Developed by Advanced Building & Development, LLC (ABD)

Similar documents
ICFs. Insulating Concrete Forms. Shorten Construction Schedule Enhance Comfort and Safety Reduce Energy Costs

LEED v4 for Homes, Residential Project Summary and Checklist One and Two Family New Construction

Presentation Overview: NC Energy Code RESNET Standards HERS Index HERS Verification Process

Structural Insulated Panels. The Future of Building with SIPs

Classic Competition Weiting Residence

Copyrighted Home Plan 2011 Natural Element Homes, LLC

Ready to Assemble Panels. What are SIPs? Insulspan SIP System Options: Prefabricated Panels. Why buy Insulspan?

Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING

Low-cost Construction for High-energy Savings. Brian J. Wimmer Construction Manager Rochester Area Habitat for Humanity

PROVIDING TODAY S WORLDWIDE BUILDING SOLUTIONS

One That is Already Built.

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

Oregon High Performance Home Requirements

Classic Competition Grand Terrace Apartments

Copyright Materials INTRODUCTION TO SIPATO AN EMPLOYEE OWNED COMPANY. This presentation is protected by US and

Construction Summary

Residential Design with Structural Insulated Panels

LEED for Homes Project Checklist

Structural Insulated Panels (SIPs) Commercial, Industrial and Residential Applications

FEBRUARY 22, GREEN BUILDING: Past, Present and Future

SECTION A. ACSE 7 Minimum Loads for Buildings and other Structures.

Ft. Campbell Deconstruction Analysis

Center for Sustainable Landscapes Pittsburgh, PA

RESEARCH HIGHLIGHT. Design and Construction of the Northern Sustainable House Arviat, Nunavut

Panelize Your Dreams. With Enercept, The Better Way To Build. Structural Insulated Panels The Builders Choice

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: PLASTIC SIDING REPORT HOLDER: KP BUILDING PRODUCTS

BUILDING YOUR HOME the right way

Net Zero Energy Ready Home in Dillingham, Alaska

Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey sqft.spf] Page 1 of 5

SAN MIGUEL COUNTY & TOWN OF MOUNTAIN VILLAGE BUILDING DEPARTMENTS PRESCRIPTIVE ENERGY CODE & GREEN BUILDING STANDARD

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: STRUCTURAL PANELS REPORT HOLDER: FOUR SEASONS SOLAR PRODUCTS

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings

Feature Zone IECC 2009 IECC

Container Installation Guide

Everything you need to know about SIPs

Crockett Log & Timber Homes May December, 2017 Program Pricing Book

Carpenter Level 2 Rev. September 2017

Earth Advantage New Homes Standard - Points Worksheet 2012 Site Built Residential Oregon. Energy Health Land Materials Water

Container Installation Guide

Introducing TJ Insulated Structural Framing Components

Dryvit Systems and Green / Sustainable Design

standard features Power Exhaust Fans w/light - Both Baths GFCI Receptacles Upgrade Light Fixture - Bath 1 Vanity - Per Lav GFCI Receptacles

The Ultimate Home Value with Quality,

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: FLEXIBLE FLASHINGS REPORT HOLDER: HUBER ENGINEERED WOODS, LLC

NREL Commercial Buildings Research

DECONSTRUCTION OPPORTUNITIES FOR SALVAGE, REUSE & RECYCLING. Northeast Recycling Council Inc. Spring Conference EPA Region III, March 2006.

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

THE RESTORE LOUISIANA REIMBURSEMENT ESTIMATE

Appendix A WORK PROCESS SCHEDULE AND RELATED INSTRUCTION OUTLINE

Genentech Building 20 Office LEED-CI Gold XL CONSTRUCTION

What is NUFORM HOUSE KIT?

COLUMN SPACING TRUCK ACCESS/DOORS EAVE HEIGHT UTILITIES PARKING & DRIVES

Characterization and Potential Recycling of Home Building Wood Waste

CONSTRUCTION TRADES TECHNOLOGY (CTT)

Seal Harbor Development 1 Nagog Park Acton, MA 01720

Balco, Inc. Stair Nosings

2/1/2016. SIPs as the Backbone of an Integrated Systems Approach to Building 16 March 2016 course W01. Bill Chaleff, A.I.A., LEED A.P.

Energy Efficiency Solutions for Multifamily Housing. Clark Energy Group LLC

Quality Inspection 8618 London Heights San Antonio, TX Phone: (210)

COLD CLIMATE HOUSING RESEARCH CENTER CCHRC. Whole Wall R-Values

The. Heritage. Collection

Sustainable Design A DIVISION OF SHIVE-HATTERY

Techna-Duc. Advantages. Features and Benefits. LEED Eligible Product

Title: Building Construction for the Fire Service. Time: 3 hours. Teaching Materials: White board Building Construction for the Fire Service (PDF)

Colorado Chapter of the International Conference of Building Officials. Building Guide. The Colorado Chapter of the International

Building Guide. Colorado Chapter of the International Code Council

Best Practice Recommendations for Wall Retrofit on the Two-Story Flexible Research Platform (FRP) at Oak Ridge National Laboratory (ORNL).

Green Building with SIPs.

UNITED WE BUILD. STRABAG GROUP CORPORATE STRUCTURE. Zublin Construction LLC (2016)

The Resource-Efficient Home: Remodels, Retrofits, Renovations, and New-Home Construction Course Description and Topic Outline

Edouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com

Energy Conservation & Building Envelope. Objectives. Introduction. Determine the Building Envelope of a House Calculate Heat Loss of a Building

BUILDING FOR OUR FUTURE

Light Steel Framing ~ From Concept to Completion

MASTERFORMAT SPECIFICATION

Choosing INSULSPAN SIP Walls

Timber Trail Plan LOT BEDROOMS 4.5 BATHROOMS 2,974 FT 2 Land/Home Package OFFERED BY: SUNRIVER REALTY LINDA DORR, BROKER

FIND THE HIDDEN ENERGY SAVINGS POTENTIAL IN YOUR HOME. HINT: It s behind that fantastic low maintenance vinyl siding everybody loves.

CTE - CIP Course Details Catalog

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: PLASTIC SIDING REPORT HOLDER: GENTEK BUILDING PRODUCTS, INC.

REPORT HOLDER: PAREX USA, INC EAST LA PALMA AVENUE, SUITE 250 ANAHEIM, CALIFORNIA EVALUATION SUBJECT:

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements

TELLUs FLORIDA USA. Tellus Integrated Panel System

Intro to Structural Cold Formed Steel (CFS)

Kitchen Remodel Estimator. Contact Info: Project Summary: Design. Demo

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

Hansen Pole Buildings Planning Guide. Toll Free / Toll Free FAX

2013 COMMERCIAL PRODUCTS

GETTING STARTED... 2 YOUR LIST OF PRODUCTS... 2 WHAT THAT LIST BECOMES... 2 PRODUCTS CREATED AS ENVISIONEER ELEMENTS... 3

Wellington Manor Series

Drywall and Plastering


OWNER S REPONSIBILITIES AND PREPARATION INSTRUCTIONS. Schedule "C"

TYPICAL BEARING WALL FRAMING

Penn State AE Senior Thesis 2009

Module Set Process. Presentation to the Quality Modular Building Task Force. October 19, 2000

A. Dimension Lumber: Lumber of 2 inches nominal or greater but less than 5 inches nominal in least dimension.

CITY OF SOUTH GATE SCHEDULE OF FEES APPROVED

Pocono Builders Association 2014 Building Awards Environmental/Energy Efficiency

Modular Wood Framing Goes Vertical

Transcription:

Developed by Advanced Building & Development, LLC (ABD)

Energy Efficiency: According to the Federal Lab in Oak Ridge, Tenn. SIPs are 60% more energy efficient than conventional 2x6 conventional framed structures. As a result reduce the size and cost of the HVAC system proportionally = $1,000. Energy Savings Payback : 2.5 years versus conventional construction, and 1.9 years if Solar is included; i.e. after which both investments are paid for plus every day your investment pays the home owner for making the investment. Speed: Utilizing ABD s Lean Assembly Process reduces construction time for walls and roof of an average building by 90% Stronger: 46% stronger than 2x lumber construction and can be engineered to withstand 180 mph hurricane winds Fire: 1-hour fire ratings Warranty: 20-years 2

Structural Insulated Panels: utilize environmentally friendly materials (low emitting VOC) and qualifies for 16 LEED points (62% of Certified) under U.S. Green Building Council, including optional Forest Stewardship certified wood Solar: SIPs and solar scales down the size and cost of PV system by 35% plus a 30% Federal Energy Credit results in cost effective near Zero Carbon structure; for 3 LEED points (11% of Certified) Percent of LEED Points Other Material & Systems 27% Solar = 11% ABD's SIPs & Low-E Windows = 62% 3

Sustainability starts with design and selecting building envelop materials & systems that are friendly to the environment, reduce waste, maximize energy efficiency, have a long useful life, and are recyclable Structural Insulated Panels (SIPs) SIPs reduce wood waste by 78% (i.e. 36% to 8%/bf) SIPs eliminate studs for framing which reduces the number of trees cut by 80% SIP insulation uses closed-cell polystyrene foam beads filled with air that is much more energy efficient than fiberglass or cellulous insulation SIP materials are totally inert SIPs are more energy efficient, i.e. saving 35% of utility cost 4

Strive for Wholeness Being able to see interconnectedness and balance between our lives and the buildings we live and work with nature and Mother Earth, and utilize both energy efficiency and the gift of free energy 5

6

TkWA s Also Leopold Legacy Center is the culmination of a rigorous process that integrates Sustainability & Master Planning with Environmental Materials & Systems for a zero net energy and carbon neutral during operation 7

8

9

10

Solar & -- 270 SIPs & Solar 3/24/2016 Combined AB&D 2015 11

57 F 4.5 SIP 2x6 Stud 19 F 5 F 12

Commercial Energy Credit of $1.80 per Sq. Ft. ($0.60 for Energy Efficient Structure, $0.60 for A/C, $0.60 for Lighting) Residential Energy Credit for Solar Energy 30% NOTE: This credit expired 1/1/14, but three times over the last 7 years has been renewed and is expected to be renewed again. 13

2,400 sq. ft. 2-Story Home or Commercial Building Cost compare conventional 2x6 framing, sheathing & insulation (labor & materials) versus SIP 6.5 walls & 8.25 roof and its utility savings with natural gas heating & electric air-conditioning 79% of Americans view energy efficiency as a priority due to the savings 2x6 SIPs Delta Cost of walls & roof $27,212 $29,856 $2,644 (Incl. labor, tax & frt. ) Annual SIP HVAC Savings 8-year avg. $1,048 Payback Annual Solar Mortgage $790 Annual SIP and Solar Savings $2,175 Payback 2.5 Years 1.9 Years 14

2,400 sq. ft. 2-Story Home or Commercial Building Comparing cost of conventional 2x6 framing, sheathing & insulation (labor & materials) versus SIP 6.5 walls & 8.25 roof and its utility savings with propane heating & electric air-conditioning 2x6 SIPs Delta Cost of walls & roof $27,212 $29,856 $2,644 (Incl. labor, tax & frt. ) SIP HVAC Savings Breakeven w/propane at $2.57/gal. $2,644 Payback 0 Years Annual Solar Mortgage $790 Annual SIP and Solar Savings $2,175 Payback 4 Months 15

2,400 sq. ft. 2-Story Home or Commercial Building Comparing cost of conventional 2x6 framing, sheathing & insulation (labor & materials) versus SIP 6.5 walls & 8.25 roof and its utility savings with #2 fuel oil heating @ $4.00/gal. & electric air-conditioning 2x6 SIPs Delta Cost of walls & roof $27,212 $29,856 $2,644 (Incl. labor, tax & frt. ) SIP HVAC Savings Breakeven w/fuel Oil at $3.23/gal. $2,644 Payback 0 Years Annual Solar Mortgage $790 Annual SIP and Solar Savings $2,175 Payback 4 Months 16

6.5 SIPs are 3.6 times more efficient than steel studs And they are 1.6 times more efficient than 2x6s 17

8' 0" Stud Framed Wall 36' 0" Stud wall built in 5 hours with sheathing and insulation SIP Wall Drywall Secured to Studs with 4 4 Fas te ne rs Drywall Secured to SIPs with 6 Fasteners & Adhesive Two panels assembled in less than 16 minutes with sheathing and insulation 18

Average US home: 2,400 F 2, 2-story, 8 walls, gable roof, and no dormer After completion of foundation with a crew of six (6): Days Assemble 1 st floor wall panels (140 LF 91 LF/ Hr. = 1.5 Hr.).2 Immediately begin installing windows, doors, and electrical wiring Build 2 nd floor with floor joists and sub-flooring.5 Assemble 2 nd floor wall panels (140 LF 91 LF/ Hr. = 1.5 Hr.).2 Finish Installation of windows and electrical wiring Assemble roof panels (1,590 SF 126 SF/Panel x 20 Min. Ea = 4.2 Hr.).6 Total Time for a crew of six (6) 1.5 Instead of 18 days using conventional materials. After 1.5 days, start exterior finishing, roofing, interior stud walls, dry wall, and installation of cabinets, appliances, and bath fixtures. 19

20

21

22

23

24

25

26

Tom Hildreth Managing Director Broomfield, CO 80020 (303) 588-1447 Email: THildreth@AdvancedBD.com www.advancedbd.com 27