+ IQ/OQ Protocol Installation Qualification/ Operation Qualification

Similar documents
DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES...

BRADDOCK ROAD YOUTH CLUB

15020 LABORATORIES. C. Section Building Automation and Control System Guidelines

Unit Substation Transformer Construction Checklist (under 500 kva)

Installation Qualification/Operational Qualification Protocols and Instructions

UC Davis/UCDHS Biological Safety Policy:

SUBJECT ADTC TO U11 CONTROLLER FIELD RETROFIT

SECTION AIR DUCT CLEANING

PI s Name Date Bldg./Rm#

Biological Safety Cabinet Policy

THOMAS JEFFERSON UNIVERSITY HOSPITAL STANDARD OPERATING PROCEDURE FOR THE BUILD OUT OF TELECOMMUNICATIONS ROOMS AND ASSOCIATED SPACES

Standard Operating Procedures for Servicing Laboratory Exhaust Systems

DIVISION 11 - EQUIPMENT FOOD SERVICE EQUIPMENT LABORATORY FUME HOODS. A. Design Considerations

Communications Page 1 of 9

Basement Renovation Guide For Residential Dwellings

LABORATORIES 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS. A. Section Accessibility for People with Disabilities

SYSTEM 1E LIQUID CHEMICAL STERILANT PROCESSING SYSTEM

Model FDL 115 Safety drying chambers for limited quantities of solvent

ASEAN Guidelines on GMP for Traditional Medicines / Health Supplement

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features

DESIGN AND CONSTRUCTION STANDARDS. Section 2: Standards for Specific Categories of Work. Laboratory Standards

A/E Design Deliverable Checklist

ASHRAE 62.2: What s New in 2016

Building Inspection Report

Facility and Equipment Maintenance

National Institutes of Health (NIH) Office of Science Policy (OSP) Recombinant or

B. ASHRAE 1991 HVAC Applications Handbook: Chapter 34--Testing, Adjusting and Balancing.

DS-520 Digital Indicator Operation Manual 73366

Model FD 115 Drying and heating chambers Avantgarde.Line with forced convection

Telecommunication Spaces

Builders Risk - Water Damage Inspection Checklist

DESIGN & CONSTRUCTION PHASE COMMISSIONING PLAN TEMPLATE

TELECOMMUNICATIONS ROOMS. Table of Contents PART 1 GENERAL 2 A. LOCATION: 2 B. SIZE 2 C. STRUCTURAL 3 D. ENVIRONMENTAL 3 E. ELECTRICAL AND LIGHTING 3

A/E Design Deliverable Checklist

Kitchen Remodel Estimator. Contact Info: Project Summary: Design. Demo

KITCHEN REMODELS CITY OF MISSION VIEJO BUILDING SERVICES DIVISON 200 CIVIC CENTER, MISSION VIEJO, CA (949)

Texas A&M University Commerce April 11, 2014

UNILAB MODULAR CLEAN LABS

Gerber M Series Site Requirements

SECTION TEMPORARY UTILITIES

PHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS

Low Voltage Switchgear Construction Checklist (under 500 kva)

Chapter 11. Dwelling Units and Sleeping Units

Gerald Desmond Bridge Replacement

Model BF 720 Incubators Avantgarde.Line with forced convection

VERTEX Corporate Headquarters 400 Libbey Parkway Weymouth, MA p: f:

THE IMPORTANCE OF EQUIPMENT ACCESSIBILITY IN BUILDINGS

Advanced Ventilation for Residential applications FBC Res 2010.

Typical Finished Basement Details


Forum M: Top 10 Cost Reduction Strategies for Science Facility Operations and Maintenance

Property Condition Assessment

IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST

VI PARTS LIST. , ELECTRIC FRYER PARTS LIST ITEM DESCRIPTION MODELS PART # 10x x24

Compliance Certificate

Construction Indoor Air Quality (IAQ) Management Plan

Is Yours? Homes Across Missouri are Being Built to the Latest National Energy Efficiency Standards

Mar Cor Purification. Carbon Block Filtration System. Operation & Maintenance Manual

Dyno Test Rooms Professional Chassis, Engine & Specialty Test Rooms for the PowerSports & Product Testing Market

! CAUTION: Read and follow these instructions.

Model BF 260 Incubators Avantgarde.Line with forced convection

Approval Standard. for. Flammable and Combustible Liquid Storage Buildings

1. Telecommunications mounting elements. 2. Backboards. 3. Telecommunications equipment racks and cabinets. 4. Grounding.

Changes to the Minnesota Commercial Energy Code. Presented by: Andy Thielen, PE

General Specifications for HVAC System Cleaning

INSTALLATION MANUAL AND OPERATING INSTRUCTIONS

Project Monitoring & Air Sampling

ENCORE 2G MEDIUM LABORATORY STERILIZER SPECIFICATION/DATA SHEET

Foreign Manufacturer Eligibility Requirements

CONSTRUCTION TRADES LABORATORY September 30, 2010

Biosafety Level 2 (BSL-2) Laboratory Guidelines

INSTALLATION MANUAL AND OPERATING INSTRUCTIONS

READ ONLY. Adopting Agency BSC SFM. Adopt Entire Chapter Adopt Entire Chapter as amended (amended sections listed below)

Thule Prototype BIM Manual for Dormitories. February 5, 2010

FUME CUPBOARDS: SELECTION, INSTALLATION, MAINTENANCE AND DECOMMISSIONING

Installation, Operation & Maintenance Manual

Low-profile, 11U high cabinets hold networking equipment, servers, and phone equipment.

Minimum-Security Criteria for C-TPAT Foreign Manufacturers

Page 3 of 12. Inspected Describe. Explained. Health & Safety. Maj. Def. Examiner Notes STRUCTURE N/A. Financial Impact. Impact.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Imperial Series. Model IMP-425/525/625/825/1000AP IMD-425/525/625/825/1000AP IMP-1025/1200/1500/2000AP IMD-1025/1200/1500/2000AP

ELECTRICAL SAFETY INSPECTION REPORT

Maintenance Bypass Breaker Cabinet Series Configuration 5. Installation and Operation Manual

NC State University Design and Construction Guidelines Division 00 Planning & Design - Laboratory Design

2017 Incentive Policies for Housing and Economic Development. Notice of Revision

Assessment of Containment and Product Protection In a Class II Type B3 Biological Safety Cabinet Under As-used Laboratory Conditions

Supply Chain Security Container Inspection and Seal Application

Local Exhaust Ventilation Improvement Efforts at a Global Specialty Chemical Manufacturer

Troubleshooting Guide 9702 Series

FITOCLIMA WALK-IN STABILITY

Containment Booths. FOR MORE INFORMATION ON CONTAINMENT BOOTHS CALL +44 (0) OR

FACILITIES MANAGEMENT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY AERIAL WORK PLATFORM POLICY 09/06/17 Last Revision

Element D Services Heating, Ventilating, and Air Conditioning

Inspection Checklist for NIH BL3 Laboratories (7 CFR 331; 9 CFR 121; 42 CFR 73; NIH Guidelines)

Thermoelectric Cooler

EPA s Lead Program Rule At-A-Glance

CFFWA-20-1-U Chilled/Hot Water Universal Mount Fan Coil 2-Pipe Heat / Cool Fan Coil 60,000 BTUH

Exhaust Options Available for a Class II Biological Safety Cabinet (EN 12469)

Transcription:

+ IQ/OQ Protocol Installation Qualification/ Operation Qualification Purifier Logic Series Biological Safety Cabinets Labconco o: 1058602 Rev. - Available at www.labconco.com or by e-mail in Word 2000 document Labconco Corporation 8811 Prospect Avenue Kansas City, MO 64132 Product Service: 1-800-522-7658 1-816-333-8811

Purpose and Scope This Qualification Protocol is solely intended to be used with Labconco Purifier Logic Series Biological Safety Cabinets, which are new or relocated. Models: 34300 Series 34400 Series 34500 Series 34600 Series 34308 Series 34408 Series 34508 Series 34608 Series 34410 Series 34610 Series It is written to assist the end-user in validation of predetermined specifications. The protocol begins with planning the site for the piece of equipment and therefore is of value prior to receipt of delivery. Responsibilities End-User The ultimate user or otherwise appointed personnel in the lab is responsible to ensure the BSC is installed and operating properly. This document can assist in that validation. This document cannot however anticipate every application or unique situation encountered with the installation and operation. It is therefore essential that users, lab managers and safety officers work together to broaden the scope of this document through cautious forethought. End-User Employer The employer is responsible for supporting the validation through adequate resources and training. The organization shall also ensure the validation process has been fully carried out prior to use of the BSC. Records should be stored in a safe, easily retrievable location. The location of the BSC, preventive maintenance and certification schedules should be documented in the company s quality system. Cabinet Certifier All BSC s must be certified prior to use. A qualified certifying technician must do this process with calibrated instruments. The cabinet must be certified upon installation, on a scheduled annual basis and whenever the cabinet is moved to a new location. Certification is the key requirement of this protocol. Manufacturer Labconco Corporation, certified ISO-9001, is responsible to fully test the Purifier Logic BSC to SF 49 requirements prior to shipment. The manufacturer must retain these records. Their staff of Product Service Representatives and Product Specialists can assist with information on the purchase, delivery and installation. Labconco is not responsible for carrying out the actual installation or validation processes. 1

Performance Qualification Once the Purifier Logic has been checked for proper installation and operation, its performance may be validated. Labconco cannot recommend specific procedures to do this. The performance validation should be designed to meet the specifications and accuracy required of the application. In general this requires establishing acceptance criteria, inspecting and testing the results with calibrated equipment and qualified personnel. Some basic suggestions are included after the Operational Qualification section. 2

A. Installation Qualification Step Description 1 Site Planning 1a 1b 1c 1d Proper airflows Mounting Surface Space Requirements Exhaust Requirements Specification or Acceptance Criteria Is the Purifier Logic to be located in a room with windows that will remain closed? Is the cabinet to be located away from heavy foot traffic, doors, fans, ventilation registers and any other air-handling devices that could disrupt its airflow patterns? Have accommodations been made for placement of the Purifier Logic on cabinetry or stand of suitable strength and proper height? Refer to Appendix B in User s Manual. Has adequate floor space been provided for placement of the cabinet? Is there proper overhead clearance for the Purifier Logic? There must be 6-inches, (150 mm) above the exhaust cover for units not connected to exhaust systems. Certain applications require the BSC to be exhausted to the outside. Have the applications been reviewed with the Safety Officer? For cabinets to be connected to exhaust systems, has a facilities manager or qualified HVAC person reviewed and approved the site plans for placement of exhaust duct? For units requiring exhausting to the outside, have the exhaust blower, ductwork, dampers, and canopy connection been ordered? Has the room/building been evaluated for adequate air changes with the device? Result ES O /A /A 3

Has the heating and cooling load been considered in the planning? All 3' Logics = 77 BTU/hr /A All 4' Logics = 99 BTU/hr All 5' Logics = 115 BTU/hr All 6' Logics = 139 BTU/hr 1d Gas Services Has the facilities manager been consulted with regard to gas/vacuum requirements? /A Does the BSC ordered/received have service valves to match expectations? /A Connections to service valves are ¼" OD metal and require a shut-off valve. WARIG: The use of flammable gasses or solvents within the BSC should be avoided. Excessive heat may alter the laminar airflow and could potentially damage the HEPA filter. A Safety Officer should approve the use of flammable materials within the cabinet. 1e Electrical Service Refer to the Electrical Requirements section of the User s Manual for a list of model numbers and their corresponding electrical ratings. Are services available for the BSC to be connected to a dedicated circuit with over-current protection of adequate size and the proper voltage? 1f Delivery Requirements If the BSC has not been delivered yet, have arrangements been made with the facility or delivery agent to have equipment capable of gently handling a packaged skid of this size and weight? (Refer to Chapter 3 of the User s Manual.) Is there a clear path from the loading platform to the final destination in the lab? When required, will there be equipment to move the cabinet onto the final mounting surface/stand? (Refer to the Getting Started section of User s Manual) 4

2 Prior to Operation 2a Damage Claims The BSC has been inspected for any signs of damage that may have occurred while in transit or within the building? Keep packaging materials until inspection is complete. If so, refer to the User s Manual for information on shipping damage claims. 2b Set Up The cabinet has been mounted to a substantial supporting stand or cabinet that has been checked for level? The cabinet or stand is set at a suitable height for the operator to work ergonomically? Before attempting to operate the sash, remove the side panels and verify that; the sash cables are centered on the pulleys, the weight restraining pin under each weight has been removed and discarded, See Installation Instruction Sheet affixed to the sash for photos and details. The User s Manual and Small Parts Kit is shipped under the work surface. These have been unpacked and stored for future use. 2c Drain Valve If the optional Drain Valve provided is to be installed, it has been sealed and fastened to the underside of the work surface per the User s Manual. 2d Electrical Connections Is the BSC connected to a dedicated electrical circuit of proper voltage and amperage? See identification plate on the front surface of the electrical box above the front panel. OTE: The cabinet should be posted with warnings not to be used until certified. Duplex receptacle(s) inside the cabinet are operational? Do the GFI test and reset buttons work properly (115V models only)? /A /A 5

2e Gas Services A qualified technician has installed the gas/vacuum services? Checked for leaks? /A Verified that valves are labeled for the proper gas/vacuum? /A 2f Exhaust System If exhausted to the outside, a qualified installer has completed the connections to the BSC? /A If exhausted to the outside, the exhaust system to the BSC is O continuously? /A 2g Basic Operational Checks Press the Light Switch O, does the Fluorescent Light illuminate the interior of the cabinet? Does the Blower operate with the Blower Switch O and the sash open? If equipped, does the U.V. Light, mounted in the upper-rear of the interior, operate when the U.V. Light Switch is turned O and the sash is fully closed? /A Does the sash rise smoothly to the appropriate height for the model indicated on the ID Plate? Series 34300, 34400, 34410, 34500, 34600, 34610 should have a 10-inch sash opening. Series 34308, 34408, 34508, 34608 should have an 8-inch sash opening. Do the audible and visual alarms indicate when the sash has been raised above the 8 or 10-inch positioning mark? Does the Alarm Mute button stop the audible alarm for approximately 5 minutes when pressed? 6

B. Operational Qualification Step Description 1 Certification 1a Initial Certification 2 Training 2a User Training 3 Cleaning 3a 3b Exterior Cleaning Interior Cleaning Specification or Acceptance Criteria Prior to use, has a qualified certifier tested the cabinet to the SF 49 standard the cabinet was listed under? Has the certifier labeled the BSC with the successful certification date? Certification should be done annually. Has the next required certification been added to your quality system s preventive maintenance or certification schedule? Have all users been properly trained on the safety, theory of operation and limitations of the BSC? Do all users understand techniques for: Cleaning & disinfection of the cabinet s interior, Loading supplies and equipment, Avoiding cross contamination, ot disturbing the laminar flow, Spill control and clean up, Shutting down the cabinet, If equipped, use of the U.V. light? Has the exterior of cabinet been cleaned of dust that accumulated throughout installation. Have the BSC s interior surfaces been cleaned and disinfected appropriately for the work that is about to be performed in it? Has the towel catch screen located in the rear under the worksurface been checked for any foreign debris requiring removal? Result ES O 7

C. Performance Qualification OTE: This Performance Qualification section is only a recommendation of some basic items to consider for your protocol. our protocol should include tests and inspections that are pertinent to the applications performed within the equipment. Step Description Suggested Criteria 1 Periodic Certification 1a Cabinet Performance 2 Maintenance Certification should be done at a minimum annually. An experienced certifier can verify the cabinet s performance. Is the BSC s current certification within the acceptable timeframe set by your organization? Has there been a procedure established if a cabinet is found to have exceeded its certification due date? Is the next required certification noted in your quality system s preventive maintenance or certification schedule? 2a U.V. Lamp If equipped, the U.V. Lamp should be replaced at least annually to remain effective. Or, the U.V. Maintenance Timer can track the hours of operation and supply an alert. 2b Towel Catch The towel catch screen located in the rear under the worksurface should be checked for any foreign debris when the cabinet is cleaned. 2c 2d 2e Fluorescent Lamp Prefilter (optional) Postfilter (optional) Regular maintenance should ensure that the Fluorescent Lamp is operating properly. Some cabinets have a rouging prefilter adhered to the towel catch. If desired, inspect the condition of the prefilter, clean or replace regularly. Some cabinets that exhaust back into the room may have been ordered with an activated carbon postfilter. If equipped, replace filter regularly to control odors. 8

D. Summary Labconco Purifier Logic Series BSC s IQ/OQ Document 1058602 Revision - Equipment Location Serial o. Model o. User Protocol Revision (or Date published) Contact (print name): Title: Review the Response columns for answers of O. Use the area below to describe the deficiency or unacceptable results. Those deficiencies are to be followed with an instruction for Corrective Actions. Once acceptable results are obtained, the deficiency is accepted by initialing the Corrective Action. Step Deficiency followed by Corrective Action Initial 9