EXHIBIT A INDEX TO TECHNICAL SPECIFICATIONS DOCUMENT FOLLOWS

Similar documents
1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

ATTACHMENT D SCOPE OF SERVICES

State Historic Preservation Office. Bidding, Contracting, and Construction Guidelines for the Historic Restoration Fund

Document B252TM 2007

Document B101 TM. Standard Form of Agreement Between Owner and Architect

SAN FRANCISCO PUBLIC UTILITIES COMMISSION WATER SYSTEM IMPROVEMENT PROGRAM CONSTRUCTION MANAGEMENT BUSINESS PROCESSES

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

Document B Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition

Ogden Regional Medical Center Courtyard Remodel. Construction Documents. MountainStar Healthcare PROJECT MANUAL FOR

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents

FOGARTY MEMORIAL SCHOOL Plumbing Renovations

TECHNOLOGY SPECIFICATIONS

SSM Project: Centennial School District Issued for Bid AC Unit Replacements 05/16/2014 Klinger and Log College Middle Schools

Document B101 TM. Standard Form of Agreement Between Owner and Architect

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

Invitation for Bid (IFB)

Both envelopes must have the following information in the lower left hand corner:

Construction Contract Basics

Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION

CITY MANAGER MEMORANDUM. John Anderson Drive Roadway Improvements - Construction Engineering and Inspection Services

1. This Section includes administrative and procedural requirements for contract closeout including, but not limited to, the following:

REQUEST FOR PROPOSALS SOLID WASTE COLLECTION AND LANDFILL MANAGEMENT STUDY CRISP COUNTY GEORGIA

Peralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department

Project Manual. Arriba Flagler Consolidated School District 20. Flagler School. MEP Renovations. 100% Construction Documents.

Santa Fe Civic Housing Authority

Professional Practice 544

Main Building Auditorium

Project Manual. Administration Building & North Pointe Center Window Replacement. Lewis Cass Intermediate School District Cassopolis, Michigan

Elmhurst Community Unit School District 205 Invitation to Bid

PROJECT MANUAL Volume 1. Project: Clayton Greenway System -Mark s Creek Bridge Replacement

Addendum Number 1. August 31, Colcock Hall Windows. Owner Project Number: Prepared by:

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

PROJECT MANUAL. New Building Addition for Kenworth Sales Company, Inc. Ontario, Oregon. Set No. 01. For the Construction of: October 2017

REQUEST FOR QUALIFICATIONS AND PROPOSAL FOR OWNER S REPRESENTATIVE March 21, 2014

Webinar Project Close Out. December 14, 2017 / 10:00 - Noon

DESIGN ARCHITECTS, INC.

PURCHASING POLICY. Code: Policy 5.1. Date of Coming into Force: June Number of Pages: 10. Finance Department

Finance & Technology Administrator (815) ext 223

JAMES HALL FAÇADE & LEAK REPAIRS PROJECT MANUAL PROJECT NO March 16, 2018

Project Manual For. Lincoln, Alabama. March 11, Owner: McDowell & Associates 128 Heath Road Carrollton, Ga Phone:

For Receipt Prior To 3:00 PM Local Time Wednesday, March 29, 2017 And Will Be Publicly Opened And Read At 3:30 PM.

IBMF STATE OF GOOD REPAIR UPGRADES

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower

PROJECT MANUAL POINT BLANK RANGE & GUN SHOP. 600 Corporate way Knoxville, TN. Bid/Permit Set

1. Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.

Facilities Planning Policy & Procedure #20

INVITATION TO BID. Roof Repair Multiple Elastomeric Coating Roofs. Invitation to Bid No. 2013/14-09

Construction Document Specifications. SMC Niles Phase V Southwestern Michigan College Niles, Michigan

CONTRACTOR S PROPOSAL


The Blue Book. Procedural Recommendations for The Maine Building Industry. Jointly Recommended By The Maine Chapters Of

Construction Family of Documents

INVITATION FOR BID Copier ST. CHARLES COUNTY AMBULANCE DISTRICT (Herein referred to as District ) 4169 OLD MILL PARKWAY ST.

EJCDC Contract Documents for America s Infrastructure Buy online at

BID PROPOSAL. For the Construction of: JEMEZ SPRINGS WATER TANK REHABILITATION TABLE OF ARTICLES. Page Article 1 Bid Recipient...

CONTRACT SERVICES PHASE 1: PRE-CONSTRUCTION

Activation, Transition & Close Out Step 7. July 13, 2012

Purchasing Department Finance Group INVITATION TO BID

Project Manual April 20, 2015

CONSTRUCTION MANAGEMENT AGREEMENT

Company Profiles. Partner Profile. Promero, Inc

TABLE OF CONTENTS. INVITATION TO BID thru INSTRUCTIONS TO BIDDERS thru

PROJECT MANUAL FOR THE FOLLOWING PROJECT(S): Davie Air Quality Monitoring Station. Site #34-NCORE BID/CONTRACT NO.: Q C1

Viewpoint Technology Survey 2014 ebook

Attachment 04 Substantial and Final Completion Approval Form. Project Description Project # Date of Completion Permit # Project Manager Phone #

Parking Structure Arts & Architecture Installation - AV. PPA No

REQUEST FOR QUOTATION (RFQ) Issue Date: December 12, 2017

HORTICULTURE SITE IMPROVEMENTS PROJECT

ALL-IN-ONE CLOUD BASED CITIZEN SERVICE PLATFORM FOR PERMITTING, LICENSING, INSPECTIONS, AND ENFORCEMENT

ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION

SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT DOCUMENT BID PROPOSAL

Callcott Social Science Building Roof Replacement

SPECIFICATIONS AND PROJECT MANUAL

Owner s Representative SCOPE OF SERVICES

Document Management System Request for Proposals

UPGRADE MAIN DISTRIBUTION PANEL PROJECT RIVERVIEW LEARNING CENTER 801 N. WILD OLIVE AVENUE DAYTONA BEACH, FLORIDA 32118

1. Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.

THE FORUM ROME, GEORGIA FOR FLOYD COUNTY PROJECT MANUAL (BALLROOM AND CONCESSIONS) Construction Documents

Manage Deliverables - Construction Step 6 February 2015

REQUEST FOR PROPOSALS

Scott Eagle Attack Thermal Imaging Camera

TABLE OF CONTENTS THE CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS BRIGHAM YOUNG UNIVERSITY-IDAHO STANDARD CONTRACT REQUIREMENTS INVITATION TO BID

Pre-Construction Meeting Minutes

FMD Project File Management Procedures

08 NOVEMBER PURPOSE

Addendum No. 1 Page 1 of 2

2017 Renewable Energy Sale - Request for Offers Solicitation Protocol

Illinois State University Softballl Dugout Replacement Normal, Illinois

Project Manual For: SOUTHWEST WISCONSIN TECHNICAL COLLEGE. Building 300 Administration Fire Protection Bronson Blvd. Fennimore, WI 53809

RESOLUTION NOW, THEREFORE, THE COMMON COUNCIL OF THE CITY OF GARIBALDI RESOLVES AS FOLLOWS:

REQUEST FOR QUOTES (RFQ) # Issue Date: December 5, 2017

HOUSING AUTHORITY OF THE CITY OF BOULDER (dba Boulder Housing Partners)

Indiana University. Vice President for Capital Planning and Facilities

AGREEMENT BETWEEN DESIGNING ARCHITECT AND THE DISTRICT BOARD OF TRUSTEES OF PALM BEACH STATE COLLEGE

The Town will coordinate with the adjacent property Owner for access allowing work to the East side of the building.

BOROUGH OF BERLIN. Municipal Planning Board Engineer. Term: January 1, 2018 to December 31, 2018.

APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES

REQUEST FOR PROPOSALS

INVITATION FOR BIDS FOR

INFORMAL BID PROPOSAL FORM STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION

Transcription:

EXHIBIT A INDEX TO TECHNICAL SPECIFICATIONS (Attach list of Technical Specifications.) DOCUMENT FOLLOWS Exhibit A

EXHIBIT B LIST OF DRAWINGS (Attach List of Drawings) DOCUMENT FOLLOWS Exhibit B

EXHIBIT C ESTIMATED MONTHLY DRAW-DOWN SCHEDULE (Attach Contractor s Estimated Monthly Draw-down Schedule) DOCUMENT FOLLOWS Exhibit C

Invitation to Bid No. APS Contract No. EXHIBIT D-1 MODIFICATION/CHANGE REQUEST PROJECT NAME: PROJECT NUMBER: Contract Architect: General Contractor: Contract Architect s Consultant: MC/R LOG NUMBER: REQUESTED BY OWNER OTHER NAME/ORGANIZATION: DESCRIPTION OF CHANGE CURRENT DATE: USER CONTRACTOR DESIGN PROFFESIONAL INITIAL ATTACHMENT(S) YES NO First why, then how. The Contract Time is proposed to be [increased/decreased/unchanged] increased/decreased/unchanged by days. Otherwise, parties agree by checking here ; that at the time of consideration of this MCR, there is no agreement on adjustment of the Contract Time. The Contractor, without prejudice and without waiving any rights to such claim for adjustment to Contract Time in relation to these MCR(s), agrees to postpone claim in accordance with Paragraph 7.3 of the General Conditions. Exhibit D-1 (Revised 07/06/2010)

Invitation to Bid No. APS Contract No. OWNER REVIEW OF CONTENT AND/OR FEASIBILITY DO NOT PROCEED PROCEED WITH ESTIMATE OF COSTS ONLY (within 10 calendar days of receipt of this MCR)! PROCEED WITH WORK, ESTIMATES OF COSTS TO FOLLOW (estimate within 10 days of receipt of this MCR)! Authorized APS Representative Date A/E-ESTIMATED COST OF REQUIRED DESIGN WORK: (estimated within 5 days; Include breakdown of costs) $ Initial Project DP Date PROCEED WITH DESIGN: (Forward proposed costs of work to OWNER for approval, include GRT) APPROVED AMOUNT $ Initial For APS: Date CONTRACTORS PROPOSED COST: (Include backup, include GRT) MCR Cost $ NMGRT @ % $ APPROVED AMOUNT $ Initial For APS: Date MUST BE COMPLETED TO FINALIZE: PROCEED WITH MODIFICATION OF WORK AND TO CONTRACT SUM (INCLUDE IN CHANGE ORDER) REJECTED BUT REPLACED BY MCR# REJECTED STOP ALL ACTION ON THIS REQUEST Exhibit D-1 (Revised 07/06/2010)

EXHIBIT D-2 CHANGE ORDER Albuquerque Public Schools PROJECT: DATE: Distribution to: Contractor Design Professional APS FDC APS Procurement Other CHANGE ORDER NO: CONTRACTOR: NOT VALID UNTIL SIGNED BY ALBUQUERQUE PUBLIC SCHOOLS. Signature of the Contractor indicates agreement herewith, including any adjustment in the Contract Sum or Contract Time. The Original Contract Sum was...$ Net change by previously authorized Change Orders...$ The Contract Sum prior to this Change Order was...$ The Contract Sum will be increased/decreased/unchanged by this Change Order in the amount of...$ The new Contract Sum including this Change Order will be...$ The Contract Time will be increased/decreased/unchanged by days The date of Substantial Completion as of the date of this Change Order therefore is Otherwise, Parties agree by checking here : that at the time of this Change Order, there is no agreement on adjustment to the Contract Time related to MCR(s) [list by MCR number]. The Contractor, without prejudice and without waiving any rights to such claim for adjustment to Contract Time in relation these MCR(s), agrees to postpone claim in accordance with Paragraph 7.3 of the General Conditions. This CHANGE ORDER encompasses the following: MCR # SUBTOTAL NMGRT DISTRICT AMOUNT SHORT DESCRIPTION INDICATE TAX RATE AS A %: By: Karen Alarid, Director APS FDC TOTAL By: By: Date: Date: ALBUQUERQUE PUBLIC SCHOOLS Date: Exhibit D-1

EXHIBIT E CERTIFICATE OF SUBSTANTIAL COMPLETION CONTRACT DATED: PROJECT NAME: WORK SUBSTANTIALY COMPLETE: (Clearly state if Substantial Completion is WHOLE 0R PART) SUBSTANTIAL COMPLETION is defined, in accordance with Article 9 of the General Conditions, as the date certified by the Design Professional when all the Work, or portion of the Work, is complete except for minor items so that the Owner can completely occupy or fully utilize the Work for it s intended use. The Design Professional also certifies that Contractor s Punch List of items to be completed or corrected prior to Final Completion, to the best of the Design Professional s knowledge, information and belief, is accurate and includes as a subset, the Punch List of Close-Out Work, in accordance with Subparagraph 9.10.2 of the General Conditions, as well as, a schedule, in accordance with Subparagraph 9.10.2 of the General Conditions, clearly stating when all Work will be complete and when Final Completion will occur in accordance with the General Conditions. The Design Professional and the Contractor certify that the Contractor has attached any agreed upon modifications or exceptions to Warranties stated in the Contract Documents. The DESIGN PROFESSIONAL therefore has determined that the Date of Substantial Completion for that Work defined above was, 20. DESIGN PROFESSIONAL: By: Date: The CONTRACTOR certifies that the above is true and in agreement and to be responsible for any Liquidated Damages due related to Substantial Completion date in accordance with the Contract Documents. The amount due for Liquidated Damages is (say in words) $. CONTRACTOR: By: Date: The OWNER hereby accepts the above defined Work as being Substantially Complete on said date. By: Karen Alarid, Director, APS FDC DISTRICT REPRESENTIVE ALBUQUERQUE PUBLIC SCHOOLS Date: Distribution to: District Representative Design Professional of Record APS Procurement Other Exhibit E

EXHIBIT F CERTIFICATE OF FINAL COMPLETION CONTRACT DATED: PROJECT NAME: SUBSTANTIAL COMPLETION DATE: FINAL COMPLETION is defined, in accordance with Article 9 of the General Conditions, as the date certified by the Design Professional when all the Work of the Project is fully complete, the Close-Out requirements of Paragraph 9.10 of the General Conditions have been completed, including the Close-Out Meeting and approval of Close-Out by the Design Professional, in accordance with Subparagraph 9.10.2, and the Contract fully performed in accordance with the Contract Documents, and the Contractor entitled to final payment. The DESIGN PROFESSIONAL has inspected the Work and has determined that the Date of Final was Completion, 20. DESIGN PROFESSIONAL: By: Date: ONE YEAR INSPECTION: Approximately thirty days prior to, the one-year anniversary of the Date of Substantial Completion, the Design Professional, the Owner, and the Contractor shall conduct an inspection of the Project to determine any correction of the Work which may be required at that time. The CONTRACTOR certifies that the Work is fully completed and was completed on or before, and submits herewith: Application for Final Payment (AIA G702, or equal) Affidavit of Payments (AIA G706, or equal) Consent of Surety (AIA G707, or equal) Release of Liens (AIA G706A, or equal) CONTRACTOR: By: Date: The OWNER hereby accepts the Work as fully complete and will make final payment. By: Karen Alarid, Director, APS FDC DISTRICT REPRESENTIVE ALBUQUERQUE PUBLIC SCHOOLS Distribution to: District Purchasing Agent Design Professional APS Procurement Other Date: Exhibit E

EXHIBIT G APS PROJECT MANAGEMENT SYSTEM ELECTRONIC DATA REQUIREMENTS General Requirements: a. The Contractor shall provide at a minimum, the following to its staff: i. Computer: Minimum Intel Pentium 4 Processor 2.4 GHz or equivalent processor with 512 MB of RAM; recommended Centrino Duo Processors 1.6 GHz or equivalent with 2GB or RAM, or higher. ii. Computer Operating System: Windows XP, Windows Vista, or Windows 7 iii. Web Browser: Microsoft Internet Explorer 9 iv. Work and Spreadsheet Processors: Microsoft Office Word, Excel and Outlook v. Scheduling Software: Microsoft Project or Primavera vi. Internet Service Provider: A reliable ISP in the area of the Project vii. Connection Speed/Minimum Bandwidth: DSL, ADSL, or T1 Line for transferring a minimum of 3Mbps Downstream and 512 Kbps Upstream viii. Have or install a scanner minimum 800 x 600 pixels, and a digital camera minimum resolution of one (1) megapixel. b. Contractor shall provide its management personnel assigned to this Project with access to personal computers and the Internet on a daily basis. Project Web Requirements: a. This project will utilize a web based project management tool called e-builder Enterprise. This web based application is a collaboration tool, which will allow project team members continuous access through the Internet to important project data as well as up to the minute decision and approval status information. b. Contractor shall have the responsibility for visiting the Project web site on a daily basis, and as necessary to be kept fully appraised of the Project developments, for correspondence, assigned tasks and other matters that transpire on the site. These may include but are not limited to: Contracts, Contract Exhibits, Contract Amendments, Drawing Issuances, Addenda, Bulletins, Permits, Insurance & Bonds, Safety Program Procedures, Safety Notices, Accident Reports, Personnel Injury Reports, Schedules, Site Logistics, Progress Reports, Daily Logs, NonConformance Notices, Quality Control Notices, Punch Lists, Meeting Minutes, Requests for Information, Submittal Packages, Substitution Requests, Monthly Payment Request Applications, Supplemental Instructions, Owner Variation Directives, Potential Variation Orders, Variation Order Requests, Variation Orders, and the like. All supporting data including but not limited to shop drawings, product data sheets, manufacturer data sheets and instructions, method statements, safety MSDS sheets, Substitution Requests and the like will be submitted in digital format via ebuilder Enterprise. Electronic File Requirements: a. In addition to the standard closeout submittal requirements detailed elsewhere in the Contract Documents, the Contractor shall also submit all closeout documents including As-Built Drawings, catalog cuts and Owner s Operation and Maintenance manuals in digital format. All documents (including as-built drawings) shall be converted or scanned into the Adobe Acrobat (.pdf) file format and uploaded to e-builder Enterprise.

e-builder Enterprise User Licenses: The Contractor is required to purchase and maintain for the life of the project at least one annual e-builder Enterprise user license as part of basic services. e-builder Inc. will facilitate user license acquisition.