COMMONWEALTH of VIRGINIA

Similar documents
J. Sargeant Reynolds Community College. Chesapeake Bay TMDL Action Plan

CHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit)

CHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit)

Chesapeake Bay Action Plan

COMMONWEALTH of VIRGINIA

Stormwater Quality Trades: Virginia Farms and Highways

COMMONWEALTH of VIRGINIA

Pollution Reduction Plan For Municipal Separate Storm Sewer System

MS4 Permits. Understanding MS4 Permits (Municipal Separate Storm Sewer System) P508-17

Arlington s New Stormwater Management Ordinance. Informational Meeting May 28, 2014

The Next Generation of Stormwater Management and Site Design. Melanie R. Grigsby, P.E. Stormwater Resource Manager, City of Fort Myers

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION

Council of Governments

PA Municipal Separate Storm Sewer System (MS4) TMDL Plan

Strategies for Financing Chesapeake Bay Restoration in Virginia

Virginia Stormwater Management Permitting

Total Maximum Daily Load (TMDL) & Pollutant Reduction Plan (PRP) For Skippack Creek Franconia Township Montgomery County, Pennsylvania

Municipal Separate Storm Sewer System (MS4) Awareness Presentation. March 8 th, :00AM 12:00PM Video Conference

Wisconsin Wastewater Operators Association. Protecting Our Water Resources: The Future Bill Hafs - NEW Water 10/2014

Pennsylvania s Phase III Watershed Implementation Plan

Go Green, Save Money: Lowering Flood Insurance Rates in Virginia with Stormwater Management. Kristen Clark VCPC Alumna, Spring 2014

THE VIRGINIA STORMWATER.

Module 4 Regulatory requirements for Land Disturbing Activities

Bacteria TMDL Action Plan Prince William County

Targets of Opportunity: Alexandria s Urban Retrofit Program

STORMWATER PROGRAM MANAGEMENT PLAN FOR TOWN OF CAPE ELIZABETH, MAINE

Mike Langland USGS PA Agricultural Advisory Board April 28, 2016

Landfills And The New Virginia Stormwater Management Program Regulations

Title 26 DEPARTMENT OF THE ENVIRONMENT

Municipal Stormwater Management Planning

Old Dominion University MS4 Program Plan

Illinois EPA update to DuPage County Watershed Management Section Bureau of Water

How Nutrient Trading Can Help Restore the Chesapeake Bay

Water Quality Resilience and Policy in an Integrated Urban and Agricultural Water Basin

Innovative Storm Water Program Implementation

Emerging Trends in Ecological Offsets

Occupational Safety & Health Environmental Health Laboratory Safety Industrial Hygiene Radiation Safety Hazardous Waste Pollution Prevention

FREQUENTLY ASKED QUESTIONS: URBAN STREAM RESTORATION BMP. David Wood Chesapeake Stormwater Network. Lisa Fraley-McNeal Center for Watershed Protection

Baltimore City Department of Public Works

National Pollutant Discharge Elimination System (NPDES) Phase II Permit

Factsheet: Town of Deep River Water Quality and Stormwater Summary

The City of Cocoa (City) is located in east

MS4 Programs: Quality, the Other Stormwater Q. Dan Bounds, PE, D.WRE IAFSM March 9, 2017

Environmental Management at DoD Facilities in the Chesapeake Bay Region. US Army Corps of Engineers BUILDING STRONG

FINAL. Appendix D: Newport Bay

Recommendations of the Expert Panel to Define Removal Rates for Urban Filter Strips and Stream Buffer Upgrade Practices

DORCHESTER COUNTY CHESAPEAKE BAY TMDL PHASE II WATERSHED IMPLEMENTATION PLAN (PROPOSED FOR PUBLIC COMMENT)

MS4 NPDES PERMITS FREQUENTLY ASKED QUESTIONS (FAQ) 1

Cost-Effectiveness Study of Urban Stormwater BMPs in the James River Basin

NPDES - PCSM. National Pollutant Discharge Elimination System Post Construction Stormwater Management Permit Preparation

Engineering Department

UNDERSTANDING THE LAW. In Pennsylvania, both state and federal law govern water pollution caused by stormwater. We briefly examine both.

Buzzards Bay. National Estuary Program

Ecosystem Service Tradeoffs in the Implementation of the Bay TMDL

North Dakota s Nutrient Reduction Strategy. Presented to the 2016 ND Water Quality Monitoring Conference March 4, 2016

Module 3. Module 3a. As of July : A lot of local ESC ordinances are out of date! Virginia Erosion & Sediment Control Program

Pennsylvania s Chesapeake Bay Tributary Strategy Implementation Plan for Sewage Facilities Planning

STORMWATER MANAGEMENT PROGRAM. Table of Contents

Recycling And The New Virginia Stormwater Management Program Regulations VIRGINIA RECYCLING ASSOCIATION 2014 ANNUAL CONFERENCE

LANCASTER COUNTY Act 167 Frequently Asked Questions (FAQs)

Municipal Separate Storm Sewer System (MS4) Program Plan

Chesapeake Bay Pollutant Reduction Plan

OVERVIEW OF LOS ANGELES COUNTY

WORKING PAPER How Baywide Nutrient Trading Could Benefit Virginia Farms

CITY OF MERCER ISLAND 2017 STORMWATER MANAGEMENT PROGRAM (SWMP) PLAN

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II

The Metropolitan District. Stormwater & I/I Reduction Presentation March 16, 2017

Clean Water is Everyone s Business. A commercial & industrial property owner s guide to improving Lake Tahoe s clarity

LOS ANGELES WATERSHED MANAGEMENT PROGRAMS October 28, 2015 JOLENE GUERRERO LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS

City of Richmond, Virginia. MS4 Program Plan

STORMWATER MANAGEMENT PROGRAM. Pottawatomie County, Kansas Stormwater Management Program

Storm Water Management Plan (SWMP)

Memorandum of Understanding for an Adaptive Management Pilot Project in the Yahara Watershed

ARLINGTON COUNT Y, VIRGINIA. Stormwater Master Plan

Stormwater Programs. BIA Meeting June 5, Jason Uhley

University of Virginia - MS4 Program Plan - VAR Minimum Control Measure No. 1: Public Education and Outreach on Storm Water Impacts

Evaluating Stormwater Management Program Effectiveness. NPDES Stormwater Program 2/9/2017

Lake Tohopekaliga Nutrient Reduction Plan and Best Management Practice Pollutant Load Analysis

DRAFT FINAL REPORT. City of Kalispell. Stormwater Impact Fee Study

Newton s Evolving Stormwater Utility

MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore MD

Rhode Island Stormwater Design and Installation Standards Manual-- Final Draft: Public Informational Session May 26, 2010 at CCRI

Review Zone Application for D&R Canal Commission Decision

STORMWATER PROGRAM MANAGEMENT PLAN. For 5 Year Permit Period FOR. Town of Yarmouth, Maine

ALMY POND TMDL MANAGEMENT PLAN

Evaluation of Pollutants in Wastewater Generated by Mobile Car Washing Operations

February 28, Re: N.J.A.C. 7:8 Stormwater Management Rules. Dear Commissioner Martin:

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

West Virginia s Chesapeake Bay TMDL Watershed Implementation Plan

Montgomery County s MS4 Permit Implementation Strategy: Using the Watershed Treatment to meet local and Bay restoration goals

GUIDELINES FOR STORMWATER BACTERIA REDUCTIONS THROUGH BMP IMPLEMENTATION NY/NJ HARBOR TMDL DEVELOPMENT

Elements of the Storm Water Management Plan. Storm Water Pollution Prevention Plan (SWPPP)

Stormwater Management Plan (SWMP)

SoPo s SW Management Approach Purpose of SW Standards

Standard Title Page - Report on Federally Funded Project 1. Report No. 2. Government Accession No. 3. Recipient s Catalog No.

Phase II WIP Background & Development Process. February 2011

Appendix 12. Pollutant Load Estimates and Reductions

Small Site Stormwater Quality Permit Application

Pennsylvania s Phase III Watershed Implementation Plan: What are the Expectations?

Transcription:

Molly Joseph Ward Secretary of Natural Resources May 23, 2016 COMMONWEALTH of VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY Street address: 629 East Main Street, Richmond, Virginia 23219 Mailing address: P.O. Box 1105, Richmond, Virginia 23218 www.deq.virginia.gov David K. Paylor Director (804) 698-4000 1-800-592-5482 Tony Dawood Director of Utilities City of Manassas 8500 Public Works Dr Manassas, VA 20110 Transmitted electronically: tdawood@ci.manassas.va.us RE: Virginia Pollutant Discharge Elimination System (VPDES) MS4 Permit VAR040063, City of Manassas, Chesapeake Bay TMDL Action Plan Approval Dear Mr. Dawood: The Department of Environmental Quality (DEQ) has reviewed the Chesapeake Bay TMDL Action Plan received on September 30, 2015 in accordance with Section I.C of the General VPDES Permit for Discharges of Stormwater from Small Municipal Separate Storm Sewer Systems (MS4). Additional information was received November 30, 2015, January 20, 2016, April 11, 2016, April 25, 2016, April 26, 2016, and May 13, 2016. As submitted, the action plan will result in the following annual reduction of pollutants of concern in the Potomac River Basin: Pollutant of Concern Annual Load Reduction (lb/yr) Percentage of L2 Reduction Achieved After Implementation Percentage of New Source Reduction Achieved After Implementation Nitrogen 5,785.01 131.15% 5% Phosphorus 951.16 270.36% 5% Suspended 2,257,911.41 589.97% 5%

VAR040063 City of Manassas Chesapeake Bay TMDL Action Plan Approval Page 2 The Chesapeake Bay TMDL Action Plan is hereby approved and is an enforceable part of the MS4 Program Plan. The approved action plan is based on the 2000 Urbanized Area as designated by the U.S. Census Bureau; and reductions were calculated based on land use data from 2009. Please note that additional reductions may be required to address loads from expanded urbanized area as a result of the 2010 Census in accordance with Section II.C.5 of the MS4 General Permit. Please note any modifications to the Chesapeake Bay TMDL Action Plan shall be made in accordance with the Program Plan Modification Section of the MS4 General Permit (Section II.F). As provided by Rule 2A:2 of the Supreme Court of Virginia, you have thirty (30) days from the date you received this decision within which to appeal this decision by filing a notice of appeal in accordance with the Rules of the Supreme Court of Virginia with the Director, Virginia Department of Environmental Quality. Please contact Kelsey Brooks at (804) 698-4321 or at kelsey.brooks@deq.virginia.gov if you have any questions. Sincerely, Allan Brockenbrough II, P.E. Manager, Office of VPDES Permits Copies: File Patrick Moore (pmoore@ci.manassas.va.us) Jacob Renaud (jrenaud@ci.manassas.va.us)

Chesapeake Bay TMDL Action Plan City of Manassas Public Works Department 8500 Public Works Dr Manassas, VA 20110 Permit Number : VAR040063

Chesapeake Bay TMDL Action Plan In compliance with the Section I C of the MS4 permit, the City is required to address the Special Conditions for the Chesapeake Bay TMDL. The MS4 permit requires the development and implementation of the Chesapeake Bay TMDL Action Plan to reduce the pollutants of concern (POC) determined by the estimation of the annual POC loads discharged from the existing sources as of June 30, 2009, based on the 2009 progress run. The following sections address the requirements of the Special Conditions for the Chesapeake Bay. a. (1) Review of the MS4 program The City has reviewed its current MS4 Program Plan and has determined that the existing legal authority and the City s ability are sufficient to ensure compliance with this special condition. a. (2) Identification of Legal Authority No new or modified legal authority has been necessarily identified to meet the requirements of this special condition. a. (3) Means and Methods to Address New Sources The City adopted the Virginia Stormwater Management Act requirements into local ordinance in 2014. This included water quantity and water quality requirements being adopted locally and will be utilized to address discharges into the MS4 from new sources. a. (4) Estimate of the Annual POC loads An estimate of the annual POC loads discharged from the existing sources as of June 30, 2009, based on the 2009 progress run is provided below; Table 1: Estimation of Existing Source Loads for the Potomac River Basin Estimated Subsource Pollutant Existing Acres Served by MS4 (6/30/09) 2009 EOS* Loading Rate (lbs/acre) POC Load Based on 2009 Progress Run Nitrogen Phosphorus Suspended 1395 16.86 23,519.70 3626 10.07 36,513.82 1395 1.62 2,259.90 3626 0.41 1,486.66 1395 1,171.32 1,633,991.40 3626 175.8 637,450.80

* EOS Edge of Stream a. (5) Determination of the Pollutant Load Reduction A determination of the total pollutant load reductions necessary to reduce the annual POC loads from existing sources utilizing the table provided in the permit based on the Potomac River Basin is provided below; Table 2: Determination of POC Reductions Required During this Permit Cycle for the Potomac River Basin First Permit Subsource Pollutant Existing Acres Served by MS4 (6/30/09) Cycle Required Reduction in Loading Rate (lbs/acre) Reduction Required First Permit Cycle (lbs) Nitrogen Phosphorus Suspended 1395 0.08 111.60 3626 0.03 108.78 1395 0.01 14.95 3626 0.001 3.63 1395 11.71 16,335.45 3626 0.77 2,792.02 a. (6) Means and Methods to Achieve the POC Reductions The City has an existing and comprehensive water quality improvement program. The means and methods implemented to date include regional stormwater management facility project, stream restoration projects, pond restoration projects, redevelopmentbased reductions, street sweeping program, and 2006-2009 historical BMPs. The City intends to achieve the required reductions included in Table 2 through the regional stormwater management facility project to meet the first permit term required reductions. This project has been initiated in 2012 and the pollutant reduction credits have been calculated using the approved removal rates for the wet pond developed by the Chesapeake Bay Program Expert Panel. The removal rates are 865.70 lb/yr for Nitrogen, 201.69 lb/yr for Phosphorus, and 255,986.50 lb/yr for Suspended. The construction is anticipated to start in March 2016 and last approximately 18 months. a. (7) Means and methods to offset the increased loads from new sources initiating construction between July 1, 2009 and June 30, 2014, that disturb one acre or greater as a result of the utilization of an average land cover condition greater than 16% impervious cover for the design of post-development stormwater management facilities The City identified five projects for new sources initiating construction between July 1, 2009 and June 30, 2014 that disturb one acre of greater and exceeded an average

land cover condition of 16% impervious cover for the design of post-development stormwater management facilities. All lands regulated under an Individual Permit were excluded from the City s regulated area. The aggregate accounting method was selected to determine the additional treatment requirements from new sources. This resulted in an increase in the POC loads and the 5% offset from the calculated increased load from the new sources are shown in Table 3 and Table 4 respectively. Table 3. POC Loads as of July 01, 2014 Subsource Pollutant Nitrogen Phosphorus Suspended Existing Acres Served by MS4 as of 07/01/14 2009 EOS Loading Rate (lbs/acre) Estimated POC Load as of 07/01/14 2623.6 16.86 44,233.9 3707.4 10.07 37,333.5 2623.6 1.62 4,250.2 3707.4 0.41 1,520.0 2623.6 1,171.32 3,073,075.2 3707.4 175.8 651,760.9 Table 4. Load Change from New Source between 06/30/09 and 07/01/14 and Additional Reductions Required during first permit cycle Subsource Urban Urban Urban Urban Urban Urban Pollutant Nitrogen Phosphorus Suspended Estimated POC Load as of 07/01/14 Estimated POC Load as of 06/30/09 Load Change 44233.90 44072.04 161.86 37333.52 37430.19-96.67 4250.23 4234.68 15.55 1520.03 1523.97-3.94 3073075.15 3,061,830.48 11244.67 651760.92 653448.6-1687.68 Load Change (lbs/yr) 5% Offset (lbs/yr) 65.18 3 11.62 1 9556.99 478 The City implemented the regional stormwater comprehensive plan and accounted for the increased POC loads by reducing the credit taken for the oversized regional BMPs that

resulted in over-treatment. City will verify the long-term maintenance and upkeep of stormwater management facilities. a. (8) Means and methods to offset the increased loads from projects as grandfathered in accordance with 4VAC50-60-48, that disturb one acre or greater that begin construction after July 1, 2014, where the project utilizes an average land cover condition greater than 16% impervious cover in the design of post-development stormwater management facilities. The City identified three grandfathered projects in accordance with 4VAC50-60- 48, that disturb one acre or greater that begin construction after July 1, 2014, where the project utilizes an average land cover condition greater than 16% impervious cover in the design of post-development stormwater management facilities.. All lands regulated under an Individual Permit were excluded from the City s regulated area. The Site by Site Accounting method was selected to determine the additional treatment requirements from the grandfathered projects. The loading rates of the grandfathered projects are 5.34 lbs/yr for Phophorus, 36.85 lbs/yr for Nitrogen, and 2505.53 lbs/yr for Suspended. Additional load offsets during this permit cycle are 0.27 lbs/yr for Phophorus, 1.84 lbs/yr for Nitrogen, and 125.28 lbs/yr for Suspended. The City will apply excess credit from reductions required for existing sources to offset required reductions from the grandfathered projects. a. (9) TMDL Implementation Plan The City has updated the TMDL Action Plan and will be addressed as part of the permit reapplication. a. (10) Future Projects that qualify as grandfathered Upon review, the City has determined that three projects that qualify as grandfathered in accordance with 4VAC50-60-48 are listed below. Projects associated with lands that are regulated under an Individual Permit and by other jurisdiction are excluded from the list. Name Address Site Area (Acres) Firestone Complete Auto Care Center 9850 Liberia Ave 2.50 Prescott Court 9214 Prescott Ave 1.62 Grant Corner Orchard Ln 1.47 a. (11) Expected Costs to implement The City estimates that it will cost $5,300,000, including $1,921,471 in SLAF funding, to meet the existing source reductions during the state permit cycle. a. (12) The City plans to make the draft Chesapeake Bay TMDL Action Plan available at the City website to provide an opportunity for receipt and consideration of public comment.

The City has currently planned the capital improvement projects to achieve the required reductions for the current and future permit cycles. Nine projects have been identified by the City: Prince William Hospital Regional SWM Pond (FY16) Cockrell Branch SWM Pond Restoration/Dredging (FY20) Hazel Drive Channel Improvements (FY18) Sumner Lake SWM Pond Restoration/Dredging (FY16) Sills Pond Upgrade (Future) Tudor Oaks SWM Pond Restoration (Future) Winter s Branch Stream Restoration (Future) Flat Branch Stream Restoration (Future) Sumner Lake Stream Restoration (Future) The existing projects identified in this first permit period this plan exceed the required reductions and the additional reductions will be applied toward achieving the additional 35 percent reductions required by the next permit cycles. The City will continue to plan for compliance and the Plan will be updated accordingly.