Design and Build a Dam

Similar documents
Description: Students build models of sinkholes to gain an intuitive knowledge of their physical aspects.

Silvan Dam and Revisions to Adapt for Latest Developments in High CFRD Design and Construction

To provide pupils with information about how water is collected. To check their knowledge and understanding of the information

When it Rains it Pours

Best Practices for Building High-Performance Resource Roads. Road Drainage. Developed by: The Roads and Infrastructure Group

Flood Hazard Assessment Report Falls Gulch, Larimer County, Colorado January 16, 2013

DISPERSIVE SOILS. Dispersive soils are those in which the clay content has a high percentage of sodium.

Permeability Tests. Geotechnical Engineering, Laboratory 7

Step-by-Step Instructions for Lesson and Materials List

CEEN Geotechnical Engineering

LAB 11: GROUNDWATER PROCESSES AND WATER RESOURCES

Freight Street Development Strategy

Lesson 2-2: Riparian Zones

PART 1 GENERAL REQUIREMENTS

7-4 Soil. By Cyndee Crawford September 2014

4 EXTREME FOUNDATION PANELS

Flood Plain Functions

Types of Hydropower Facilities

Teacher Resources: Lesson 3: Groundwater. Lesson #3: Groundwater

BUILDING A WATERSHED MODEL

Watershed: an area or ridge of land that separates waters flowing to different rivers, basins, or seas. It is the interdependent web of living

Permeability Field Investigation

Forensics with TI-Nspire Technology

Reading the River, Summer Watersheds and Streams A unit for 8 th Grade Science. Arthur H. Shutt III. Bullitt Lick Middle School

Page 1. Name:

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

[7-8] SA1.2 The student demonstrates an understanding of the processes of science by collaborating

UNDERSTANDING UNPAVED ROAD MATERIAL PERFORMANCE INTERPRETATION David Jones, PhD University of California Pavement Research Center

Advanced Geosynthetic Solutions. CeTeau Vinyl Sheet Pile (PVC)

OPERATING INSTRUCTIONS

Releasing a River. Reading Selection

Filter Tube Barriers (Instream)

Inspection of New One- and Two- Family Dwellings

Grade Six: Energy Lesson 6.7: Peanut Energy

SCOTTISH ENVIRONMENT PROTECTION AGENCY PREVENTION OF POLLUTION FROM CIVIL ENGINEERING CONTRACTS: GUIDELINES FOR THE SPECIAL REQUIREMENTS

INVESTIGATION: Flour vs. Bread: How Soil Aggregate Structure Influences Water Flows. Time: minutes, depending on the amount of discussion.

Storm Drain Inlet Protection for Construction Sites (1060)

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER

Worksheet #8 Assessing the Risk of Groundwater Contamination from Livestock Yards Management

Science Grade 07 Unit 04 Exemplar Lesson 03: Effects of Human Activity on Water

DRAINAGE & DESIGN OF DRAINAGE SYSTEM

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

Awesome Aquifers Vocabulary

AQUIFERS OF THE SAN ANTONIO RIVER BASIN

Coloring Page PRIMARY STUDENTS

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN

Timing Key Narrative Snapshots a) 00:44 How does groundwater recharge occur? How do streams form?

What Do The Sand Testing Numbers Mean

7. The diagram below represents cross sections of equal-size beakers A, B, and C filled with beads.

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

CHAPTER 13 OUTLINE The Hydrologic Cycle and Groundwater. Hydrologic cycle. Hydrologic cycle cont.

UNHSC Bioretention Soil Specification February, SOIL PREPARATION (PERFORMANCE SPECIFICATION) for Bioretention Systems

GROUNDWATER. Narrative

WONDERFUL, WATERFUL WETLANDS

KEY CONCEPTS AND PROCESS SKILLS

Application for resource consent Form B Damming and diversion of water

2. Pavement Materials: Consist of flexible or rigid pavements, typically HMA or PCC, respectively, or a composite of the two.

Stepping Stone. Name: Date:

Understanding Environmental Impacts of Horticulture

These potential changes and their implications are outlined in Annex 1.

10 EXTREME BASEMENT PANELS

The water in the town of Fruitvale may be polluted.

Closure Plan Ash Disposal Area PGE Boardman Power Plant

Town of Fortville Utility Street Standards

Stormwater Management Fact Sheet: Porous Pavement

Characteristic study on seepage field of dam under cutoff wall construction defects and freeze in winter

GEOTECHNICAL & SOILS LABORATORY PERMEABILITY TEST : CONSTANT HEAD & FALLING HEAD

Electrical Conductivity & Hydraulic Profiling. The Combining of Two Subsurface Investigation Methods (With More to Come)

Name Lab Section Date. Sediment Lab

GOAL STATEMENT: Students will learn about soil as a natural resource, what its components are, how it is used, and whether it is renewable.

Appendix G: Sanitation Project. Objective:

Anchorplex retaining wall construction guide. Building. Anchorplex. Retaining Wall Systems

Measurements of Student Progress. Science Grade 8

Introduction to Groundwater. Photo: Joanne Offer/The IRC

Dry structural excavation is usually done with front-end loaders, bulldozers or backhoes.

Mrs. Butler Oceanography

Building a Watershed Model

4 EXTREME FOUNDATION PANELS

Albemarle County Public Schools K-5 Science Program

Materials. Materials. NOTE Delta Education Customer Service can be reached at

Sherman Library Maintenance Handbook for Porous Asphalt

Builder s enviro guide

Geoenvironmental impact assessment of a landfill for solid chemical wastes

Water, Water, Everywhere? Students explore the availability of water for humans and wildlife use.

ECOSYSTEMS, WATERSHEDS AND POLLUTION CONTROL REVIEW

Day in the Life of the Hudson & Harbor Vocabulary

Heating Earth Surfaces

PROJECT AT THE DENVER

Sealing Leaking Ponds

RWSSHP Resource Manual # 3b. Spring Development. Construction Manual

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

Protecting the Source

Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows [1] Deep Water [2]

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.

TOWER CHALLENGE. DESIGN CHALLENGE Build the tallest tower with the smallest footprint.

A POORLY GRADED SAND COMPACTION CASE STUDY

CHAPTER 7. San Dieguito River Flooding Adaptation

Effect of Clay Content on Permeability and Compaction Parameters of Sand

Redi Rock Specification and Installation Manual

Civil Engineering and Architecture Detailed and Performance Objective Outline

Transcription:

TEACHER NOTES Lab zonetm Design and Build a Dam The following steps will walk you though the. Use the hints and detailed directions as you guide your students to design and build a dam and then to test and redesign, if time allows. Overview The purpose of this project is to introduce students to the concepts of building an earthen dam, using the engineering design process and the scientific method. Introduce the purposes for building earthen dams: Dams help control floods by regulating water flow. Often the reservoirs above dams are able to absorb some of the floodwater to protect downstream locations. Dams are used to produce a reservoir that can be used to generate electricity or can be used recreationally. Dams are also used to impound a stream or river, creating a water supply area for area towns and cities. Dams result in a human-made change to Earth s surface and require upkeep. Students might investigate the levees along the Mississippi River, which are mainly earthen dams running along the edge of the river to keep it from overflowing its banks and flooding adjacent towns. Distribute Worksheet 1. After students have read the worksheet, ask if they have any questions. Students should use the worksheet while completing the Chapter Project. Organize students in teams of two or three to work together to investigate the project. The teams should plan their designs together, although they may decide to divide the tasks. In conducting the permeability test, students should place the same height of soil sample in a test tube for each of the different grain sizes. A sample of water should be carefully poured onto the soil. Students should use a stopwatch to determine how long it takes the water to travel a set distance. (This distance should be the same for each of the test tubes.) The sample with the shortest time has the highest permeability since it allows water to pass through it more quickly. In conducting the erosion study, students should just pour water over the soil at an equal rate and determine how much material is eroded. This can be done visually if equal amounts of soil are used. When designing the dam, students should consider the placement of material based on the materials properties. Students should either redesign the dam or discuss approaches they would take to do so. Materials and Preparation Have water, test tubes, and stopwatches on hand. The types of soil given to students need to represent three different grain sizes. This could be accomplished by using silt, sand, and gravel. If silt is difficult to obtain, cornstarch may be used. If it is difficult to obtain gravel, aquarium gravel may be used. The permeability test may be completed in test tubes or graduated cylinders. The dam can be constructed inside a large foil roasting pan. The dam can be built in the middle of the pan, across the short dimension. Water can be poured into one half of the tray, and students can time how long it takes to penetrate the dam. Section 1 Students should design a scientific experiment to determine the permeability of the soil and the ease of erosion for the different grain sizes. They need to know how rapidly water can pass through the sample and how rapidly water can remove the soil. Credit should be given for innovative approaches.

Erosion and Deposition TEACHER NOTES Teams should brainstorm the project to determine which construction materials to use. If possible, they should create a sketch showing the layers of the structure. Alternate solutions should be evaluated, and teams should select the best design for the project. Section 2 Students should complete construction of the dam. Section 3 Students should test the structure, noting how well the dam performed. Section 4 Allow students the opportunity to redesign their structure. Ask them to reflect on their design and make suggestions for how they would alter the construction. allow water to pass through easily, while the fine-grained soils are the least permeable, which means they will form a barrier against the water. The soils may need to be compacted slightly in order to be more effective. They may also be more effective if they are slightly damp (sprayed with a misting bottle). The shape of the dam should be a rough triangle for maximum integrity. Extension The weathering of Earth s surface accounts in part for the creation of the different grain sizes of the soil. A mountain river begins with large coarse materials, but the time that river reaches the sea, it is generally depositing very fine silts and clays. Engineers are aware of the different properties of soils and use those properties to their advantage in dam construction and other projects. In sealing off a landfill, engineers use the fine-grained clays to form an impermeable barrier above and below a landfill. This prevents water from entering the landfill and becoming contaminated. Section 6 A group presentation should be developed, explaining all the steps taken to construct the dam. How did students accomplish the design? Why did they choose a particular technique? Students should create a diagram of the dam they constructed, outlining the placement of the different soils. Wrap-Up Investigating the permeability of the soils may be difficult, depending on the equipment available to students. If this is the case, tell students that the coarse-grained soils are the most permeable, which means that the soil will

Name Date Class Erosion and Deposition Overview Lab zonetm Design and Build a Dam Dams are something that we are all familiar with, yet many of us may not know why they exist. Dams have many purposes: They can be used as a means of controlling flooding, they can be used to generate power, and they are also integral in many communities for creating and maintaining a public water supply. Dams can range in height from a low of 1 to 2 meters to as high as the world s tallest dam 292 meters. Dams can be constructed from a variety of natural and synthetic materials, including wood, concrete, and soil. Project Rules The purpose of this project is to introduce you to the concepts of building an earthen dam. You will use an engineering design process and the scientific method. You will be using soils with three different grain sizes. You will need to test the permeability of each soil to determine how readily water passes through it. You will then need to develop an experiment to test how easily water erodes each soil. When constructing the dam, you will need to combine the information from your two experiments to make the best dam. Think about which layers or combinations of materials will make the most effective dam. Create a chart that shows which soil eroded easily and which did not. Identify which soil was most permeable. Record your data on a single chart to make evaluation of the soil types easier. Then describe the construction process for your dam and why you chose to put each soil type where you did. Include in your description a diagram of the dam that shows the placement of the different soils. In your journal, please comment on the following questions: If you were able to redesign, what did you change? If you did not have an opportunity to redesign the project, what would you do differently next time? Which part of the project was most difficult for you? Can you create a relationship between how easily a material is eroded and the permeability of the object? Project Hints Your class may choose to conduct the permeability experiment together, rather than in individual groups. The results would be shared as a class.

Name Date Class Erosion and Deposition Overview (continued) Your class may choose to have different groups working on separate parts of the project. For example, one group might be responsible for testing the permeability of each soil. Another group might be responsible for testing how easily each soil is eroded. The permeability test may cause problems. If the soil is not placed in the test tubes properly, the water could run down the side of the tubes. This would make it impossible to calculate the permeability of the soil. Care should be taken when pouring water into the large foil pan to decrease the erosion of your work, unless that is the desired outcome. In redesigning your dam, you may want to consider the following: Use the medium-grained materials to form the basic shape of the dam. Place the fine-grained materials around the basic shape of the dam, compacting the materials as you proceed. Construct the exterior of the dam of coarse-grained materials that do not erode easily. They will help keep the fine-grained materials from eroding. Experiment to determine the appropriate mass of the dam needed to hold back the water from one half of the tray. Project Timeline Task Due Date Teacher s Initials 1. Complete Worksheet 1. 2. Design your dam. 3. Conduct the permeability test. 4. Conduct the erosion study. 5. Build the dam. 6. Test the structure. 7. Complete Worksheet 2. 8. Present your dam and your findings to the class.

Name Date Class Erosion and Deposition Worksheet 1 Planning Your Investigation With other members of your group, you will be designing and building a dam. To help you get started, answer the following questions and share your answers with the group. 1. What three types of soils will you use to build your dam? 2. How will you design your permeability test? 3. How will you conduct the permeability test? 4. How will you design your erosion study? 5. How will you conduct the erosion study? 6. How might these test results impact the design of your dam?

Name Date Class Erosion and Deposition Worksheet 2 Design and Build a Dam As you conduct your project experiments and build your dam, complete this worksheet to document your findings. Upon completion of your project, use this worksheet to present your findings to the class. Progress Checklist Task Notes Completed Y/N Conducted permeability test Conducted erosion test Created a chart listing the soil types and their relative permeability and ease of erosion Brainstormed dam solutions and selected the best one Tested the dam Assessed what would be done differently when redesigning the dam

Design and Build a Dam In evaluating how well you complete the, your teacher will judge your work in three categories. In each, a score of 4 is the best rating. Permeability and Erosion Analysis Dam Construction Final Presentation 4 3 2 1 Students conducted an experiment, analyzed data, and successfully ranked the soils. Students constructed a successful dam with justification for choosing particular soils. Students tie all three parts together and state how they would improve the dam in the future. Students conducted two successful experiments, but soil ranking was incorrect. Students constructed a successful dam but did not include justification for choosing soils. Students state how they would improve the dam. Students conducted only one successful experiment. Students constructed an unsuccessful dam and did not provide justification for soil change. Students relate how the first two steps impacted their decision for construction. Students sorted the soils without any investigation. Students built the dam from non-sieved soil. Students talk about their project. Name Date Class Erosion and Deposition Scoring Rubric Lab zone TM