For Silverback Solar

Similar documents
moment Engineering + Design Warwick Avenue, Suite #C5 Fairfax, VA Phone: Web:

Installation Guide EcoFoot5D High Density 5-Degree Ballasted Racking System Document No. ES10560

GroundTrac. Installation Manual

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

Permitting and Inspecting PV Systems. PV Codes and Standards 101. Photovoltaic System Basics

Conergy SunTop IV Price List. Made in. USA & Ontario, CANADA

On-roof system Tau Installation manual

Conergy SolarFamulus II

Ballasted Roof Mounting Installation Manual

ASSEMBLY INSTRUCTIONS RESIDENTIAL SOLUTION CROSSRAIL GROUND MOUNT SYSTEM USA

ASSEMBLY INSTRUCTIONS for DATASAFE TM HX and HX FRONT TERMINAL UBC BATTERY RACKS

SEISMIC PROTECTION SYSTEMS Bracing Products for Racks & Cabinets

SnapNrackTM GROUND MOUNT CODE COMPLIANT INSTALLATION MANUAL

INSTALLATION GUIDE Sika SolarMount 1 Exposition East West

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7

Fig. 1 - Standard Clevis Hanger

2016 V1 SERAPHIM ECLIPSE PHOTOVOLTAIC MODULE JIANGSU SERAPHIM PHOTOVOLTAIC SYSTEM CO. LTD. ADDRESS: JIANGSU CITY OF CHANGZHOU PROVINCE WANG ZHEN HENG

PATHWAYS FOR COMMUNICATIONS SYSTEMS

A. Product Data shall be provided for each type of product indicated.

Com-Tray. Under Floor

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE

SECTION CHAIN-LINK FENCES AND GATES 02821/1

Solar PV System Code Compliance Best Practices, 2017 NEC Updates, and Opportunities for Improvement

PITCHED ROOF. Photovoltaic Mounting Systems. Assembly Instructions. for roofing tiles, plain tiles and slate

ZS880 Linear Shower Drain Installation Instructions

Suspension System Data Center Ceiling Solutions

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

TRAPEZOIDAL SHEET METAL RAIL

ST-AK 1/12. Photovoltaic Mounting Systems. Assembly Instructions. Mounting system for roofing with trapezoidal sheet metal

METAL HANDRAILS AND RAILINGS. A. Properly identified manufacturer's literature, including shop and erection drawings before starting work.

ROOF MOUNT KIT OWNERS MANUAL

SWH Solar Racking Installation Guide

INSTALLATION INSTRUCTIONS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

The University of Texas at Austin September 30, 2011

Fig Beam Clamp Retaining Strap (B-Line B3367)

YINGLI SOLAR PV MODULES Installation and User Manual

US Pool Lift Model #114 (Independence) Installation Guide

PM200M00 PM245P00 PM250M01 PM300P00 PM318B00 PM318B01 PM096B00. Version 1.1

SECTION OUTLET, PULL, AND JUNCTION BOXES

Details of technical leaflets/write-up on various pieces of equipment.

2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

MOUNTING SYSTEM FOR PITCHED ROOF WITH TILES. mounting system for pitched roof with tiles for solar panels in landscape setup. Rev

Mounting systems for solar technology ASSEMBLY INSTRUCTIONS. S-Dome 2.0 System.

Product Portfolio 2016 v2. Trace the sun Capture the benefit

Model: LoLander Series Truck Scale Model: LL FT Model: LL FT Installation, Set-Up and Operation Manual

INSTALLATION MANUAL ANNEX OF STANDARD. For professional use only

Model # 358H-PR. 4/8/2011 Page 1 of 12

rec Peak energy modules

Modular CABANA Kit 16 x 16 (6x6) Lumber: Western Red CEDAR #1 (Cabinet) Shingles: 5X / 16" long / 1/2" thick or 16 oz. copper

UNDERGROUND SERVICES SECONDARY

YCW 250 I-Beam Curtain Wall System Installation Manual

Seismic Restraints. Cent-R-Rail Supplement* SYSTEMS THAT MAKE SENSE

TOLCO Fire Protection Support Systems. Pipe Hangers Supports Seismic Bracing. UL Listed FM Approved for Fire Sprinkler Installations

SCAFFOLDING RUNWAY SYSTEM

Smarter. Safer. Leaner.

Product Specifications MRI Trench Duct

SWH Solar Racking Installation Guide

1675 Locust Street Red Bud, IL Phone: Fax: WARRANTY & TERMS

FLORIDA PHOTOVOLTAIC BUILDINGS PROGRAM

Trench Duct Class Catalog 5230CT9601R10/08

e. Cutouts and Holes for Toilet Accessories: Made to template and edge-reinforced.

YINGLI SOLAR PANDA BIFACIAL MODULES Installation and User Manual

PV System Permitting and Inspection. PV Codes and Standards Uniform Solar Energy Code

AN INNOVATIVE DESIGN FOR PAVING USING VERTICALLY- INTERLOCKING ARTICULATED CONCRETE MATS

Vehicle Restraint Installation Manual

Instructions for 12 and 15 IGT systems (12 pictured)

Model # 922-S4. 12/18/2013 Page 1 of 8

Model # 158-P4. 12/12/2013 Page 1 of 11

Mounting instructions. novotegra for trapezoidal metal - roof parallel

Model # 238HS-P8. 4/27/2011 Page 1 of 11

Pre-Fabricated Roof Curbs

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck)

Mounting instructions

Flotation Docking Systems, Inc.

BoSS Climalite Camera and lighting tower

Welcome to Douglas County PUD

1675 Locust Street Red Bud, IL Phone: Fax: WARRANTY & TERMS

Electrical Metallic Tubing (EMT) Fittings

SECTION METAL FLOOR PLATE STAIRS

A-Series Aluminum Gantry Crane

Model # 800SM-PS3. 8/3/2016 Page 1 of 8

CIRRUS AIRPLANE MAINTENANCE MANUAL

4400 Series UPS Seismic Adapter Kit Installation Instructions

INSTALLATION MANUAL UL

Mounting systems for solar technology ASSEMBLY INSTRUCTIONS. SpeedRail System.

Schüco Mounting System MSE 210 Mounting on trapezoidal roofing

SECTION GROUNDING AND BONDING

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

Materials Carbon Steel is used in the manufacturing of riser and pipe clamps. Stainless Steel and other materials are available.

Seismic Installation Manual

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

Electrical Metallic Tubing (EMT) Fittings

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

FIXTURE CARRIERS TABLE OF CONTENTS S-WD-FC

D D TYPE A1, A2 & B MICHIGAN DEPARTMENT OF TRANSPORTATION 5-40 CONNECTION. L4" x 4" x 3/8" Brace. C8 x 4.25 Strut. WT9 x 17.5.

YINGLI SOLAR TWINMAX MODULES Installation and User Manual

Transcription:

Washer, Electrical Equipment Bond WEEB Patent Pending INSTALLATION INSTRUCTIONS For Silverback Solar Please read carefully before installing. Wiley Electronics recommends that the sufficient details of the installation be submitted to the AHJ for approval before any work is started. WEEB-DPF WEEBLug-8.0 WEEB Bonding Jumper-8.0 Products are tested to UL 467, CAN/CSA-C22.2 No. 41 US/Canadian standards for safety grounding and bonding equipment Document Number 104-0404-000066-001 2006-2011 All Rights Reserved 3098177

Standard Top Down Clamps WEEB COMPATIBILITY The WEEB family of products can be used to bond anodized aluminum, galvanized steel, steel and other electrically conductive metal structures. All installations shall be in accordance with NEC requirements in the USA and with CSA C22.1 in Canada. The WEEBs are for use with modules that have a maimum series fuse rating of less than 25A. The WEEBs used for bonding the PV modules to the mounting rails are compatible with various cross-sections of module frames. The following are eamples of module frames that are compatible. Notice that the WEEB teeth are positioned completely under the edge of the module frame. OK OK OK The following is an eample of a module frame that is incompatible with the WEEB. The module frame will not contact the fleible leg of the WEEB-DPF. If the module doesn't sit against the leg, the WEEB teeth will not sit in the proper location. X 2006-2011 All Rights Reserved

Top Down Clamps for Lipped Modules The following are a few variations of lipped solar modules mounted with inverted U-shaped clamps. Notice that the force which the inverted U- shaped clamp eerts is in line with the WEEB teeth. WEEB-DPF bottoms out prematurely on low lipped module frames X Low-Lipped Module WEEB-DPF is not compatible with high lipped modules. The WEEB teeth do not intersect with the solar module frame. X High-Lipped Module 2006-2011 All Rights Reserved

WEEB COMPATIBILITY Module frames like those shown here may have a ridge or lip on the bottom edge of the frame that would prevent the WEEB teeth from fully embedding. X Shown here is an eample of a lip that will prevent the WEEB teeth from properly penetrating the module frame. This type of frame is not compatible with the WEEB. X Shown here is an eample of a groove that will prevent the WEEB teeth from properly penetrating the module frame. This type of frame is not compatible with the WEEB. Important Note: Inspect each module frame used with a WEEB to ensure that the bottom mounting face of the frame is flat, and that there are no hinderances to embedding WEEB teeth. Do not use a module with a frame that prevents the WEEB teeth from embedding fully. 2006-2011 All Rights Reserved

WEEB-DPF on Boed Module Frames Certain module frames do not have enough structural strength to withstand the force required to embed a WEEB. These frames will deform and therefore not allow sufficient penetration of the WEEB teeth. The general requirements for minimum module frame thickness of "boed" type module frames are illustrated below. OK NO LESS THAN 3.0mm NO GREATER THAN 8.5mm NO THINNER THAN 1.5mm 2006-2011 All Rights Reserved

SYSTEM OVERVIEW Use WEEB-DPF to bond solar modules to module mounting rail. Use WEEB Bonding Jumper-8.0 to electrically connect mechanically spliced rails. Important notes 1. 2. 3. Use one WEEBLug-8.0 assembly per rail to connect system to equipment ground conductor. Use general purpose anti-seize compound on fastener threads when installing WEEBs. The NEC section 690.43 states, "Eposed non-current carrying metal parts of module frames, equipment, and conductor enclosures shall be grounded in accordance with 250.134 or 250.136(A) regardless of voltage." WEEBs are intended for SINGLE USE ONLY. Functionality will not be guaranteed if reused. 2006-2011 All Rights Reserved

WEEB-DPF ASSEMBLY 1 Silverback Solar Mid Clamp WEEB-DPF 5/16" Split Lock Washer 5/16"-18 He Nut 2 Install End Clamp Assembly according to manufacturers specifications 2006-2011 All Rights Reserved

3 Install WEEB-DPF and mid clamp assembly in position. Do not tighten hardware yet. Slightly lift solar module and slide it over the WEEB-DPF teeth and under the mid clamp assembly, ensuring the module frame is flush against the midclamp. WEEB teeth will automatically be aligned under the edge of the module when mid clamp assembly is correctly installed. Important note: To correctly install mid clamp assembly, ensure that the bolt is perpendicular to the mounting rail and both sides of the solar modules are completely positioned against the mid clamp. Refer to WEEB compatibility page for illustrations. Visually check that WEEBs are properly positioned. 2006-2011 All Rights Reserved

Important note: WEEBs are for SINGLE USE ONLY! Do not torque fasteners down if position of solar modules is not finalized. Only slighty tighten fasteners to keep modules in place. 4 When position of solar modules is finalized, tighten fasteners to 15 ft-lb / 20.5 N-m using general purpose anti-seize compound on threads. 5 Assemble end clamp to manufacturer's specification. 2006-2011 All Rights Reserved

6 WEEB-DPF LAYOUT EVEN NUMBER OF MODULES IN ROW X DENOTES PLACES TO INSTALL WEEB-DPF C X R = 4 X 1 WEEB-DPF NEEDED = C X R = 4 X 1 = 4 ODD NUMBER OF MODULES IN ROW X DENOTES PLACES TO INSTALL WEEB-DPF C X R = 5 X 1 WEEB-DPF NEEDED = [C+1] X R = [5+1] X 1 = 6 Note: When replacing a single faulty module, also remove the adjacent module which contacts the same WEEBs as the faulty module. This will ensure that there are never ungrounded modules in the array. 2006-2011 All Rights Reserved

WEEBLUG ASSEMBLY 7 WEEB teeth towards rail Install 5/16"-18 bolt at desired position and slip bolt through WEEB-8.0 Drill bolt clearance hole 21/64in / 8.5mm on center of vertical rail support. WEEB-8.0 Install WEEBLug-8.0 assembly and torque 5/16"-18 fasteners to 15 ft-lb / 20.5 N-m using general purpose anti-seize compound on threads. Important note: 1. 2. WEEB-8.0 that sits under the WEEBLug is for SINGLE USE ONLY. Ensure position is correct before tightening down. The WEEBLug-8.0 may be used with a maimum equipment ground wire of 6 AWG. 2006-2011 All Rights Reserved

6 GROUND CONDUCTOR ASSEMBLY Equipment Ground Conductor Lay in equipment ground conductor and tighten bolt to 7 ft-lb / 10 N-m. 2006-2011 All Rights Reserved

7 SILVERBACK SOLAR SPLICE KIT ASSEMBLY The fleible WEEB Bonding Jumper can be mounted in different ways shown below. WEEB Bonding Jumper-8.0 Torque 5/16"-18 hardware 15 ft lb /20.5 N-m using general purpose anti-seize compound on threads. WEEB Bonding Jumper-8.0 Torque 5/16"-18 hardware 15 ft lb /20.5 N-m using general purpose anti-seize compound on threads. Route WEEB Bonding Jumper as shown above if edge of solar module lands between two splice rails. 2006-2011 All Rights Reserved