ADVERTISEMENT FOR PREQUALIFICATION FOR THE FOLLOWING BID PACKAGES

Similar documents
ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION

LEVEL I PREQUALIFICATION DOCUMENTS

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower

LEVEL I PREQUALIFICATION DOCUMENTS COMPUTER SCIENCE ENGINEERING (CSE) ADDITION AND RENOVATION

REQUEST FOR BIDDER QUALIFICATIONS

Architectural Services

PROJECT DESCRIPTION. The project is the Spartan Complex Seismic Upgrade, San Jose, California.

Building Code 8 th Edition

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

UNIVERSITY OF CALIFORNIA, SAN DIEGO

REVISED NEW HANOVER COUNTY OGDEN SKATEPARK SPECIALTY PRE-QUALIFICATION PACKET

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE ROOF AND HVAC REPLACEMENT PROJECT PW1320

UNIVERSITY OF CALIFORNIA, RIVERSIDE BARN EXPANSION PROJECT. ADVERTISEMENT FOR PREQUALIFICATION for CONSTRUCTION MANAGER/GENERAL CONTRACTOR AT RISK

ADVERTISEMENT FOR BIDS

CONTRACTOR PREQUALIFICATION REQUIREMENTS DATA CONTRACTORS FOR THE

Both envelopes must have the following information in the lower left hand corner:

INVITATION FOR BID. HVAC Equipment Replacement for Nordlof Center Lower Level West. Issued November 8, Name of Bidding Firm:

INVITATION FOR BID. HVAC Equipment Replacement for Black Box Theatre at Nordlof Center. Issued June 14, Name of Bidding Firm:

ADDENDUM NO. A. April 18, 2017 BIDDING AND CONTRACT DOCUMENTS FOR

Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION

INVITATION TO BID. Roof Repair Multiple Elastomeric Coating Roofs. Invitation to Bid No. 2013/14-09

Main Building Auditorium

CITY OF CHINO HILLS. Request for Proposals (RFP) for. On-call Electrical Repair Service. On-call Electrical Repair including Water and Wastewater

JMU Capital Projects SWaM Outreach Event Presentations

ADVERTISEMENT FOR BIDS

AGENDA STAFF REPORT. CLERK OF THE BOARD Pending Review COUNTY COUNSEL REVIEW. Approved Agreement to Form. Current Year Cost: NI A

COUNTY OF SAN JOAQUIN

STATE UNIVERSITY CONSTRUCTION FUND

ATTENTION CONTRACTORS

REQUEST FOR PROPOSAL. HRIS Human Resources Information Software Fort Morgan, Colorado

Lyndhurst Elementary School Renovation & Addition Secondary Technology Design Package

PRESCRIPTIVE COMPLIANCE METHOD

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

SECTION I: ADVERTISEMENT/ INVITATION TO TENDER... 3 DISPOSAL NOTICE... 3 CONDITION OF SALE... 3 TENDERING INSTRUCTIONS... 3

VFA SAMPLE RFP (DETAILED FACILITY CONDITION ASSESSMENT)

UNC Chapel Hill Informal Contracting Guidelines

Supply of Office Furniture, Fittings, Furnishings & other Equipments.

POSTAL STATION B ENVELOPE REHABILITATION & BASE BUILDING UPGRADE CONSTRUCTION MANAGER FAIRNESS MONITOR FINAL REPORT

THE HOUSING AUTHORITY OF THE BOROUGH OF HIGHLAND PARK 242 SOUTH SIXTH AVENUE, HIGHLAND PARK, NJ PHONE (732)

CALIFORNIA STATE UNIVERSITY MONTEREY BAY

Town of York, Maine Request for Qualifications

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

Building Permit Application Instructions INFORMATION REQUIRED FOR ISSUANCE OF A BUILDING PERMIT

Elmhurst Community Unit School District 205 Invitation to Bid

Chapter 6. Competitive Sealed Bidding: Elements of an Invitation for Bids

ADDENDUM ADDENDUM NUMBER: One DATE: 30 October 2012

Project Information Session / Meet and Greet # 3

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

New Jersey State Prevailing Wage Act

IRVINE UNIFIED SCHOOL DISTRICT CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20

Interior Architects, P.C REV 2 CONCEPTUAL ESTIMATE. Brooklyn Heights Library, Brooklyn Public Library, Brooklyn, NY GARDINER AND THEOBALD INC FOR: AT:

Request For Proposal (RFP) For Architectural/Design Services. Ski Hi Park Multi-Purpose Building

Request for Qualifications Professional Services For. Wood Recycling Center Facility. Contract Number: C City of Chattanooga, Tennessee

700 CMR: MASSACHUSETTS DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION

Commercial Remodel Permit

Date: Telephone: Company Name: Address: City: State: Zip Code: Contact Person: Title: Authorized Signature:

State Historic Preservation Office. Bidding, Contracting, and Construction Guidelines for the Historic Restoration Fund

Vandalia-Butler City Schools

New York State Contract Reporter NYS' official source of contracting opportunities Bringing business and government together

The Town will coordinate with the adjacent property Owner for access allowing work to the East side of the building.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

TENANT IMPROVEMENT MANUAL

CITY OF CHICAGO DEPARTMENT OF BUILDINGS

PRE-QUALIFICATION OF SUPPLIERS PROVISION OF FUMIGATION, SANITATION AND SANITAL DISPOSAL SERVICES TENDER NO.KPLC1/5BC/9A/PT-ST/113/2010

INVITATION TO BID. WHATCOM COUNTY LIBRARY SYSTEM ADMINISTRATIVE SERVICES BUILDING REMODEL 5205 Northwest Drive, Bellingham, WA 98226

REQUEST FOR QUALIFICATIONS

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

4. Number of drawings required: ( ) Locations of nearest streets

The Building Codes A.R.E. Building Design and Construction Exam Prep

CODE COMPLIANCE PLAN REVIEW PROCEDURES

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

Minnesota Healthcare Engineers Association, Fall Conference. Bob Dehler, P.E. Engineering Program Manager September 14, 2017

GWINNETT COUNTY DEPARTMENT OF WATER RESOURCES

TEACHERS SERVICE COMMISSION TENDER DOCUMENT FOR DISPOSAL OF LPG CYLINDERS WITH GAS (TSC EMPLOYEES ONLY). CLOSING DATE: FRIDAY, 1 ST APRIL 2016.

CITY OF GLENDALE-CALIFORNIA REPORT TO CITY COUNCIL. Report on Proposed Improvements at Various Park Sites - Design-Build Project.

CITY OF BLUE ASH REQUEST FOR QUALIFICATIONS TO PROVIDE ARCHITECTURAL AND ENGINEERING SERVICES FOR THE DESIGN OF THE

House Doctor Consulting Services Application Package

REQUEST FOR PROPOSALS

BID AND PURCHASING LAWS/BEST PRACTICES

A NEW GYMNASIUM AND RENOVATED FINE ARTS FOR MONTGOMERY CATHOLIC PREPARATORY SCHOOL MONTGOMERY, ALABAMA

CONTRACTOR S PREQUALIFICATION FORM

CONTRACT / CONSTRUCTION REQUIREMENTS FOR PUBLIC SCHOOLS PROJECTS. August 2005

VANDERBILT UNIVERSITY

SEMINOLE TRIBE OF FLORIDA INVITATION TO BID

BUYER MUST MAKE ARRANGEMENTS FOR LOADING AND TRANSPORTING THE CONTAINERS.

PREQUALIFICATION OF CONSTRUCTION CONTRACTORS QUESTIONNAIRE PACKET

Finance & Technology Administrator (815) ext 223

UNIVERSITY OF CALIFORNIA, SAN DIEGO

PURCHASING DIVISION BOARD OF COUNTY COMMISSIONERS BROWARD COUNTY, FLORIDA. Terrazzo Floors at Concourse B, C and E ADDENDUM NO. 4

START WORK NOTIFICATION

SUBJECT: ITB , Oxford Road Complete Street Improvements Project ADDENDUM #1

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies

Outreach Meeting September 29, 2016

REQUEST FOR BIDS METROPOLITAN PARK DISTRICT OF TACOMA Northwest Trek Core Area Fence Upgrade SWR BID NO. T Request for Bids

TO MEMBERS TO THE COMMITTEE ON GROUNDS AND BUILDINGS: DISCUSSION ITEM UNIVERSITY SEISMIC SAFETY POLICY AND UPDATE ON PROGRAM FOR SEISMIC IMPROVEMENTS

MOUNTAIN AREA WORKFORCE DEVELOPMENT BOARD HEALTHCARE CAREER PATHWAYS OUTREACH REQUEST FOR PROPOSALS

(August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS **************************************************************************

EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT/ENGINEER. A. Basic Services... A-2. B. Architectural Programming... A-5

Transcription:

ADVERTISEMENT FOR PREQUALIFICATION FOR THE FOLLOWING BID PACKAGES BID PACKAGE DESCRIPTION REQUIRED LICENSE Bid Package No. 1 Asbestos Abatement C-22 Bid Package No. 2 Hard Demolition C-21 Bid Package No. 4 Fiber-Reinforced Polymer Reinforcing C-33 Bid Package No. 5 Shotcrete C-8 Bid Package No. 8 Structural Steel C-51 Bid Package No. 9 Ornamental Metal C-23 Bid Package No. 27 Sprinkler, Fire Protection C-16 Bid Package No. 28 Plumbing C-36 Bid Package No.29 Mechanical, HVAC C-20 Bid Package No. 30 Electrical, Low Voltage, Fire Alarm C-10 Subject to conditions prescribed by the CM/Contractor, responses to the CM/Contractor s prequalification documents for a Combined Bid Subcontract are sought from prospective subcontractor bidders (hereafter subcontractors ) for the following projects: UCLA CHS SEISMIC CORRECTION AND FIRE SAFETY Project Number 948943.01 UCLA CHS SOM WEST SEISMIC RENOVATION Project Number 948909.01 PREQUALIFICATION OF PROSPECTIVE BIDDERS: The CM/Contractor has determined that subcontractors who submit bids on these Bid Packages must be prequalified. GENERAL DESCRIPTION OF WORK: CHS SEISMIC CORRECTION AND FIRE SAFETY: Seismic and Fire Life Safety corrections to the 7 level Southeast Wing, 7 level School of Medicine East/Vivarium, and the 7 level Biomedical Library in the Center for the Health Sciences (CHS). Seismic correction work includes selective structural strengthening including Fiber Reinforced Polymer (FRP) wrapping of structural elements, cast in place concrete and exterior and interior shotcrete shear walls. Fire Life Safety correction work includes both Fire Suppression and Fire Alarm work upgrades. Fire Suppression work includes a new fire-main sprinkler loop expansion and SUBCONTRACTOR PREQUALIFICATION 1

new vertical wet standpipes. Fire alarm work includes the infrastructure for a new replacement fire alarm system. The scope of work to complete the seismic corrections and non-structural upgrades will include the removal, replacement and repair of building systems, elements, and finishes obstructing the proposed work. Additional work includes the abatement of hazardous materials, exterior brick and masonry repair, and code upgrades to existing door hardware, and toilet facilities. The buildings will remain occupied and operational during construction and require the coordination and staging of occupants. All work will be sequenced and phased and all work will be performed off-hours. The Anticipated Contract Value of this project is: $40,000,000.00 CHS SOM WEST SEISMIC RENOVATION: Seismic and Fire/life safety corrections to the School of Medicine West (SOM-W), Brain Research Institute and REED buildings and subterranean levels in the Center for the Health Sciences (CHS). Seismic correction work includes selective structural strengthening including Fiber Reinforced Polymer (FRP) wrapping of structural elements, cast in place concrete and interior shotcrete. Fire Life Safety correction work includes both Fire Suppression and Fire Alarm work upgrades. Fire Suppression work includes an expansion of the existing fire-main sprinkler loop and new vertical wet standpipes within the REED building. The work will also include the resupply to the existing lower levels within CHS from the main fire loop located on the first floor. Additionally, the existing fire main loop will be interconnected between the Semel Institute and CHS South Tower along the 1st floor bridge. Fire alarm work includes the infrastructure and backbone for a new replacement fire alarm system, within the subterranean levels of the CHS complex, School of Medicine West, REED and Brain Research Institute. Additional work includes relocation of existing utilities obstructing seismic correction work; tenant improvements, accessibility upgrades to toilet facilities, drinking fountains, doors and hardware; signage, control panels and handrails. Selective demolition of walls, ceilings and floor finishes to accommodate the structural repair will be required in addition to the restoration and installation of new interior finishes. SUBCONTRACTOR PREQUALIFICATION 2

The buildings will remain occupied and operational during construction and require the coordination and staging of occupants. All work will be sequenced and phased and all work will be performed off-hours. The Anticipated Contract Value of this project is: $20,000,000.00 ESTIMATED VALUE OF BID PACKAGES: Refer to specific Bid Package advertisement pages at www.smartbidnet.com for Estimated Bid Package Values. PREQUALIFICATION SCHEDULE: On Friday, April 22, 2016, prequalification documents will be available to intending Subcontractor bidders online at www.smartbidnet.com, (each bidder must contact PCL Construction Services, Inc. to obtain access to view and download the prequalification documents) same documents will be issued at no cost at: PCL Construction Services, Inc. 650 Charles E. Young Dr. S Los Angeles, CA 90095 Level B, PCL Office BS-330 Tel: (310) 206-6402 MANDATORY PRE-QUALIFICATION CONFERENCE: A mandatory Pre-Qualification Conference for the above listed Bid Packages will be conducted on Wednesday, April 27, 2016, beginning promptly at 9:00 a.m. Only Subcontractor bidders who participate in the Conference in its entirety will be allowed to submit prequalification documents, and if prequalification is achieved, bid on one of the above listed Bid Packages. Participants must arrive at or before the above-specified time. Persons arriving later than said time will not be allowed to submit prequalification documents or submit bids. Participants shall meet at: 650 Charles E. Young Dr. S. Los Angeles, CA 90095, Conference Room BS-673 on Level B. (see map at end of this document) For further information, contact PCL Project Manager Sam Wen at 310-206-6402. NOTES: 1. Attendee shall be a staff member of the subcontractors firm who will be actively involved in responding to this Prequalification, and who is highly knowledgeable of the firm s potential response to the prequalification criteria. 2. Attendees are advised that time be allocated to secure parking. Attendees must allow ample time to drive to the above location in heavy traffic, find a parking space, walk to the building, and arrive in the designated Meeting Room prior to the required time. It is currently anticipated that the Conference will last 60 minutes. SUBCONTRACTOR PREQUALIFICATION 3

RFI PROCEDURES: Any questions related to the questionnaire shall be submitted in the form of an RFI. All RFI s are to be emailed only, to Sam Wen, Sr. Project Manager, at swen@pcl.com and Ara Gregorian, Field Engineer, at agregorian@pcl.com. The deadline for RFI submission is Friday, April 29, 2016, 5.00 p.m. SUBMITTAL DEADLINE: Each bidder s completed Prequalification Questionnaire and associated documents must be received at: PCL Construction Services, Inc. 650 Charles E. Young Dr. S Los Angeles, CA 90095 Level B, PCL Office BS-330, (CM/Contractor s Office) Tel: (310) 206-6402 in a sealed envelope no later than: Tuesday, May 03, 2016, 2:00 p.m. NOTE: Only hard copy submittals will be accepted. Telephonic, electronic mail (e-mail), facsimile, or telegraphic Prequalification Questionnaires are invalid and will not be accepted. Only CM/Contractor s Prequalification Questionnaires (and associated documents) will be accepted. CM/Contractor reserves the right (but is not obligated) to request, receive, and evaluate supplemental information after the above time and date at its sole determination. Any person or entity not satisfied with the outcome of the prequalification must file a writ challenging the outcome within 10 calendar days from the date of the CM/Contractor s written notice regarding prequalification determination as further detailed in the Prequalification Questionnaire. Any assertion that the outcome of the prequalification process was improper will not be a ground for a bid protest. The dates, times, and location set for receiving and opening of bids will be set forth in an Advertisement for Bids. The CM/Contractor reserves the right to reject any or all responses to Prequalification Questionnaires and to waive non-material irregularities in any response received. All information submitted for prequalification evaluation will be considered official information acquired in confidence, and the CM/Contractor will maintain its confidentiality to the extent permitted by law. Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the CM/Contractor within the limits imposed by law or University policy. Each bidder may be required to show evidence of its equal employment opportunity policy. The successful Bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the Bidding Documents and to pay prevailing wage at the location of the work. SUBCONTRACTOR PREQUALIFICATION 4

The work described in the contract is a public work subject to section 1771 of the California Labor Code. No contractor or subcontractor, regardless of tier, may be listed on a Bid for, or engage in the performance of, any portion of this project, unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 and 1771.1. These projects are subject to compliance monitoring and enforcement by the Department of Industrial Relations. SUBCONTRACTOR PREQUALIFICATION 5

DIRECTIONS TO CONFERENCE ROOM #BS-673 SUBCONTRACTOR PREQUALIFICATION 6