Ontario Structure Inspection Manual Inspection Form Structure Number: 12

Similar documents
MICHIGAN DEPARTMENT OF TRANSPORTATION

Alberta Transportation Bridge Inspection & Maintenance System (Web 2005) N-1 Bridge. Bridge Inspection Form Type Lot No. 2

HistoricBridges.org - National Bridge Inventory Data Sheet

Implementation of a Bridge Management System In The Province of Nova Scotia

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges.

Post Earthquake Bridge Safety Assessment Program

1.0 CHAPTER 1 INTRODUCTION

US 278 East Bound and West Bound. MacKay Creek and Skull Creek. Cursory Above Water and Underwater Investigation Of. Over

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.

NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA

Deck Joints and Bearings

A STRUCTURAL ASSESSMENT STUDY ON THE SUSTAINABILITY OF SULTAN ISKANDAR BRIDGE KUALA KANGSAR PERAK MALAYSIA

BRIDGE PREVENTIVE MAINTENANCE STRATEGY FOR ERIE-NIAGARA LOCAL BRIDGE OWNERS

BRIDGE INSPECTION REPORT

BRIDGE INSPECTION REPORT

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

Evaluation of Rehabilitation Alternatives for the Cedar Avenue Bridge

MINISTRY OF TRANSPORTATION ONTARIO MANAGING OUR ASSETS

Structural - Engineering Review Checklist

BRIDGE GIRDERS TECHNICAL GUIDE

Inspection guidance for bridge expansion joints. Part 2 Inspector s Practical Guide

Bridges. Chapter 6: chapter contents

Superstructure Guidelines

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

Use of Hand-Held Thermographic Camera for Condition TPF-5(152)

In Service Replacement of Box Girder Bottom Slab

Bridge articulation No. 1.04

Bonner Bridge Replacement Update:

Alder Drive / Blair Road Bridge Replacement Projects

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION

RETROFIT AND REPLACEMENT OF DUMBARTON RAILROAD BRIDGES

Chapter 4 Bridge Program Drawings

ATHABASCA RIVER BRIDGE REHABILITATION PROJECT

Designing Bridges for Inspectability

LRFD Bridge Design Manual Changes

Implementing Asset Management: WSDOT s Experience

QEW Garden City Skyway Niagara Street to Glendale Avenue Risk and Value Engineering Support Major Infrastructure Decisions

JULY 2016 LRFD BRIDGE DESIGN 11-1

VENETIAN CAUSEWAY. (Venetian Way) Project Development & Environment (PD&E) Study FROM NORTH BAYSHORE DRIVE TO PURDY AVENUE. FM No.

!"#$ % 1( =4+0(1*0)4 A)*.(.)44)4 8(: 4 0, 2(3*05. Page 1A of 10 11

ODOT Design & Construction Requirements for MSE Walls

MMM Group Limited. Eagle Island Pier Inspection Report. Prepared for: District of West Vancouver. July

Preserva on Assessment

Inspection & Maintenance of Concrete Facilities By Cheyenne Wohlford CCS GROUP, LLC

The Chief Estimator Software. Item Cost Summary Bridge & Overpass Projects

Inspection & Maintenance of Concrete Facilities

MIDAS Training Series

AUGUST 2016 LRFD BRIDGE DESIGN 3-1

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)

G2-0 List of Active Ministry of Transportation of Ontario Drawings (MTOD s)

Design and Construction of Concrete Overlays. By: James K. Cable, P.E. Cable Concrete Consultation

Lesner Bridge Replacement

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

Designer Supplement: AS-2-15 Approach Slab Installation January 16, 2015

Procedure No: (SP) Effective: August 28, 2002 Responsible Office: Division of Finance and Forecasting INFRASTRUCTURE CAPITALIZATION PROCEDURE

Service life extension of existing precast concrete girders

BRIDGE INSPECTION REPORTS 101. Protecting Your Bridge Inventory for the Future Jason Kelly, PE

Bridge Preventative Maintenance.Act now before this happens to you! Keith Cooper, P.E. Local Bridge Program Manager

Grade-Separated Trail Crossings How Do We Get Over There?

Scoping & Design Project Level. By Robert J. Blight Principal Engineer Pavement Management & Technology

BRIDGE CONSTRUCTION APPROACHES

G2-0 LIST OF ACTIVE MTODs

Application Study on Elastomer Expansion Joint in Heavy Haul Railway

REHABILITATION AND UPGRADING OF A HERITAGE LISTED TIMBER TRUSS BRIDGE

Guidelines for Checking Final Design Bridge Plans

Executive Summary. Champlain Bridge Approach Spans Edge Girder Condition Assessment and Rehabilitation Requirements.

Alligator Cracking. Light. Medium. High

Management of Half Joints in RTA Bridges Amie Nicholas, Project Engineer, NSW Roads and Traffic Authority

Bridge Replacement Study (Phase 1)

CONTINUOUSLY REINFORCED CONCRETE AND UNPAVED ROADS CONDITION SURVEY FIELD MANUAL PUBLICATION 343 APRIL 2017 PUB 343 (4-17)

Chapter 11 Culverts and Bridges

STRUCTURE AND BRIDGE DIVISION

Ironton Russell Bridge Project

ROADSIDE SAFETY BARRIER ELEMENTS Module 3

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Bijan Khaleghi, Ph, D. P.E., S.E.

MSE Walls Problems and Solutions

Table of Contents. July

DEVELOPING DETERIORATION MODELS FOR NEBRASKA BRIDGES

Bridge Inspection Manual. Revised July 2002 by Texas Department of Transportation (512) all rights reserved

SIDEWALK & RAILING REPLACEMENT BOARD OF ED BUILDING

SCHEDULE THREE TECHNICAL PROPOSAL SUBMISSION REQUIREMENTS

APPENDIX B ABC STRUCTURES DESIGN GUIDE

Ironton Russell Bridge Project

CHAPTER 12 MICHIGAN DESIGN MANUAL BRIDGE DESIGN REHABILITATION PROJECTS REHABILITATION PROJECTS SCOPE OF REHABILITATION PROJECTS

BRIDGE DESIGN MANUAL UPDATES. Jamie F. Farris, P.E.

Bridge Development Update

Parapet/railing terminal walls shall be located on the superstructure.

Ageing and Life extension for structures. David Galbraith Ocean Structures / Sigma Offshore

550 Surface Treatments

STRUCTURE AND BRIDGE DIVISION

Pavement Surface Evaluation and Rating Presentation. City of Oberlin Public Works Department July 5, 2011

Folsom Lake Crossing by Hans Strandgaard, Alex Harrison, Jeff Aldrich, and Jeff Thomure, CH2M HILL

Design, fabrication and construction of Railway Bridge over Södertälje canal

GEOTECHNICAL LRFD DESIGN

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1%

Structural Design of Dam Sluice Gate Walkway Slabs: Retrofit and Replacement Options

Transcription:

Inventory Data: Structure Name Gailbraith Road Bridge 1 Main Hwy/Road # On Under Crossing Navig. Water Non-Navig. Water Rail Type: Road Ped. Other Hwy/Road Name Structure Location Latitude Owner(s) Galbraith Road 0.4 km South West of County Road 9 N 45 09 28 Township of Lanark Highlands Longitude Heritage Not Cons. W 76 41 06 Cons./not App. List/not Desig. Designation: Desig./not List Desig. & List MTO Region Eastern Road Class: Freeway Arterial Collector Local MTO District Ottawa Posted Speed Not posted No. of Lanes 2 Old County Lanark AADT <500 % Trucks Geographic Twp. Lanark Inspection Route Sequence Structure Type Simply Supported Steel Girder Interchange Number Total Deck Length 11.3 (m) Interchange Structure Number Overall Str. Width 6.9 (m) Min. Vertical Clearance (m Total Deck Area 78.0 (sq.m) Special Routes: Transit Truck School Bicycle Roadway Width 6.1 (m) Detour Length Around Bridge 10 (km) Skew Angle 0 (Degrees) Direction of Structure N-S No. of Spans 1 Fill on Structure 0 (m) Span Lengths 10.3 (m) Historical Data: Year Built 1950 Year of Last Major Rehab. 2010 Last OSIM Inspection Last Enhanced OSIM Inspection Enhance Access Equipment May 12, 2011 Last Evaluation Current Load Limit 5 (tonnes) (ladder, boat, lift, etc.) Load Limit By-Law # Last Underwater Inspection Last Survey By-Law Expiry Date Rehab History: In 2010 a rehabilitation was done to the south end abutment/deck connection due to noticeable settlement. Page 1 of 14 June 2013

Scheduled Improvements: Ontario Structure Inspection Manual Inspection Form Structure Number: 12 Regional Priority Number Programmed Work Year Nature of Program Work: Appraisal Indices: Comments Fatigue Seismic Scour Flood Geometrics Barrier Curb Load Capacity 5 tonnes/axle At the time of the noted settlement in 2010, a load restriction of 5 tonnes per axle was posted at the bridge. Since the posting, a repair to the south end was completed, but the posting has not been removed. Page 2 of 14 June 2013

Field Inspection Information: Ontario Structure Inspection Manual Inspection Form Structure Number: 12 Date on Inspection: June 18, 2013 Type of Inspection: OSIM Enhanced OSIM Inspector: Kosta Karadakis, P.Eng. Others in Party: Thomas McCarthy Access Equipment Visual, Sounding Equipment, Digital Camera Weather: Sunny Temperature: 15 C Additional Investigations Required: Priority None Normal Urgent Estimated Cost Material Survey Detailed Deck Survey: Non-destructive Delamination Survey of Asphalt-Covered Deck: Concrete Substructure Survey: Detailed Coating Survey: Detailed Timber Investigation: Post-Tensioned Strand Investigation: Underwater Investigation: Fatigue Investigation: Seismic Investigation: Structure Evaluation: Monitoring Monitoring of Deformations, Settlements and Movements: Monitoring Crack Widths: Investigation Notes: Total Cost $0.00 Overall Structure Notes: Recommended Work on Structure: None Minor Rehab. Major Rehab. Replace Timing of Recommended work: 1 to 5 years 6 to 10 years Overall Comments: Significant section loss of interior girder ends, more prominent at south ends. South end girders buckled and temporary support installed in 2010. Date of Next Inspection: 2015 Suspected Performance 00 None 06 Bearing not uniformly loaded/unstable 12 Slippery Surfaces 01 Load carrying capacity 07 Jammed Expansion joint 13 Flooding/channel blockage 02 Excessive deformations (deflections & rotations) 08 Pedestrian/vehicular hazard 14 Undermining of foundation 03 Continuing settlement 09 Rough riding surface 15 Unstable embankments 04 Continuing movements 10 Surface ponding 16 Other 05 Seized bearings 11 Deck drainage Maintenance Needs 01 Lift and Swing Bridge Maintenance 07 Repair to Structural Steel 13 Erosion Control at Bridges 02 Bridge cleaning 08 Repair of Bridge Concrete 14 Concrete Sealing 03 Bridge Handrail Maintenance 09 Repair of Bridge Timber 15 Rout and Seal 04 Painting Steel Bridge Structures 10 Bailey Bridges Maintenance 16 Bridge Deck Drainage 05 Bridge Deck Joint Repair 11 Animal/Pest Control 17 Scaling (Loose Concrete or ACR Steel) 06 Bridge Bearing Maintenance 12 Bridge Surface Repair 18 Other Page 3 of 14 June 2013

Repair and Rehabilitation Required: Priority Element Repair and Rehabilitation Required 6 to 10 1 to 5 Within years years 1 year Urgent Estimated Structural Cost Structure Demolition $50,000 Structure Replacement $400,000 OR Deck Rehab. = Sidewalk/Curb Rehab. = Barriers Rehab. = Joints Rehab. = Girders Rehab. = Abuments Rehab. = Pier Rehab. = Other Estimated Structure Dimensions for Costing (m) Deck Length = Deck Width = Total Structural Cost $450,000.00 Associated Work: Approaches: Detours: Traffic Control: Utilities: Other: Comments Estimated Associated Work Cost Total Associated Work Cost $0.00 Total Estimated Construction Cost $450,000.00 Justification:. Page 4 of 14 June 2013

Element Data Element Group: Approaches Length: 6.0m Element Name: Wearing Surface Width: 7.0m Location: N/S approaches Height: Material: Surface Treatment Count: 2.0 Element Type: Total Quantity: 84.0 m 2 Data: m 2 / m / each / % / all 75.5 8.5 09 Comments: Many pot holes and filled pot holes noted at S approach. Ravelling of the surface also noted. Re-surface asphalt pavement during replacement Element Group: Barriers Length: 17.7m Element Name: Railing Systems Width: Location: E/W side of structure Height: Material: Steel Count: 2 Element Type: Posts and two rails Total Quantity: 35.4m Data: m 2 / m / each / % / all 35.4 08 Comments: Collision damage to two posts. Significant surface rust of steel also. Railing system does not meet current bridge design standards and should be upgraded with next rehab. Upgrade barrier system during replacement. Element Group: Decks Length: 11.3m Element Name: Deck Top Width: 6.9m Location: Height: Material: Cast-in-Place Concrete Count: 1 Element Type: Total Quantity: 78.0m 2 Covered by surface treatment Data: m 2 / m / each / % / all 39 39 Comments: Unable to view majority of deck, but exposed outside edges with severe scaling and disintegration. Surface treatment covering concrete is in good condition expect for a couple small areas. Replace with during structure replacement Page 5 of 14 June 2013

Element Group: Sidewalks/Curbs Length: 17.7 m Element Name: Curbs Width: 0.38m Location: E/W side of roadway Height: 0.26m Material: Cast-in-Place Concrete Count: 2 Element Type: Total Quantity: 31.9 m 2 Data: m 2 / m / each / % / all 28.9 2.0 1.0 Comments: Rusting staining from reinforcing was noted. Disintegration of E exterior curb. Replace during complete replacement Element Group: Embankments and Streams Length: Element Name: Embankments Width: Location: Height: Material: Native Soil Count: 4 Element Type: Total Quantity: 4 Data: m 2 / m / each / % / all 4 Comments: Moderate erosion of embankment due to rain run-off at all quadrants Element Group: Abutments Length: Element Name: Abutment Walls Width: 6.9m Location: N/S ends Height: 3.0m Material: Cast-in-Place Concrete Count: 2 Element Type: Total Quantity: 41.4 m 2 Data: m 2 / m / each / % / all 20.7 20.7 Comments: Unable to view the S abutment wall as it is covered with structural steel support from strengthening rehab. N wall is in good condition with light scaling and rust staining from girders. Ballast walls also appear to be in good condition. Page 6 of 14 June 2013

Element Group: Abutments Length: 3.3m Element Name: Wingwalls Width: Location: All 4 quadrants Height: 1.5m Material: Cast-in-place Concrete Count: 4 Element Type: Total Quantity: 19.8m 2 Data: m 2 / m / each / % / all 17.8 2.0 Comments: Hairline and narrow cracks were noted in the walls. Element Group: Decks Length: 11.3 m Element Name: Soffit Thin Slab Width: 6.9 m Location: Underside of deck Height: Material: Cast-in-place Concrete Count: 1 Element Type: Total Quantity: 78.0 m 2 Data: m 2 / m / each / % / all 70.0 4.0 4.0 Comments: Stained cracks were noted. Small spalls with exposed rebar also noted and provide poor portion. Complete replacement. Element Group: Beams/MLE s Length: 11.3 m Element Name: Girders Width: 0.20 m Location: Height: 0.53 m Material: Steel Count: 5 Element Type: I - type Total Quantity: 93.4 m 2 Coating Data: m 2 / m / each / % / all 73.4 10.0 10.0 Comments: The top flange of exterior girders exhibit surface rust. The south ends of girders have significant section loss, likely due to leaking deck joint above. S end of interior girders buckling. The north ends of interior girders have significant section loss and buckling appears to be initiating. Replace during complete replacement Page 7 of 14 June 2013

Element Group: Accessories Length: Element Name: Signs Width: Location: Height: Material: Count: 8 Element Type: Total Quantity: 8 Data: m 2 / m / each / % / all 8 Comments: Approaches were posted with two hazard markers, bump signs, and a load limit signs at the time of inspection. Element Group: Embankments and Streams Length: Element Name: Streams and Waterways Width: Location: West to East Height: Material: Count: Element Type: Total Quantity: All Data: Comments: m 2 / m / each / % / all all Element Group: Abutments Length: Element Name: Bearings Width: Location: N/S ends Height: Material: Steel Count: 10 Element Type: Pinned plates Total Quantity: 10 Data: m 2 / m / each / % / all 4 6 Comments: Unable to view many of the bearings due to high water levels and strengthening at S abutment. Exterior bearings were in good condition with some surface rust exposed, while interior girders showing signs of significant rust. Page 8 of 14 June 2013

1 North approach looking south 2 East elevation (outlet) Page 9 of 14 June 2013

3 South joint, repaired end 4 North joint, note settlement at approach Page 10 of 14 June 2013

5 Disintegration of exterior curb at SE 6 - Substandard structure connection Page 11 of 14 June 2013

7 - Interior girder buckling at south end 8 - Interior girder buckling at south end Page 12 of 14 June 2013

9 - Significant section loss and buckling initiating in interior girder at north end 10 - Severe rusting of north end girder Page 13 of 14 June 2013

11 - Temporary support at south abutment 12 Typical condition of deck soffit Page 14 of 14 June 2013