Mark R. Norton P.E., LEED AP, ENV SP Water Resources & Planning Manager Santa Ana Watershed Project Authority

Similar documents
2005 ANNUAL REPORT OF SANTA ANA RIVER WATER QUALITY

Report on Groundwater Recharge in the Orange County Groundwater Basin

Cadiz Inc. Corporate Presentation November 2017

Engineer s Report on the groundwater conditions, water supply and basin utilization in the. Orange County Water District

2 Region Description. 2.1 Regional Boundaries IRWM Boundaries

Charles W. Binder WATERMASTER SANTA MARGARITA RIVER WATERSHED CIVIL NO. 51-CV-1247-GPC-RBB

Chapter 6 Water Resources

Chapter 5.3 Water Recycling

Los Angeles 3 rd Regional

Kern Water Bank. Kern Water Bank Authority

Agenda Item #17. OCWD Board Meeting. November 15, Irvine Ranch Water District October 18, 2017 Request

Optimum Basin Management Program

1969 Western Judgment History and Application. January 7, 2011 Board of Public Utilities

Optimum Basin Management Program

Upper Santa Ana River Watershed Integrated Regional Water Management Plan

Project Prioritization

A joint effort of the Orange County Water District and Orange County Sanitation District

Environmental Geography

PRESENTATION TITLE. Orange County Water and Beyond!

MONTE VISTA WATER DISTRICT 2015 URBAN WATER MANAGEMENT PLAN

Phase 1 Salinity Management Plan Technical Memorandum. January 2010

Executive Summary. ES.1 Project Background

Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project

Colorado River Challenges Impacts to Southern Arizona

CHAPTER 5 WASTEWATER FLOWS

SOUTHERN NEVADA WATER BRIEFING Prepared for the Legislative Commission's Subcommittee to Study Water

Option 11. Divert Water from Miocene and Hendricks Canal to Supply the Ridge

TAUSSIG. & Associates, Inc. DAVID. Public Finance Facilities Planning Urban Economics CAPACITY FEE STUDY FOR SAN GORGONIO PASS WATER AGENCY

CITY OF REDLANDS MASTER PLAN OF DRAINAGE San Bernardino County, California

Water Reuse: Orlando s Experiences & Perspectives. Rick Howard, PE Public Works Director

Stormwater Programs. BIA Meeting June 5, Jason Uhley

Committee on Water. Desalination as a Water Source

San Diego, A Cadillac Desert; Presentation by: Dana Fi Friehauf, fpe P.E. Water Resources Manager

Volume II I Three Valleys Municipal Water District

John M. Stomp III, PE

Santa Clara River Watershed Feasibility Study. Information Meeting City of Santa Clarita August 16, 2007

Crystal M. Craig, Local Government Analyst I

California Drought, Water, Parks, Climate, Coastal Protection, and Outdoor Access for All Act of 2018 (Proposition 68) Item 5.7

WATERSHED MANAGEMENT INITIATIVE: GOALS & IMPLEMENTATION OBJECTIVES, JULY 26, 1999

FEMA s Mitigation Support for Resiliency: Innovative Drought and Flood Mitigation Projects

PREPARE60 OVERVIEW 1

MMWD Drought Resiliency Committee Meeting

Constructed Wetlands

Rainfall, runoff and sediment transport in the Napa River watershed: now and a possible future

Date: Wednesday, October 4, Location: Western Municipal Water District Board Room Meridian Parkway, Riverside, 92518

Section 5 Packages. 5.1 Package Development Problem Statements A 5-1

STORMWATER CAPTURE ENHANCING RECHARGE & DIRECT USE THROUGH DATA COLLECTION W H I T EP A P E R U P D A T E

Soquel Creek Water District s Groundwater Recharge Feasibility Study. Lydia Holmes

Cadiz Valley Water Conservation, Recovery & Storage Project

Robert Macias, San Antonio Water System James Dwyer, P.E., CH2M HILL

Local Resource Management in Southern California

SCAMA / NOGALES WATER STORAGE STUDY APPRAISAL STUDY

Fillmore One to seven million acre-feet in storage depending on calculation assumption; surface area is 20,100 acres.

Transforming Wastewater to Drinking Water: How Two Agencies Collaborated to Build the World s Largest Indirect Potable Reuse Project

Lake Elsinore and Canyon Lake Watersheds Nutrient TMDL Monitoring Annual Report

CALFED Ecosystem Restoration Program (ERP)

OKANAGAN WATER PROJECTS GET FUNDS TO MOVE AHEAD

Frequently Asked Questions Updated July 17, 2015

Retail Water Rates. Board of Directors August 2, 2017

SLIDES: Status of Southern Nevada Water Authority (SNWA): Third Intake into Lake Mead and Groundwater Project

Amortized annual capital cost ($) + Annual Operating Cost ($) = Unit Cost ($/acre-foot) Annual beneficially used water production in acre-feet (AF)

Chehalis Basin Strategy Programmatic SEPA Draft EIS

U.S. Water Budget. Figure Source:Data from The Nation s Water Resources , Vol. 1, U.S. Water Resources Council.

United Water Conservation District November 2016 Hydrologic Conditions Report 2017 Water Year. December 6, 2016

Questions and Answers about the Water Supply and Water Quality bond act for the November, 2018 ballot. Updated November 17, 2017

Project Goals and Scoping

The State of the Colorado River

Alameda County Water District

Montecito Water District Drought and Quarterly Water Supply Update

Decentralized Scalping Plants

Paso Robles Groundwater Basin Management Plan A Focus on Voluntary Actions to Improve the Sustainability of Our Water Supply

Cedar River Watershed Habitat Conservation Plan

A Water Budget For the Arroyo Seco Watershed

Eastside Water District Diffused Surface Water Project PROGRESS REPORT ON EXPENDITURES July 20, Background.

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

ENVIRONMENTAL IMPACT ANALYSIS WATER RESOURCES: WATER SUPPLY 1. ENVIRONMENTAL CONDITIONS. a. Physical Setting. (1) Water Supply

Alternatives Analysis

STORMWATER HARVESTING FOR ALTERNATIVE WATER SUPPLY IN VOLUSIA COUNTY, FLORIDA

NAVAJO NATION WATER DEVELOPMENT AND CUTTER LATERAL OF THE NAVAJO-GALLUP WATER SUPPLY PROJECT

BIG CHICO CREEK WATERSHED ALLIANCE

CLWA Recycled Water Master Plan

Tim Hayden, Yurok Tribe Natural Resources Division Mat Millenbach, Western Rivers Conservancy Sarah Beesley, Yurok Tribal Fisheries Program

SECTION 7: DEMAND MANAGEMENT MEASURES

Madera Irrigation District Water Supply Enhancement Project

Water and Environment. Monterey Peninsula, Carmel Bay and South Monterey Bay Integrated Regional Water Management Draft Plan

Colorado River Basin Water Supply and Demand Study. WRRC 2013 Conference University of Arizona Tucson, AZ March 5, 2013

Managed Groundwater Recharge to Support Sustainable Water Management. A Sacramento Valley Perspective November 8, 2017

STATE OF COLORADO. From: Rod K1.I. harich ewes Director. Date: January 17, 2006 Acting Deputy Director

TABLE OF CONTENTS TABLE OF CONTENTS ELSINORE VALLEY MUNICIPAL WATER DISTRICT

West Placer Groundwater Sustainability Agency Community Meeting February 16, 6 to 8 p.m. McBean Pavilion in Lincoln

Integrated Regional. South Tahoe Public Utility District. Water Management Plan. July 2014 K/J Prepared By Kennedy/Jenks Consultants

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS...

VOLUME 1 TABLE OF CONTENTS

Fullerton Creek Channel (OCFCD Facility No. A03) from downstream Beach Blvd. including undercrossing to downstream I-5 Freeway.

Scottsdale Water Campus 20 Years of Sustainable Water Management. Brian K. Biesemeyer, PE Director, Scottsdale Water

Shortage on the Colorado River: Analysis of Impacts to Water Users in Central Arizona. Ken Seasholes

SUPERSEDED. BDCP Conservation Measure 1: Water Facilities and Operation. BDCP Bay Delta Conservation Plan

Environmental Setting, Impacts, and Mitigation Measures - Water Supply

Securing and Protecting Water Rights and Uses in Arizona

Chapter 8 National Economic Development and Locally Preferred Alternative

Transcription:

Mark R. Norton P.E., LEED AP, ENV SP Water Resources & Planning Manager Santa Ana Watershed Project Authority 1

Provides watershed-wide regional collaboration Creates new water supply/demand management: 2,400 AFY from Arundo Donax Removal 60,000 AFY dry-year yield capacity 7,236 AFY of demand reduction Increases resiliency of water supply Improves natural environment Implements One Water One Watershed (OWOW) Santa Ana River Watershed IRWMP Exceeds IRWMP 2035 Target: 58,000 afy Conjunctive Use 3

Habitat Improvement: Arundo Removal & Santa Ana Sucker fish habitat restoration Water Use Efficiency: Conservation-Based Rates Support, Water-use Efficient Landscaping Design Groundwater Banking: Put and Take Conjunctive Use Facilities 4

640 acres of Arundo removal 1 acre uses 3.75+ acre-feet of water per year more water than native habitat 2,400 afy of water conserved Removal to be completed within 5 years 5

15 Fwy Van Buren Blvd Archibald Ave 60 Fwy Limonite Ave Santa Ana River Prado Basin 91 Frwy SARCCUP Arundo Donax Removal Locations

Santa Ana Sucker Habitat Restoration Create 3.5 miles of stream habitat for Santa Ana sucker spawning, foraging, and refugia Restore 41 acres of native riparian habitat Restore hydrology to maintain exposed gravel/cobble and flow conditions adverse to non-native fishes Restore connection to Santa Ana River at the floodplain for access to tributary habitat 7

Excavation of sediment and debris plug at confluence Realign channel and construct new bank at floodplain Remove non-native and replant with natives Augment substrate and add woody debris habitat features Supplemental water supply to maintain functional hydrology 8

Resource Efficient Landscaping - Learn, Save, Grow Water-efficient landscape design and installation Sustainable landscaping and irrigation maintenance practices Education and training for Residents businesses landscape professionals 9

Provide support for five agencies to implement conservation-based rates Includes consultant support for rate design, public outreach, allocation development. Builds on existing regional program providing GIS/digital Aerial Infrared imagery for outdoor allocations. Estimated Water Savings from Conservation-based Rate Program Implementation is 7,236 afy 10

1,000,000 AF potential storage capacity in SAR GW Basins Phase 1 of SARCCUP Water Bank: 180,000 af Build recharge and extraction infrastructure to take advantage of wet year extraordinary supply Storage on use-side of major earthquake faults All five agencies share equally in dry year yield 11

Groundwater Basin Storage DYY (AF) (AFY) San Bernardino Basin 60,000 20,000 Chino Basin 96,000 32,000 San Jacinto 19,500 6,500 Elsinore Basin 4,500 1,500 Orange County 0 0 Totals 180,000 60,000 (Equiv Storage Volume to both Lake Mathews and Pyramid Lake)

Chino Basin (96,000 af) San Bernardino Basin (60,000 af) Elsinore Basin (4,500 af) San Jacinto Basin (19,500 af)

PUT (IN LIEU GWR) PUT (WET) OR EXCHANGE (PAPER) TAKE (WET EXCHANGE) STATE WATER PROJECT WET YEAR WATER DELIVERY PUT TO EMWD OR WMWD TAKE (WET EXCHANGE) SBVMWD PUT (GWR) PUT (GWR) PUT (GWR) BASELINE FEEDER EXTENSION (IEUA-SBVMWD) DEVIL CANYON - AZUSA PIPELINE (SGVMWD) RIALTO FEEDER (MWD) TAKE (WELLS) SAN BERNARDINO GROUNDWATER BASIN CHINO GROUNDWATER BASIN TAKE (IW/RW EXCHANGE) IEUA RW TAKE (WELLS) IEUA TAKE (IN-LIEU EXCHANGE) MWD PIPELINES PUT (WET) OR EXCHANGE (IN-LIEU) EMWD GWR PUT TAKE (WELLS) MWD CRA OCWD PRADO OBLIGATION IEUA Member Agencies CHINO DESALTER EXCHANGE (IW FOR CDA) WMWD PUT-TAKE (ASR WELLS) SAN JACINTO GROUNDWATER BASIN ELSINORE GROUNDWATER BASIN

Features 96,000 AF Storage Capacity 32,000 AFY New Dry-Year Yield Production and exchanges Construct 48-in. Baseline Feeder Extension Turnout & Interties at San Sevaine Crk Devil Canyon-Azusa PL dual use turnout near San Antonio Crk Extraction wells into South Pressure Zone of RW system (for OCWD take) 15

Chino Basin exchanges can be in-lieu State Water Project exchanges, wet water put and takes, or exchanges through Chino Desalting Authority. Institutional agreements will be required for puts & takes.

Features 60,000 AF Storage Capacity 20,000 AFY New Dry-Year Yield Construct 5 Extraction Wells Transmission pipeline Expand Redlands Pump Station(add 20 cfs pump)

Orange St 210 Frwy Construct 5 wells and Pipeline Extension San Bernardino Blvd Expand Redlands PS

Features 19,500 AF Storage Capacity 6,500 AFY New Dry-Year Yield Construct Mountain Ave. West Recharge Basin 3 Extraction Wells

Features 4,500 AF Storage 1,500 AFY New Dry-Year Yield Construct 2 Dual Use Wells (Injection and Extraction)

Chino Basin (96,000 af) San Bernardino Basin (60,000 af) Elsinore Basin (4,500 af) San Jacinto Basin (19,500 af)

SARCCUP Phase 1 Dry-Year Yield: $940/af 2015 Spot Market: $1,500/af MWD with allocation surcharge: $2,500/af 23

SARCCUP Storage = $84M for 180,000 AF Proposed Sites Reservoir $2.3B to $3.2B/1.8 MAF Equivalent: 180,000 AF would cost $230M-$320M (3-4 times greater) Diamond Valley Reservoir $1.9B / 800,000 AF Equivalent: 180,000 AF would cost $430M (5 times greater) 24

$60 $50 Total SARCCUP Project Cost = $100 million $55M Proposition 84 Grant $45M Local Match WMWD $40 $9M SBVMWD $30 $47.7M $9M OCWD IEUA $20 $10 $0 $0.8M $5.5 Grant $9M $9M $9M Local Match EMWD Water Bank WUE Habitat/Arundo

Takes regional cooperation to the next level 2,464 square mile watershed-wide multi-benefit project Improves environmental resources and creates endangered species habitat Reduces water demands Creates additional new dry year water supply Supported by five agencies as equal partnership

Cost Summary Grant Local Match Total Project 43% Administration $1,000,000 - $1,000,000 Habitat Creation/Arundo Removal $7,522,328 $7,522,328 $15,044,656 Habitat Creation $5,022,328 $5,022,328 $10,044,656 Arundo Removal $2,500,000 $2,500,000 $5,000,000 Water Use Efficiency $2,326,000 $2,326,000 $4,652,000 Turf Removal (1,500,000 sf) $1,743,000 $1,743,000 $3,486,000 Conservation Based Rates $583,000 $583,000 $1,166,000 Water Banking $49,151,672 $35,288,328 $84,440,000 Master Plan - $1,000,000 $1,000,000 Water Bank in 4 Basins $49,151,672 $34,288,328 $83,440,000 Totals $60,000,000 $45,136,656 $105,136,656 $60,000,000 $45,136,656 $105,136,656 Each SAR Agency Particpation: $8,712,751 28

MWD Wet Year Supply: 2.5MAF MWD Wet Year Demand: 1.5-1.7MAF Surplus Supply:.8-1.0MAF In Wet year, LADWP will prioritize taking LA Aqueduct supply MWD total storage in-district is 1MAF MWD total storage (In-District and outside So Cal) is 5.7MAF 29