholder text as it is since you do not know who will be working on the project. Tip: to search and replace placeholder text, start with your cursor at the beginning of the document and then, do a find and replace for all/each of the bracketed [] placeholder text, e.g., [ProjectLocation]. As a final check search for the bracket symbol [ to make sure that you have not missed any placeholder replacements. UPDATE PAGE NUMBERS AND CROSS REFERENCES Keep the Word document in one file to preserve automatic updating of cross-references. Use control-a keys to select the whole document, and then Press F9 to update page numbers and table of contents (update entire table) Note: you may need to do this more than once if it does not work the first time. FINAL PREPARATIONS Add electronic signatures or print out the document and sign where required. Signature sheet signed by President and Managers President and Managers sign appointment forms Also complete any forms that you chose to fill out by hand. The final step is to scan the document into a PDF format document file. Submit your files in PDF format only. QUESTIONS? CALL US AT 410-451-8006

First Time Quality, LLC. Project Quality Communications Plan Project ID Project Name Preparer Date Distribution of project organization chart and assigned responsibility and authority of the Project Manager, Quality Manager, and Superintendent: All personnel listed on contact list. Points of contact list distribution: All personnel listed on contact list. Project startup meeting participants, date, location: Completed Bi-Weekly project communication meeting participants, and nominal day of week, time, and location: TBD Daily quality report distribution, frequency, and due date: Friday of every week for the previous 7 days. Monthly project quality status report distribution and due date: Third day of every month Distribution of quality inspection and test records, and due date: Friday of every week for the previous 7 days. Nonconformance report distribution and customer approval authority: Immediately Location of project quality records storage and point of contact for records access:

In the job office trailer. Superintendent is point of contact. Nominal frequency of project quality audits and the job position that will conduct the audits: Nominally every week by Quality Manager. Warehousing of customer supplied materials/equipment location, security, damage prevention.

First Time Quality, LLC Training Plan Project ID Project Name Preparer Date Training Title/ID Training Description When Required (date, milestone or event) Planned Participants (Job Position/Organization) Sandstone Restoration Before related work begins First Time Quality Project Terra-Cotta Restoration Before related work begins First Time Quality Project Cast Stone Restoration Before related work begins First Time Quality Project Exterior Sealants Before related work begins First Time Quality Project Grouting of Brick Before related work begins First Time Quality Project Tuckpointing Brick Before related work begins First Time Quality Project Notes

First Time Quality, LLC Project Regulatory Building Codes Project ID Project Name Preparer Date Regulation Reference Code or Regulation Notes Applicable building codes Local addenda to building codes Applicable Fire Code Energy Code Applicable Fuel and Gas Code Applicable Mechanical Code Applicable Plumbing Code Other applicable codes or regulations IBC 2006 (WI Commercial Building Code, Chapter 62) None apply 2006 NFPA-1 (WI Commercial Building Code, Chapter 30) IECC 2006 (WI Commercial Building Code, Chapter 63)

First Time Quality, LLC Controlled Materials Form Contract ID Contract Name Preparer Date Contract Section/ Activity ID 04 01 00 04 02 00 Sandstone Material Grout Material Portland Cement Grout Material Hydrated Lime Grout Material Aggregate Mortar Material - Hydrated Lime Mortar Material - Sand Mortar Material Portland Cement Mortar Material - Pigments Stone Anchors and Dowels Stone Patching Compound Intended Use (if description is necessary) Lot Traceability Requirements Method for identification of Approved Inspection Status Material Receiving Report Cementitious Crack Filler 04 21 00 Terra-Cotta Units Mortar Material - Hydrated Lime Material Receiving Report

Work Task : Project: Id# First Time Quality, LLC Work Task Inspection Form Sandstone Installation Project Name: Subcontractor Company ID/Name: Location/Area: Reference drawing version #: Crew ID/Name Compliance Verification Compliance with initial job-ready requirements Compliance with material inspection and tests Compliance with work in process first article inspection requirements Compliance with work in process inspection requirements Compliance with work task completion inspection requirements Compliance with inspection and test plan Production Notes: Reported Nonconformances: Project Superintendent Sign and date*: Work task verified complete to specifications (sign and date) Project Superintendent score subcontractor/crew performance and feedback notes Quality Manager Sign and date*: Work task verified complete to specifications (sign and date) Quality Manager score quality performance and feedback notes Heightened Awareness Checkpoints Shop drawings, product data, and samples have been submitted and approved. All materials are as designed, specified, and approved. Site conditions are in compliance with requirements for installation. Substrate examined and acceptable. Anchoring devices and reinforcing dowels properly installed. Patterns are per approved samples. Defective or damaged stone masonry has been removed or replaced. Joints are full, tight, and solid; raked back for sealing/pointing as required. Verification of Work Task Completion (sign and date) Quality: 5 4 3 2 1 Safety: 5 4 3 2 1 Delivery: 5 4 3 2 1 Quality: 5 4 3 2 1 * On behalf of the contractor, I certify that this report is complete and correct and equipment and material used and work performed during this reporting period is in compliance with the contract drawings and specifications to the best of my knowledge except as noted in this report.

First Time Quality, LLC Quality Controlled Work Task List Project ID Project Name Preparer Date Project Work Tasks / Contract Section Building1 Halls Holton, Merrill, Pearse Quality Controlled work task Method for identification of Approved Inspection Status 04 02 00 1240 Install Sandstone N. Elev Bldg 1 CV-04 02 00 Sandstone Restoration A) PRE- 04 02 00 1250 Tuckpointing & Cleaning N. Elev. Bldg 1 CV-04 02 00 Sandstone Restoration B) First Time Quality Sandstone Installation Task Completion Checklist CV-04 02 00 Sandstone Restoration C) FINISHING AND CLEANING CHECKS First Time Quality Tuckpointing and Cleaning Task Completion Checklist 04 02 00 1220 Apply Caulking N. Elev. Bldg 1 First Time Quality Exterior Caulking Completion Checklist 04 21 10 1190 Install Terra Cotta N. Elev. Bldg 1 CV-04 21 10 Architectural Terra Cotta A) PRE- 04 21 10 1400 Tuckpointing & Cleaning E. Elev. Bldg 1 CV-04 21 10 Architectural Terra Cotta B) First Time Quality Terra Cotta Installation Task Completion Checklist CV-04 21 10 Architectural Terra Cotta C) FINISHING AND CLEANING CHECKS First Time Quality Tuckpointing and Cleaning Completion Checklist 07 90 05 1370 Apply Caulking E. Elev. Bldg 1 First Time Quality Exterior Caulking Completion Checklist 04 21 10 1520 Install Terra Cotta E. Elev. Bldg 1 CV-04 21 10 Architectural Terra Cotta A) PRE- CV-04 21 10 Architectural Terra Cotta B) First Time Quality Terra Cotta Installation Task Completion Checklist 04 72 00 1300 Install Precast Bldg 1 CV-04 72 00 Cast Stone Masonry A) PRE-

Division 26 Electrical Quality Inspection and Test Plan Contract Number Contract Activity/ Specification Reference # Description Direct current highpotential test for conductors Visual and mechanical inspections and electrical tests Ground rod resistance to ground Project Name Reference Standard Number IEEE 400.2 NETA ATS IEEE 81 Reference Standard Title Guide for Field Testing of Shielded Power Cable Systems Using Very Low Frequency (VLF) Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems Remarks Upon successful completion of the dielectric absorption tests In accordance with the manufacturer's recommendations Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Ground System Trigger Event/ Frequency Responsible Person/ Organization(s) Test Report Date

A. ADDITIONAL QUALITY CONTROL REQUIREMENTS Below is a list of project quality control requirements that have not been included elsewhere in this Project Quality Assurance/Quality Control Plan, if any. Additional Quality Control Requirements as Required by Contract Specifications or Quality Assurance: (with reference to the section amended) At the Pre-Construction Meeting, the Contractor shall provide DSF a full description of the Contractor's quality control and inspection system and method of implementation. Prior to the start of significant on-site work by any trade DSF s Project Representative, the related prime Contractor s Superintendent and the Subcontractor s foreman shall conduct a pre-installation conference. The purpose of the meeting is to review and discuss Contract requirements applicable to the Subcontractor s work, samples required, level of quality necessary, and find answers to any questions that may arise. Such meeting is in addition to regularly scheduled progress meetings and will be arranged on-site by DSF s Project Representative. The Contractor shall maintain complete inspection records and test data to ensure that quality of the Work is in strict compliance with the terms of the Contract Documents. These records shall be available to DSF's Project Representative at all reasonable times and places. The doctrine of "substantial conformity" to the quality Construction Verification: A quality control verification process performed by the installer as building assemblies, components, equipment and systems are being installed which documents that the materials, installation procedures, interfaces with other trades, start-up, testing and operation are correct, complete, in compliance with contract documents and manufacturer s recommendations and are ready for functional performance testing. MEETINGS Each contractor is required to attend meetings related to commissioning (pre-construction, construction progress, etc.) and have personnel requested by CxP in attendance to facilitate quality control and coordinate commissioning efforts. Provide copies of all quality assurance testing reports. QUALITY ASSURANCE The Contractor shall retain the services of an independent materials testing consulting A/E to conduct sampling, testing and analysis as required by this section and elsewhere in the Contract Documents. The materials testing consulting A/E shall meet the requirements of ASTM E329, and shall be subject to approval by the DSF Construction Representative. Collection of concrete test specimens shall be complete in accordance with ASTM C172 and ASTM C31M. When collecting cylinders for compressive strength testing, collect and cure one (1) set of cylinders, consisting of three (3) cylinders and one (1) extra cylinder, for each required test. Extra cylinders may be used in the event that one of the primary cylinders is damaged.