Mining Technology and Sustainable Development. Water and the Environment

Similar documents
Filter-Pressed Dry Stacking: Design Considerations Based on Practical Experience

The future of water in the mining industry Jerry Rowe

Dewatered Tailings Management ARD Aspects. Todd Martin, P.Eng., P.Geo. AMEC Vancouver

Feasibility of an eco friendly disposal method for Iron ore tailings

AN OVERVIEW OF TAILINGS MANAGEMENT SYSTEM SELECTION

Converting slurry tailings facilities to filtered dry stacks a case history. John Lupo Newmont Mining Corporation Marcelo Mussé - Consultant

The implications of ore hardness variability on comminution circuit energy efficiency (and some other thoughts)

Adding Value. Delivering Results. WAIMM New Techniques & Innovations for Tailings Dam Construction and Operational Efficiency

Resource Efficient Mining Processes of Tomorrow

APPENDIX A.4A: Tailings Management Facility Construction Material Alternatives

Dry Stacking Operation at Pogo Mine, Alaska June 12, Sumitomo Metal Mining Pogo LLC

Comparative Evaluation of Thickened versus Slurry Tailings Surface Disposal D. Johnson Golder Associates Ltd., Canada R. Moghaddam Golder Associates

LABORATORY EVALUATION OF CO-MIXED TAILINGS WASTE ROCK AND SLAG FOR THE CONSTRUCTION OF BARRIER COVER SYSTEMS AT COPPER CLIFF

OUTOTEC INDUSTRIAL WATER TREATMENT

Towards Minimum Impact Concentrators. PhD (Chem) Eija Saari Basf Innovation Day, Sept 13-14, 2018 Ludwigshafen

The TMAC Resources Inc. Hope Bay Project An Innovative Approach. Gerhard Bezuidenhout

Dry Stacking Filtration of Bauxite Residue with Filter Presses

Minerals to Market. September 26 th 2011

IPS Inclined plate settlers. Maximum process recovery, minimum plant footprint

It pays to talk to a specialist

ENGINEERING SERVICES

Paste Thickeners. Advanced Thickening Technology

Surface Disposal of Past Tailings at the Bulyanhulu Gold Mine, Tanzania

Sustainable Mining through Continuous Operational Cost Control and Decrease of It Over the Mine Life Saso Kitanoski Director Sales and Service CEE

Economical dewatering of tailings for mine backfill with high performance disc filters

GEOTECHNICAL CHARACTERIZATION OF MINE WASTE MATERIALS (ZINC/LEAD MINE) FROM RAJPURA DARIBA MINE, UDAIPUR ABSTRACT

Integrated Mine Waste Storage Concept, Krumovgrad Gold Project, Bulgaria

Project Corridor A New Union for mining the future. May 17th 2016, Santiago, Chile

Oil sands tailings dewatering can it be done?

Innovative Solutions for Tailings Management. BASF Mining Solutions

White Dam Gold Project Dump Leach

Revision Tailings Management Plan Minto Mine, YT

Tailings filtration: risk reduction through understanding and designing for variability

Abstract. 1 Introduction. Golder Associates Ltd, Canada

Mining Solutions. RHEOMAX ETD Coal Case study

Development of a new mine on a brownfield site and drainage chemistry: Doyon Mine & Westwood Mine

NEW APPROACH ON FLOTATION TAILINGS DEWATERING

The Increased Recovery Project at the Phu Kham Copper-Gold Operation, Laos PDR. Authors: A Hoyle, D Bennett, and P Walker

Kumtor Gold Company 2018

BAP or BAT? A review of some dramatic changes in tailings management in the recent past and potential changes in the future

Karara Iron Ore TSF design considerations for a unique large scale dry stack facility

Selection of Tailings Paste Thickener. 17 February Norris September / Rebecca Kirkwood

IDM Mining Updates Pre-Development Engineering and Optimization at Red Mountain Gold Project

Alternatives to Coal Mine Tailings Impoundment - Evaluation of Three Dewatering Methods at Rockspring Coal Mine

EXPERTISE. What We Do

The economics of seawater use in the Chilean mining industry. Doug Aitken, SMI-ICE Chile

FLSmidth Colossal filter demonstration plant

Review of ML/ARD Geochemistry & Water Quality Predictions

Australia s leading magnetite producer

Minto Mine. Mill Operations Plan

Practise of large scale hematite ore beneficiation

EURARE Kvanefjeld Refinery Demo Plant Work Package 5

PILOT PLANT TESTWORK CONFIRMS HIGH GRADE PRODUCT FOR JAMBREIRO IRON ORE PROJECT

Compact Gasification System Development Status

Phosphate Plant Yield Comparisons

FUTURESMART MINING. Tony O Neill Group Technical Director

Field Testing of Co-Disposal Techniques for Acid Generating Tailings and Waste Rock at Cerro de Maimón Mine

KOCH Transporttechnik. Bernie H. Loyer, VP Minerals Technology, FFE Minerals

2018 TAILINGS AND MINE WASTE CONFERENCE ALTERNATIVE APPROACHES TO MANAGEMENT FACILITIES AND CLOSURE OF TAILINGS STORAGE

BOKELA HiBar Filtration

Communition Abstract. Fine grind attritional mills; can they or should they go coarser. D Capstick and B Currie

Enabling Innovation Innovating to zero Roadmap to the Future

It pays to talk to a specialist

NICO Tailings and Mine Rock Co-disposal Facility (CDF) Design Concept

FOR MINERAL AND MINING SLURRIES WITH HIGH SOLIDS CONCENTRATION

Mining Solutions. Innovative Solutions for Solid Liquid Separation

Dewatering to higher densities an industry review

High pressure grinding rolls applications for the platinum industry

Nalco technologies for mining industry

Fortuna provides update on the Lindero gold Project in Argentina

Welcome to a world class operation

Kanowna Belle Pre-Oxidation Project

Large scale backfill technology and equipment

Wednesday, December 28, 16

ACID ROCK DRAINAGE (ARD)

2015 Managing Our Most Precious Resource - Water

20 June Pat Turner, President FLSmidth Krebs. Pumps and Cyclones. Capital Market Day 2017

INTEGRATED SGS SERVICES FOR EXPLORATION AND RESOURCE DEVELOPMENT

Dirk J.A. van Zyl, Ph.D., P.Eng. P.E. Tailings and Mine Rock Management

Outotec OreMet Optimizer

Mobile processing plant to reinvigorate small

Olympias: Highlights Q Phase 1 Retreatment. Acquired from European Goldfields in February. EIA approved. Phase 1 Retreatment began

Closed Water Loop Dewatering. System Possible Coagulant Feed Points

COPPER PRECIPITATION AND CYANIDE RECOVERY PILOT TESTING FOR THE NEWMONT YANACOCHA PROJECT

Proven solutions in ore processing

Up-grades and Optimization of Crushing and Grinding Plants HPGRs for hard rock applications

SMARA Reclamation Standards Review

IRON ORE What is the Future for Magnetite Projects in Australia and Why Have Some of the New Projects Been so Problematic?

RESOURCE GOLD PTY. LTD.

ASSESSMENT OF PASTE ROCK AS A COVER MATERIAL IN MINE RECLAMATION AT THE CANADIAN MALARTIC MINE

SAG Page 1. Page 2

FINES CIRCUIT DESIGN AND PERFORMANCE ENHANCEMENT ELEMENTS IMPACT ON PRODUCT VIU

#Disrupt Mining: Integrated Extraction and Recovery System for Complex. Ores and Wastes"

FLSmidth ABON. Low Speed Sizers, Chain Feeders, & Rollerscreens

Development of an Innovative Copper Flowsheet at Phu Kham. M F Young and I Crnkovic

FLSmidth VXPmill. Delivering Value

Mines update. CMD 21 November Jan Moström President Boliden Mines

Base Metal and Iron Ore Mining

Transcription:

Mining Technology and Sustainable Development Water and the Environment Capital Market Day 2017 21 June 2017 1

About us FLSmidth is a leading supplier of equipment and services to the global minerals and cement industries FLSmidth supplies everything from single machine units to complete minerals and cement flow sheets including associated services FLSmidth primarily focuses on the following industries: coal, iron ore, fertilizers, copper, gold and cement and has the ambition of being among the leading and preferred suppliers in each of these industries Listed on NASDAQOMX Copenhagen, Denmark Close to 15,000 employees Capital Market Day 2017 21 June 2017 2

Water scarcity, access rights and costs As water scarcity deepens, political instability grows (The Guardian-March 2017): In Bolivia, Peru and Ecuador disputes over water shortages are part of a wider fight for equal access and shared responsibility Average size concentrator with a capacity 100,000 tpd and a Water Ratio of 0.5-0.7 (Cyclone High Rate Thickener) requires 50-70,000 m3 (50 70 million liter) of water per day Capital Market Day 2017 21 June 2017 4

Many drivers toward filtered tailings Land: Minimizing tailings management facility footprint saving money Footprint is < 50% of a conventional TMF Water reclamation => reduce dependency on external water supply and saving money Water can cost > USD 5/m3 (seawater desalination) Reduction in closure costs at end of mine life reduce liabilities Progressive closure possible Providing a social license to the mine Minimum environmental impact => quicker permitting possible Reduced tailings risk improving safety Avoid / remove water pool and dam prior to failure Capital Market Day 2017 21 June 2017 5

Dry Stack Tailings Synchronizing market demand and solution development Market interest for large scale DST Early adaptors acceptance for large scale DST concepts Market acceptance for large scale DST technology Market demand for large scale DST solutions 2014 2015 2016 2017 2018-2020 2020- Development of large filter solutions Testing pilot plant and optimization 1st full-scale pilot & demo plant Commercialisation and market penetration DST flowsheet studies Colossal filter plant development Prototype built Colossal trial operational R&D projects completed and commercialised Smaller traditional sized projects ready to start First Colossal large scale DST commercial operation Demonstration of new R&D projects / improvements in costs Continuous demand for large scale integrated DST project

FLSmidth is the one source for tailings solutions Only OEM with complete equipment offering Thickeners - conventional to paste High-rate thickener underflow - 50 60 wt% solids High-density thickener underflow 60 65 wt% solids Paste thickener underflow 65 70 wt% underflow Filters - vacuum to high pressure filters Filtered tailings with 80 85 wt% solids Pumps Hydro-cyclones Material handling - filter discharge and mobile stacking conveyors Systems engineering to tie it all together Understand how the complete flowsheet effects the performance of tailings equipment Grind size and ultra fines vs. tailings dewatering Tailings dewatering vs. conveyability Thickening vs. vacuum filtration vs. pressure filtration lifecycle economics Robust R&D program to develop and commercialise filtered tailings systems Partnering experience and corporate culture Capital Market Day 2017 21 June 2017 7

Why EcoTails? Tailings dams fail at an unacceptable rate Dam failures represent a significant liability to the mining industry A step-change in tailings management is required to address these challenges Water resources are increasingly scarce and expensive The collaborative team of Goldcorp and FLSmidth was created and tasked to provide this step-change

Main Focus Areas Throughput and Cost Tailings dewatering and storing throughputs exceeding 100,000 tonnes per day Capital and operating cost less than $2.50 per tonne stored in place To achieve this step-change, innovation was necessary

What is EcoTails EcoTails is An efficient, co-mingled dewatered tailings and waste rock operation Blended in transit The resulting co-mingled material is referred to as GeoWaste Major Benefits Include: No tailings dam Lower fresh water use Reduced ARD potential Less risk & Lower costs

Example 120ktpd tailings requiring significant airblow of the pressure filter cake to get the cake moisture required for Geotech strength 2x2 filters required = 72 2x4 filters required = 36 Bigger filters required (part of EcoTails) = 16 Fast Filtering (Eliminating Airblow) = 8 filters STEP CHANGE reducing 72 filters to 8 Eliminating airblow increases the cake moisture to 18 20 wt% as a saturated filter cake. STEP CHANGE GeoWaste Needed to increase Geotech strength

What is GeoWaste? HOW DOES IT WORK? Low oxygen diffusion rates Reduced footprint Tailings fill the void space between rock particles to reduce opportunity for oxygen flow Reduced Acid Rock Drainage Reduced Permeability Improved permitting timeline No tailings dam Coarse waste rock particles provide shear strength for physical stability Early or progressive closure Reduced ARD potential The waste rock and tailings are blended in transit using the energy of conveyance for mixing. Improved water recovery Improved geotech strength & permeability

GeoWaste Tailings Tailings Failure Risks Typically saturated Low shear strength Physical stability issues Low permeability Anaerobic conditions Waste Rock Waste Rock ARD Risks Typically unsaturated High shear strength Good stability High permeability Aerobic conditions GeoWaste No tailings dam Reduced costs and risks Unsaturated Higher shear strength Good stability Lower permeability Anaerobic conditions

EcoTails Flow Sheet Tailings 30% solids 120,000 tpd solids 280,000 tpd water Overall Water Ratio 0.2 m3/tonne Thickener 55% solids 120,000 tpd solids 98,200 tpd water Filtration 82% solids 120,000 tpd solids 26,400 tpd water Conveyor Water Back to Mill 181,800 tpd (65%) Water Back to Mill 71,800 tpd (26%) Water Back to Mill 2,000 tpd (1 %)

Achievable Step-Changes Current State Conventional Wet Tailings Facility Generic EcoTails 100,000 tonne per day operation, and a billion tonnes of reserves, the following stepchanges are within reach: Tailings OpEx about $1.5 per tonne Tailings with a rockfill dam CapEx about $1 per tonne OpEx less than $2 per tonne CapEx less than $0.50 per tonne Water ratio of 0.5 to 0.7 m 3 /tonne Tailings dam failure risks. Achieves water ratio of 0.2 m 3 /tonne A geotechnically and geochemically stable GeoWaste

Issues and Challenges Co-mingling Co-mingling can increase stacking height from 20m to +/- 50m Thin lift (2m) tails only 5 October 2017 16

Thank You Contact Todd Wisdom Director Tailings Solutions The information contained or referenced in this presentation is confidential and proprietary to FLSmidth and is protected by copyright or trade secret laws. 5 October, 2017 17