Noise Feasibility Study Proposed Residential Development Brock Road Pickering, Ontario

Similar documents
Noise Feasibility Study Proposed Residential Development Old Barber House 5155 Mississauga Road City of Mississauga, Ontario

Noise Assessment Report Main Street, Residential Site Cambridge, ON

Noise Feasibility Study Framgard Apartments (South Block) NW corner of Britannia Road and Regional Road 25 Town of Milton, Ontario

ENVIRONMENTAL NOISE ASSESSMENT

Place Vanier Édifice AEFO

Appendix K. Environmental Noise Assessment

ENVIRONMENTAL NOISE ASSESSMENT

Noise Feasibility Study 2480 Old Bronte Road, Oakville, Ontario

UAL URBAN AERODYNAMICS LTD

Environmental Noise Assessment Feasibility Assessment 92 Plains Road East

NOVATECH ENGINEERING CONSULTANTS LTD. Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6

Rail Traffic Noise and Vibration Feasibility Study Proposed Zone Change for 6 Residential Lots Inkerman Street Guelph, Ontario

SS WILSON ASSOCIATES Consulting Engineers

For The Regional Municipality of Waterloo 150 Frederick Street, 8 th Floor Kitchener, Ontario, N2G 4J3. Prepared by. Sheeba Paul, MEng, PEng

NOISE AND VIBRATION FEASIBILITY STUDY 316 BLOOR STREET WEST CITY OF TORONTO, ONTARIO

Environmental Noise Feasibility Assessment Proposed Guelph Woods Development Guelph, ON

The content of this supplement is based upon the that described in our letter of May 28, 2012.

Noise Impact Assessment 1158 Second Line Road Ottawa, Ontario

BAY MEADOWS PHASE II SPAR 2 SAN MATEO, CALIFORNIA

Compatible Use Odour, Dust, and Noise Assessment

Policy for the Assessment and Mitigation of Traffic Noise on County Roads

Environmental Noise Assessment Feasibility Assessment 939 Eglinton Avenue Development

BRITISH COLUMBIA MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE POLICY FOR ASSESSING AND MITIGATING NOISE IMPACTS

ENVIRONMENTAL NOISE CONTROL GUIDELINES: Introduction and Glossary

Traffic Noise Introduction to Traffic Noise Analysis and Abatement

Section 1 OBC FADS /13 Access to Parking Areas

FIGURE N-1 LAND USE COMPATIBILITY FOR NEW DEVELOPMENT NEAR TRANSPORTATION NOISE SOURCES

RS-1 District Schedule

Attachment E2 Noise Technical Memorandum SR 520

ASSESSMENT OF INWARD TRAFFIC NOISE IMPACT AT RESIDENTIAL DEVELOPMENT, WONDERFUL BARN, LEIXLIP, CO. KILDARE

H3. Residential Single House Zone

Rural-Residential Rural-Residential Explanatory Statement Significant Issues Objectives and Policies...

Buffer distances for surface roads and elevated highways correlated with pre-existing ambient noise

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

Australian Standard. Acoustics Road traffic noise intrusion Building siting and construction AS

Stantec. Allenby Court Extension, Waterloo Noise Impact Assessment. Prepared for: BU Holdings Inc Ontario Limited Waterloo ON.

NOISE IMPACT STUDY - HORIZONTAL DIRECTIONAL DRILLING FOR BLUEWATER RIVER CROSSING REPLACEMENT PROJECT

Regional Official Plan Amendment No OMB Decision on Settlement, File: Commissioner's Report No P-4

Residential Design Standards Draft 9 August 2013

APPENDIX C NOISE STUDY TECHNICAL REPORT

5 INFORMATION UPDATE TRAFFIC NOISE ASSESSMENT TESTON ROAD CITY OF VAUGHAN

H3 Residential Single House Zone

Noise Impact Study for Hyatt House in Davis, California

MCKENZIE INTERCHANGE PROJECT

Noise Assessments for Construction Noise Impacts

H2. Residential Rural and Coastal Settlement Zone

Stage 6 & 7 Design Guidelines

Practice Note FOR THE. Small Lot Housing Code

City of Kingston Engineering Department. Application for New Outdoor Patio. Note: Agreement:

Advanced Ventilation for Residential applications FBC Res 2010.

FENCE PERMIT APPLICATION

SPECIFICATION FOR NOISE MITIGATION

Noise Study Bristol Park Redevelopment Area

CASE STUDY OF THE SOUND REDUCTION OF VARIOUS RESIDENTIAL GLAZING TREATMENTS

Appendix F. Environmental Noise Assessment

Ontario Corp. as general partner for and on behalf of Illumination LP 545 Speedvale Ave W Guelph, Ontario N1K 1E6

Stage 10 Design & Building Guidelines

NORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV

You have applied in accordance with Section 9 of the Environmental Protection Act for approval of:

One and Two Family Additions

Neighborhood Suburban Single-Family District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

1569 West 6th Avenue By-law No (Being a By-law to Amend By-law 3575, being the Zoning and Development By-law)

Acoustic Consulting Australia PtyLtd. I Consultants on Noise and Vibration P0 Box 332

SOUND TRANSIT STAFF REPORT MOTION NO. M Link Noise Mitigation Policy

Appendix D Environmental Noise Assessment

NIGHTTIME ILLUMINATION

Noise measurement and mitigation for urban building foundation excavation

# 7 ) UN MY PLACE HOTEL SPECIAL USE PERMIT PUBLIC HEARING

Commercial Tax Abatement

SECTION 7: INDUSTRIAL ZONE RULES

Alterations to a Designated Heritage Property in the North Rosedale Heritage Conservation District Glen Road

Content Copy Of Original

Noise Analysis Study along I Tim Bjorneberg Project Development Program Manager SDDOT

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

ARCHITECTURAL REVIEW CRANBERRY WOODS

Peak noise levels during any time period can be characterized with statistical terms.

MnDOT GREATER MN STAND ALONE NOISE BARRIER PROGRAM

FEDERAL BOULEVARD (5 TH AVENUE TO HOWARD PLACE) PLANNING ENVIRONMENTAL LINKAGE STUDY TRAFFIC NOISE IMPACT ANALYSIS

DR-15-11/LLA Staff Presentation for ConAM Properties LLC applications for Design Review and Lot Line Adjustment

Basement Renovation Guide For Residential Dwellings

Section 10 - Airport Business Zone (Titanium Park)

Neighborhood Suburban Single-Family District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Noise Control Case Studies TIM WIENS CONESTOGA-ROVERS & ASSOCIATES

9. NOISE AND VIBRATION

NOISE IMPACT ASSESSMENT PROTOCOL. Number Three Wind Farm Lewis County, New York. Case 16-F-0328

Transportation and Works Department The Regional Municipality of York Yonge Street Newmarket, Ontario L3Y 6Z1

SECTION 24 Page 1 of 5. SECTION 24 (By-law 87-67, S.9) RESTRICTED BUSINESS PARK ZONE (B-2)

Design Guidelines. 1. INTRODUCTION 2. SECTION SPECIFICATIONS 3. HOUSE DESIGN RULES

DECISION REGARDING NEED FOR ENVIRONMENTAL IMPACT STATEMENT

INFORMATIONAL PACKAGE ACCESSORY RESIDENTIAL BUILDINGS (INCLUDING DETACHED GARAGES, STORAGE BUILDINGS & WORKSHOPS)

Environmental Assessment May 2007

B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT. Uses allowed in the B-2 Community Commercial Business District are subject to the following conditions:

3.1 Noise Overlay District

APPENDIX C NOISE STUDY TECHNICAL REPORT

511. S.F.U. NEIGHBOURHOOD DISTRICT (P11) (2) Multiple-family dwellings or groups of multiple-family dwellings.

1. Introduction Noise Analysis Results Figures. List of Tables

COMPONENTS OF THE NOISE ELEMENT

A homeowners/applicants guide to understanding and making application for a building permit.

Draft Noise Study Report

Content Copy Of Original

Transcription:

Noise Feasibility Study Proposed Residential Development Brock Road Pickering, Ontario Prepared for: Madison Brock Limited 369 Rimrock Road Toronto, Ontario M3J 3G2 Prepared by: Jingyi Guo Reviewed by: Mandy Chan, PEng June 28, 2017 Project No: 01700338

Table of Contents 1 Introduction and Summary... 1 2 Site Description and Noise Sources... 1 3 Noise Level Criteria... 2 3.1 Road Traffic Noise... 2 4 Traffic Sound Level Assessment... 4 4.1 Road Traffic Data... 4 4.2 Road Traffic Noise Predictions... 4 5 Discussion and Recommendations... 5 5.1 Outdoor Living Areas... 5 5.2 Indoor Living Areas and Ventilation Requirements... 6 5.3 Building Façade Constructions... 6 5.4 Warning Clauses... 7 6 Summary and Recommendations... 9 6.1 Implementation... 10 Figure 1: Key Plan Figure 2: Proposed Draft Plan Showing Prediction Locations Figure 3: Proposed Draft Plan Showing Barrier and Ventilation Requirements Appendix A: Road Traffic Information Appendix B: Sample STAMSON 5.04 Output

Noise Feasibility Study, Proposed Residential Development Page 1 Brock Road, Pickering, Ontario June 28, 2017 1 Introduction and Summary Howe Gastmeier Chapnik Limited (HGC Engineering) was retained by Madison Brock Limited to conduct a noise feasibility study for a proposed low-rise residential development to be located at west of Brock Road and south of Dersan Street in the City of Pickering, Regional Municipality of Durham, Ontario. The proposed development will include a number of stacked townhouse blocks, street townhouse blocks and rear lane townhouse blocks. There are some existing residential areas along Brock Road and an existing cemetery on the east side of Brock Road. The study is required by the municipality as part of the site plan approval process. The primary impacting noise source is road traffic on Brock Road. Relevant forecasted traffic data was obtained from the City of Pickering for Brock Road. Traffic data information was used to predict future traffic sound levels at the locations of the proposed developments. The predicted sound levels were compared to the guidelines of the Ministry of Environment and Climate Change (MOECC) and the Region of Durham to develop noise control recommendations for the proposed development. The sound level predictions indicate that standard building envelope elements will ensure that indoor sound levels can comply with the MOECC noise criteria. Central air-conditioning is required for some specific units so that windows can be kept closed. Warning clauses are also recommended to inform residents of the possible traffic noise impact and the presence of nearby commercial facilities and existing cemetery. A detailed noise study should be performed when detailed floor plans, elevation drawings and grading plans are available to refine the glazing requirements and acoustical barrier requirements. 2 Site Description and Noise Sources Figure 1 is a key plan indicating the location of the proposed development. The proposed development is located on the west side of Brock Road and south of Dersan Street in the City of Pickering, Ontario. The residential development site includes a number of stacked townhouses, street townhouses and rear lane townhouses. All blocks are 3-storey buildings. Prediction locations are indicated on Figure 2 for reference.

Noise Feasibility Study, Proposed Residential Development Page 2 Brock Road, Pickering, Ontario June 28, 2017 There are existing residences along Brock Road and an existing cemetery on the east side of Brock Road. To the southeast is a garden centre, significant noise impact due to the garden centre is not expected as traffic on Brock Road is the dominant noise source in the area. 3 Noise Level Criteria 3.1 Road Traffic Noise Guidelines for acceptable levels of road traffic noise impacting residential developments are given in the MOECC publication NPC-300, Environmental Noise Guideline Stationary and Transportation Sources Approval and Planning, release date October 21, 2013, and are listed in Table I below. The values in Table I are energy equivalent (average) sound levels [LEQ] in units of A-weighted decibels [dba]. Table I: MOECC Road Traffic Noise Criteria (dba) Area Daytime L EQ (16 hour) Road Nighttime L EQ (8 hour) Road Outside Bedroom Windows 55 dba 50 dba Outdoor Living Area 55 dba -- Inside Living/Dining Rooms 45 dba 45 dba Inside Bedrooms 45 dba 40 dba Daytime refers to the period between 07:00 and 23:00. Nighttime refers to the time period between 23:00 and 07:00. The term Outdoor Living Area (OLA) is used in reference to an outdoor patio, a backyard, a terrace, or other area where passive recreation is expected to occur. Small balconies are not considered OLAs for the purposes of assessment. Terraces greater than 4 m in depth (measured perpendicular to the building façade) are considered to be OLAs. The guidelines in the MOECC publication allow the daytime sound levels in an Outdoor Living Area to be exceeded by up to 5 dba, without mitigation, if warning clauses are placed in the purchase and rental agreements to the property. Where OLA sound levels exceed 60 dba, physical mitigation is required to reduce the OLA sound level to below 60 dba and as close to 55 dba as technically, economically and administratively feasible. The Region of Durham has accepted sound levels of

Noise Feasibility Study, Proposed Residential Development Page 3 Brock Road, Pickering, Ontario June 28, 2017 60 dba in the OLA in the past. A central air conditioning system as an alternative means of ventilation to open windows is required for dwellings where nighttime sound levels outside bedroom or living/dining room windows exceed 60 dba or daytime sound levels outside bedroom or living/dining room windows exceed 65 dba. Forced-air ventilation with ducts sized to accommodate the future installation of air conditioning is required when nighttime sound levels at bedroom or living/dining room windows are in the range of 51 to 60 dba or when daytime sound levels at bedroom or living/dining room windows are in the range of 56 to 65 dba. Building components such as walls, windows and doors must be designed to achieve indoor sound level criteria when the plane of window nighttime sound level is greater than 60 dba or the daytime sound level is greater than 65 dba due to road traffic noise. Warning clauses to notify future residents of possible noise excesses are also required when nighttime sound levels exceed 50 dba at the plane of the bedroom or living/dining room window and daytime sound levels exceed 55 dba in the outdoor living area and at the plane of the bedroom or living/dining room window due to road traffic.

Noise Feasibility Study, Proposed Residential Development Page 4 Brock Road, Pickering, Ontario June 28, 2017 4 Traffic Sound Level Assessment 4.1 Road Traffic Data Traffic data for Brock Road was obtained from the City of Pickering and is provided in Appendix A. A forecasted AADT of 40000 vehicles per direction per day was applied for Brock Road in the analysis. A commercial vehicle percentage of 15% was split into 9.75% heavy trucks and 5.25% medium trucks during both daytime and nighttime. A day/night split of 90%/10% was used along with a speed limit of 70 km/h. Table II summarizes the traffic volume data used in this study. In the analysis, the traffic volume was split in half for each direction, northbound and southbound. Table II: Ultimate Road Traffic Data Road Name Cars Medium Trucks Heavy Trucks Total Brock Road Daytime 30 600 1 890 3 510 36 000 Nighttime 3 400 210 390 4 000 Total 34 000 2 100 3 900 40 000 4.2 Road Traffic Noise Predictions To assess the levels of road traffic noise which will impact the study area in the future, sound level predictions were made using STAMSON version 5.04, a computer algorithm developed by the MOECC. Sample STAMSON output is included in Appendix B. Prediction locations were chosen around the residential blocks to obtain a representation of the future sound levels at various dwellings with exposure to Brock Road. Sound levels were predicted at the plane of the 3 rd storey bedroom and/or living/dining room windows during daytime and nighttime hours to investigate ventilation requirements. Blocks 1-4, 15-22 are stacked townhouses and rear lane townhouses without rear yards, while Block 5-14 are street townhouses with rear yards. Sound levels were also predicted in the center of rear yards to investigate acoustic barrier requirements. The results of these predictions are summarized in Table III.

Noise Feasibility Study, Proposed Residential Development Page 5 Brock Road, Pickering, Ontario June 28, 2017 Prediction Location Table III: Predicted Road Traffic Sound Levels [dba], Without Mitigation Description Daytime in the OLA L EQ-16 hr Daytime at the Façade L EQ-16 hr Nighttime at the Facade L EQ-8 hr [A] Block 1, northeast corner -- 73 67 [B] Block 15, southeast corner -- 64 58 [C] Block 12, southeast corner -- 59 53 [D] Block 16, southeast corner -- 62 55 [E] Block 16, southwest corner -- 60 54 [F] Block 12, middle of south side wall -- 54 47 [G] Block 22, southeast corner -- 55 48 [H] Block 5, middle of 2 nd unit rear yard OLA 64 -- -- [J] Block 5, middle of 4 th unit rear yard OLA 60 -- -- [K] Block 8, middle of 1 st house OLA 57 -- -- 5 Discussion and Recommendations The sound level predictions indicate that the future traffic sound levels will exceed MOECC guidelines at the dwelling units with exposure to Brock Road. The following discussion outlines the recommendations for acoustic barrier requirements, ventilation requirements, upgraded building façade construction, and warning clauses to achieve the noise criteria stated in Table I. 5.1 Outdoor Living Areas The predicted daytime sound levels in the OLA s of Block 5, first street townhouse will be up to 64 dba, which is 9 dba in excess of the MOECC s limit of 55 dba. Physical mitigation in the form of an acoustic barrier is required. A 2m high noise barrier will reduce the sound levels in the OLAs to 59 dba. All noise barriers must return back to the dwelling units so that the rear yards are entirely shielded from the roadway. Barrier location is shown on Figure 3. The wall component of the barrier should be of a solid construction with a surface density of no less than 20 kg/m 2. The walls may be constructed from a variety of materials such as wood, brick, pre-cast concrete or other concrete/wood composite systems provided that it is free of gaps or cracks within or below its extent.

Noise Feasibility Study, Proposed Residential Development Page 6 Brock Road, Pickering, Ontario June 28, 2017 The predicted daytime sound levels in the OLA s of the remainder of the lots are 60 dba or less. MOECC accepts sound levels of 5 dba in excess of the limits in OLAs, thus physical mitigation will not be required in the rest of OLAs. 5.2 Indoor Living Areas and Ventilation Requirements Central Air Conditioning The predicted future sound levels outside the 3 rd storey living room/dining room/bedroom windows of the dwellings on Block 1-4 will be greater than 65 dba during the daytime hours and 60 dba during the nighttime hours. To address these excesses, the MOECC guidelines recommend that the dwelling units be equipped with central air conditioning systems, so that the windows can be closed. Provision for the Future Installation of Air Conditioning The predicted future sound levels outside the 3 rd storey living room/bedroom windows of the front rows of dwellings closest to Brock Road on Block 5-9, 11-13 and 15-16 will be between 51 and 60 dba during the nighttime hours. To address these excesses, the MOECC guidelines recommend that these dwellings be equipped with forced air ventilation systems with ducts sized to accommodate the future installation of air conditioning by the occupant. Figure 3 shows the ventilation requirements for the development. Window or through-the-wall air conditioning units are not recommended for any residential units because of the noise they produce and because the units penetrate through the exterior wall which degrades the overall noise insulating properties of the envelope. The location, installation and sound ratings of the outdoor air conditioning devices should minimize noise impacts and comply with criteria of MOECC publication NPC-300, as applicable. The guidelines also recommend warning clauses for all units with ventilation requirements. 5.3 Building Façade Constructions Future sound levels on Block 1-4 along Brock Road will exceed 65 dba during daytime hours and/or 60 dba during nighttime hours. MOECC guidelines recommend that the windows, walls and doors be designed so that the indoor sound levels comply with MOECC noise criteria.

Noise Feasibility Study, Proposed Residential Development Page 7 Brock Road, Pickering, Ontario June 28, 2017 The required building components are selected based on the Acoustical Insulation Factor (AIF) value for road traffic. To do so, calculations were performed to determine the acoustical insulation factors to maintain indoor sound levels within MOECC guidelines. The calculation methods were developed by the National Research Council (NRC). They are based on the predicted future sound levels at the building facades, and the anticipated area ratios of the facade components (windows and walls) and the floor area of the adjacent room. The minimum necessary specification for the building envelope for the Block 1-4 facades of dwellings is AIF-32 for bedrooms and AIF-33 for living/dining rooms, based on the possibility of sound entering the buildings through windows and walls. Preliminary floor plans and building elevations were reviewed. Any well sealed thermopane unit having a Sound Transmission Class (STC) rating of 33 will provide sufficient noise insulation as long as the window to floor area ratio is less than 32% for bedrooms and less than 25% for living/dining rooms. Any exterior wall construction meeting the Ontario Building Code (OBC) will be acceptable for all the dwellings in the development. Any insulated metal exterior door meeting OBC requirements will be sufficient to provide noise insulation. If sliding patio doors are to be used in the dwellings, they must be included in the window area. When detailed floor plans and elevations are available for Blocks 1-4, a detailed noise study should be performed to specify wall and window requirements with sufficient acoustical insulation based on actual window to floor area ratios. The remaining units within the development will have daytime and nighttime sound levels at the top storey façade that are less than 65 and 60 dba respectively. For these units, any exterior wall, and double glazed window construction meeting the minimum OBC will provide adequate sound insulation for the dwelling units. 5.4 Warning Clauses The MOECC guidelines recommend that warning clauses be included in the property and tenancy agreements and offers of purchase and sale for all lots with anticipated traffic sound level excesses. The following noise warning clauses are required for specific dwellings as indicated in Table V.

Noise Feasibility Study, Proposed Residential Development Page 8 Brock Road, Pickering, Ontario June 28, 2017 A suggested wording for future dwellings with sound level excesses of the MOECC criteria but do not require physical mitigation measures is given below. Type A: Purchasers/tenants are advised that sound levels due to increasing road traffic may occasionally interfere with some activities of the dwelling occupants as the sound levels exceed the sound level limits of the Municipality and the Ministry of the Environment and Climate Change. Suggested wording for future dwellings for which physical mitigation has been provided is given below. Type B: Purchasers/tenants are advised that despite the inclusion of noise control features in the development and within the building units, sound levels due to increasing road traffic may occasionally interfere with some activities of the dwelling occupants as the sound levels exceed the City s and the Ministry of the Environment and Climate Change s noise criteria. The acoustical barrier as installed shall be maintained, repaired or replaced by the owner. Any maintenance, repair or replacement shall be with the same material, to the same standards and having the same colour and appearance of the original. A suggested wording for future dwellings requiring central air conditioning systems is given below. Type C: This dwelling unit has been supplied with a central air conditioning system which will allow windows and exterior doors to remain closed, thereby ensuring that the indoor sound levels are within the sound level limits of the Municipality and the Ministry of Environment and Climate Change. A suggested wording for future dwellings requiring forced air ventilation systems is given below. Type D: This dwelling unit has been designed with the provision for adding central air conditioning at the occupant s discretion. Installation of central air conditioning by the occupant in low and medium density developments will allow windows and exterior doors to remain closed, thereby ensuring that the indoor sound levels are within the sound level limits of the Municipality and the Ministry of the Environment and Climate Change. These sample clauses are provided by the MOECC as examples, and can be modified by the Municipality as required.

Noise Feasibility Study, Proposed Residential Development Page 9 Brock Road, Pickering, Ontario June 28, 2017 6 Summary and Recommendations The following list and Table V summarize the recommendations made in this report. The reader is referred to the Figure 3 and previous sections of the report where these recommendations are applied and discussed in more detail. 1. Acoustic barriers are required for the rear yards of the 1 st to 3 rd unit to Brock Road of Block 5. When grading plans are available, acoustic barrier heights should be refined. 2. Central air conditioning is required for the dwellings on Blocks 1-4, the blocks along Brock Road. Forced air ventilation systems with ducts sized to accommodate the future installation of central air conditioning by the occupant is recommended for dwellings on Blocks 5-9, 11-13 and 15-16. The location, installation and sound ratings of the air conditioning devices should comply with NPC-300, as applicable. 3. Upgraded building construction is required for the dwellings for Blocks 1-4. When detailed floor plans and building elevations are available, a detailed noise study should be performed. OBC construction is sufficient for the remaining dwellings. 4. Noise warning clauses should be included in the Development Agreements registered on titles, and in purchase, sale and lease agreements, to inform future owners of noise concerns. Table IV: Summary of Noise Control Requirements and Noise Warning Clauses Block No. Unit Acoustic Barrier Ventilation Requirements* Type of Warning Clause Upgraded Building Constructions 1-4 All -- Central Air A, C 1 st to 3 rd unit closest to BR: AIF-32 LR/DR: AIF-33 5 Brock Road Forced Air B, D OBC Remaining Units in Block -- Forced Air A, D OBC 6-9, 11-13, 15-16 All -- Forced Air A, D OBC 10, 14, 17-22 All -- -- A OBC Notes: -- no specific requirement * The location, installation and sound rating of the air conditioning condensers must be compliant with MOECC Guideline NPC-300, as applicable. LRDR Living Room/Dining Room BR Bedroom OBC Ontario Building Code

Noise Feasibility Study, Proposed Residential Development Page 10 Brock Road, Pickering, Ontario June 28, 2017 6.1 Implementation To ensure that the noise control recommendations outlined above are properly implemented, it is recommended that: 1. When architectural and grading plans are available for dwellings closest to Brock Road (Blocks 1 4), an acoustical consultant should review the plans to determine appropriate window and wall constructions and refine acoustic barrier requirements. 2. Prior to the acceptance for maintenance of this development, the Municipality s building inspector or a Professional Engineer qualified to perform acoustical engineering services in the Province of Ontario should certify that the noise control measures have been properly incorporated. 3. Prior to assumption of the subdivision, the Municipality s building inspector or a Professional Engineer qualified to perform acoustical engineering services in the Province of Ontario should certify that the noise control measures have been properly installed and constructed.

[E] [G] 84-90 152-155 [D] 141-144 [F] [J] 115-119 BLOCK 15 V62 V1 V2 (REAR LANE TOWNHOUSE) V3 136-140 V7 V6 [C] COMMUNITY MAILBOX AS PER CANADA POST STANDARDS. REFER TO ENGINEERING DRAWING V10 [H] TOT LOT 120-127 COMMUNITY MAILBOX AS PER CANADA POST STANDARDS. REFER TO ENGINEERING DRAWING V11 99-106 107-114 V64 145-151 [B] 128-135 76-83 COMMUNITY MAILBOX AS PER CANADA POST STANDARDS. REFER TO ENGINEERING DRAWING COMMUNITY MAILBOX AS PER CANADA POST STANDARDS. REFER TO ENGINEERING DRAWING V25 V24 91-98 V52 V38 V37 V56 [K] V61 V60 V59 V58 V57 BLOCK 1 6-10 11-15 16-20 [A] 21-25 BLOCK 4 BLOCK 3 BLOCK 2 (STACKED TOWNHOUSE) (STACKED TOWNHOUSE) 1-5 (STACKED TOWNHOUSE) (STACKED TOWNHOUSE) 26-30 31-35 36-40 41-45 46-50 51-55 EXISTING ASPHALT SIDEWALK 56-60 61-65 66-70 71-75 EXISTING ASPHALT SIDEWALK 52 Figure 2: Proposed Site Plan Showing Prediction Locations Pickering fire Service Fire Prevention Division 241215'& 56#%-'& 564''6 #0& 4'#4.#0' 6190*175' &'8'.12/'06 BROCK ROAD, PICKERING ONTARIO

84-90 884 44-9 90 90 15 155 152-155 141-144 115-119 BLOCK 15 V62 V1 V2 (REAR LANE TOWNHOUSE) V3 136 140 136-140 V7 V6 V10 COMMUNITY MAILBOX AS PER CANADA POST STANDARDS. REFER TO ENGINEERING DRAWING COMMUNITY MAILBOX AS PER CANADA POST STANDARDS. REFER TO ENGINEERING DRAWING V11 99-106 107-114 V64 145-151 TOT LOT 120-127 120 220-127 0-1 128-135 128 35 V25 V24 91-98 91 98 76-83 68 COMMUNITY MAILBOX AS PER CANADA POST STANDARDS. REFER TO ENGINEERING DRAWING COMMUNITY MAILBOX AS PER CANADA POST STANDARDS. REFER TO ENGINEERING DRAWING V52 V38 V37 V61 V600 V59 V56 V58 V57 BLOCK B LOCK 1 6-10 11-155 16-20 21-25 2-225 21 BLOCK 4 BLOCK BLOCK B LOCK 3 BLOCK B LO LOCK OCK CK 2 ((STACKED (ST TACKE T ACKED C E TOWNHOUSE) TOW WNHOUSE) (STACKED ((STA ST A ACKED CKED KED TOWNHOUSE) TO 1-5 (STACKED ACK CK TOWNHOUSE) TOW (STACKED KED TOWNH TOWNHOUSE) 26-30 6-3 31-35 1-35 36-40 36-44 41-45 46-50 50 51-55 61-655 56-60 56 66-70 66 71-75 71-775 EXISTING ASPHALT SIDEWALK EXISTING ASPHALT SIDEWALK Forced Air Ventilation Central Air Conditioning Acoustical Barrier Figure 3: Proposed Site Plan Showing Barrier and Ventilation Requirements 52 Pickering fire Service Fire Prevention Division 241215'& 56#%-'& 564''6 #0& 4'#4.#0' 6190*175' &'8'.12/'06 BROCK ROAD, PICKERING ONTARIO

Appendix A Road Traffic Information

The Regional Municipality of Durham Planning and Economic Development Department Planning Division 605 ROSSLAND RD. E. 4TH FLOOR P.O. BOX 623 WHITBY, ON L1N 6A3 CANADA 905-668-7711 1-800-372-1102 Fax: 905-666-6208 E-Mail: planning@durham.ca www.durham.ca Brian Bridgeman, MCIP, RPP Commissioner of Planning and Economic Development ROAD SEGMENT TRAFFIC FORECASTS FOR NOISE ANALYSES This information is to be used as the basis for assessing the potential impacts of noise, generated by traffic on Provincial Highways and arterial roads, on proposed land uses that are sensitive (e.g., residential subdivisions). Arterial roads include existing and future Type A, B and C, as designated in the Durham Regional Official Plan. Noise assessment reports recommend specific measures to be integrated into the design of sensitive developments to reduce road noise impacts to acceptable levels. Provided For: Name / Name of Firm: Address: Sheeba Paul, HGC Engineering 2000 Argentia Rd., Plaza One, Suite 203, Mississauga, ON Telephone: (905) 826-4044 Fax: Location of Proposal: West side of Brock Road, south of Dersan Street Note: Planned widening of Brock Road to 6-lanes is for future HOV lanes. Municipality: Pickering Lot(s): Concession: Durham Region File No. (if available): Name of Property Owner (if available): Date Request Received: May-11-17 Received By: Chris Leitch Date Forecast Sent: May-17-17 Name of Road Segment Forecasted AADT* No. of Lanes % of Trucks Heavy : Medium Truck Ratio Speed (km/h) Brock Road, north of Third Concession Road 40,000 6 15 65 35 70 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * Average Annual Daily Traffic. Forecast based on ultimate development according to the Durham Regional Official Plan. May-17-17 Page 1 of 1

Appendix B Sample STAMSON 5.04 Output

Page 1 of 3 [A] STAMSON 5.0 NORMAL REPORT Date: 26-05-2017 15:34:13 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: a.te Time Period: Day/Night 16/8 hours Description: Predicted daytime and nighttime sound levels at the upper storey windows, at Prediction Location [A] Road data, segment # 1: BrockSB (day/night) ------------------------------------------- Car traffic volume : 15300/1700 veh/timeperiod * Medium truck volume : 945/105 veh/timeperiod * Heavy truck volume : 1755/195 veh/timeperiod * Posted speed limit : 70 km/h Road gradient : 0 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): 20000 Percentage of Annual Growth : 2.50 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 5.25 Heavy Truck % of Total Volume : 9.75 Day (16 hrs) % of Total Volume : 90.00 Data for Segment # 1: BrockSB (day/night) ----------------------------------------- Angle1 Angle2 : -90.00 deg 90.00 deg Wood depth : 0 (No woods.) No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : 22.00 / 22.00 m Receiver height : 10.50 / 10.50 m Topography : 1 (Flat/gentle slope; no barrier) Reference angle : 0.00 Road data, segment # 2: BrockNB (day/night) ------------------------------------------- Car traffic volume : 15300/1700 veh/timeperiod * Medium truck volume : 945/105 veh/timeperiod * Heavy truck volume : 1755/195 veh/timeperiod * Posted speed limit : 70 km/h Road gradient : 0 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): 20000 Percentage of Annual Growth : 0.00 Number of Years of Growth : 10.00 Medium Truck % of Total Volume : 5.25 Heavy Truck % of Total Volume : 9.75 Day (16 hrs) % of Total Volume : 90.00 Data for Segment # 2: BrockNB (day/night) -----------------------------------------

Page 2 of 3 [A] Angle1 Angle2 : -90.00 deg 90.00 deg Wood depth : 0 (No woods.) No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : 32.00 / 22.00 m Receiver height : 10.50 / 10.50 m Topography : 1 (Flat/gentle slope; no barrier) Reference angle : 0.00 Results segment # 1: BrockSB (day) ---------------------------------- Source height = 1.77 m ROAD (0.00 + 70.80 + 0.00) = 70.80 dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq -90 90 0.38 74.04 0.00-2.30-0.94 0.00 0.00 0.00 70.80 Segment Leq : 70.80 dba Results segment # 2: BrockNB (day) ---------------------------------- Source height = 1.77 m ROAD (0.00 + 68.55 + 0.00) = 68.55 dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq -90 90 0.38 74.04 0.00-4.55-0.94 0.00 0.00 0.00 68.55 Segment Leq : 68.55 dba Total Leq All Segments: 72.83 dba Results segment # 1: BrockSB (night) ------------------------------------ Source height = 1.77 m ROAD (0.00 + 64.26 + 0.00) = 64.26 dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq -90 90 0.38 67.51 0.00-2.30-0.94 0.00 0.00 0.00 64.26 Segment Leq : 64.26 dba

Page 3 of 3 [A] Results segment # 2: BrockNB (night) ------------------------------------ Source height = 1.77 m ROAD (0.00 + 64.26 + 0.00) = 64.26 dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq -90 90 0.38 67.51 0.00-2.30-0.94 0.00 0.00 0.00 64.26 Segment Leq : 64.26 dba Total Leq All Segments: 67.27 dba TOTAL Leq FROM ALL SOURCES (DAY): 72.83 (NIGHT): 67.27

Page 1 of 3 [B] STAMSON 5.0 NORMAL REPORT Date: 26-05-2017 15:40:00 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: b.te Time Period: Day/Night 16/8 hours Description: Predicted daytime and nighttime sound levels at the upper storey windows, at Prediction Location [B] Road data, segment # 1: BrockSB (day/night) ------------------------------------------- Car traffic volume : 15300/1700 veh/timeperiod * Medium truck volume : 945/105 veh/timeperiod * Heavy truck volume : 1755/195 veh/timeperiod * Posted speed limit : 70 km/h Road gradient : 0 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): 20000 Percentage of Annual Growth : 2.50 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 5.25 Heavy Truck % of Total Volume : 9.75 Day (16 hrs) % of Total Volume : 90.00 Data for Segment # 1: BrockSB (day/night) ----------------------------------------- Angle1 Angle2 : 0.00 deg 90.00 deg Wood depth : 0 (No woods.) No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : 60.50 / 60.50 m Receiver height : 10.50 / 10.50 m Topography : 1 (Flat/gentle slope; no barrier) Reference angle : 0.00 Road data, segment # 2: BrockNB (day/night) ------------------------------------------- Car traffic volume : 15300/1700 veh/timeperiod * Medium truck volume : 945/105 veh/timeperiod * Heavy truck volume : 1755/195 veh/timeperiod * Posted speed limit : 70 km/h Road gradient : 0 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): 20000 Percentage of Annual Growth : 0.00 Number of Years of Growth : 10.00 Medium Truck % of Total Volume : 5.25 Heavy Truck % of Total Volume : 9.75 Day (16 hrs) % of Total Volume : 90.00 Data for Segment # 2: BrockNB (day/night) -----------------------------------------

Page 2 of 3 [B] Angle1 Angle2 : 0.00 deg 90.00 deg Wood depth : 0 (No woods.) No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : 70.50 / 70.50 m Receiver height : 10.50 / 10.50 m Topography : 1 (Flat/gentle slope; no barrier) Reference angle : 0.00 Results segment # 1: BrockSB (day) ---------------------------------- Source height = 1.77 m ROAD (0.00 + 61.71 + 0.00) = 61.71 dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq 0 90 0.38 74.04 0.00-8.37-3.95 0.00 0.00 0.00 61.71 Segment Leq : 61.71 dba Results segment # 2: BrockNB (day) ---------------------------------- Source height = 1.77 m ROAD (0.00 + 60.79 + 0.00) = 60.79 dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq 0 90 0.38 74.04 0.00-9.29-3.95 0.00 0.00 0.00 60.79 Segment Leq : 60.79 dba Total Leq All Segments: 64.28 dba Results segment # 1: BrockSB (night) ------------------------------------ Source height = 1.77 m ROAD (0.00 + 55.18 + 0.00) = 55.18 dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq 0 90 0.38 67.51 0.00-8.37-3.95 0.00 0.00 0.00 55.18 Segment Leq : 55.18 dba

Page 3 of 3 [B] Results segment # 2: BrockNB (night) ------------------------------------ Source height = 1.77 m ROAD (0.00 + 54.26 + 0.00) = 54.26 dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq 0 90 0.38 67.51 0.00-9.29-3.95 0.00 0.00 0.00 54.26 Segment Leq : 54.26 dba Total Leq All Segments: 57.75 dba TOTAL Leq FROM ALL SOURCES (DAY): 64.28 (NIGHT): 57.75