RESOLUTION MEPC.67(37) adopted on 15 September 1995 GUIDELINES ON INCORPORATION OF THE PRECAUTIONARY APPROACH IN THE CONTEXT OF SPECIFIC IMO

Similar documents
MINIMUM REQUIREMENTS FOR VESSELS BOUND FOR OR LEAVING PORTS OF THE BALTIC SEA STATES AND CARRYING DANGEROUS OR POLLUTING GOODS

Intermaritime Certification Services (ICS) QUALITY MANAGEMENT SYSTEM INSTRUCTIVE FOR ISM-CODE

This electronic edition is licensed to for 1 copy. International Maritime Organization

ANNEX 1 DRAFT RESOLUTION MEPC.140(54) Adopted on 24 March 2006

Ecosystem-Based Management/Integrated Coastal Management. Effort Progress Timing. Medium High Some Delay

(Acts whose publication is obligatory)

TANKER SAFETY ISSUES. Mr Paul Markides Director OCIMF

Environmentally sound dismantling of ships

INTERNATIONAL CONVENTION FOR THE CONTROL AND MANAGEMENT OF SHIPS' BALLAST WATER AND SEDIMENTS, 2004

Recognizing that pollution of the Caspian Sea by oil and by oil pollution incidents of the sea threatens the marine environment,

The North-East Atlantic Environment Strategy

G20 Action Plan on Marine Litter

The role of the health sector in the Strategic Approach to International Chemicals Management towards the 2020 goal and beyond

Carriage of Dangerous Goods and Harmful Substances

(UNEP/FAO/RC/COP.4/24)

Appendix B. Treaties including the Precautionary Principle

RESOLUTION MSC.18(58) adopted on 24 May 1990 ADOPTION OF AMENDMENTS TO THE CODE FOR THE CONSTRUCTION AND EQUIPMENT OF SHIPS CARRYING DANGEROUS

DECISION ADOPTED BY THE CONFERENCE OF THE PARTIES TO THE CONVENTION ON BIOLOGICAL DIVERSITY AT ITS NINTH MEETING

MINISTERIAL MEETING OF THE OCEANS MEETING 2016

VOLUNTARY IMO MEMBER STATE AUDIT SCHEME (VIMSAS) 12 th North Indian Ocean Hydrographic Commission Conference. Colombo, Sri Lanka March 2012

IAEA SAFETY STANDARDS for protecting people and the environment. Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle Facilities

Rio Ocean Declaration

2007/40 Non-legally binding instrument on all types of forests

UNEP Principles 1. Integration of Tourism into Overall Policy for Sustainable Development

Alien species that threaten ecosystems, habitats or species I. STATUS AND TRENDS

HELSINKI COMMISSION HELCOM MARITIME 13/2013 Maritime Group 13 th Meeting Szczecin, Poland, November 2013

THE ROLE OF PRECAUTIONARY PRINCIPLE IN ENVIRONMENTAL PROTECTION OF COASTAL AREA

The role of the health sector in the Strategic Approach to International Chemicals Management towards the 2020 goal and beyond

Basel Convention on the Control of Transboundary Movements of Hazardous Wastes and Their Disposal

THE COMPLETE GUIDE TO ISO14001

United Nations Environment Programme

Initiation of Emerging Contaminants Characterization and Response Actions for Protection of Human Health

Coal-fired China: Rethink the Precautionary Principle

4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: +44 (0) Fax: +44 (0)

Central Baltic Programme

Baltic Marine Environment Protection Commission

Legal Strategies for Climate Change Adaptation by Vulnerable Communities. Learning Course, UN-CSD 15, New York, May 2, 2007

Prof. (Dr.) Arup Poddar

6183/16 AMM/FC/vm DGE 2

REPORT MEDITERRANEAN ACTION PLAN

The Precautionary Principle and Protection of Children s s Health

THE COVENANT OF MAYORS FOR CLIMATE AND ENERGY

TERMS OF REFERENCE. For. The Design of a Monitoring & Evaluation System to track the Progress of the CARIFORUM-EU EPA Implementation

Page 1 of 6. (As adopted during the last session of UNFF10 on Saturday 20 April 2013)

REDUCTION OF GHG EMISSIONS FROM SHIPS. A proposal to consider in developing the IMO GHG strategy. Submitted by BIMCO, IPTA and WSC SUMMARY

PROTOCOL FOR SUSTAINABLE DEVELOPMENT OF LAKE VICTORIA BASIN

INADEQUACY OF RECEPTION FACILITIES. The IMO Comprehensive Manual on Port Reception Facilities. Note by the Secretariat SUMMARY

Guidelines for providing and improving port reception facilities and services for ship-generated marine litter in the Northwest Pacific region

EAF: common sense as a concept. Kevern Cochrane Dept of Ichthyology and Fisheries Science Rhodes University

SingClass Courses are practical application courses and are meant for: Course Title

Prepared for Unmanned Surface Vessel Regulation Conference. Southampton October 2016

France Telecom Orange Group Sourcing & Supply Chain

The Economics of Climate Change C 175. Learning. Spring 09 UC Berkeley Traeger 5 Risk and Uncertainty 39

Pedro Madureira. Task Group for the Extension of the Continental Shelf. Legal and Technical Commission of the International Seabed Authority

RESOLUTION MEPC.284.(70) (Adopted on 28 October 2016) AMENDMENTS TO THE 2012 GUIDELINES ON IMPLEMENTATION OF EFFLUENT STANDARDS AND PERFORMANCE TESTS

St. Kitts and Nevis International Ship Registry

GREEN INFRAPORT PROJECT

Available online at ScienceDirect. Energy Procedia 63 (2014 ) GHGT-12. IEAGHG b

IMO. Resolution A.962(23) Adopted on 5 December 2003 (Agenda item 19) IMO GUIDELINES ON SHIP RECYCLING

Spoil and Water. Irish Ports Association Conference Ciaran Callan Dublin Port Company. 26 th September 2008

COAL AND COAL SEAM GAS REGULATION

MARITIME AND PORT AUTHORITY OF SINGAPORE

OUTCOME OF THE COUNCIL MEETING. 3486th Council meeting. Environment. Brussels, 30 September 2016 PRESS

Subject: New FSI regime and PSC assistance program for vessels trading in Paris MoU and Tokyo MoU.

The National Environment and Planning Agency (NEPA)

Mediterranean Memorandum of Understanding on Port State Control Alexandria/ Egypt

Baltic Marine Environment Protection Commission

OSHA ELECTRONIC INJURY REPORTING RULE CHANGES

1. The UNEP Regional Seas Programme was established in 1974 as a global programmed

REPORT TO THE MARITIME SAFETY COMMITTEE 1 GENERAL 4 2 DECISIONS OF OTHER IMO BODIES 5

EMAS KEY BENEFITS FOR ORGANISATIONS AND AUTHORITIES

From Valletta to Tallinn: Statement of the European Sea Ports Organisation (ESPO) to mark the Maritime Year of the European Union

Scaffold Public Documents - SPD16

European Parliament resolution of 8 March 2011 on the revision of the General Product Safety Directive and market surveillance (2010/2085(INI))

Green Olympiad Study Material. Free Chapter II

e-navigation workshop

AUDIT COMMITTEE REGULATIONS. The Supervisory Board appointed an Audit Committee, such in accordance with Article 6 of the Regulations.

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction

Status of international and domestic regulations on installation and use of ballast water management systems. Draft Report

ANNEX 1. RESOLUTION MSC.325(90) (adopted on 24 May 2012)

Principles for environmental and social responsibility

IACS Recommendations May 2003 No. 81

Code of conduct for suppliers of products and services to the Group Conservas Garavilla

REVIEW OF TEN YEAR PROGRAMME OF WORK ON SUSTAINABLE CONSUMPTION AND PRODUCTION PATTERNS

Action plan of the International Coral Reef Initiative (ICRI) Secretariat ( )

THE PRECAUTIONARY PRINCIPLE - ITS ORIGINS AND ROLE IN ENVIRONMENTAL LAW

ODFJELL DRILLING QHSE PROGRAMS Safety will never be compromised

Guidelines concerning a statistical definition of employment in the environmental sector

IMO; the facilitation and security of maritime transport

End poverty in all its forms everywhere

Designing A Model State Environmental Quality Act For 2007

12807/16 MS/ach 1 DG E 1B

IAEA SAFETY STANDARDS for protecting people and the environment. Predisposal Management of Radioactive Waste from Nuclear Fuel Cycle Facilities

ISO 22000:2005 Standard INTERNATIONAL STANDARDS REGISTRATIONS

Potable Water Supply, Wastewater & Reuse Element

MODULE 2 TOURISM AND DEGRADATION OF COASTAL RESOURCES

Baltic Marine Environment Protection Commission

WORLD TRADE ORGANIZATION

ISO INTERNATIONAL STANDARD

Action Plan for the Safety of Transport of Radioactive Material

Transcription:

MEPC 37/22/Add.l THE MARINE ENVIRONMENT PROTECTION COMMITTEE RECALLING Article 38(c) of the Convention on the International Maritime Organisation concerning the functions of the Marine Environment Protection Committee, NOTING that General Assembly resolution 471191 requests the United Nations Specialized agencies to report on steps taken to strengthen and adjust their activities in line with Agenda 21, NOTING ALSO that the Marine Environment Protection Committee, as IMO's focal point for UNCED follow-up actions, approved in November 1994 a report to the Commission on Sustainable Development in fulfilment of General Assembly Resolution 471191, AWARE that principle 15 of the Rio Declaration calls for the application of the Precautionary Approach, ADOPTS these guidelines on incorporation of the Precautionary Approach in the context of specific IMO activities,on an interim basis until further experience with their application has been gained, REQUESTS all relevant IMO bodies to review the guidelines and provide comments to the Committee with a view to their eventual submission to the Assembly for adoption as guidance for all relevant IMO activities. I:\MEPC\3 7\22-Al (1)

MEPC 37/22/ Add. 1 Page 2 ANNEX 1 The precautionary approach referred to IMO as set out in Principle 15 of the Rio Declaration states: "In order to protect the environment, the precautionary approach shall be widely applied by States according to their capabilities. Where there are threats of serious or irreversible damage, lack of full scientific certainty shall not be used as a reason for postponing cost-effective measures to prevent environmental degradation." and in Agenda 21, chapter 17: "17.21 A precautionary and anticipatory rather than a reactive approach is necessary to prevent the degradation of the marine environment. This requires, inter alia, the adoption of precautionary measures, environmental impact assessments, clean production techniques, recycling, waste audits and minimization, construction and/or improvement of sewage treatment facilities, quality management criteria for the proper handling of hazardous substances, and a comprehensive approach to damaging impacts from air, land and water. Any management framework must include the improvement of coastal human settlements and the integrated management and development of coastal areas. 17.22 States, in accordance with the provisions of the United Nations Convention on the Law of the Sea on protection and preservation of the marine environment, commit themselves, in accordance with their policies, priorities and resources, to prevent, reduce and control degradation of the marine environment so as to maintain and improve its life-support and productive capacities. To this end, it is necessary to: (a) (b) (c) (d) (e) Apply preventive, precautionary and anticipatory approaches so as to avoid degradation of the marine environment, as well as to reduce the risk of long-term or irreversible adverse effects upon it; Ensure prior assessment of activities that may have significant adverse impacts upon the marine environment; Integrate protection of the marine environment into relevant general environmental, social and economic development policies; Develop economic incentives, where appropriate, to apply clean technologies and other means consistent with the internalization of environmental costs, such as the polluter pays principle, so as to avoid degradation of the marine environment; Improve the living standards of coastal populations, particularly in developing countries, so as to contribute to reducing the degradation of the coastal and marine environment." I:\MEPC\3 7\22-Al (l )

MEPC 37/221Add. 1 Page 3 Incorporation of the precautionary approach in the work of IMO 2 Many accidents and incidents giving rise to damage to the environment are due to failure to comply with existing standards and procedures, rather than to inadequacies in the instruments concerned. Damage to the environment may also be caused by operational pollution, human error, system failures or force majeure. 3 Many of the current IMO activities are directed at achieving improved compliance, viz. flag State implementation, port State control and the International Ship Management (ISM) Code. The underlying philosophy of the precautionary approach as set out in Principle 15 of the Rio Declaration and particularly the section on "lack of full scientific certainty shall not be used as a reason for postpoing cost-effective measures to prevent environmental degradation" could usefully be applied. Decision-making and management processes 4 The following elements for decision-making and management processes, which would seem desirable if a precautionary approach is to be routinely incorporated into the work of 1M0 should ensure:.1 anticipation and prevention of environmental problems arising from any regulatory activities of IMO and striving for continual improvement in all facets of those activities;.2 that solutions to problems and consideration of new and existing policies, programmes, guidelines and regulations are developed in accordance with the precautionary approach;.3 that; where action is necessary and options may involve uncertainty, all options are evaluated consistent with the precautionary approach;.4 adoption of cost effective practices and practical solutions to problems and promotion of their continued development;.5 where appropriate, that decision-making is preceded by environmental assessment and risk analysis to identify the environmental impacts of the proposed or alternative courses of action, whether these impacts can be prevented or minimized and how this might be done;.6 improvement of decision-making and management by obtaining and providing baseline and other data, identifying and explaining environmental changes;.7 promotion of national and international research, analysis and information programmes to identify, understand and disseminate information about threats to the environment from maritime operations, to contribute to defining problems, including analysis of the degree of risk involved, by which uncertainties are reduced, and developing and testing solutions to problems;.8 consideration and adoption of economic incentives to encourage environmental responsibility so as to conserve the marine environment and avoid its further degradation;.9 support for development of new and existing policies, programmes, guidelines or regulations, where appropriate, which contribute to the protection and enhancement of the marine and coastal environment consistent with IMO's mandate; I: \MEPC\3 7\22-Al (1)

MEPC 37/22/ Add. 1 Page 4.10 that, as necessary and appropriate, IMO should, through programmes such as its Integrated Technical Co-operation Programme; assist countries to improve their capabilities in order to comply with IMO standards in the shortest possible time;.11 where existing practices fail to provide adequate environmental protection, encouragement of the development and use of cost-effective interim protective measures within feasible time-frames, which include best environmental practice and best available technology;.12 promotion of clean technologies and waste minimization techniques for maritime activities, including use of best environmental practice and best available technology to ensure improving environmental performance. The precautionary approach should not be considered in isolation of other IMO practices, procedures and resolutions, including resolutions A.500 and A.777 and principles such as the "polluter pays" principle as reflected in Rio Declaration principle 16. I:\MEPC\37\22-Al(l)

I:\MEPC\37\22-AI 1 MEPC 37/221 Add. 1 Page 5 Framework for incorporation of the precautionary approach into the programmes and activities oflmo 5 In order to promote incorporation of preventive, precautionary and anticipatory approaches as identified above in the programmes and activities of IMO that might impact the environment, the decision-making and management framework outlined below should be followed. (1) Consistent with resources and worload demands, the review and consideration should include environmental assessments and a systematic review ofimo's work. In developing measures to prevent or reduce pollution, priority should be given to the use of cost-effective pollution prevention measures such as clean production, product substitution, and waste minimization. Not engaging in polluting activities should be considered as an option when there are imminent threats of serious or irreversible damage. Where pollution prevention measures are not available, discharge standards or other cost-effective measures to protect the marine environment should be established, based upon the best available scientific information. This should include consideration of the results of any environmental assessments used in step (1). In developing environmental measures, consideration should also be given to the steps needed for their effective implementation. This might include enforcement provisions, verification procedures and techniques, achievable schedules and deadlines, and capacity-building and technical co-operation programmes for developing countries. Where scientific uncertainties arise as to the sufficiency of standards, targets or the availability of appropriate technology, these uncertainties should be identified. The results should be used to incorporated into an action plan used to encourage and promote, within IMO and the Member States, research to reduce or eliminate the uncertainties. The outcome of such research should then be used to review and improve the measures adopted and to establish, where appropriate, phase-in dates for improved technology. Following development of measures, their effectiveness in protecting the environment and the extent to which they are actually implemented must be reviewed. If the measures do not prove effective or are not being successfully implemented, then appropriate corrective measures should be undertaken Review and consider environmental risks when prioritizing IMO's work Evaluate feasibility of pollution prevention measures Where measures under (2) are not available, use best available information and science to set standards Identity implementation steps and procedures Promote research or gather more data to reduce uncertainties or improve technology Assess effectiveness of implementation (2) (3) (4) (5) (6) ***