FIRST MAJESTIC SILVER CORP.

Similar documents
AVINO SILVER & GOLD MINES LTD.

Santacruz Silver Reports First Quarter 2017 Production and Financial Results

World s largest silver producing country. Six producing silver mines; 100% owned. Two advanced stage silver projects

AuRico Gold Provides Monthly Update on Young-Davidson Ore Processing Underway

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel:

Non-IFRS performance measure. Refer to the Non-IFRS Performance Measures contained in the Q Management s Discussion and Analysis.

Forward Looking Statement

SILVERCORP REPORTS Q3 RESULTS: NET INCOME OF $12.7 MILLION, $0.08 PER SHARE AND PROVIDES FISCAL 2019 PRODUCTION AND CASH COSTS GUIDANCE

SILVERCORP REPORTS SILVER PRODUCTION OF 5.0 MILLION OUNCES, CASH FLOWS FROM OPERATIONS OF $31.9 MILLION, OR $0

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

Corvus Gold Receives Sulfide Gold Recovery of +90% Using AAO Process at the North Bullfrog Project, Nevada

Suite West Hastings Street Vancouver BC CANADA V6C 2W2 Tel: Fax: December 3, 2013 #

Production Report. for the three months ended 31 December 2010

NEWS RELEASE. Equinox Gold Begins Mining at Aurizona and Receives Award for Mining Excellence in Brazil

IDM Mining Updates Pre-Development Engineering and Optimization at Red Mountain Gold Project

Ste De Maisonneuve Blvd W Montréal, QC H3A 3L4 Tel: Fax:

Third Quarter Production Report. for the three months ended 30 September 2017

Bisha Mining Share Company

AGM - Lorena Gold Project

OCEANAGOLD PROVIDES AN UPDATE TO HAILE COMMISSIONING AND REVISED COMPANY GUIDANCE

Zinc Business. September 19, 2017 Dale Andres, Senior Vice President, Base Metals

TINKA RESOURCES LIMITED

Update of Amaruq Agnico Eagle s near-term future in Nunavut Nunavut Mining Symposium, Iqaluit, Nunavut

RE: REVIEW OF THE PRAIRIE CREEK MINE SCOPING STUDY

Newmont Reports 2017 Reserves and Resources; Reserve additions replace depletion, Resources increase

New Gold Announces Highest Gold Production and Lowest Cash Cost in its History and Provides 2011 Guidance

PRESS RELEASE CANADIAN ZINC REPORTS ON ANNUAL GENERAL MEETING OF SHAREHOLDERS. Company Provides Corporate Update

ecobalt SEDAR Files Positive Feasibility Study for the Idaho Cobalt Project; Pre-Tax NPV $176M 7.5%, IRR 25.1%

Confidence in Carrapateena project grows

2016 Fourth Quarter Highlights

Olympias: Highlights Q Phase 1 Retreatment. Acquired from European Goldfields in February. EIA approved. Phase 1 Retreatment began

For personal use only

Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum

2017 Third Quarter Highlights

NEWS RELEASE ROXGOLD ANNOUNCES POSITIVE FEASIBILITY STUDY FOR ITS BAGASSI SOUTH PROJECT

HIGH-GRADE EXPANDING COPPER- GOLD PRODUCER CANADA RAB TSXV RMM AIM

TVI Pacific Inc. Announces First Nickel Production from Pilot Plant

For personal use only

BUILDING CANADA S LARGEST GOLD MINE Production Early Mining Ready Summit October 23, 2012

IDM Mining Updates Continued Engineering Advancement for the Red Mountain Gold Project and EA/EIS Review Status

TRANS-SIBERIAN GOLD PLC

BUCHANS MINERALS SUCCESSFULLY PRODUCES HIGH PURITY MANGANESE ELECTROLYTE FOR THE PRODUCTION OF ELECTROLYTIC MANGANESE METAL

OSISKO REPORTS INCREASED GOLD RECOVERY RESULTS AT MARBAN

ASX Release ASX Code: YTC

23 July Half-Year Trading Update Petropavlovsk PLC ( Petropavlovsk, the Company or, together with its subsidiaries excluding IRC Limited

At Home in North America

PRELIMINARY OXIDE HEAP LEACH TESTWORK DELIVERS EXCELLENT RESULTS AT THE SOUTH HOUNDÉ PROJECT

Strong open pit drilling results boost plan to grow Paulsens' production to 100,000ozpa

BARRICK GOLD CORPORATION Denver Gold Forum Alto Chicama Update September Denver Gold Forum September 24, 2003

Summary of Peñasquito Technical Report - Goldcorp, December 31, 2007

Mineral Ridge, Nevada

Figure 1. Location of new RC drilling at Castelo de Sonhos.

CANADA S NEXT INTERMEDIATE GOLD PRODUCER. Nishnawbe Aski Development Fund Aboriginal Partnership Conference Timmins, Ontario May 30, 2013

AMUR MINERALS CORPORATION (AIM: AMC) Independent Review of Cost Estimates $1.78 Per Pound Nickel Cost to Deliver to Rail Station

Gum Creek Gold Project Free Milling Scoping Study

North River Resources plc / Ticker: NRRP / Index: AIM / Sector: Mining 30 June 2014 North River Resources plc ( North River or the Company )

Skeena Announces Preliminary Economic Assessment for Spectrum-GJ Copper-Gold Project

RESOURCE GOLD PTY. LTD.

* All figures reported are in 2015 US dollars and on a 100% Project and 100% equity basis valuation.

NEWS RELEASE Orca Gold Reports Voting Results from Annual Meeting and Provides Highlights of Presentation Given on Revised PEA

ABM Hits 3000 Ounce Target from Trial Mining

For personal use only

ASX ANNOUNCEMENT 12 MAY 2016

Joe Hamilton CEO January 2008 AIM/TSX: ACU BSE:African Copper

ERDENE RESOURCE DEVELOPMENT CORP.

MINDORO DRILLS 16.9 METERS OF 1.81% NICKEL AT AGATA

Shareholder Update. April Dear Shareholders,

Massawa gold project January 2016

Filtered Tailings: A Silver Bullet?

Fresh drilling and metallurgical results advance plan to establish 100,000ozpa operation at Ashburton Project

Quebrada Blanca Phase 2. April 2012

White Dam Gold Project Dump Leach

Second drill rig to accelerate major drilling program at Productora

Kibali Mine Development

BROKEN HILL MINERAL RESOURCES AND ORE RESERVES UPDATE

Australia s leading explorer in Mexico

EXCO S PROJECT PIPELINE

Cautionary Statements

On The Road To Silver & Gold Mining In Mexico

ASX ANNOUNCEMENT 13 December 2011 ASX Code: BDR TUCANO GOLD PROJECT CONSTRUCTION AND MINING UPDATE

Volcan Compañia Minera S.A.A. and Subsidiaries Management Discussion and Analysis First Quarter 2015

Improvements in bi-metal production at the Brunswick plant, Costerfield.

Special Report. Uranium Production Cost Study. August 2015 UXC.COM A PUBLICATION OF

ZincOx Resources plc. Corporate Overview

Georgian Mining Corporation / EPIC: GEO / Sector: Natural Resources

Quality, Diverse Group of Mining Assets. February 2018

Prefeasibility Study Outlines Optimisation Plan of Canadian Copper Producer with 45 per cent IRR and 21 Year Mine Life

RED TIGER MINING INC. Copper Production Copper and Gold Exploration

NEW LIFE OF MINE PLAN AT MRC BOOSTS GOLD PRODUCTION ABOVE 200,000 OZS. Canadian dollars unless otherwise noted

For personal use only

16 July 2013 AIM:AMA / TSX:AMZ. Amara Mining plc ( Amara or the Company )

2014 MINERAL RESOURCES AND ORE RESERVES

T A S M A N M E T A L S L T D

Annual General Meeting. May 2017

Expansion Programmes Neves-Corvo and Zinkgruvan

Uranium Operations. Uranium Strategy. Exploration Potential. Uranium Investing in clean electricity

Valdecañas Vein Deep. Corporate Presentation

Project development work focused on critical path to enable initial production of concentrate by 2022

Presentation and Company Update 7 July 2016 Dr Chris Giles, Managing Director. Cash flow from gold sales New project developments Exploration success

Transcription:

FIRST MAJESTIC SILVER CORP. Suite 1805 925 West Georgia Street Vancouver, B.C., Canada V6C 3L2 Telephone: (604) 688-3033 Fax: (604) 639-8873 Toll Free: 1-866-529-2807 Web site: www.firstmajestic.com; E-mail: info@firstmajestic.com NEWS RELEASE New York AG October 13, 2016 Toronto FR Frankfurt FMV Mexico - AG First Majestic Achieves New Record in Silver Production; Produces 4.5 million Silver Eqv. Ounces in Third Quarter First Majestic Silver Corp. ("First Majestic" or the "Company") is pleased to announce that total production in the third quarter of 2016 from its six operating silver mines reached 4.5 million silver equivalent ounces. Total production consisted of 3.1 million ounces of silver, 14,452 ounces of gold, 8.0 million pounds of lead and 1.5 million pounds of zinc. Higher silver grades, throughput rates and recoveries propelled silver production to a new Company record of over 3.1 million ounces during the quarter, said Keith Neumeyer, President & CEO. We saw significant grade improvements, particularly at Santa Elena, La Guitarra and San Martin, as a result of improved mine sequencing and dilution control. Due to the improved operational cash flows, we ve significantly expanded our exploration programs resulting in 19 drill rigs currently active on our properties which will allow us to release updated Reserve and Resource estimates for Del Toro, La Parrilla and San Martin in the first quarter of 2017. At La Encantada, detailed engineering has been completed and furnace manufacturing has started for the construction of our new roasting circuit planned for final completion in the fourth quarter of 2017. Production Details Table: Q3 Q3 Y/Y Q2 Q/Q 2016 2015 Change 2016 Change Ore processed/tonnes milled 838,233 675,032 24% 798,182 5% Total production - ounces of silver equivalent 4,524,619 3,558,035 27% 4,681,608-3% Total silver ounces produced 3,114,627 2,593,309 20% 2,844,930 9% Silver grade (g/t) 150 167-10% 148 1% Silver recovery (%) 77 72 7% 75 3% Pounds of lead produced 8,038,206 8,743,453-8% 8,825,234-9% Pounds of zinc produced 1,519,143 3,122,498-51% 3,837,301-60% Gold ounces produced 14,452 4,434 226% 16,371-12%

Quarterly Operational Review: Total ore processed during the quarter at the Company's six operating silver mines: Santa Elena, La Encantada, La Parrilla, Del Toro, San Martin and La Guitarra, amounted to 838,233 tonnes, reflecting a 5% increase compared to the previous quarter. In the month of August, processing rates at Del Toro, La Parrilla, San Martin and La Guitarra were affected by the heavy seasonal rains causing temporary clogging of ore in the crushing areas. Average silver grades in the quarter increased to 150 g/t compared to 148 g/t in the previous quarter. Higher silver grades were achieved at Santa Elena, La Guitarra and San Martin due to improved mine sequencing and dilution control however, offset by lower grades at La Encantada due to the blending of ore from old stopes, stockpiles and the recovery of pillars. Combined silver recoveries averaged 77%, representing a 3% increase compared to the previous quarter. La Encantada, Del Toro, La Guitarra and Santa Elena all achieved higher silver recoveries during the quarter. Furthermore, silver recoveries at Santa Elena achieved a new operating record of 91% primarily due to the higher silver grades being mined from underground. The Company's underground development in the third quarter consisted of 12,764 metres, reflecting a 9% increase compared to 11,738 metres completed in the previous quarter. The Company also completed 36,290 metres of diamond drilling in the quarter compared to 19,342 metres in the prior quarter, representing an 88% increase. A substantial portion of the current drilling and development is for the purpose of updating Mineral Reserves and Resources at Del Toro, La Parrilla and San Martin. Updated NI 43-101 Technical Reports for each of these three mining units are expected to be released in the first quarter of 2017. Mine by Mine Quarterly Production Table: Mine Ore Processed Tonnes per Day Silver Grade (g/t) La Guitarra 39,092 425 252 83% 263,235 1,977 - - 397,627 Total 838,233 9,111 150 77% 3,114,627 14,452 8,038,206 1,519,143 4,524,619 *Certain amounts shown in this news release may not add exactly to the total amount due to rounding differences. *The following prices were used in the calculation of silver equivalent ounces: Silver: $19.61 per ounce; Gold: $1,334 per ounce; Lead: $0.85 per pound; Zinc: $1.02 per pound. At the Santa Elena Gold/Silver Mine: Silver Recovery % Silver Oz Produced Gold Oz Produced Pounds of Lead Pounds of Zinc Equivalent Silver Ounces Santa Elena 241,996 2,630 95 91% 671,423 11,156 - - 1,430,506 La Encantada 247,858 2,694 145 59% 685,478 35 - - 687,841 La Parrilla 147,414 1,602 146 79% 547,913 296 2,129,908 1,519,143 739,026 Del Toro 86,646 942 195 82% 446,137 81 5,908,297-707,524 San Martin 75,228 818 246 84% 500,441 907 - - 562,096 During the quarter, Santa Elena produced 671,423 ounces of silver and 11,156 ounces of gold for a total production of 1,430,506 silver equivalent ounces. Compared to the previous quarter, silver production increased 11% primarily due to an increase in grade and tonnage mined from the high grade Alejandra vein. During the quarter, the Company modified the production split between underground ore and the reprocessing of ore from the heap leach pad due to achieving higher production rates from the Alejandra vein. As a result, production of underground ore increased to a rate of 1,750 tpd while reducing heap leach production to 1,000 tpd. This improved run rate is expected to increase production due to the higher grades and recoveries of underground ore. 2

The mill processed a total of 241,996 tonnes, consisting of 155,552 tonnes of underground ore and 86,444 tonnes from the above ground heap leach pad. Silver and gold grades of underground ore averaged 124 g/t and 2.0 g/t, respectively. Whereas silver and gold grades from the above ground heap leach pad averaged 43 g/t and 0.7 g/t, respectively. At the end of the quarter, total development of the new San Salvador ramp reached 1,070 metres, or 47% of a 2,300 metre development plan. The new ramp will connect to the Main Vein along level 575 by April 2017. Once the ramp is completed, it is expected to improve underground productivity by reducing trucking bottlenecks. A total of 2,444 metres of underground development were completed in the third quarter compared to 2,931 metres of development in the previous quarter. A total of 3,520 metres of exploration drilling was completed in the third quarter compared to 3,509 metres of drilling in the previous quarter. In October, the Company is expected to begin a 3,000 metre surface drilling program on the Ermitaño West property. Assay results from the drill program are expected to be completed by the end of the fourth quarter. At the La Encantada Silver Mine: For the quarter, silver production reached 685,478 ounces representing a 10% increase over the previous quarter. The increase in production was primarily due to a 19% increase in tonnes milled offset by lower silver grades. Silver grades averaged 145 g/t during the quarter, or a 14% decrease compared to the prior quarter primarily due to the blending of ore from old stopes, stockpiles and the recovery of pillars. The roasting project advanced in the third quarter with the completion of the detailed engineering design of this new circuit. Site preparations and civil work are planned to start in the fourth quarter. The Company continues to anticipate completion of this circuit in the fourth quarter of 2017. Once in full production, the Company expects to recover an additional 1.5 million ounces of silver per year from the reprocessing of above ground tailings. A total of 519 metres of underground development were completed in the third quarter compared to 1,043 metres of development in the previous quarter. The decrease in development was primarily due to limited ventilation. A total of 3,681 metres were drilled in the third quarter, representing a 20% increase compared to 3,062 metres in the previous quarter. At the La Parrilla Silver Mine: During the quarter, the flotation circuit processed 93,686 tonnes (1,018 tpd) with an average silver grade of 158 g/t and an 84% recovery while the cyanidation circuit processed 53,727 tonnes (584 tpd) with an average silver grade of 125 g/t and a 69% recovery for total production of 739,026 silver equivalent ounces. The Company is modifying the processing rates of oxides and sulphides in order to accommodate for higher production rates from the San Marcos mine along with lower sulphide base metal grades. Milling rates of oxide ore is increasing to 700 tpd (up from 500 tpd) along with a reduction of sulphide ore to 1,000 tpd (down from 1,200 tpd). The increase in oxide production is expected to improve the mill head grades and increase production of silver doré bars. The lead circuit processed an average lead grade of 1.3% with recoveries of 78% for total lead production of 2.1 million pounds, representing a 26% decrease compared to the previous quarter. The decrease in lead production was primarily attributed to an 18% decrease in processed ore due to the recent mill modifications. The zinc circuit processed an average zinc grade of 1.4% with recoveries of 53% for total zinc production of 1.5 million pounds, representing a 60% decrease compared to the previous quarter. The 3

decrease in zinc production was primarily due to the lower circuit throughput and a 24% decrease in zinc grades. Underground development completed in the quarter totaled 2,612 metres compared to 1,834 metres developed in the previous quarter. A total of 5,115 metres were drilled in the third quarter, representing a 69% increase compared to 3,030 metres in the previous quarter. At the Del Toro Silver Mine: For the quarter, Del Toro produced a total of 707,524 silver equivalent ounces representing a 4% increase in production compared to the prior quarter primarily due to higher throughput rates. Throughput rates were 7% higher compared to the previous quarter due to an increase in underground development in the San Juan and Perseverancia mines. Silver grades and recoveries improved during the quarter, averaging 195 g/t and 82%, respectively. Lead grades and recoveries averaged 5.0% and 66%, respectively, producing a total of 5.9 million pounds of lead, consistent with the previous quarter. Underground development completed in the quarter totaled 2,328 metres compared with 1,754 metres developed in the previous quarter. Total exploration metres drilled in the quarter amounted to 6,643 metres, representing a 101% increase compared to 3,306 metres drilled in the previous quarter. At the San Martin Silver Mine: During the quarter, San Martin produced 500,441 ounces of silver and 907 ounces of gold for a total production of 562,096 silver equivalent ounces. Silver production increased 22% compared to the prior quarter primarily due to a 12% increase in silver grade and an 8% increase in tonnes milled. Silver grades and recoveries averaged 246 g/t and 84%, respectively, during the quarter. In addition, gold grades and recoveries averaged 0.4 g/t and 85%, respectively. The higher silver grades were primarily the result of higher production rates from the Rosarios and Veladora veins. Detailed engineering work for the installation of the tailings filter presses were completed during the quarter. Ground preparations including the installation of the foundations are expected to begin in late October. The filter presses, which are designed to recover and re-use solution and to save on water consumption, are expected to be installed and undergo testing in the first quarter of 2017. Following successful lab tests, the Company is planning to install oxygen injectors and lead nitrate into the processing leach tanks over the next six months. Lab results indicate the potential for a 2% increase in metallurgical recoveries by using these reagents. Underground development completed in the third quarter totaled 2,807 metres compared with 2,524 metres of development in the previous quarter. Total metres drilled in the third quarter amounted to 7,817 metres, representing an 89% increase compared to 4,137 metres of drilling in the previous quarter. 4

At the La Guitarra Silver Mine: During the quarter, La Guitarra produced 263,235 ounces of silver and 1,977 ounces of gold for a total production of 397,627 silver equivalent ounces. Silver production increased 28% compared to the previous quarter primarily due to an 11% increase in silver grades and a 12% increase in tonnes milled. Silver grades and recoveries improved during the quarter, averaging 252 g/t and 83%, respectively. In addition, gold grades and recoveries averaged 2.0 g/t and 78%, respectively. Approximately 31% of the production ore came from the Coloso area and the remaining 69% was extracted from the La Guitarra area. During the quarter, underground development continued to advance towards the Soledad 1 and 2 veins. These high-grade parallel veins were recently discovered following successful exploration from both underground and surface drilling. The Soledad veins are approximately 150 metres SW from the recently intersected Nazareno vein. A total of 2,055 metres of development were completed in the third quarter compared to 1,652 metres of development in the previous quarter. Total metres drilled in the quarter amounted to 9,515 metres, representing a 314% increase compared to 2,298 metres drilled in the previous quarter. The increase in exploration drilling is in preparation of the upcoming mine expansion to 1,000 tpd. First Majestic is a mining company focused on silver production in México and is aggressively pursuing the development of its existing mineral property assets and the pursuit through acquisition of additional mineral assets which contribute to the Company achieving its corporate growth objectives. FOR FURTHER INFORMATION contact info@firstmajestic.com, visit our website at www.firstmajestic.com or call our toll free number 1.866.529.2807. FIRST MAJESTIC SILVER CORP. "signed" Keith Neumeyer, President & CEO Cautionary Note Regarding Forward Looking Statements This press release contains "forward-looking statements", within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities legislation, concerning the business, operations and financial performance and condition of First Majestic Silver Corp. Forward-looking statements include, but are not limited to, statements with respect to the future price of silver and other metals, the estimation of mineral reserves and resources, the realization of mineral reserve estimates, the timing and amount of estimated future production, costs of production, capital expenditures, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, hedging practices, currency exchange rate fluctuations, requirements for additional capital, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, timing and possible outcome of pending litigation, title disputes or claims and limitations on insurance coverage. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of First Majestic Silver Corp. to be materially different from those expressed or implied by such forward-looking statements, including but not limited to: risks related to the integration of acquisitions; risks related to international operations; risks related to joint venture operations; actual results of current exploration activities; actual results of current reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of metals; possible variations in ore reserves, grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of development or construction activities, as well as those factors discussed in the section entitled "Description of the Business - Risk Factors" in First Majestic Silver Corp.'s Annual Information Form for the year ended December 31, 2015, available on www.sedar.com, and Form 40-F on file with the United States Securities and 5

Exchange Commission in Washington, D.C. Although First Majestic Silver Corp. has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. First Majestic Silver Corp. does not undertake to update any forward-looking statements that are incorporated by reference herein, except in accordance with applicable securities laws. 6