Dienstleistung. Certification as "Quality Approved Passive House" Criteria for Residential-Use Passive Houses

Similar documents
Passiv Haus Institut. Certification as "Quality Approved Passive House" Criteria for Non-Residential Passive House Buildings

EnerPHit. Criteria for Residential-Use Refurbished Buildings

Homesol Passive House Design Process

EnerPHit and EnerPHit +i

Catalogue of Learning Targets. Certified PHPP Expert

4.2.3 MINERGIE ORIGIN AND ORGANISATION

St Loyes Extra Care Facility PHPP Pre-Assessment Report

D3.9_Overall Refurbishment Plan DRAFT CS03. Hotel Restaurant Valcanover

Passive House: Overview

Built examples and project certification. Zeno Bastian, Passive House Institute

Catalogue of Learning Targets

Passive House: Overview

PHPP Report. Beattie Passive Inchkeith Drive

Optimization of air tightness and night ventilation for Passive houses in Italian climates under Fanger and Adaptive comfort models

AM-55, AM-56) B U I L D I N G P A R T N E R S H I P S F O R E N E R G Y S E C U R I T Y

Passivhaus Projects and Benefits

71 kwh/(m²a) Project Documentation. 1 Abstract. Single family house in Bellbrae, Victoria, Australia. 1.1 Data of building. Year of construction

Project name Gentoo Retrofit Bid 1 Project summary Refurbishment of 2no. Semi Detached houses using Passivhaus principles

PASSIVHAUS Designed for you to enjoy maximum comfort with minimum energy.

PASSIVE HOUSE. is a building, which doesn t need an active type of heating. Dr. Ing Mihail Stancu

Project Description. Projected build start date 01 May 2010 Projected date of occupation 01 Nov Belfast, County Antrim, Northern Ireland

White Paper. Ultra Low Energy Houses. Frank Ermers Caroline Faasen Rudy Rooth KEMA Consulting December Energy Efficiency

Energy consumption and thermal comfort in a passive house built in Romania

PASSIVE HOUSE FACT SHEET (pg 1 of 2)

Project name SOLAR HOUSE 80/50 Project summary

Apartment building Sodastraße 40 in Ludwigshafen, DE

Project Description. Projected build start date 12 Apr 2010 Projected date of occupation 28 Feb

Healthy Buildings 2017 Europe July 2-5, 2017, Lublin, Poland

Project Description. Projected build start date 01 Mar 2010 Projected date of occupation 01 Aug Energy target.

14.8 kwh/(m²a) Project Documentation. 1 Abstract. R-951 Residence: Three Family Passive House Building. 1.1 Data of building. Year of construction

Potential of ventilative cooling in German residential buildings

PASSIVE HOUSE OBJECT DOCUMENTATION

Passivhaus Project Documentation Wrexham Passivhaus

Passive House Object Documentation

Passivhaus Introduction

ENERGETIC MONITORING AND OPTIMIZATION OF A SOLAR HOUSE

Project Description. Projected build start date Projected date of occupation. Dungannon, County Tyrone, Northern Ireland

Single family semi-detached four-bedroom home in London, England

Project Description. Projected build start date 02 Aug 2010 Projected date of occupation 03 Dec

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

1. PREINSPECTION RESIDENTIAL ENERGY EFFICIENCY 7

The Passive House Institute US

Passive houses for the Northern climate

Passive House Guidelines for RS-1. Adopted by City Council on November 3, 2015

Achieving the nearly zero energy building concept - A study based on practical experience

Adaption of the passive house concept in northern Sweden - a case study of performance

Minimum Energy Consumption 84% energy heating savings*

Passive house optimization for Southern Italy based on the New Passivhaus Standard

Project Description. Projected build start date Projected date of occupation. Existing external wall construction.

Residential New Construction Passive House The Nordeast Nest Case Study Tim Eian, Dipl.-Ing., Certified Passive House Planner & Consultant

CASE STUDIES - CENTRE FOR SUSTAINABLE BUILDING (ZUB) KASSEL, GERMANY

Passive Houses in South West Europe

Passive Design Solutions. Passive House The Road to Net-Zero

Project Description. Projected build start date 02 Aug 2010 Projected date of occupation 03 Dec Existing external wall construction

Passive House Project documentation

OPEN COMPETITION Energy Design of High Performance Buildings Organised by EC-JRC and ESRU

51 kwh/(m²a) Project Documentation Gebäude-Dokumentation. 1 Abstract / Zusammenfassung. Detached single family house in Budapest, Hungary

EuroPHit. Outlines for training modules for designer

Assignment 3 Integrated Energy Design

Analysis of Heating Energy of Ventilation Systems in Non- Residental Passive Houses in Estonia

ISOVER Multi-Comfort House Students Contest Edition 2015 Residential function in cold climate Astana, Kazakhstan

# +,, - - -!! " #$!! % &! ' (! ) % * *! & &

Row House Henz-Noirfalise in Eupen, Belgium

Results from the Application of the Maltese Energy Performance Rating of Dwellings in Malta EPRDM Software to a New Block of Apartments

Built for sustainability Built for the environment Built for fuel efficiency Built for life

Passive House Object Documentation

WP5.5: Product concepts for high efficiency step by step retrofits

Tage Møller Architect office building

Project Description. Projected build start date 19 Apr 2010 Projected date of occupation 30 Sep

> Performance requirements: Part L UK vs Energiesprong vs Passivhaus.

Energy-Efficient Passive House using thermal mass to achieve high thermal comfort


A well-planned building envelope is a requirement for achieving high user comfort and low energy costs.

Semi-detached house in De Pinte, Belgium

FOR ADDITIONS and REMODELS Before filling out this application, read Green Building & Green Points Guideline Booklet for more in-depth information.

Step by Step. ww.europhit.eu. retrofits. with. Passive House. Institute. Passive House. components

Fraunhofer Gesellschaft Hansastrasse 27c, München,

Building Sustainability Why Passive House?

Project Description. Projected build start date 05 Jul 2010 Projected date of occupation 25 Sep

D3.9_Overall Refurbishment Plan DRAFT CS15. André Tournon-sur-Rhône

Analysis of Heating Energy of Ventilation and Underground Heat Exchanger in North European Passive Houses

Computational and the real energy performance of a single-family residential building in Poland an attempt to compare: a case study

Project Description. Projected build start date 18 Mar 2013 Projected date of occupation 11 Nov 2013

BRE Bites: Passivhaus Ecobuild 20 th 22 nd March 2012

PHPP V9.6 Validation using ANSI/ASHRAE Standard

Project Description. Projected build start date 01 Mar 2010 Projected date of occupation 31 May Aberdare, Rhondda Cynon Taff, Wales

Project Description. Projected build start date Projected date of occupation 01 Jun Low Energy Buildings

City of Vancouver Land Use and Development Policies and Guidelines

Oregon High Performance Home Requirements

Building your Energy Efficient New Home or Apartment Building

Construction Studies Theory - Higher Level

Primary School Retrofit Project

2000 Antwerp, terraced house

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

DI (FH) Dieter Herz - Herz & Lang GmbH. House of the Future

Effects of the use of DIN on the energetic assessment of residential buildings reflection on the calculation

THE SET OF CEN STANDARDS DEVELOPED TO SUPPORT THE IMPLEMENTATION OF THE ENERGY PERFORMANCE OF BUILDINGS DIRECTIVE (EPBD) IN THE EU MEMBER STATES

THE ROAD TO NEARLY ZERO-ENERGY BUILDINGS

Transcription:

Passiv Haus Institut Passivhaus Dienstleistung GmbH Dr. Wolfgang Feist Rheinstr. 44/46 Rheinstr. 44/46 D-64283 Darmstadt D-64283 Darmstadt www.passiv.de www.passivhaus-info.de Certification as "Quality Approved Passive House" Criteria for Residential-Use Passive Houses Passive Houses are buildings, in which a comfortable temperature in winter as well as in summer can be achieved with only a minimal energy consumption. They are more demanding in regard to conception, design and execution of construction work. For reasons of quality approval, Passive Houses can be checked and certified. The certification criteria, applicable to residential buildings, are described below. 1 Evaluation Criteria for the Certification Specific Space Heat Demand max. 15 kwh/(m²a) Pressurization Test Result n 50 max. 0,6 h -1 Entire Specific Primary Energy Demand max. 120 kwh/(m²a) incl. domestic electr. If active cooling is necessary, the useful cooling demand must not exceed 15 kwh/(m²a). The primary energy criterion stays unaltered in this case as well. The energy demand for cooling has to be compensated elsewhere. The reference value (Treated Floor Area) is the net living area inside of the thermal envelope. For the calculation of the demands all units inside a thermal envelope, e.g. terraced houses or apartment buildings may be considered as a whole. The verification may be carried out using calculations for the entire building or with weighted average values for several partitions. Combining thermally divided buildings is not permitted. For the certification of renovated old buildings or building extensions, the zone in question must contain at least an exterior wall, a roof area, and a floor slab or basement ceiling. Individual flats within an apartment buildings will not be certified. The criteria have to be verified with the Passive House Planning Package 2007 (PHPP2007). For the specific space heat demand, the monthly as well as the annual method can be applied. If the space heat demand is below 8 kwh/(m²a) or the relation of free heat to heat losses is above 0.70 in the annual method, the monthly method has to be applied. Certification as "Quality Approved Passive House" Criteria for residential use Passive Houses, as at 06.18.2007 1

The most recent certification criteria have to be applied (refer to: www.passiv.de). The calculation method described in the PHPP hand book and the PHPP software is subordinate to this. 2 Documentation Required for the Passive House Quality Approval Certificate 2.1 PHPP (signed) containing at least the following calculations (Please enclose the calculations as MS-Excel file or send them via e-mail, too) Name of Worksheet Building registration and Passive House verification... Verification Summary of areas...areas Calculations of U-values of building elements...u-values List of the project s buildings elements...u-list Window U-value calculations... Windows List of employed windows...win-typ Reduction factors for building elements against the ground, applicable cases...ground Shading factor calculations...shading calculations of air flow rate and efficiency of heat recovery; analysis of pressurization test results...ventilation Verification of space heat demand using the PHPP annual method...annual Heat Demand Verification of space heat demand using the PHPP monthly method (if selected in the verification worksheet)... Monthly Method Heating load verification using the PHPP... Heating Load Calculation of the frequency of overheating in summer...summer Summer shading factor determination... Shading-S Determination of summer ventilation (if applicable)... SommLuft Heat loss calculations of space heating and DHW distribution systems... DHW + Distribution System Solar fraction calculations of solar thermal DHW systems (if applicable)... SolarDHW Verification of the annual use efficiency of the heat generator...compact, Boiler or District Heat Calculation of electricity demand...electricity Calculation of auxiliary electricity demand......aux Electricity Calculation of primary energy demand... PE-Value Selection of climate data, if standard is not used... Climate Data Verification of useful cooling energy demand, if active cooling is being used...cooling Certification as "Quality Approved Passive House" Criteria for residential use Passive Houses, as at 06.18.2007 2

Verification of cooling load, if active cooling is being used... Cooling Load Calculation of cooling units, if active cooling is being used...cooling Units 2.2 Construction Drawings Site plan showing building orientation, location and elevation of neighbouring buildings, prominent tree lines, or any ground levels that cast lateral shadows. If appropriate, photographs of the surroundings. The shading situation must be comprehensible. Design drawings (plans, sections, and elevations) as 1:100 permit drawings (design development), or 1:50 working drawings (construction documents) with comprehensive dimensions of all calculated areas: room dimensions, overall building and room areas, and all rough openings in the exterior envelope. Location plans of the thermal envelope, the windows and if existent of the thermal bridges for a clear allocation of the areas and thermal bridges calculated in the PHPP. Comprehensible record of the calculation of the treated floor area. Mechanical plans or sketches showing ventilation, heat supply, DHW and (if existent) climatisation. Description of the heat generation, storage and distribution and the corresponding insulation standards. Description of the ventilation system with declaration of the layout, air flow rates, soundproofing, filters, supply and extract air valves, outdoor air intake and exhaust air outlet, insulation of air ducts, subsoil heat exchanger (if existent), control etc. Detail drawings of all junctions of the thermal envelope, e.g. exterior and interior wall junctions to the basement floor or floor slab; exterior wall junctions to roof and ceiling; ridge joint, lateral; window installation (lintel, parapet and reveals), anchorage systems of balconies etc.. All details have to be provided with dimensions and information about materials and thermal conductivity groups. The air tight layer has to be marked and it s realization at junctions has to be described. 2.3 Technical specifications, if necessary with product data sheets: The following details about window and doorframe installations are to be provided: manufacturer, type, U f -value, Ψ Installation, Ψ Spacer, and drawings showing all planned installations in the exterior wall. The calculated values 1 are to be verified in accordance with EN 10077-2. Data for products certified by the Passive House Institute is already available. 1 The calculated values of certified components are available through the internet at http://www.passivehouse.com. Certification as "Quality Approved Passive House" Criteria for residential use Passive Houses, as at 06.18.2007 3

Specifications to be submitted for glazing: manufacturer, type, U g -value according to EN 673 (accuracy: 2 digits), total solar transmittance according to EN 410 (g-value), spacer type. A brief description of the building services system, if necessary, supplemented with schematic diagrams. Manufacturer, type, and specifications of all components: ventilation system, space heating and DHW systems, DHW storage tank, auxiliary heater, frost protection, etc. Specifications of the subsoil heat exchanger (if existent): length and depth of the installation, layout type, soil quality, pipe material and sizes, verification of heat exchange efficiency (e.g. using PH-Luft. 2 ). When using brine subsoil heat exchangers: Control, category temperatures for winter and summer, verification of the heat exchange efficiency Specifications on plumbing and ducts: length and insulation of the supply pipes (DHW and space heating), and of the ventilation ducts between the heat exchanger and the thermal building envelope. A concept for efficient household electricity consumption: e.g. high-efficiency household appliances, user s guide and energy-saving incentives for homebuyers). If no evidence for an efficient use of electricity is provided, average values of the appliances which are available on the market are used (standard values PHPP) 2.4 Verification of the Airtight Building Envelope According to DIN EN 13829 Deviant from the DIN EN 13829 a series of overpressurization and underpressurization tests is necessary for every project. The pressurization test should only be performed for the heated building envelope (basements, front buildings, conservatories etc., which are not integrated in the thermal envelope, have to be omitted from the pressurization test) It is recommended to perform the test when the airtight plane is still easily accessible and corrections can be implemented. The pressurization test must be carried out by an institution or person independent of the clients and homeowners. If a client conducts the pressurization test himself, it is only accepted if an independent witness signs the test results and thereby certifies the correctness of the data. 2.5 Record of the adjustment of the ventilation system The record must contain at least the following information: object, address of the building site, name and address of the inspector, time and date of the adjustment, 2 PH-Luft: A program to support designers of Passive House ventilation systems. It is available as a free download from the Passive House Institute website: http://www.passivehouse.com. Certification as "Quality Approved Passive House" Criteria for residential use Passive Houses, as at 06.18.2007 4

manufacturer and type of the ventilation system, adjusted air flow rates for every valve at standard operating mode, balancing of mass and air flow volume for fresh and exhaust air (max. 10% disbalance). 2.6 Declaration of the construction supervisor The realization according to the verified Passive House project planning has to be documented with the declaration of the construction supervisor. Deviant realizations are to be declared. Evidence of conformity has to be provided for deviant products. 2.7 Photographs Photographs of the realized building have to be provided (preferably digital), which can document the construction of the Passive House. Under certain circumstances additional test reports or data sheets for the components used in the building can become necessary. If more favourable assumptions than those used in the standard PHPP calculation should be applied, they have to be documented with more precise evidence. 3 Procedure of the Quality Approval There is no specific form needed for the application for the certificate. The verifier has to be provided with the necessary documents which are to be filled in completely. The documents have to be examined at least once for the certification. Depending on the procedure, more examinations can be agreed upon. Please note: The documents which are relevant for the Passive House standard should favourably be examined during the planning period, so that potential corrections or suggestions for improvement can be taken into account at an early stage. If the planner does not have any experience building passive houses, we suggest at least one preliminary counselling interview and if appropriate also an continuous, accompanying counselling for the project. When the examination has been finished, the applying party receives the results of the examination, if necessary with the corrected calculations and suggestions for improvement. An examination of the execution of construction work is not automatically included in the process of certification. However from the execution of the construction work the following documents have to be provided: verification of the air tightness, record of the adjustment of the ventilation system, declaration of the construction supervisor and at least one photograph. If the necessary verifications have been found to be correct and the above criteria have been met, the following certificate is being issued. Certification as "Quality Approved Passive House" Criteria for residential use Passive Houses, as at 06.18.2007 5

Quality Approved Passive House Dr. Wolfgang Feist By issuing the certificate only the examined correctness of the provided documents, following the technological development regarding the Passive House standard can be stated. The examination does neither apply to the surveillance of the execution of construction work nor to the observation of the behaviour of the inhabitants. The warranty for the design remains with the technical planner, the warranty for the execution of construction work remains with the responsible construction supervisor. The logo of the Passive House Institute may only be used in association with the certificates. An additional quality assurance of the execution of construction work does make sense, especially if the construction supervisor in charge does not have any experience building Passive Houses. The right to adapt the criteria and the methods of calculation to the progress of technical development remains reserved. 4 Calculation Methods, Basic Conditions, Reference to Norms In the PHPP the following basic conditions and calculation methods respectively have to be used: Climate data for Germany: alternatively Standard-Germany or regional data set (adequate to the building s location; deviant altitude of the location: use temperature correction of 0.6 C for each 100 m of difference in altitude) Climate data other countries: regional data set (adequate to the building s location; deviant altitude of the location: use temperature correction of 0.6 C for each 100 m of difference in altitude) Own climate data of the applicant: For approval of usability please ask the responsible certifying party Lay-out temperature: 20 C without lowering of temperature at night Internal heat sources: 2.1 W/m², as long as the Passive House Institute has not specified any other national values Occupancy: 35 m²/person, deviant values may be used with an explanation (actual occupancy or specification of the building design) in the range of 20-50 m²/person Certification as "Quality Approved Passive House" Criteria for residential use Passive Houses, as at 06.18.2007 6

Domestic hot water demand: 25 litres / person / day of 60 C water; cold water temperature is 10 C if no other national values have been specified by the Passive House Institute Average air flow rate is 20-30 m³/h per person in a household; use at least an air change rate of 0,3 times an hour applied to the treated floor area multiplied by 2.5 m of room height. The applied air flow volumes have to correspond with the actual values of the adjustment of the ventilation system. Domestic electric energy demand: use standard values of the PHPP; deviant values only with individual verification by the building owner or domestic electric energy concept respectively Thermal envelope: Use exterior dimensions without exception U-values of opaque building elements: PHPP-method on the basis of EN 6946 with rated value of the thermal conductivity following the national norm or the technical approval of the governmental authority in charge U-values of windows and doors: PHPP-method following EN 10077 with calculated rated values for window frame U-Value U f, glass edge thermal bridge Ψ g, and installation thermal bridge Ψ Installation Glazing: calculated U-value U g (accuracy: two digits) following the EN 673 and g-value following the EN 410 Efficiency of heat recovery: examination method of the Passive House Institute (refer to www.passiv.de); alternatively following the DiBt-method (German Institute for Building Technology) or equivalent subtracting 12% of the value Efficiency of the heat generator: PHPP-method or individual verification respectively Primary energy factors: PHPP data set Certification as "Quality Approved Passive House" Criteria for residential use Passive Houses, as at 06.18.2007 7