INSTRUCTIONS FOR PREPARING YOUR QUALITY PLAN SUBMITTAL SAVE A COPY OF YOUR TEMPLATE Save a copy of your template under a different name. Keep one master copy for future use and save project specific copies separately. COMPLETE FORMS IN THE PROJECT-SPECIFIC SECTION Complete the applicable forms in the Project-Specific Quality Plan section by inserting project-specific information on the form. You can complete the form on the computer or print it out and write in the information by hand during the final preparations. Forms may include (but are not limited to) the following: Complete the Point of Contact list Complete the Communications Plan (or remove if not necessary) List major subcontractors and suppliers on Source of Supply form List tasks on the Quality Controlled Task form List inspections and tests on the Inspection and Tests Plan form Copy contract special quality requirements into the Special Requirements form. SEE ATTACHED EXAMPLES FOR ADDITIONAL HELP When additional forms are necessary, copy the form from the Standard Operating Procedures section at the back of your master template and paste it into the appropriate section of the project-specific Quality Assurance/Quality Control Plan. Tip: You can always insert extra rows into forms by placing the curser where you want to insert a row, right click the mouse, and select insert. To check boxes: If you d like to electronically check boxes on the forms, Place your cursor next to the box you want to check, and then double click. A dialogue box will appear like the one shown to the left. Under Default value click Checked, then click OK. An X should now appear in the box on your form. You always have the option of completing forms by hand during final preparations (see below). INSERT RESUMES Insert resumes in the Names and Qualifications Section. You can use the resume form or replace it with your own information.
ADD PROJECT SPECIFIC INFORMATION REPLACE PLACEHOLDER TEXT Your document contains placeholder text so that you can change the project-specific information for different contracts. For Bid/Pre-Qualifications, you can leave the placeholder text as it is since you do not know who will be working on the project. Tip: to search and replace placeholder text, start with your cursor at the beginning of the document and then, do a find and replace for all/each of the bracketed [] placeholder text, e.g., [ProjectLocation]. As a final check search for the bracket symbol [ to make sure that you have not missed any placeholder replacements. UPDATE PAGE NUMBERS AND CROSS REFERENCES Keep the Word document in one file to preserve automatic updating of cross-references. Use control-a keys to select the whole document, and then Press F9 to update page numbers and table of contents (update entire table) Note: you may need to do this more than once if it does not work the first time. FINAL PREPARATIONS Add electronic signatures or print out the document and sign where required. Signature sheet signed by President and Managers President and Managers sign appointment forms Also complete any forms that you chose to fill out by hand. The final step is to scan the document into a PDF format document file. Submit your files in PDF format only. QUESTIONS? CALL US AT 410-451-8006
First Time Quality, LLC. Project Quality Communications Plan Project ID Project Name Preparer Date Distribution of project organization chart and assigned responsibility and authority of the Project Manager, Quality Manager, and Superintendent: All personnel listed on contact list. Points of contact list distribution: All personnel listed on contact list. Project startup meeting participants, date, location: Completed Bi-Weekly project communication meeting participants, and nominal day of week, time, and location: TBD Daily quality report distribution, frequency, and due date: Friday of every week for the previous 7 days. Monthly project quality status report distribution and due date: Third day of every month Distribution of quality inspection and test records, and due date: Friday of every week for the previous 7 days. Nonconformance report distribution and customer approval authority: Immediately Location of project quality records storage and point of contact for records access:
In the job office trailer. Superintendent is point of contact. Nominal frequency of project quality audits and the job position that will conduct the audits: Nominally every week by Quality Manager. Warehousing of customer supplied materials/equipment location, security, damage prevention.
First Time Quality, LLC Training Plan Project ID Project Name Preparer Date Training Title/ID Training Description When Required (date, milestone or event) Planned Participants (Job Position/Organization) Sandstone Restoration Before related work begins First Time Quality Project Terra-Cotta Restoration Before related work begins First Time Quality Project Cast Stone Restoration Before related work begins First Time Quality Project Exterior Sealants Before related work begins First Time Quality Project Grouting of Brick Before related work begins First Time Quality Project Tuckpointing Brick Before related work begins First Time Quality Project Notes
First Time Quality, LLC Project Regulatory Building Codes Project ID Project Name Preparer Date Regulation Reference Code or Regulation Notes Applicable building codes Local addenda to building codes Applicable Fire Code Energy Code Applicable Fuel and Gas Code Applicable Mechanical Code Applicable Plumbing Code Other applicable codes or regulations IBC 2006 (WI Commercial Building Code, Chapter 62) None apply 2006 NFPA-1 (WI Commercial Building Code, Chapter 30) IECC 2006 (WI Commercial Building Code, Chapter 63)
First Time Quality, LLC Controlled Materials Form Contract ID Contract Name Preparer Date Contract Section/ Activity ID 04 01 00 04 02 00 Sandstone Material Grout Material Portland Cement Grout Material Hydrated Lime Grout Material Aggregate Mortar Material - Hydrated Lime Mortar Material - Sand Mortar Material Portland Cement Mortar Material - Pigments Stone Anchors and Dowels Stone Patching Compound Intended Use (if description is necessary) Lot Traceability Requirements Method for identification of Approved Inspection Status Material Receiving Report Cementitious Crack Filler 04 21 00 Terra-Cotta Units Mortar Material - Hydrated Lime Material Receiving Report
Work Task : Project: Id# First Time Quality, LLC Work Task Inspection Form Sandstone Installation Project Name: Subcontractor Company ID/Name: Location/Area: Reference drawing version #: Crew ID/Name Compliance Verification Compliance with initial job-ready requirements Compliance with material inspection and tests Compliance with work in process first article inspection requirements Compliance with work in process inspection requirements Compliance with work task completion inspection requirements Compliance with inspection and test plan Production Notes: Reported Nonconformances: Project Superintendent Sign and date*: Work task verified complete to specifications (sign and date) Project Superintendent score subcontractor/crew performance and feedback notes Quality Manager Sign and date*: Work task verified complete to specifications (sign and date) Quality Manager score quality performance and feedback notes Heightened Awareness Checkpoints Shop drawings, product data, and samples have been submitted and approved. All materials are as designed, specified, and approved. Site conditions are in compliance with requirements for installation. Substrate examined and acceptable. Anchoring devices and reinforcing dowels properly installed. Patterns are per approved samples. Defective or damaged stone masonry has been removed or replaced. Joints are full, tight, and solid; raked back for sealing/pointing as required. Verification of Work Task Completion (sign and date) Quality: 5 4 3 2 1 Safety: 5 4 3 2 1 Delivery: 5 4 3 2 1 Quality: 5 4 3 2 1 * On behalf of the contractor, I certify that this report is complete and correct and equipment and material used and work performed during this reporting period is in compliance with the contract drawings and specifications to the best of my knowledge except as noted in this report.
First Time Quality, LLC Quality Controlled Work Task List Project ID Project Name Preparer Date Project Work Tasks / Contract Section Building1 Halls Holton, Merrill, Pearse Quality Controlled work task Method for identification of Approved Inspection Status 04 02 00 1240 Install Sandstone N. Elev Bldg 1 CV-04 02 00 Sandstone Restoration A) PRE- 04 02 00 1250 Tuckpointing & Cleaning N. Elev. Bldg 1 CV-04 02 00 Sandstone Restoration B) First Time Quality Sandstone Installation Task Completion Checklist CV-04 02 00 Sandstone Restoration C) FINISHING AND CLEANING CHECKS First Time Quality Tuckpointing and Cleaning Task Completion Checklist 04 02 00 1220 Apply Caulking N. Elev. Bldg 1 First Time Quality Exterior Caulking Completion Checklist 04 21 10 1190 Install Terra Cotta N. Elev. Bldg 1 CV-04 21 10 Architectural Terra Cotta A) PRE- 04 21 10 1400 Tuckpointing & Cleaning E. Elev. Bldg 1 CV-04 21 10 Architectural Terra Cotta B) First Time Quality Terra Cotta Installation Task Completion Checklist CV-04 21 10 Architectural Terra Cotta C) FINISHING AND CLEANING CHECKS First Time Quality Tuckpointing and Cleaning Completion Checklist 07 90 05 1370 Apply Caulking E. Elev. Bldg 1 First Time Quality Exterior Caulking Completion Checklist 04 21 10 1520 Install Terra Cotta E. Elev. Bldg 1 CV-04 21 10 Architectural Terra Cotta A) PRE- CV-04 21 10 Architectural Terra Cotta B) First Time Quality Terra Cotta Installation Task Completion Checklist 04 72 00 1300 Install Precast Bldg 1 CV-04 72 00 Cast Stone Masonry A) PRE-
Division 26 Electrical Quality Inspection and Test Plan Contract Number Contract Activity/ Specification Reference # Description Direct current highpotential test for conductors Visual and mechanical inspections and electrical tests Ground rod resistance to ground Project Name Reference Standard Number IEEE 400.2 NETA ATS IEEE 81 Reference Standard Title Guide for Field Testing of Shielded Power Cable Systems Using Very Low Frequency (VLF) Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems Remarks Upon successful completion of the dielectric absorption tests In accordance with the manufacturer's recommendations Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Ground System Trigger Event/ Frequency Responsible Person/ Organization(s) Test Report Date
A. ADDITIONAL QUALITY CONTROL REQUIREMENTS Below is a list of project quality control requirements that have not been included elsewhere in this Project Quality Assurance/Quality Control Plan, if any. Additional Quality Control Requirements as Required by Contract Specifications or Quality Assurance: (with reference to the section amended) At the Pre-Construction Meeting, the Contractor shall provide DSF a full description of the Contractor's quality control and inspection system and method of implementation. Prior to the start of significant on-site work by any trade DSF s Project Representative, the related prime Contractor s Superintendent and the Subcontractor s foreman shall conduct a pre-installation conference. The purpose of the meeting is to review and discuss Contract requirements applicable to the Subcontractor s work, samples required, level of quality necessary, and find answers to any questions that may arise. Such meeting is in addition to regularly scheduled progress meetings and will be arranged on-site by DSF s Project Representative. The Contractor shall maintain complete inspection records and test data to ensure that quality of the Work is in strict compliance with the terms of the Contract Documents. These records shall be available to DSF's Project Representative at all reasonable times and places. The doctrine of "substantial conformity" to the quality Construction Verification: A quality control verification process performed by the installer as building assemblies, components, equipment and systems are being installed which documents that the materials, installation procedures, interfaces with other trades, start-up, testing and operation are correct, complete, in compliance with contract documents and manufacturer s recommendations and are ready for functional performance testing. MEETINGS Each contractor is required to attend meetings related to commissioning (pre-construction, construction progress, etc.) and have personnel requested by CxP in attendance to facilitate quality control and coordinate commissioning efforts. Provide copies of all quality assurance testing reports. QUALITY ASSURANCE The Contractor shall retain the services of an independent materials testing consulting A/E to conduct sampling, testing and analysis as required by this section and elsewhere in the Contract Documents. The materials testing consulting A/E shall meet the requirements of ASTM E329, and shall be subject to approval by the DSF Construction Representative. Collection of concrete test specimens shall be complete in accordance with ASTM C172 and ASTM C31M. When collecting cylinders for compressive strength testing, collect and cure one (1) set of cylinders, consisting of three (3) cylinders and one (1) extra cylinder, for each required test. Extra cylinders may be used in the event that one of the primary cylinders is damaged.