Rajasthan State Pollution Control Board

Environmental Clearance Compliance Half Yearly Report

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

Hind Energy & Coal Beneficiation (India) Ltd.

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

Environmental Clearance Compliance Half Yearly Report

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Mangalam Cement Ltd.(Unit I)

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

Hind Energy & Coal Beneficiation (India) Ltd.

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

Mangalam Cement Ltd. (Unit-II) Stack No.

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx

Mangalam Cement Ltd.

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

STANDARD OPERATING PROCEDURE

Environmental impact assessment of a 1600 MW thermal power plant project in Karimnagar district of Telangana

Excerpt of Thermal Power Guidelines for New Plants

ZZH/CLAB-KSPCB/04/ Environmental Officer,

SCHEDULE I LIST I GENERAL STANDARDS AND CRITERIA FOR THE DISCHARGE OF INDUSTRIAL EFFLUENTS INTO INLAND SURFACE WATERS

KKB Micro Testing Labs Pvt. Ltd., , 2 nd Floor, Tarun Plaza, NFC Main Road, Krishna Nagar Colony, Moula Ali, Hyderabad, Telangana

Particulate Emission Monitoring HN Pathak Supdtg Engr Madhya Pradesh Power Generation Co. Ltd

HAZARDOUS WASTES (MANAGEMENT AND HANDLING) RULES, 1989

FORM V (See rule 14) Environmental Statement for the financial year ending 31 st March 2014 PART A

THE PLASTICS MANUFACTURE, SALE AND USAGE RULES, 1999

ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A

GENERAL PERMIT WMGR098 BENEFICIAL USE OF WASTE FOUNDRY SAND AND SAND SYSTEM DUSTS

Questionnaire (Conventional Energy)

Ministry of Environment and Forests Telefax : 011: M/s Posco India Private Limited

Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated (Period April 2016 to September 2016)

Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A. Company Information

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

Environment Clearance for Proposed Inland Water Transport along East Coast of Mumbai.

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P)

Abu Dhabi Trade Effluent Standards & Regulations Summary

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

Himachal Pradesh State Pollution Control Board

Compliance Report of EC : Compliance Status

Environmental Impact Assessment

Monitoring the Implementation of Environmental Safeguards

Ministry of Environment and Forests Notification New Delhi, the 4 th February ( As amended up to )

Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi

ENVIRONMENTAL MONITORING PROGRAMME

Max. building height (m)

ENVIRONMENTAL AUDIT REPORT [STATEMENT] CONSTRUCTION WORK [ HALF YEARLY ] PERIOD OCTOBER 2012 TO MARCH 2013 FOUNDRY PARK

Discipline Chemical Testing Issue Date Certificate Number T-3553 Valid Until Last Amended on - Page 1 of 9

NATCO PHARMA LIMITED CHEMICAL DIVISION Mekaguda (Village), Nandigama (Mandal), Rangareddy (Dist.)

.in Dated 9th August, Sharma ;

Subject: Environmental and CRZ clearance for expansion of Karaikal Port (Phase-II) at Puducherry by MIs. Karaikal Port Pvt. Ltd. - Reg.

Sr.No Condition Status A. SPECIFIC CONDITIONS:

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999

Telefax : 011: Dated 1 st November, 2011

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD.

Registered. M/s Baba Jiwan Singh Baba Dalip Singh Educational Trust, Goindwal Sahib Road, Tarn Taran.

Annexure - 1 The summary of the Air quality monitoring from April, 2016 to March, 2017 as follows CORE ZONE BUFFER ZONE

HAZARDOUS WASTE ( MANAGEMENT, HANDLING AND TRANSBOUNDARY MOVEMENT) RULES 2008 AMENDMENTS MADE THERE OF

PRE FEASIBILITY REPORT

CATEGORY 1 & 2 TRADE WASTE QUALITY LIMITS. The temperature shall not exceed 28 degrees Celsius.

ENVIRONMENTAL CLEARANCE (J-11015/121/ IA.II(M) ) October 14 to March 15. INTEGRATED ASHOK WASHERY cum FBC

SPECIAL CONDITIONS GENERAL PERMIT NUMBER WMGR089

Waste Discharge By-law

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

The Chemical Industry and Climate Change. A Snapshot from India

SUBMITTED TO M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

Torrent Pharmaceuticals Ltd. Indrad EC Compliance Report

Himachal Pradesh State Pollution Control Board,

Appendix VIII: Determination of chimney heights

EXECUTIVE SUMMARY TABLE - 1

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

Public Notice. Issuance of Industrial Waste Discharge Permit

Public Notice. Issuance of Industrial Waste Discharge Permit

Application Pack 5. How to apply for a Connection to a Public Sewer/Lateral Drain

SHREE CEMENT LIMITED; RAS (PALI) RAJASTHAN COMPLIANCE STATUS OF ENVIRONMENT CLEARANCE LETTER NO.: J-11011/981/2008-IA-II (I) dated: February 27, 2010

M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area.

Telefax : 011: Dated 1 st March, 2013

Waste Discharge Permit Application. for. Commercial, Industrial and Institutional Discharges

SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at

Details of the proposed project as presented before the committee are tabulated below:

c: Don Labossiere, Director, Environmental Compliance and Enforcement Public Registries

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

Environmental Impact Assessment for TASNEE Petrochemicals Ethylene and Polyethylene Projects

WASTEWATER DISCHARGE PERMIT APPLICATION SHORT FORM

Notification of Department of Industrial Works

Business Responsibility Policy

Environment Laboratory, Central Mine Planning & Design Institute Limited, Regional Institute-IV, Kasturba Nagar, Jaripatka, Nagpur, Maharashtra

Environment Protection Licence

Visakhapatnam Steel Plant Rashtriya Ispat Nigam Ltd.

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited

PRE-FEASIBILITY REPORT

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

MATRIMONY.COM LIMITED

Transcription:

M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and under section 21(4) of Air (Prevention & Control of Pollution) Act, 1981. Your application for Consent to Operate dated 11/06/2013 and subsequent correspondence. Sir, Consent to Operate under the provisions of section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 (hereinafter to be referred as the Water Act) and under section 21 of the Air (Prevention & Control of Pollution) Act, 1981, (hereinafter to be referred as the Air Act) as amended to date and rules & the orders issued thereunder is hereby granted for your Stage IV (Unit VII & VIII) plant situated at village- Bhadresh Tehsil:Barmer District:Barmer, Rajasthan, subject to the following conditions:- 1 2 That this Consent to Operate is valid for a period from 01/11/2013 to 31/10/2016. That this Consent is granted for manufacturing / producing following products / by products or carrying out the following activities or operation/processes or providing following services with capacities given below. Particular Type Quantity with Unit ELECTRICITY Product 270.00 MW 3 4 That this consent to operate is for existing plant, process & capacity and separate consent to establish/operate is required to be taken for any addition / modification / alteration in process or change in capacity or change in fuel. That the quantity of effluent generation along with mode of disposal for the treated effluent shall be as under: Page 1 of 5

Type of effluent Max. effluent generation (KLD) Recycled Qty of Effluent (KLD) Disposed Qty of effluent (KLD)and mode of disposal Trade Effluent 9800.000 NIL 9,800.000 Dust suppression/plantation/horticult ure Domestic Sewage 75.000 NIL 75.000 On Land For Plantation/Horticulture 5 That the sources of air emmissions along with pollution control measures and the emission standards for the prescribed parameters shall be as under: Sources of Air Emmissions Pollution Control Measures Parameter Prescribed Standard Boiler-VII ESP 100 mg/nm3 Boiler-VIII ESP 100 mg/nm3 D.G set( 1000KVA) ACOUSTIC ENCLOSURE, SAFE STACK HEIGHT AS PER ER IV CO 75 mg/nm3 150 mg/nm3 NMHC 150 mg/nm3 NOx 1100 mg/nm3 6 That the Stage IV (Unit VII & VIII) plant will comply with the standards as prescribed vide MOEF notification No. GSR 826(E) dated 16th November, 2009 with respect to National Ambient Air Quality Standards. Page 2 of 5

7 That the domestic sewage shall be treated before disposal so as to conform to the standards prescribed under the Environvent (Protection) Act-1986for disposal Into Inland Surface Water. The main parameters for regular monitoring shall be as under. Total Suspended Solids Parameters Standards Not to exceed 100 mg/l ph Value Between 5.5 to 9.0 Oil and Grease Total Residual Chlorine Biochemical Oxygen Demand (3 days at 27 C) Sulphide ( as S ) Chlorides Chemical Oxygen Demand Not to exceed 10 mg/l Not to exceed 30 mg/l Not to exceed 2.0 mg/l Not to exceed 1000 mg/l Not to exceed 250 mg/l 8 That the trade effluent shall be treated before disposal so as to conform to the standards prescribed under the Environment (Protection) Act-1986 for disposal Into Inland Surface Water. The main parameters for regular monitoring shall be as under Parameters Total Suspended Solids Phosphate Free Available Chlorine Standards Not to exceed 100 mg/l Not to exceed 5 mg/l Not to exceed 0.5 mg/l ph Value Between 6.5 to 8.5 Oil and Grease Copper as Cu) Zinc (as Zn) Iron ( as Fe ) Chromium (total) Not to exceed 20 mg/l Not to exceed 0.2 mg/l Page 3 of 5

9 That this consent to operate is being issued for production capacity of 2 x 135 MW (Unit 7 & 8) thermal power plant. 10 That the total project cost of the unit shall not exceed 1297.25 crores including the cost of land, building, plant & machinery. 11 That the industry shall comply with all the conditions as imposed by MOEF, Government of India vide its office letter no. F. No. J-13011/58/2006-IA II(I) dated 20/07/2007 while issuing EC to your project. 12 That all the conditions imposed vide letter no F (Tech)/Barmer(Barmer)/3(1)/ 2008-2009/6666-6669 dated 29/10/2012 shall be complied. 13 That the Charter of Corporate Responsibility for Environment Protection specified for Thermal Power Plants shall be complied. 14 That the particulate emissions from the stack of various sections of the power plant shall not exceed 100 mg/nm³. 15 That low Nox burners shall be installed at the boiler feeding system. 16 17 18 19 20 21 22 23 24 25 The industry shall comply with the MOE&F, Government of India Notification dated 06th April, 2011 relating to installation of continuous online monitoring systems for stack as well as ambient air and shall provide relevant details to the State Board and MOE&F, Government of India. That fly ash shall be collected in dry form and its 100% utilization shall be ensured. Ash to be disposed off in the pond shall be done though HCSD system. That the industry shall comply with all emission standards prescribed for power plant under the Environment (Protection) Rules, 1986. That no industrial effluent will be discharged outside from the factory premises in to a stream or well or sewer or on land and the effluent generated from power plant shall be used for ash quenching, control of fugitive emissions and plantation. The domestic effluent shall be treated up to prescribed standards and shall be used for plantation/ green belt development within the premises. Ash pond shall be lined with HDPE/LDPE lining or any other suitable impermeable media such that no leachate takes place at any point of time. Adequate safety measures shall also be implemented to protect the ash dyke from getting breached. That no ground water shall be abstracted without prior permission from the State Board and the Central Ground Water Authority. That the industry shall undertake suitable measures for rain water harvesting for artificial recharge of ground water. The industry shall comply with the MoEF, Government of India, Notification date 14th September 1999 with till the date amendments relating to fly ash management and shall provide relevant details to the State Board, MoEF, Government of India. That this consent to operate does not absolve the unit from compliance of other requirements under any other law. Page 4 of 5

26 That, not withstanding anything provided hereinabove, the State Board shall have power and reserves its right, as contained under section 27(2) of the Water Act and under section 21(6) of the Air Act to review anyone or all the conditions imposed here in above and to make such variation as it deemed fit for the purpose of Air Act & Water Act. 27 That the grant of this Consent to Operate is issued from the environmental angle only, and does not absolve the project proponent from the other statutory obligations prescribed under any other law or any other instrument in force. The sole and complete responsibility to comply with the conditions laid down in all other laws for the time-being in force, rests with the industry/ unit/ project proponent. 28 That the grant of this Consent to Operate shall not, in any way, adversely affect or jeopardize the legal proceeding, if any, instituted in the past or that could be instituted againt you by the State Board for violation of the provisions of the Act or the Rules made thereunder. This Consent to Operate shall also be subject, besides the aforesaid specific conditions, to the general conditions given in the enclosed Annexure. The project proponent will comply with the provisions of the Water Act and Air Act and to such other conditions as may, from time to time, be specified, by the State Board under the provisions of the aforesaid Act(s). Please note that, non compliance of any of the above stated conditions would tantamount to revocation of Consent to Operate and project proponent / occupier shall be liable for legal action under the relevant provisions of the said Act(s). This bears the approval of the competent authority. Yours Sincerely Copy To:- Group Incharge 1 SEE (SWMC), RSPCB, Jaipur. 2 SEE - ADC, RSPCB, Jaipur. 3 Regional Officer, Regional Office, Rajasthan State Pollution Control Board, Balotra. Please arrange to conduct stack and ambient air quality monitoring of the plant according to office order no. F14(15)Policy/RPCB/Plg/2260-86Dated 10/8/2001. 4 Master File. Group Incharge Page 5 of 5