Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions)

Similar documents
Erosion and Sediment Control Plan for a Timber Harvesting Operation

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Erosion and Sedimentation Pollution Control (ESPC) Plan Narrative

Erosion & Sedimentation Control Policy

SACHSE EROSION CONTROL GUIDELINES

Town of Fortville Utility Street Standards

DIVISION VII SOIL EROSION AND SEDIMENTATION CONTROL

GRASS-LINED CHANNEL (acre) CODE 840

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Cass County Soil Erosion & Sedimentation Control Program

PART 1 GENERAL REQUIREMENTS

Roscommon County Soil Erosion and Sedimentation Control (SESC) Program Guide

SITE DESIGN ENGINEER'S STATEMENT:

Unit E: Basic Principles of Soil Science. Lesson 7: Understanding Soil Erosion and Management Practices

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.

Construction Site Erosion Control and Phase II of the Stormwater Permit Program

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Recommended Resources: The following resources may be useful in teaching this lesson:

Streamlines V2, n2 (May 1997) A Newsletter for North Carolina Water Supply Watershed Administrators

SECTION EROSION AND SEDIMENTATION CONTROLS

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR GRASSED WATERWAYS. Definition. Purpose

The Clean Water Act: Phase I

CHAPTER 2 EROSION CONTROL

Module 4 Regulatory requirements for Land Disturbing Activities

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

Erosion Control for Home Builders

Watercourses and Wetlands and Agricultural Activities

Wetland Permit Application

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

Planning & Building Department. Requirements for Erosion and Sediment Control

E. STORMWATER MANAGEMENT

SOIL EROSION CONTROL PERMIT APPLICATION

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

Water Pollution Control for Work in Sensitive Areas

Soil Erosion and Sedimentation Control 12 Items required on a SESC Plan pursuant to Rule 1702

Berks County Conservation District EROSION CONTROL FOR TIMBER HARVEST ACTIVITIES

901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES

WOODFORD COUNTY, ILLINOIS EROSION, SEDIMENT AND STORM WATER CONTROL ORDINANCE

SECTION 17.1 STORMWATER MANAGEMENT AND EROSION CONTROL

SECTION TRENCHING & BACKFILLING

Straw Bale Barrier. - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow

Erosion Control State Standards Sampling of Material Innovations

Understanding Soil Erosion and Management Practices

Construction Inspection Checklists

INSTRUCTIONS FOR SUBMITTING A COMMERCIAL SEWAGE DISPOSAL PERMIT APPLICATION

Small Site Stormwater Quality Permit Application

Construction Application for Permit (CAP) Instructions

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

U.S. ARMY CORPS OF ENGINEERS. Little Rock District

JEFFERSON COUNTY STORM WATER MANAGEMENT

STANDARD CONSTRUCTION DETAILS EROSION CONTROL REVISED - JANUARY 2018

STORMWATER POLLUTION PREVENTION PLAN (SWP3)

Straw Bale Barrier. Parallel to a roadway to keep sediment off paved areas

Erosion, Erosion, Everywhere

Pahiatua Waste Water Treatment Plant Wetland Erosion and Sediment Control Plan (ESCP)

Stormwater Pollution Prevention Plan (SWPPP) For Single Family Residential Construction within a larger plan of development

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

INVASIVE SPECIES CONTROL PLAN FOR CONSTRUCTION ACTIVITIES AND POST CONSTRUCTION MONITORING

SPECIAL CONDITIONS GENERAL PERMIT NUMBER WMGR089

Chapter 12 Erosion and Sediment Control

COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia Tel.

C. This project shall be designed to meet LEED Silver design criteria. Construction activity pollution prevention is a mandatory requirement.

Block or Log forms of PAM and PAM blends are manufactured for specific use in drainage waterways to remove suspended particulates from runoff.

You re the Solution to Water Pollution!

Storm Drain Inlet Protection for Construction Sites (1060)

Grassed Waterway Improvement and Gully Restoration

RESIDENTIAL BUILDING PERMIT

SECTION UNCLASSIFIED EXCAVATION AND GRADING

ALABAMA S BEST MANAGEMENT PRACTICES. Protection of Water Quality During Timber Harvesting

Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782

CITY OF MIDDLETOWN, OHIO EROSION AND SEDIMENT CONTROL RULES & REGULATIONS

Before we get to the E&SC

Review of State and Federal Stormwater Regulations November 2007

5.0 SURFACE WATER CONTROL MEASURES

APPENDIX B Construction Surface Water Management Plan PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER PROJECT INVITATION TO BID ITB NO.

ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION

Outline of Presentation. Inspecting Construction Site BMPs. Inspector. Back to Basics. Erosion Control. Erosion Control

Storm Drain Inlet Protection

TEMPORARY SEDIMENT TRAP CODE

Richland County Department of Public Works Engineering (Land Development) Division

North Carolina Sedimentation Control Law

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

EROSION AND SEDIMENT CONTROL PROGRAM. SOUTH PLATTE NATURAL RESOURCES DISTRICT 551 Parkland Drive P.O. Box 294 Sidney, Nebraska 69162

Manure Management Manual Revisions

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS

General Permit No.: OHR Page 53 of 146

UMD Storm Water Program Construction Requirements. Greg Archer, MBA Environmental Compliance Specialist

Section 2: Site Restorations and PCSM s Office of Oil and Gas Management Oil and Gas Industry Training Summer 2012

Section 2: Site Restorations and PCSM s Office of Oil and Gas Management Oil and Gas Industry Training Summer 2012

Temporary Watercourse Crossing: Culverts

Soil Erosion and Sedimentation Control Compliance Form

Belmont County Erosion & Sediment Control Regulations

Holly Swartz and Jason Shirey

CONSTRUCTION PHASE ENVIRONMENTAL ISSUE MITIGATION REQUIREMENTS 1. Access road selection and construction

Revised Universal Soil Loss Equation

MACOMB COUNTY SOIL EROSION AND SEDIMENTATION CONTROL ORDINANCE. Adopted August 16, 2007 by Resolution of the Macomb County Board of Commissioners

2015 PROCEDURES GREATER BALTIMORE EXPOSED SOIL = POLLUTION SURVEY

Transcription:

Adams Co. Conservation District 670 Old Harrisburg Road, Suite 201 Gettysburg, PA 17325 Telephone: 334-0636 Fax: 337-0730 www.adamscounty.us Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions) What is Soil Erosion? Erosion is the wearing away of soil and its parent material (rock) through the natural processes of wind and rain. Sedimentation, which results from erosion, is the transport and deposition of these soils and rock particles to a location away from their origin. In many cases the waters of the Commonwealth (streams, lakes, wetlands, storm sewers, etc.) become the recipients of this sedimentation. Through man's activities (Earthmoving Activities) however, the rates of erosion and sedimentation are greatly accelerated. The PA DEPARTMENT OF ENVIRONMENTAL PROTECTION defines an earthmoving activity as " any construction or other activity which disturbs the surface of the land including, but not limited to, clearing and grubbing, grading, excavations, embankments, land developments, subdivision development, agricultural plowing or tilling, timber harvesting activities, road maintenance activities, mineral extraction and the moving, depositing or storing soil, rock, or earth. Simply put, if the vegetative cover (grass and other plant material) is removed, leaving earth exposed, an earthmoving activity has occurred. Without proper controls, the exposed earth will erode. WHAT CAN I DO? WHY SHOULD I CARE? The PA Clean Streams Law as amended defines sediment as a pollutant. Sediment has become the number one pollutant by volume to the waters of the Commonwealth. The soil particles contained in sediment also carry and retain chemical pollutants such as herbicides, pesticides, and fertilizers. Accelerated sedimentation that flows into the waters of the Commonwealth can: 1. Raise the level of the streams, lakes, etc. and increase flooding. 2. Decrease oxygen in the waters, suffocating fish and other aquatic life. 3. Deposit sediment over the breeding beds (eggs) of aquatic life. 4. Increase filtering costs of public water supply. 5. Ruin the scenic values of the waters LEAVE IT GREEN! Practice erosion control by keeping the soil covered with vegetation, which will not allow the soil to erode easily. Minimize amount of disturbance at any given time. Plan your grading around growing season for establishing vegetative cover. DEVELOP A PLAN for controlling accelerated erosion during construction. If the site has features such as steep slopes, flowing streams, wetlands, springs, highly erodable soils, etc. specific care and planning must be taken to control erosion. Assistance is available from private consultants, contact the Conservation District for a list of professionals The total cost of damages caused by sedimentation is about 500 million dollars per year nationally. This pamphlet contains an overview of PA State regulations governing soil erosion, a sample plan for single residential lot, and installation details for common erosion and sedimentation pollution control devices. 1

STATE REGULATIONS In an attempt to control sediment pollution, The Department of Environmental Protection (DEP) adopted strict rules and regulations concerning erosion and sedimentation control in 1972. The rules and regulation, known as PA CODE TITLE 25 CHAPTER 102 EROSION CONTROLS states...any landowner...engaged in earthmoving activities shall develop, implement and maintain erosion and sedimentation control measures which effectively minimize accelerated erosion and sedimentation. These erosion and sedimentation measures must be set forth in a plan IF (any of the following 3 criteria are met) 1. The earth disturbance activity will result in a total of 5,000 square feet disturbed or more. 2. The person proposing the earth disturbance activities is required to develop an Erosion and Sediment Control Plan pursuant to this chapter under Department regulations other than those contained in this chapter. 3. The disturbance activity, because of its proximity to existing drainage features or patterns, has the potential to discharge to water classified as a High Quality or Exceptional Value. Furthermore, the plan must be available at all times at the site of the activity. Failure to follow the rules and regulations of Chapter 102 and the PA Clean Streams Law carries strict penalties ranging up to $10,000 per day per violation. The Adams County Conservation District has been granted authority by DEP to review E&S plans and to enforce these rules and regulations by conducting inspections of earthmoving activities. REMEMBER, the LANDOWNER, NOT THE CONTRACTOR, is responsible for any violation that may occur on his/her property. The Plan Must Consider: -The existing topography of the site: slope or grade of the land; location of any water (stream, ponds, wetlands, springs, etc.); any other significant features of the site. -The types of soils on the site and means of addressing any soils limitations. A copy of the Adams County Soil Survey book is available for inspection at the Conservation District. -The amount of runoff from the project area (water flowing across or from the site). -The staging of earthmoving activities. Determine the sequence in which the earthmoving will occur, always keeping in mind that the most effective method of controlling erosion is to disturb only those areas necessary for construction. Disturbed areas should be stabilized immediately after earthmoving has been completed. -Temporary and permanent control measures and their maintenance. Seeding and Mulch Specifications Temporary seeding should be an annual grass. Permanent seeding should be a perennial grass. Straw mulch should be applied at 3 tons per acre. For additional information on lawn establishment, consult the Adams County Penn State Cooperative Extension Office at 334-6271. Recycling and Disposal of Construction Waste All building materials and wastes must be removed from the site and recycled or disposed in accordance with DEP s Solid Waste Management Regulations. No building materials or wastes or unused building materials shall be buried, dumped, or discharged at the site. For more information, contact the Adams County Solid Waste and Recycling Office at (717) 337-9827. 2

Standard Filter Fabric Fence (18 High ) Filter Fabric Fence must be placed at level existing grade. Both ends of the barrier must be extended at least 8 feet up slope at 45 degrees to the main barrier alignment. Proper Fence Installation Extend end of silt fence upslope Stakes spaced @ 8 maximum. Use 2"x 2" wood or equivalent steel stakes. Silt fence installed level with the ground contour Sediment must be removed when accumulations reach 1/2 the above ground height of the fence. Rock Construction Entrance MAINTENANCE: Rock Construction Entrance thickness shall be constantly maintained to the specified dimensions by adding rock. A stockpile shall be maintained on site for this purpose. At the end of each construction day, all sediment deposited on paved roadways shall be removed and returned to the construction site. 3

Maximum Slope Lengths for Filter Fabric Fence Slope - Percent 2 (or less) 5 10 20 25 30 35 40 45 50 Maximum Slope Length (ft) Above Fence 18 High Fence 0 100 50 35 25 20 10 10 4

Typical Layout Showing E & S Controls Suggested Staging of Earthmoving Activities 1. Install a rock construction (tire cleaning) entrance. (see detail) 2. Install temporary sediment control measures such as silt fence. (see detail) 3. If applicable, install and stabilize any temporary or permanent upslope conveyance channel with an appropriate lining (ex. seed, mulch, matting, sod or stone). 4. Once topsoil is stripped and stabilized, proceed with rough grading of site. 5. Construct dwelling and all utilities. 6. Finish grade and permanently stabilize (seed. mulch, sod, etc.) the site. 7. Remove temporary sediment controls. (Do not remove these controls until the upslope disturbed areas are permanently covered stone, paved, concrete, or established grass.) 5

The information contained in this pamphlet is an overview of the Pennsylvania Erosion and Sediment Pollution Control Program. The Adams County Conservation District has prepared these basic guidelines for incorporation into certain earthmoving activities. This information is not meant to supersede the required erosion and sediment control plans but to be used as a tool to develop a plan for a residential earthmoving activity that will not exceed 1 acre of earth disturbance. (See exceptions) Exceptions: 1. Sites which have the potential to discharge to HQ/EV waters of the Commonwealth 2. Sites that require other permits requiring District or other approvals of Erosion and Sediment Plans 3. Sites with unique soil limitations 4. Sites with slope steeper than 5% 5. Sites within 50 of bodies of Water 6. Sites with point source discharge 6