INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC1974. Date ISDS Prepared/Updated: 02/06/2006 I. BASIC INFORMATION. A. Basic Project Data

Similar documents
INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6042. Date ISDS Prepared/Updated: 01/26/2011 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3946. Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION. A. Basic Project Data

Implementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916)

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

I Managing Unit: EASRE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA62867

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE. I Estimated Board Date: July 27, 2017

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Peru Second Rural Electrification

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

Integrated Safeguards Data Sheet (Initial)

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA982. Project Name. Region. Country

Project Name PROJECT INFORMATION DOCUMENT (PID) Nepal Village Micro Hydro Carbon Offset Project. South Asia SASSD P095978

INTEGRATED SAFEGUARDS DATA SHEET

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Environmental and Social Impact Assessment and Strategic Environmental and Social Assessment at the World Bank

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

InfoShop. Integrated Safeguards Data Sheet (Initial) Date ISDS Prepared/Updated: 10/21/2002. Section I - Basic Information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:51272 Project Name

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

PROJECT INFORMATION DOCUMENT / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) CONCEPT STAGE

ETHIOPIA - AGRICULTURAL GROWTH PROJECT (AGP) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5416 Project Name

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA1291. Project Name. Region. Country

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Integrated Safeguards Data Sheet (Initial)

I Fifth Power System Development Project SOUTH ASIA Power (100%) P POWERGRID CORPORATION OF INDIA LIMITED

PROJECT INFORMATION DOCUMENT AND INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. West Africa Agricultural Productivity Program APL (WAAPP-1B) Region

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA Project Name. Parent Project Name. Region Country Sector(s) Theme(s)

INTEGRATED SAFEGUARDS DATASHEET RESTRUCTURING STAGE

DEMOCRACTIC REPUBLIC OF CONGO Implementing Agency Democratic Republic of Congo Congo, Democratic Republic of

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC Project Name. Region Country Sector(s) Theme(s)

India-Nepal and India-Bangladesh Cross Border Transmission and Trade Project Region. Bangladesh-India-Nepal Sector

Large Marine Ecosystem Management Activities (US$5.62)

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. GZ-Gaza II Emergency Water Project MIDDLE EAST AND NORTH AFRICA PLO FOR THE BENEFIT OF THE PA

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Project Name. 1. Key development issues and rationale for Bank involvement

INTEGRATED SAFEGUARDS DATA SHEET RESTRUCTURING STAGE Note: This ISDS will be considered effective only upon approval of the project restructuring

Table A1 - Environmental and Social Safeguard Policies Policy Objectives and Operational Principles

The World Bank s Safeguards Policies in Context of Hydropower Projects International Conference on Sustainable Hydropower in the Dinaric Arc

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA5469. Project Name. Region. Country

COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) APPRAISAL STAGE. Parent Project ID (if any):

Hydropower Sustainability Assessment Protocol Section III Trail ESKOM. Ingula Pumped Storage Scheme. November 2009

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5800 Project Name. EGAT And PEA Advancing Clean Energy Investment - CTF Region

Summary of Project/Program. Summary - Project Approval Request. Amount (USD):USD 1 1 million Date: June 29 th, 2011

Independent Accountability Mechanism for IFC & MIGA, World Bank Group

LAO PEOPLE S DEMOCRATIC REPUBLIC PEACE INDEPENDENCE DEMOCRACY UNITY PROSPERITY

4 foshop ThtWd ILj^ ik

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name Region Country Sector(s) Theme(s)

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) CONCEPT STAGE. Parent Project ID (if any):

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify)

World Bank Group Renewable Energy & Energy Efficiency Performance July June2005 Q&A

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: India Energy Efficiency Scale-Up Operation (P162849) Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6559 Project Name. Arab World Initiative for Financing Food Security Region

MINISTRY OF AGRICULTURE, IRRIGATION AND WATER DEVELOPMENT MALAWI SHIRE RIVER BASIN MANAGEMENT PROJECT - P117617

ZAMBEZI RIVER AUTHORITY

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

ENVIRONMENTAL IMPACT ASSESSMENT

World Bank Group Recruitment Drive (TOR for Future Vacancies)

EIB Contribution in Renewable Energy Projects Financing in West Africa

CAO terms of reference for an Audit of IFC. About the CAO

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

Session: For more information:

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1145 Project Name. Sindh Water Sector Improvement Project Region

Combined Project Information Documents / Integrated Safeguards Datasheet (PID/ISDS)

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Report No.: ISDSA13100

Sustainable Energy for All. Gearing up for the road ahead

BANK MANAGEMENT RESPONSE TO REQUEST FOR INSPECTION PANEL REVIEW OF THE UGANDA: PRIVATE POWER GENERATION PROJECT (PROPOSED)

Briefing Summary. Board Meeting on Nam Theun 2 Project: November 22, 2010

Transcription:

Date ISDS Prepared/Updated: 02/06/2006 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC1974 Country: Africa Project ID: P094916 Project Name: WAPP APL 2 - OMVS Felou Hydroelectric Project Task Team Leader: Amarquaye Armar Estimated Appraisal Date: February 20, Estimated Board Date: May 30, 2006 2006 Managing Unit: AFTEG Lending Instrument: Adaptable Program Loan Sector: Power (50%);Renewable energy (50%) Theme: Regional integration (P);Water resource management (S) IBRD Amount (US$m.): 0.00 IDA Amount (US$m.): 75.00 GEF Amount (US$m.): 0.00 PCF Amount (US$m.): 0.00 Other financing amounts by source: BORROWER/RECIPIENT 10.00 EC: EUROPEAN INVESTMENT BANK 40.00 50.00 B. Project Objectives [from section 2 of PCN] WAPP APL: The goal of West Africa Power Pool (WAPP) is to establish a well-functioning, cooperative, power pooling mechanism for West Africa, as a means to increase access of the citizens of the Economic Community of West African States (ECOWAS) to stable and reliable electricity at affordable costs. The developmental objectives of OMVS Second Generation Hydropower Projects of the WAPP APL (WAPP APL 2) are to: (a) augment the supply of low cost electricity to the national power utilities of Mali (EDM), Mauritania (SOMELEC) and Senegal (SENELEC) as a means to alleviate widening power supply deficits that have resulted in chronic load shedding in the Senegal River Basin countries (Mali, Mauritania, Senegal); and (b) develop the OMVS power system into a nucleus power pooling mechanism that can be replicated for other sub-regions of WAPP Zone B. This developmental objective is to be achieved, inter alia, by: (a) implementing the proposed OMVS Second Generation Hydropower Projects at the Felou (refurbishment of existing facility) and Gouina sites using a Design-Build-Operate-Transfer (DBOT) approach that involves deployment of date-certain, fixed price, performance-based contracts for each plant; and

(b) providing institutional restructuring and capacity building support to improve the efficiency and performance of the public-private partnership involving an OMVS-sponsored power asset holding entity (currently the Societe de Gestion de l Energie de Manantali - SOGEM) and a private operation and maintenance concessionaire (currently ESKOM Energie Mali (EEM)). C. Project Description [from section 3 of PCN] This FY06 project (WAPP APL 2 Felou Hydro-Electric Plant (HEP)) will provide IDA credits through the Governments of Mali, Mauritania and Senegal to the OMVS High Commission and the designated OMVS-sponsored power asset holding entity - the proposed L Agence de Gestion du Patrimoine de l OMVS (AGP-OMVS)- to finance the implementation of the proposed 60 MW Felou Hydro-Electric Plant (Felou HEP). The components of the WAPP APL 2 - Felou HEP are: Component 1: Design-Build-Operate-Transfer (D-B-O-T) Contract for the Felou HEP. The site of the proposed 60 MW run-of-the-river Felou HEP is located on the river Senegal about 200 km downstream of the Manantali Hydroelectric plant and 15 km from the Kayes sub-station of the OMVS power system. Component 2: Consulting Services Project Cycle Management and Supervision. Comprehensive project cycle development and supervision assistance, covering consultant services required by the OMVS High Commission and the designated OMVS-sponsored power asset holding entity to: (a) plan and schedule the project, prepare bidding documents, conduct the bidding process up until bid evaluation and contract award (Phase 1); and subsequently (b) oversee all aspects of the design, construction, commissioning and operational stages (Phase 2) of the implementation of the proposed Felou HEP. Component 3: Institutional Restructuring and Capacity Building TA. This component will provide comprehensive technical assistance and capacity building support to restructure/reconfigure the existing public-private partnership between SOGEM and EEM to accommodate the OMVS second generation hydropower projects. D. Project location (if known) The investment component of WAPP APL 2 (Phase 2) is located entirely within Mali and will be implemented by the DBOT Contractor under the supervision of the OMVS High Commission and the designated OMVS-sponsored power asset holding entity - the proposed L'Agence de Gestion du Patrimoine de l'omvs (AGP-OMVS). E. Borrower s Institutional Capacity for Safeguard Policies [from PCN] Both the OMVS High Commission and SOGEM (to be restructured into the proposed AGP- OMVS) have had experience in implementing the Manantali Regional Hydropower Project, in accordance with the World Bank s Safeguard Policies. The main social development issue in the project area (Kayes/ Bafoulabe) pertains to the negative impacts on fishing activities and acquisition of about 2 ha of land planted with orchards and vegetable garden for project facilities. Activities planned under the Senegal River Basin Multipurpose Water Resource Development (MWRDP) project, which is being developed in parallel, are directed to improving fishing techniques and equipment of fishermen.

F. Environmental and Social Safeguards Specialists Mr Robert A. Robelus (AFTS1) Ms Yvette Laure Djachechi (AFTS3) II. SAFEGUARD POLICIES THAT MIGHT APPLY Safeguard Policies Triggered Yes No TBD Environmental Assessment (OP/BP 4.01) An Environmental Assessment (EA) has been prepared and will be disclosed prior to appraisal. There are potential impacts on fisheries resources, public health, especially bilharzia, and HIV/Aids, potential impacts on food security of the local villagers near the project site, security issues with regard to the new channel and access to bathing and washing facilities. These issues will need to be adequately addressed in the final EA report. Natural Habitats (OP/BP 4.04) Forests (OP/BP 4.36) Pest Management (OP 4.09) Cultural Property (OPN 11.03) Indigenous Peoples (OP/BP 4.10) Involuntary Resettlement (OP/BP 4.12) About 2 ha of land planted with orchards and vegetable gardens need to be acquired for project facilities: a new channel and a new road. A Resettlement Action Plan will be prepared and disclosed in country and in the Infoshop prior to appraisal. Safety of Dams (OP/BP 4.37) The Felou Hydropower Project will rehabilitate an existing two meter high sill. An analysis has indicated that there are no dam safety issues. The Dam Safety Report for the upstream Manantali Dam is being reviewed (Felou will use water from the Manantali Dam). Projects on International Waterways (OP/BP 7.50) The project is part of the overall OMVS program. In the OMVS all OMVS country members are represented. The notification process has gone through the OMVS to notify the member countries, as has been standard for other projects in the Senegal River. Projects in Disputed Areas (OP/BP 7.60) Environmental Category: A - Full Assessment III. SAFEGUARD PREPARATION PLAN A. Target date for the Quality Enhancement Review (QER), at which time the PAD-stage ISDS would be prepared: 02/10/2006 B. For simple projects that will not require a QER, the target date for preparing the PAD-stage ISDS: N/A

C. Time frame for launching and completing the safeguard-related studies that may be needed. The specific studies and their timing 1 should be specified in the PAD-stage ISDS. An Environmental Assessment has been prepared and a Draft Final report is available. A Resettlement Action Plan (RAP) will be prepared. Both documents will be disclosed in country, including the project site and in the Infoshop, prior to appraisal. IV. APPROVALS Signed and submitted by: Task Team Leader: Mr Amarquaye Armar 02/06/2006 Approved by: Regional Safeguards Coordinator: Mr Thomas E. Walton 02/06/2006 Comments: Sector Manager: Mr Subramaniam V. Iyer 02/06/2006 Comments: 1 Reminder: The Bank s Disclosure Policy requires that safeguard-related documents be disclosed before appraisal (i) at the InfoShop and (ii) in-country, at publicly accessible locations and in a form and language that are accessible to potentially affected persons.