Report JRC2 JRC. Park Royal City International: rail phasing options. Potential train service volume at Old Oak Interchange

Similar documents
Old Oak and Park Royal. Guided tour Briefing Pack

Passenger service for the Dudding Hill line: brief for feasibility study

WEST LONDON ORBITAL RAIL SERVICE

HS2. Beth West Commercial Director, HS2 Ltd

CREWE : Now New Next

HS1 Link The View from London

London East-West study

B6: RAILWAY POWERS IN THE HYBRID BILL

Greengauge 21 consultation response to National Infrastructure Commission: London s Transport Infrastructure

The changing face of London and Southeast Railway Architecture. Tony Ramanathan Systems Design Engineer Network Rail

Old Oak Common Station

This paper outlines the carbon footprint and greenhouse gas assessment for HS2 Phase One.

Transport in the Liverpool City Region: Update for TravelWatch

HS1 HS2 Link and Camden

IPSWICH NORTHERN ROUTES STUDY. Stage 1 Progress

Input from Engineers Ireland Into the Department of Transport s Statement of Strategy

Transport for the North Strategic Transport Plan

Strategic Transport Plan Position Statement. June 2017

Because Transport Matters

Liverpool City Region Candidate Major Schemes April 2013

Transport2025. Transport vision for a growing world city

MyJourney. Rail Plan 7. Connecting people and places. Metro. Here to get you there. West Yorkshire Local Transport Plan

Greater Newcastle Transport Plan

High Speed Rail London to the West Midlands and Beyond. A Report to Government by High Speed Two Limited. PART 7 of 11

The case for the Digital Railway. Patrick Bossert. Digital Railway Transformation Director. Agenda

J13 M1 15M UNDER DC4 NEW 275,000 SQ FT INDUSTRIAL/DISTRIBUTION OPPORTUNITY TO LET CONSTRUCTION CLEAR HEIGHT PROLOGIS PARK AVAILABLE JUNE 2017

Oxford, Milton Keynes, Cambridge Northampton Growth Corridor

Please find attached the Wells House Road Residents Association response to the HS2 AP2 ES consultation. Many thanks

Freight Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland

Brent Cross Thameslink

PLANNING FOR GROWTH. A position statement from England s Economic Heartland s Transport Forum.

1 Introduction 4. 2 Our vision 5. 3 Critical transport challenges 6. 4 Keeping it customer-focussed 10

Niagara s Transportation Strategy 1. Introduction:

England s Economic Heartland Strategic Alliance

ENVIRONMENTAL IMPACT STATEMENT METRO NORTH BELINSTOWN TO SWORDS STOP AREA MN101 VOLUME 2 BOOK 1 OF 7

The Infrastructure Decade

Corridors of Statewide Significance: Introduction

3.0 REVIEW OF PREVIOUS STUDIES

TfL Managing Adaptation to Climate Change

CROSSRAIL INFORMATION PAPER D24 TUNNELLING DURATION AND CONSTRUCTION STRATEGY

Logistics and Distribution in Kent

OPERATIONAL PLANNING AND PERFORMANCE: WHO, WHAT & WHY?

MEDIA BRIEFING NOTE: CROSSRAIL TUNNEL CONTRACTS, TUNNELLING STRATEGY AND CROSSRAIL PROGRESS

Bijwasan: A World Class Station

Economic Growth and Social Benefit potential from Modernisation of rail services in North Wales. Phase 2 Report. Greengauge 21.

Crossrail Environmental Statement

17 April To whom it may concern, Response to the consultation on the draft Strategic Transport Plan

Response to the Mayor of London s Draft Transport Strategy 2017

Helsinki-Tallinn Transport Link Feasibility Study of a Railway Tunnel February 2018

SEARs project justification and conclusion

IMPACTS OF TUNNELS IN THE UK. Non-technical summary

Management Incentive Plan

Making the Journey A Manifesto for Transport

Mega Projects at WSDOT

Crossrail and our international tunnelling expertise

Fairmount Line Feasibility Study

Alan J Peakall Independent Economic and Transport Planning Advice

I KEEP SIX HONEST SERVING-MEN

Your guide to fares and tickets within Zones 1-6

Long Term Planning Process: Freight Market Study. October 2013

Great Western franchise consultation Passenger Focus response. June 2014

AGENDA. HS1 Overview. Construction ti & Engineering i Overview. Funding. Procurement & Delivery. Operating Railway

FAST FIT TEMPORARY HOARDING SY COMBINED BASE & PANEL SYSTEM FAST FIT TEMPORARY HOARDING SY

Transit Service Guidelines

Greater Manchester Local Transport Plan / /11

DART Expansion Programme

Forecasting robustness of timetables

Fairfax County Countywide Transit Network Study

US & USRC Track Capacity Study Train Capacity Analysis Present to Maximum Capacity and Beyond

TransAction Plan October 2017

TONBRIDGE & MALLING BOROUGH COUNCIL. PLANNING and TRANSPORTATION ADVISORY BOARD. 15 November 2016

Consultation Paper. Proposed Removal of Ashchurch Rail Freight Facility Scheme from Gloucestershire s Local Transport Plan

OPPORTUNITY KNOCKS. Delivering the UK s infrastructure pipeline CONTACT. Arcadis United Kingdom

MIC Core Pre-Schematic Program Analysis

Transport Infrastructure Works

THE ROLE OF TRANSPORT IN SELECTED EUROPEAN MARINAS PART ONE

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Proposed Alternatives. December 14, 2017

Planning For Employment and Industry in Melbourne s Growth Areas

PIA Submission on Future Transport 2056 and Services and Infrastructure Plans for Greater Sydney and Regional NSW

1 Introduction. 2 Mobility in Palermo. 164 Urban Transport XIX

CP6 and Beyond Mark Carne, Chief Executive. Construction News Summit Hilton Bankside, London 21 November 2017

F0.2 Integrated Transport and Land Use Planning

LONDON BOROUGH OF BARNET (BRENT CROSS CRICKLEWOOD)

State Transit Authority. Corporate Plan June 2016 (Issue 5) State Transit Authority. Corporate Plan June 2016 (Issue 5) 1

INDEPENDENT PUBLIC INQUIRY SYDNEY S LONG TERM PUBLIC TRANSPORT PLAN

Report from Sir Peter Hendy to the Secretary of State for Transport on the replanning of Network Rail's Investment Programme.

Section 9 Implementation

THE ROLE OF TRANSPORT IN SELECTED EUROPEAN MARINAS. PART TWO

System Operator. Strategic Business Plan. February 2018

Complex Business Transformation Leading to a Customer-Centric Organisation. Tim Craddock Network Rail

D7: TUNNEL CONSTRUCTION AND METHODOLOGY

Materials Management at TubeLines Limited on the London Underground

Notice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report

Spatial Planning and National Roads

RTPI SCOTLAND. Rail2014 Transport Scotland Buchanan House 58 Port Dundas Road Glasgow G4 0HF. to:

committee report SPT response to InterCity West Coast Franchise Consultation

CAPITAL AREA TRANSIT PLANNING SERVICE STANDARDS AND PROCESS. Planning Department

Caltrain Rapid Rail Plan

SCDC is a core Steering Group partner in the Cambridgeshire Travel For Work Partnership (TfW).

CROSSRAIL INFORMATION PAPER D26 SURFACE RAILWAY NOISE AND VIBRATION

Transcription:

JRC Report JRC2 Park Royal City International: rail phasing options Potential train service volume at Old Oak Interchange

NOW (2011) Old Oak Central area Circles show 1 kilometre radius from station entrances = approximate walking catchment (actual catchment will depend on streets/paths). 2011 stations serving Old Oak area shown in pink: North Acton (Central Line), Willesden Junction (Bakerloo Line, London Overground incl Orbital lines from Richmond/West London/North London) Notional Old Oak Central development catchment shown in background (in bright blue). Lands at Kensal in light blue. Former Eurostar North Pole depot and sidings (yellow) assumed to be used until 2018 for Hitachi Intercity Express train testing, then GW services. Railways serving catchment stations shown as thick lines, other passenger lines shown thin. 2

NOW (2011) London & Home Counties catchment Most direct rail access is within inner West, North, North West and East London. Some indirect connectivity to South and South West London via Richmond/Clapham interchanges, and into Thames Valley/Chilterns/Herts. Other connectivity dependent on general London rail network where development strengths of Old Oak dissipated within built-up area. Risk of development not delivering economic returns and regeneration without additional rail accessibility. 3

2018 RADIAL STATION ONLY Old Oak Central area and early Transit shuttles Only stations shown are: Old Oak Central interchange, North Acton, Willesden Junction. Main changes: new radial station on GW local lines/crossrail to enable starter phase of development, stimulated by Great Western electrification (2018) and Crossrail initial scheme (2019-20 via Old Oak to West London). Requires early inclusion of station within GW investment project. Potential for initial service of 10 Crossrail trains per hour and some GW outer suburban trains. Can be designed to allow reversal of Central tunnel Crossrail trains. Direct interchange with orbital lines is not assumed early Transit links are shown diagrammatically (pink lines). Pedestrian access across Crossrail depot throat to reach early development phases near Scrubs Lane, alternatively Transit shuttle to local stops. Land immediately adjoining (north of) Crossrail station may be sterilised for use as HS2 tunnel-boring and works site until around 2024/25. Good radial rail access should stimulate good development scope Transit shuttles will also support initial development at Transit hubs including Kensal, North Acton, Hammersmith Hospital health community and en route to Willesden Junction. 4

2018 RADIAL STATION ONLY London & Home Counties catchment Crossrail and GW electrification stimulate wider accessibility of Oak Oak Central. Fast journey times to West End, City, Canary Wharf. Direct rail access opened to Heathrow Airport T1,2,3,4 (indirect to T5), Thames Valley, Thames Gateway. Main accessibility improvements will benefit selective high value corridors with rapid economic growth. Starts long standing regeneration of North Hammersmith and Kensal and North Kensington areas if two local stations at Old Oak and Kensal, or Old Oak and Kensal Transit. The LSE RUS considers that a Kensal Crossrail station is not consistent with the rail strategy for the GW line. In parallel, by 2018, powers should be secured for HS2 Phase 1 and HS2-HS1 link, so the shape of works land will be known. Powers will also have had to be secured for Crossrail-West Coast rail link and for rerouted orbital railway and interchange if these are to proceed in time for HS2 Phase 1 this too will inform land availability and design options for stations and eventual interchange at Old Oak. 5

2018/early 2020s RADIAL + ORBITAL INTERCHANGE STATION locality Major radial/orbital interchange makes Old Oak a strategic hub for transport network across West/South West/North West London. Facilitates many suburban journeys by rail (environmental/carbon benefit), strengthens economic and regeneration case for Old Oak Central and Park Royal City International developments. Key is to address funding of new orbital linkages who pays, in what railway investment phase? (Generally 5-year periods, 2014-19, 2019-24 ) Existing orbital lines already very busy, will need investment to achieve new capacity in all scenarios scope to align with this investment need by securing further payback thanks to wider connectivity. Powers to build new lines will be needed if outside existing railway lands. At least 3 primary options for location of orbital station(s): (1) TfL initial idea could be N or S of Eurostar site: positive:- near main GW/Crossrail and future HS2 station; negative:- not all North London / West London Line trains might call at Old Oak (to avoid reversal there). 6

(2B) is Balfour Beatty idea and allows Southern and West London orbital trains to call (not Midland Line), (2A) would be West London orbital trains only (not Southern or Midland Line), but nominally low cost in heart of early development area (should allow space for 8-car trains and doesn t require major bridge reconstruction over GW line). (2A) is about 200m from GW/Crossrail station, 2B is over 300m distant (though closest to RBK&C lands). Transit shuttle could be altered to serve (2A) or (2B). (3) shifts the orbital hub to the west and avoids need for long viaduct crossing all tracks east of Crossrail station, at cost of new western curve which using tight radius can also avoid high value development lands close to eventual HS2 station entrance. (3) allows access by all existing and possible future orbital services: West London Line, Richmond Line and TfL-suggested Hounslow Line, North London Line, Southern-Milton Keynes and TfL-suggested Midland Line connection from St Albans etc. Scope also to create interchange with North Acton station in LB Ealing. Transit shuttle could be altered to serve (3). Overall, (3) may have stronger overall benefits at lower capital cost than (1) and can further benefit North Acton. Adoption of (3) would place reliance by early land developments (near Scrubs Lane) on orbital access from Willesden Junction station. Option 1 Orbital routes Option 2A/2B Orbital routes Option 3 Orbital routes 7

2018/early 2020s RADIAL + ORBITAL INTERCHANGE STATION London & Home Counties catchment There are three strategic gains from combining a radial and orbital interchange within a few years. (1) London gains high quality orbital links, causing more suburban journeys by rail (and by linking with the Central Line at North Acton). (2) The Home Counties catchment is enlarged with North-South connections from commuter towns such as Milton Keynes, Luton and Croydon, complementing the radial East-West links with the GW/Crossrail corridors, and also stimulating interchange between those NS and EW routes. (3) The commercial case for high value development at Old Oak Central is enhanced by the earning power of the outer suburban and Home Counties commuters who are offered direct services to Old Oak with Southern and Midland Line trains. Early progress with high value developments within Old Oak Central should be achievable with such connectivity. It creates the possibility of incremental values being returned to the transport sector as S106 / CIL contributions. Sites showing potential high value yields need priority. 8

MID TO LATE 2020s HS2, HS2-HS1 link, Crossrail to West Coast line London & Home Counties catchment Arrival of HS2 Phase 1 (London-Birmingham-West Coast) in 2026 opens many opportunities. 25-40% of HS2 passengers will use Old Oak. As part of the London & South East Route Utilisation Strategy plans to 2031, Crossrail is forecast to have: (1) a second western leg to Milton Keynes; (2) an extension from Maidenhead to Reading; (3) a possible extension to Dartford and Gravesend (see light blue lines). These Crossrail extensions create scope for use of existing or new depots and sidings elsewhere in the enlarged network, allowing the depot and/or sidings within Old Oak Central to be re-assigned as development lands adjoining the new HS2/Crossrail interchange - or to add oversite development as part of commercial development over rail lands. HS2 and Crossrail combined can return development gains to the public sector or support other transport investment - entirely fitting for railways budgeted initially at 14.5bn (Crossrail) and 9bn (HS2 Phase 1) and paid for by taxpayers, passengers and businesses. Crossrail extensions would also enhance the benefits of interchange at Old Oak Central by then a most accessible hub for London. The HS2-HS1 link can be designed to allow London & Home Counties regional services via Old Oak (see dark green lines). 9

MID 2020s TO 2030s HS2, HS2-HS1 link, Crossrail to West Coast line UK catchment HS2 Phase 1 expands access and capacity to and beyond the West Midlands Phase 2 in the early 2030s takes this access and capacity to the main Northern centres and Scotland, enabling Old Oak to become a truly national hub. By this stage, there may be a commercial case for it also to be served by all Great Western Intercity trains. There are consequential opportunities to maximise development yields at Old Oak Central and the wider Park Royal City International, with the commercial logic of a 21 st Century business and residential quarter with high environmental standards. 10

This is mirrored by accessibility into mainland European centres with the HS2-HS1 link. Old Oak Central will be a primary European hub. Through airport links, Park Royal City will be a location of world importance. 11