D. Pajarito Corridor East Planning Area

Similar documents
Los Alamos National Laboratory Waste Management Program

SECTION 7 SEPARATION OF WATER MAINS AND SANITARY SEWERS

STATE UNIVERSITY CONSTRUCTION FUND

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS

Northwest State Route 138 Corridor Improvement Project

ORDINANCE ON TECHNICAL REQUIREMENTS FOR CABLE DUCTS

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan

Sewer System- Pipes Material and Loads

6 Preliminary Assessment of Construction Method and Constructability Issues

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

GUIDANCE MEMO NO : GUIDANCE CRITERIA FOR THE SEPARATION OF WATER MAINS AND NON-POTABLE PIPELINES

WEKO-SEAL Internal Joint Sealing. internal pipe-joint sealing

Draft Noise Abatement Guidelines

ARTICLE 987. PD 987. PD 987 was established by Ordinance No , passed by the Dallas City Council on June 14, (Ord.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

Landscaping and Fencing

2.0 DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVES

Public Hearing January 13, Request Conditional Use Permit (Auto Repair Garage) Staff Planner Carolyn A.K. Smith

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013

DESIGN OF SEWER SYSTEMS

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)

Curb Ramps [ 4.7.3] [ 4.7.2; 4.8.2; 4.1.6(3)(a)] [ 4.3.7] ADA Accessibility Survey Instructions Curb Ramps Page 1 of 6

Lake County Success. support through synergistic local partnerships that not only mitigate, but also produce

Pipe Bursting Services. pipe bursting. services

Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL

PIPE BURSTING SUCCESS

B. ALL RESIDENTIAL ALTERNATIVE

Mobility and System Reliability Goal

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

Environmental Review Standards for OHTF Funded Projects

Preferred Elevated Tank Site

NORTHWEST TERRITORIES CONSOLIDATION OF CAPITAL AREA DEVELOPMENT SCHEME BY LAW NO. 3934

Cleanup at the Los Alamos National Laboratory The Challenges

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW

I-405 Sepulveda Pass Widening Project. Community Advisory Committee Meeting June 24, 2010

Appendix D - Evaluation of Interim Solutions

Project Alignment Appendix A

TECHNICAL MEMORANDUM

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK

SECTION CONSTRUCTION OPERATIONS AND SITE UTILIZATION PLAN

CODE CONSOLIDATION PHASE II SUMMARY OF CHANGES Effective February 1, 2011, Ordinance s

Factor Potential Effects Mitigation Measures

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

NOBLESVILLE PLAN COMMISSION STAFF REPORT DECEMBER 16, 2013

The rezoning application and proposed transportation facility warrants consideration.

1RUWKZHVW#:LFKLWD 0DMRU#,QYHVWPHQW#6WXG\

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT

Public Meeting. US Highways 18 & 281 and SD Highway 50 From Douglas County Line to SD46 Charles Mix County

PERMEABLE INTERLOCKING PAVERS

CORBIN AND NORDHOFF IV. ENVIRONMENTAL IMPACT ANALYSIS ENV EIR F. HYDROLOGY

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

Chapter 10 Natural Environment

AED Design Requirements: Site Layout Guidance

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES

ASBESTOS CEMENT PIPE: ASSET OR LIABILITY?

TABLE OF CONTENTS. LIST OF FIGURES Figure 4-1: Alternative 1 System Overview Figure 4-2: Alternative 3 System Overview...

XI. Thornton Planning Area

Storm Drain Inlet Protection for Construction Sites (1060)

3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction.

STANDARD DETAILS AND DETAIL SPECIFICATIONS

Categorical Exclusion Programmatic Agreement Between the Federal Highway Administration And the Indiana Department of Transportation

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

Pipe-Bursting Success with AC Pipe

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING TOOLS AND STRUCTURES

D1 June 11, 2014 Public Hearing

California High-Speed Train Program FEIR/EIS

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

RECOMMENDATION: Staff recommends approval and provides the following motion for the commission s consideration:

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002)

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies

on the eastbound side of Route 29). identified in the table.

GRAND NIAGARA Proposed Secondary Plan

DTE Energy St. Clair Power Plant

Chapter 2: Alternatives

State Route 8 Bridge Replacement Project

Structural Design of Dam Sluice Gate Walkway Slabs: Retrofit and Replacement Options

Ottawa-Trussler Area Sewage Facility Class Environmental Assessment

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM

Categorical Exclusion (CE)

NEVADA. Smart Solar Focusing on Low-Conflict Zones to Promote Nevada s Economy, Protect Wildlands, and Build a Clean Energy Future.

SECTION 4(f) EVALUATION ALASKA RAILROAD MOODY TUNNEL REMOVAL FEDERAL TRANSIT ADMINISTRATION U.S. Department of Transportation

LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR

City of Surrey, ND Municipal Infrastructure Needs Assessment September 2012

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

RURAL RESIDENTIAL COMMUNITY ROLE COUNCIL ROLE RURAL RESIDENTIAL ALL COMMUNITIES

PIPE BREAK ANALYSIS WATER. Aldo Ranzani,

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3

The Narragansett Electric Company d/b/a National Grid. and Clear River Energy LLC. (Burrillville Interconnection Project) RIPUC Dkt. No.

SEARs project justification and conclusion

Lessons [being] learnt 2016 Flood in Cedar Rapids. Sandy Pumphrey Project Engineer II Flood Mitigation

CHARLES COUNTY GOVERNMENT ITB NO WAKEFIELD PUMPING STATION UPGRADE

Currituck County Moyock Mega-Site Market Feasibility Study March 28, 2016

For Public Input Period

Transcription:

PAJARITO CORRIDOR EAST PLANNING AREA D. Pajarito Corridor East Planning Area IV THE PLANS IV.D1 1. General Description Pajarito Corridor East Planning Area is approximately 2.6 square miles and is similar in landscape character to the Pajarito Corridor West Planning Area which is at the western border of the planning area. The planning area is bounded by the Dynamic Testing Area Planning Area to the south; San Ildefonso Pueblo land to the north, and State Route 4 and the White Rock residential community to the east. Pajarito Road bisects the planning area from the northwest to the southeast for approximately 4.6 miles. After crossing the planning area, Pajarito Road descends eastward into the lower stretches of Pajarito Canyon. The western half of the Pajarito Corridor East Planning Area planning is situated on Mesita del Buey. Map IV-D1: Key Map Pajarito Corridor East Planning Area consists of: TA-18: Special nuclear materials criticality TA-46: Applied photochemistry research TA-51: Environmental research and development TA 54: Waste management operations TA-65: A narrow width of the northern boundary of TA-36 is included in this planning area because of its geographic association to Pajarito Road. C O M P R E H E N S I V E S I T E P L A N 2 0 0 0

IV.D2 I V T H E P L A N S 2. Specific Planning Assumptions Major planning assumptions for the Pajarito Corridor East Planning Area are: The long range thinking for TA-18 is to close activities there. This will require the transfer of key functions to new locations. The nuclear nature of the activities would require these functions to be within the proposed nuclear park. Some of these activities may be relocated to the Nevada Test Site. Other functions will need to be maintained at the Laboratory. TA 54 is necessary to keeping the Laboratory operational. The storage of waste and its characterization and shipment to WIPP is handled through facilities at TA-54. The development of a non-public road from TA-54 to TA-48 is planned for ease of SNM shipments. This would eliminate the need for continued costly road closures. PAJARITO CORRIDOR EAST PLANNING AREA LOS ALAMOS NATIONAL LABORATORY

PAJARITO CORRIDOR EAST PLANNING AREA IV THE PLANS IV.D3 Map IV-D2: Pajarito Corridor East Programmatic Associations C O M P R E H E N S I V E S I T E P L A N 2 0 0 0

IV.D4 I V T H E P L A N S 3. Future Trends The future trends for this area are continued operations of the existing work. The removal of TA-18 to consolidate the nuclear activities within the conceptual nuclear park is proposed. The area is proposed to have upgraded facilities including a non-public road to connect TA-48 to TA- 54 for SNM shipments. 4. Existing and Proposed Land Use 1. Existing Land Use The land uses in the Pajarito Corridor East Planning Area are Nuclear Materials R&D, Experimental Science, Waste Management, and Physical/Technical Support. The remainder of the area (and bulk of the acreage) is Reserve, of which only a small portion is developable. PAJARITO CORRIDOR EAST PLANNING AREA LOS ALAMOS NATIONAL LABORATORY

PAJARITO CORRIDOR EAST PLANNING AREA IV THE PLANS IV.D5 Map IV-D4: Pajarito Corridor East Existing Land Use Ex. Land Use Map C O M P R E H E N S I V E S I T E P L A N 2 0 0 0

IV.D6 I V T H E P L A N S 2. Future Land Use The Pajarito Corridor East and the Pajarito Corridor West Planning Areas will become one restricted area and the current activities will remain and grow as required. PAJARITO CORRIDOR EAST PLANNING AREA Table IV.D1: Pajarito Corridor East Planning Area Existing Land Use Future Land Use Land Use Category Acreage Land Use Category Acreage Experimental Science 132 Experimental Science 136 Nuclear Materials R&D 46 Nuclear Materials R&D 46 Waste Management 140 Waste Management 140 Physical/Technical Support 12 Physical/Technical Support 12 Reserve (Developable: Reserve (Developable 94 acres) 1,329 94 acres) 1,329 Total 1,659 Total 1,659 LOS ALAMOS NATIONAL LABORATORY

PAJARITO CORRIDOR EAST PLANNING AREA IV THE PLANS IV.D7 Map IV-D5: Pajarito Corridor East Future Land Use C O M P R E H E N S I V E S I T E P L A N 2 0 0 0

IV.D8 I V T H E P L A N S 5. Transportation/Circulation a. Existing Transportation/Circulation/Parking The transportation system in the Pajarito Corridor East Planning Area is limited to Pajarito Road and TA entrances. TA-54 has only one entrance/ exit to its long, narrow mesa, creating severe safety problems. The road leading into TA-18 is inaccessible to public traffic. PAJARITO CORRIDOR EAST PLANNING AREA LOS ALAMOS NATIONAL LABORATORY

PAJARITO CORRIDOR EAST PLANNING AREA IV THE PLANS IV.D9 Map IV-D6: Pajarito Corridor East Existing Transportation Ex Transportation Map C O M P R E H E N S I V E S I T E P L A N 2 0 0 0

IV.D10 I V T H E P L A N S b. Future Transportation/Circulation/Parking Pajarito Road and its intersections will be upgraded for safety purposes. A secondary access/service road should be constructed eastward from the mesa in TA-54 to Pajarito Road for safety reasons. If the eastern end of TA-54 were developed, a new road from Pajarito Road would access the area. A guard gate will be established near the intersection of NM 4 and Pajarito Road to restrict access to the Pajarito Corridor West and Pajarito Corridor East Planning Areas. The road that intersects Pajarito Road along the boundaries of TA-18 and -36 will be upgraded allowing for a second exit/entrance to the Dynamic Testing Planning Area (particularly TA-36 and -67). It will travel through areas constrained by streambeds, floodplains, and threatened and endangered species habitat core and buffer zones. Therefore, environmentally sensitive construction techniques will be required. PAJARITO CORRIDOR EAST PLANNING AREA LOS ALAMOS NATIONAL LABORATORY

PAJARITO CORRIDOR EAST PLANNING AREA IV THE PLANS IV.D11 Map IV-D7: Pajarito Corridor East Future Transportation C O M P R E H E N S I V E S I T E P L A N 2 0 0 0

IV.D12 I V T H E P L A N S 6. Security Security operations are planned to remain at the current level with the exception of TA-18 (Verify). Pajarito Corridor East is used for basic research requiring limited security at TA-46, Category I and II SNM security at TA-18, and environmental research requiring controlled security at TA-51. TA-54 requires controlled safety access for waste operations. However, TA-54 controlled access stations are not part of security division activities. Recommendations Expand programs requiring materials access areas and Category I and II SNM security only within or adjacent to the existing Category I and II SNM security area in TA-18. Site any additional facilities requiring limited-security within or adjacent to the existing limited-security area to limit the number of security islands. Reserve the area directly west of the TA-46 fence for classified activities because there is no room for such expansion in the other three directions. Reserve the area along Pajarito Road and on the north edge of the TA-46 mesa for unclassified functions. PAJARITO CORRIDOR EAST PLANNING AREA LOS ALAMOS NATIONAL LABORATORY

P A J A R I T O C O R R I D O R E A S T P L A N N I N G A R E A I V T H E P L A N S IV.D13 Map IV-D8: Pajarito Corridor East Existing and Future Security Areas Security map C O M P R E H E N S I V E S I T E P L A N 2 0 0 0

IV.D14 I V T H E P L A N S 7. Utilities PAJARITO CORRIDOR EAST PLANNING AREA a. Water System Condition of System: The water distribution system is in good condition throughout the planning area. No projects are required to improve any water system conditions. System Materials: Pipe materials used in the water distribution system include cast iron, steel, asbestos cement, reinforced concrete, copper, ductile iron, and plastic. Cast iron has been replaced by ductile iron for distribution sized pipe. Steel and reinforced concrete are not common in today s systems of the Laboratory s size (greater than 24 inches diameter). Plastics and ductile iron dominate the water supply market for these sizes and fittings. Concerns regarding materials include: Replacement of asbestos cement pipe, particularly in areas where pipe may be disturbed for repair or replacement. Replace aged cast iron or steel pipe. System Capacities: Fire hydrants are typically connected to 6-inchdiameter pipe. Water service lines, less than 6 inches should be replaced if they provide fire protection services. LOS ALAMOS NATIONAL LABORATORY

PAJARITO CORRIDOR EAST PLANNING AREA IV THE PLANS IV.D15 Map IV-D9: Pajarito Corridor East Existing Water System Water Map C O M P R E H E N S I V E S I T E P L A N 2 0 0 0

IV.D16 I V T H E P L A N S b. Sanitary Sewer System Condition of System: The sewer system is generally in good operating condition. System Materials: Pipe materials used in the sewer system include cast iron, vitrified clay, steel, asbestos cement, reinforced concrete, copper, ductile iron, and plastic. Material concerns are Replacement of concrete pipe that has shown evidence of interior deterioration from exposure to sewer gases. Replacement of asbestos cement pipe, especially where it could be disturbed by maintenance operations. General condition of aged vitrified clay pipe. System Capacities: The sewer system has no capacity issues, with exception of limitations set by lift station pumps. There is currently a strategy in place to abandon lift stations where economically feasible and replace them with gravity flow. Those gravity systems will accommodate increased demands and require considerably less maintenance. PAJARITO CORRIDOR EAST PLANNING AREA LOS ALAMOS NATIONAL LABORATORY

PAJARITO CORRIDOR EAST PLANNING AREA IV THE PLANS IV.D17 Map IV-D10: Pajarito Corridor East Existing Sanitary Sewer System Sewer Map C O M P R E H E N S I V E S I T E P L A N 2 0 0 0

IV.D18 I V T H E P L A N S c. Natural Gas System A 3-inch steel pipe in good condition serves this area. This pipe is too small, and the area experiences large pressure drops during winter months. Long range plans are to install a 6-inch PE pipe upstream from the Core Planning Area through the Pajarito Corridor West Planning Area to TA-55. This new section of pipe will satisfy the capacity problem. PAJARITO CORRIDOR EAST PLANNING AREA LOS ALAMOS NATIONAL LABORATORY

PAJARITO CORRIDOR EAST PLANNING AREA IV THE PLANS IV.D19 Map IV-D11: Pajarito Corridor East Existing Natural Gas System Natural Gas Map C O M P R E H E N S I V E S I T E P L A N 2 0 0 0

IV.D20 I V T H E P L A N S d. Electric Transmission and Distribution System There are three remaining transformers that are PCB contaminated. These transformers should either be replaced or refilled with a suitable dielectric fluid to mitigate the PCB concerns. The 115kV Norton transmission line is limited to 120MVA in its present configuration. With the SVC exporting VARs to maintain system voltage, the Norton line is not adequate to carry electrical loads greater than 75MW if the TA-3 power plant and the PNM-Reeves line were out of service. The Norton line can be reconductored to a capacity of over 200MVA, so that it could carry existing and future loads alone, but with reliability solely dependent upon its integrity. PAJARITO CORRIDOR EAST PLANNING AREA LOS ALAMOS NATIONAL LABORATORY

PAJARITO CORRIDOR EAST PLANNING AREA IV THE PLANS IV.D21 Map IV-D12: Pajarito Corridor East Existing Electrical System Electric Map C O M P R E H E N S I V E S I T E P L A N 2 0 0 0

IV.D22 I V T H E P L A N S 8. Facilities The facilities within the Pajarito Corridor East Area are old and in need of replacement. TA-18 is an example of an entire set of facilities in need of major improvements or replacements. An alternativeproposal is to close down the entire technical area and relocate the appropriate functions elsewhere. TA-54 is almost entirely developed with temporary facilities, such as, fabric domes, trailers, transportables, and covered storage slabs, all with short life cycles. The only fixed structure within TA-54 is a high bay building near the entrance, which is a key facility used to support the shipment of waste to the Waste Isolation Pilot Plant (WIPP). TA-46 is an example of a Laboratory technical area with a mixture of buildings, a large percentage being in poor condition with a number of trailers and transportables meeting its housing needs. The Pajarito Corridor East Planning Area accounts for 7% of the Laboratory s on-site population. About 567,000 GSF of space, which accounts for 7% of the Laboratory s total GSF, is contained in 201 structures. Overall, the facilities in this planning area are in acceptable condition, with only about 28% in poor or failing condition. However, approximately 72% of the employees are housed in these facilities. Service and laboratory uses are the majority. PAJARITO CORRIDOR EAST PLANNING AREA TableIV-D3: Pajarito East Employee Environment Condition Pajarito East Employee Environment Fail 36% Excellent 0% Good 9% Poor 36% Adequate 4% Fair 15% TableIV-D2: Pajarito East Facilities Condition Pajarito East Facilities Condition TableIV-D4: Pajarito East Facility Use & Condition Pajarito East Facility Use & Condition Poor 12% Fail 16% Excellent 23% 140000 120000 100000 80000 60000 40000 Fair 23% Adequate 4% Good 22% 20000 0 A I L O P S Poor Adequate Excellent LOS ALAMOS NATIONAL LABORATORY

PAJARITO CORRIDOR EAST PLANNING AREA 9. Environment, Safety, and Health The facilities within the Pajarito Corridor East Area include nuclear, hazardous chemical, waste and industrial. These facilities include laboratory, office and storage land uses. Some of the activities require a high degree of protective measures for the safety of the workers and surrounding environment. This planning area has canyons to the north and south. Both are environmentally sensitive requiring careful review of all activities and development to ensure appropriate protection of these environments. All of these surrounding areas contain habitat supporting local wild life and plant life, which can be impacted by the activities within the facilities of the Pajarito Corridor East Area. 10. Quality Environment The urban area of the Pajarito Corridor East Area is largely developed. As with other Laboratory areas the character is very industrial with a few small spaces reflecting a human scale environment. It is not possible for people to walk from one area to another because the distances are too great, with non-urban areas in between. Within the developed urban areas, such as the office core of TA-54 or TA-46, pedestrian movement is severely hampered due to the lack of pedestrian paths without vehicle conflict. Where some of this is related to the narrow mesas, the basic problem is a result of growth being addressed with trailers and transportables in lieu of permanent buildings and appropriate parking. This is a common pattern of development throughout the Laboratory. The Laboratory has issued a ban on new trailers or transportables to meet housing needs in the future. However, this does not eliminate the ongoing need to continue the use of the existing units throughout the Laboratory. The most notable natural areas within the Pajarito Corridor East Planning Area are the canyons and the mesa edges. The lack of trees within the developed areas is indicative of poor development. Even though the work of the Laboratory is industrial, the technical areas within TA-18, -54 and -46 have not been developed in harmony with the surrounding environment. It is common throughout the Pajarito Corridor East Planning Area to have outdoor spaces reflecting their very industrial urban environment, which defines the quality of environment for the workforce as not very attractive. IV THE PLANS IV.D23 C O M P R E H E N S I V E S I T E P L A N 2 0 0 0

IV.D24 I V T H E P L A N S PAJARITO CORRIDOR EAST PLANNING AREA Pajarito Corridor East Planning Area Assessment/Needs Summary Current Current Forecasted Functions/Capability Mission Activity Functions/Capabilities Waste Management Admin Facilities Offices -NWP -Material Disposition Continue as current Plan Discussion It can be argued that this is a temporary site, however the length of temporary warrants replacing many or all temporary trailers and transportables with permanent facilities Criticality Experiment Facilities - TA-18 Criticality Experiments and Assemblies -NWP Manufacturing -NWP Nuclear Materials Continue as current for immediate future These functions may move to the nuclear campus at LANL, Nevada, or other. Adjacency to public Pajarito Road poses safety and security issues Area G Low Level Rad Waste Storage/Disposal Facility Rad and Hazardous Storage NWP Continue as current Rad/RCRA Temporary Storage and Handling NWP Area L Hazardous Chemical Storage Facility Chemical and Hazardous NWP Storage Temporary Storage and NWP Handling Waste Characterization and Packaging Facility (Randt) Reducing over time as shipments to WIPP continue Continue as current Continue as current Waste characterization NWP Continue as current LOS ALAMOS NATIONAL LABORATORY

PAJARITO CORRIDOR EAST PLANNING AREA IV THE PLANS IV.D25 Needed Development Proposed Projects Land Use Transp. Security Utilities Facilities Quality ESH Temporary facilities None Close TA-18, relocate activities to other locations, reuse of facilities None None None None None None C O M P R E H E N S I V E S I T E P L A N 2 0 0 0

IV.D26 I V T H E P L A N S PAJARITO CORRIDOR EAST PLANNING AREA Pajarito Corridor East Planning Area Assessment/Needs Summary Current Current Forecasted Functions/Capability Mission Activity Functions/Capabilities Engineering, Electronics, & Chemical Test Laboratories - TA-46 Research Labs and Offices -Various -work for others Continue as current Plan Discussion This is an active area with miscellaneous facilities. Many are old or not used for current experiments. Program Offices ER/WM program Continue as current Infrastructure Facilities Utility Supply & Site Access All missions in the planning area Continue as current Road System: Redesign TA-54 entry road for safety. Create secondary roads to TA-54 for safety, emergency and security needs. Create secure internal roads for transport of SNM between TA-55 and TA-54. LOS ALAMOS NATIONAL LABORATORY

PAJARITO CORRIDOR EAST PLANNING AREA IV THE PLANS IV.D27 Needed Development Proposed Projects Land Use Transp. Security Utilities Facilities Quality ESH Not located with other program administration areas None None Access control station near intersection of NM4 and Pajarito Road Upgrade intersections at TA-54 Build non-public road from TA-54 to TA-48 Build secondary access eastward from TA-54 to Pajarito Road Upgrade road along TA-18 Upsize 3 pipe from Pajarito Corridor West Develop outdoor interactive spaces None Mesita Del Buey Extension/ Intersection Improvements Connector Bypass from TA- 54 to TA-55 Secondary (East) Connnector Route to TA-54 None On-Going Utility Upgrades None C O M P R E H E N S I V E S I T E P L A N 2 0 0 0

IV.D28 I V T H E P L A N S PAJARITO CORRIDOR EAST PLANNING AREA LOS ALAMOS NATIONAL LABORATORY