B.COM II COST ACCOUNTING

Similar documents
COST ACCOUNTING b.com part II Regular & Private (SUPPLEMENTARY) Solved Paper. Compiled & Solved by: Sameer Hussain

B.COM 2 PRIVATE COST ACCOUNTING. B.com-2 PRIVATE Annual Examination COMPILED & SOLVED BY: Jahangeer Khan

SECTION I. Sh ,000 10,200 16,680 14,000 2,600 4,200 13,300 2,520 1,600 10,500 12, ,000

COST OF GOODS MANUFACTURES B.COM. PART II

JOB ORDER COSTING. LO 1: Cost Systems. Determine whether job order costing or process costing would be more appropriate for each industry.

1. Cost accounting involves the measuring, recording, and reporting of: A. product costs. B. future costs. C. manufacturing processes.

*Brief Exercise

rate is used to apply overhead costs to products. Our purpose in this section is to provide a detailed example of cost flows in an ABC system.

PROBLEMS INVENTORY VALUATION (1-6)

Chapter 2. Job Order Costing and Analysis QUESTIONS

UNIT 2 : FINAL ACCOUNTS OF MANUFACTURING ENTITIES

Basic Costing Guidance

Chapter 20: Job Order Costing

Chapter 2--Cost Terminology and Cost Behaviors

FFQA 1. Complied by: Mohammad Faizan Farooq Qadri Attari ACCA (Finalist) Contact:

Chapter 2--Cost Terminology and Cost Behaviors

2. Standard costs imply a) Predetermined cost for a period b) Incurred cost c) Conversion cost d) Incremental cost

COST SHEET. Samir K Mahajan

Of the following manufacturing operations, which is the best suited to the utilization of a job order system?

Akuntansi Biaya. Modul ke: 09FEB. Direct Material Cost. Fakultas. Diah Iskandar SE., M.Si dan Nurul Hidayah,SE,Ak,MSi. Program Studi Akuntansi

MULTIPLE CHOICE QUESTIONS OF

Chapter 2--Cost Terminology and Cost Behaviors

DEEPAK GUPTA CLASSES

Which of the following is correct? Select correct option: Units sold=opening finished goods units + Units produced Closing finished goods units Units

Chapter 17 Job Order Costing Study Guide Solutions Fill-in-the-Blank Equations. Exercises. 1. Estimated activity base. 2. Underapplied. 3.

Level 3 Accounting, 2005

INTER CA MAY PAPER 3 : COST AND MANAGEMENT ACCOUTING Branch: Multiple Date: Page 1

Chapter 3. Accounting for Labor

Paper T4. Accounting for Costs. Thursday 10 December Certified Accounting Technician Examination Intermediate Level

Section A: Summary Content Notes

YAVAPAI COLLEGE/PRESCOTT UNIFIED SCHOOL DISTRICT District Instructional Guide (DIG) Year-Long Semester Pacing Guide 2015/2016 School Year

ACCOUNTING FOR PERPETUAL AND PERIODIC INVENTORY METHODS

Module 10 : Product and Process Costing. Lecture 1 : Product and Process Costing. Objectives

2014/2015 School Year. Unit / Theme Content (Nouns) Skills (Verbs) YC Learning Outcomes & Course Content/ADE Standards

B.Com II Year (Hons.) Cost Accounting Model Paper I

COST SHEET. Samir K Mahajan

1. F; I 2. V ; D 3. V ; D 4. F; I 5. F; I 6. F; I 7. V ; D 8. F; I 9. F; I 10. V ; D 11. F; I 12. F; I 13. F; I 14. F; I

CHAPTER 17 (FIN MAN); CHAPTER 2 (MAN) JOB ORDER COST SYSTEMS

PROCESS COSTING FIRST-IN FIRST-OUT METHOD

Syllabus: Accounting

Exercise E21-1 page 886. (a) Factory Labor 103,000 Factory Wages Payable 90,000 Employer Payroll Taxes Payable 9,000

Financial Accounting and Auditing Paper-III Financial Accounting

This is the second in our series of blog posts looking at recording and evaluating costs and revenues (ECR) Unit 6.

Process Costing Joint and By Product CA Past Years Exam Question

1. The cost of an item is the sacrifice of resources made to acquire it. 2. An expense is a cost charged against revenue in an accounting period.

Test Bank For Cost Accounting A Managerial Emphasis Fifth Canadian 5th Edition By Horngren Foster Datar And Gowing

1). Fixed cost per unit decreases when:

Chapter 02 - Cost Concepts and Cost Allocation

` 16,667 ` 3,33,340. = 16, MT Truck: x = 14,167

Cost Accounting. Multiple Choice Questions:

ACC108 Hospitality Accounting- Administrative Outline

Financial Transfer Guide DBA Software Inc.

Chapter 4. Systems Design: Process Costing. Types of Costing Systems Used to Determine Product Costs. Job-order Costing.

Inventory Cost Accounting Tips and Tricks. Nick Bergamo, Senior Manager Linda Pei, Senior Manager

CHAPTER 4 ACCOUNTING FOR MERCHANDISING OPERATIONS

JOB COSTING AND OVERHEAD

MANAGEMENT 9 ACCOUNTING

After completing this course, the student should be able to:

Chapter 3 Systems Design: Job-Order Costing

Case study Dealing with overheads

Invest Northern Ireland. Cost Based Claims Guidance Notes

CHAPTER 8. Valuation of Inventories: A Cost-Basis Approach 1, 2, 3, 4, 5, 6, 7, 8, 11, 12, 14, 15, 16

Chapter 2 An Introduction to Cost Terms and Purposes

Level II Foundation Certificate in Accounting

Variance C Labor Variances

D.SRINIVASAN. M.COM., M.Ed., P.G.D.C.A., P.G.D.I.T., K.G.S. MATRIC. HR. SEC. SCHOOL TIRUPUR. CELL

COST C O S T COST. Cost is not a simple concept. It is important to distinguish between four different types - fixed,, variable, average and marginal.

Higher National Unit specification. General information for centres. Unit code: F7JR 34

Accounting I Instructional Unit Accounting I Unit Content Objective Performance Indicator Performance Task State Standards Code:

Heintz & Parry. 20 th Edition. College Accounting

Welcome to: FNSACC507A Provide Management Accounting Information

Training & Exercise. Thank you for your patience. This webinar will begin momentarily

ACCOUNTING FOR MERCHANDISING ACTIVITIES

Management s Accountability to Stakeholders Stakeholders Provide Management is accountable for: Owners Operating activities Government Creditors

Management Accounting

Part 1 Study Unit 5. Cost Accumulations Systems Jim Clemons, CMA Ronald Schmidt, CMA, CFM

2. Some suggested best practices for preparing for year end and the start of the new fiscal year

Itawamba Community College ACC 2213 Principles of Accounting I

Cost concepts, Cost Classification and Estimation

Overheads/Job and Batch Costing. RST Ltd. has two production departments Machining and Finishing. There are three service

Chapter 2--Product Costing: Manufacturing Processes, Cost Terminology, and Cost Flows

Ch6 Practice Test Part 1: Multiple Choice Choose the most correct answer from the choices provided.

(AA32) MANAGEMENT ACCOUNTING AND FINANCE

Chapter 2--Measuring Product Costs

C H A P T E R 8 VALUATION OF INVENTORIES: A COST-BASIS APPROACH

Chapter 3--Product Costing: Manufacturing Processes, Cost Terminology, and Cost Flows

PEACHTREE COMPLETE 2009 WORKSHOP 6 THE CORNER DRESS SHOP

SCHOOL OF ACCOUNTING AND BUSINESS BSc. (APPLIED ACCOUNTING) GENERAL / SPECIAL DEGREE PROGRAMME

Variable Costing: A Tool for Management. M. En C. Eduardo Bustos Farías

CEBU CPAR CENTER. M a n d a u e C I t y

MANAGERIAL ACCOUNTING (135) Post-secondary

COST ACCOUNTING QUESTION ONE

Guide for the Preservation of Records For Public Water Utilities

Accounting Professional Certificate Program with Externship

THE PROFESSIONALS ACADEMY OF COMMERCE Mock Exam, Summer-2015 Management Accounting (Solution)

Mona Loa Malaysian Manufacturing cost per bag... $6.00 $5.00 Add markup at 30% Selling price per bag... $7.80 $6.50

QUICKBOOKS PRO 2008 WORKSHOP 6 THE CORNER DRESS SHOP

Sage 100 Direct Deposit. Getting Started Guide

HFTP Hospitality Financial and Technology Professionals

Transcription:

The workings under the heading of Additional Working are not required according to the requirement of the examiner. These are only for understanding the solutions. For more help, visit 2014 B.COM II COST ACCOUNTING REGULAR Compiled and Solved by: Sameer Hussain

COST ACCOUNTING 2014 REGULAR Instructions: (1) Attempt any FIVE questions in all. (2) All questions carry equal marks. (3) Answers without necessary computations will not be accepted. Q.No.1 ACCOUNTING FOR MANUFACTURING OPERATIONS a) Describe the element of briefly. b) Determine the missing figures and complete the following table (Show your computation) No. Work in Process Finished Goods Cost of Manufacturing Cost of Goods Opening Ending Opening Ending Goods Cost Manufactured Inventory Inventory Inventory Inventory Sold 1. 53,000 5,000 8,000? 10,000 12,000? 2. 145,000 15,000? 150,000 20,000? 160,000 3. 270,000? 30,000 260,000? 30,000 240,000 4.? 12,000 15,000 180,000 20,000 20,000? SOLUTION 1 (a) Elements of Cost: 1. Material: The production supplies of an organization that features as revenue expenditure purchased from a third party. Material may be classified as direct materials or indirect materials. Materials are not necessarily raw materials, but can include components and sub-assemblies used in the finished product. 2. Labour: Expenditure on wages paid to those operators who are both directly and indirectly concerned with the production of the product, service, or unit. 3. Overhead: An indirect of an organization is called overhead. Overheads are usually classified as manufacturing overheads, administration overheads, selling overheads, distribution overheads, and research and development. SOLUTION 1 (b) Computation of Cost of Goods Manufactured (Case 1): Manufacturing 53,000 Add: Work in process beginning inventory 5,000 Total work in process during the period 58,000 Less: Work in process ending inventory (8,000) Cost of goods manufactured Rs.50,000 Computation of Cost of Goods Sold (Case 1): Cost of goods manufactured 50,000 Add: Finished goods beginning inventory 10,000 Finished goods available for sale 60,000 Less: Finished goods ending inventory (12,000) Cost of goods sold Rs.48,000 B. C o m II C o s t A c c o u n t i n g 2 0 1 4 ( R e g u l a r ) Page 2

Computation of Work in Process Ending Inventory (Case 2): Manufacturing 145,000 Add: Work in process beginning inventory 15,000 Total work in process during the period 160,000 Less: Cost of goods manufactured (150,000) Work in process ending inventory Rs.10,000 Computation of Finished Goods Ending Inventory (Case 2): Cost of goods manufactured 150,000 Add: Finished goods beginning inventory 20,000 Finished goods available for sale 170,000 Less: Cost of goods sold (160,000) Finished goods ending inventory Rs.10,000 Computation of Work in Process Opening Inventory (Case 3): Cost of goods manufactured 260,000 Add: Work in process ending inventory 30,000 Total work in process during the period 290,000 Less: Manufacturing (270,000) Work in process opening inventory Rs.20,000 Computation of Finished Goods Opening Inventory (Case 3): Cost of goods sold 240,000 Add: Finished goods ending inventory 30,000 Finished goods available for sale 270,000 Less: Cost of goods manufactured (260,000) Finished goods opening inventory Rs.10,000 Computation of Manufacturing Cost (Case 4): Cost of goods manufactured 180,000 Add: Work in process ending inventory 15,000 Total work in process during the period 195,000 Less: Work in process opening inventory (12,000) Manufacturing Rs.183,000 Compiled & Solved by: Sameer Hussain Computation of Cost of Goods Sold (Case 4): Cost of goods manufactured 180,000 Add: Finished goods beginning inventory 20,000 Finished goods available for sale 200,000 Less: Finished goods ending inventory (20,000) Cost of goods sold Rs.180,000 No. Work in Process Finished Goods Cost of Manufacturing Cost of Goods Opening Ending Opening Ending Goods Cost Manufactured Inventory Inventory Inventory Inventory Sold 1. 53,000 5,000 8,000 50,000 10,000 12,000 48,000 2. 145,000 15,000 10,000 150,000 20,000 10,000 160,000 3. 270,000 20,000 30,000 260,000 10,000 30,000 240,000 4. 183,000 12,000 15,000 180,000 20,000 20,000 180,000 B. C o m II C o s t A c c o u n t i n g 2 0 1 4 ( R e g u l a r ) Page 3

Q.No.2 STANDARD COSTING Amjad Company presents the following information about standard and actual for the month of November 2014: Standard Actual Material 5,000 units at a of Rs.75,000 Costing Rs.79,200 at a unit price of Rs.16.00 Labour 5,500 hours at an hourly rate of Rs.9.00 5,600 hours at an hourly rate of Rs.9.50 Factory Fixed Rs.8,000 and variable overhead Rs.4,800 for production of 9,000 units Fixed Rs.8,000 and variable Rs.5,000 for a normal volume of 10,000 units REQUIRED (a) Calculate: (i) Material price and quantity variance. (ii) Labour wage and efficiency variance. (iii) Factory overhead controllable and volume variance. (b) Give entries in General Journal to record and to close the variance accounts. SOLUTION 2 (a) Computation of Material Price Variance: Material price variance = (Standard price Actual price) x Actual quantity Material price variance = (75,000/5,000 16.00) x (79,200/16.00) Material price variance = (15.00 16.00) x 4,950 Material price variance = (4,950) (Unfavourable) Computation of Material Quantity Variance: Material quantity variance = (Standard quantity Actual quantity) x Standard price Material quantity variance = {5,000 (79,200/16.00)} x (75,000/5,000) Material quantity variance = (5,000 4,950) x 15.00 Material quantity variance = 750 (Favourable) Computation of Labour Wage Variance: Labour wage variance = (Standard price Actual price) x Actual hours Labour wage variance = (9.00 9.50) x 5,600 Labour wage variance = (2,800) (Unfavourable) Computation of Labour Efficiency Variance: Labour efficiency variance = (Standard hours Actual hours) x Standard price Labour efficiency variance = (5,500 5,600) x 9.00 Labour efficiency variance = (900) (Unfavourable) Computation of Factory Overhead Rate: Fixed factory overhead rate (8,000/10,000) Variable factory overhead rate (5,000/10,000) Factory overhead rate Rs.0.80 Rs.0.50 Rs.1.30 B. C o m II C o s t A c c o u n t i n g 2 0 1 4 ( R e g u l a r ) Page 4

Computation of Factory Overhead Controllable Variance: Actual factory overhead (8,000 + 4,800) 12,800 Less: Budgeted allowance based on standard output: Fixed factory overhead budgeted 8,000 Variable factory overhead (10,000 x 0.50) 5,000 Budgeted allowance based on standard output (13,000) Factory overhead controllable variance (Favourable) Rs.200 Computation of Volume Variance: Budgeted allowance based on standard output 13,000 Less: Applied factory overhead for actual output (9,000 x 1.30) (11,700) Factory overhead volume variance (Unfavourable) Rs.1,300 Compiled & Solved by: Sameer Hussain SOLUTION 2 (b) AMJAD COMPANY GENERAL JOURNAL Date Particulars P/R Debit Credit 1 Work in process 75,000 Material price variance 4,950 Material quantity variance 750 Raw material 79,200 (To record the material price and quantity variance) 2 Work in process (5,500 x 9.00) 49,500 Labour wage variance 2,800 Labour efficiency variance 900 Accrued payroll (5,600 x 9.50) 53,200 (To record the labour rate and efficiency variance) 3 Work in process (9,000 x 1.30) 11,700 Factory overhead volume variance 1,300 Factory overhead controllable variance 200 Factory overhead (8,000 + 4,800) 12,800 (To record the factory overhead variance) AMJAD COMPANY CLOSING ENTRIES Date Particulars P/R Debit Credit 1 Material quantity variance 750 Factory overhead controllable variance 200 Cost of goods sold 9,000 Material price variance 4,950 Labour wage variance 2,800 Labour efficiency variance 900 Factory overhead volume variance 1,300 (To close the all variances) B. C o m II C o s t A c c o u n t i n g 2 0 1 4 ( R e g u l a r ) Page 5

Q.No.3 MATERIAL COSTING INVENTORY SYSTEM Rahat Industries uses a single type of material. The following data relate to purchases and issue of the material: October 01: Balance 1,000 units @ Rs.50 October 05: Purchased 500 units @ Rs.51 October 06: Returned to supplier 50 units October 10: Issued to job 600 units October 15: Purchased 700 units @ Rs.52 October 20: Issued to job 1,000 units October 25: Purchased 800 units @ Rs.53 October 28: Issued to job 700 units REQUIRED Prepare inventory card under perpetual system using: (i) First in First out. (ii) Last in First out. SOLUTION 3 (i) RAHAT INDUSTRIES MATERIAL LEDGER CARD PERPETUAL INVENTORY SYSTEM - FIFO METHOD FOR THE MONTH OF OCTOBER Date Purchases Issued Balance Units Unit Total Units Unit Total Units Unit Total Oct. 01 1,000 Rs.50 50,000 Oct. 05 500 Rs.51 25,500 1,000 Rs.50 50,000 500 Rs.51 25,500 Oct. 06 (50) Rs.51 (2,550) 1,000 Rs.50 50,000 450 Rs.51 22,950 Oct. 10 600 Rs.50 30,000 400 Rs.50 20,000 450 Rs.51 22,950 Oct. 15 700 Rs.52 36,400 400 Rs.50 20,000 450 Rs.51 22,950 700 Rs.52 36,400 Oct. 20 400 Rs.50 20,000 550 Rs.52 28,600 450 Rs.51 22,950 150 Rs.52 7,800 Oct. 25 800 Rs.53 42,400 550 Rs.52 28,600 800 Rs.53 42,400 Oct. 28 550 Rs.52 28,600 650 Rs.53 34,450 150 Rs.53 7,950 1,950 101,750 2,300 117,300 650 34,450 Net purchases of raw material Rs.101,750. Cost of direct material used Rs.117,300. Cost of raw material ending inventory Rs.34,450. B. C o m II C o s t A c c o u n t i n g 2 0 1 4 ( R e g u l a r ) Page 6

SOLUTION 3 (i) Compiled & Solved by: Sameer Hussain RAHAT INDUSTRIES MATERIAL LEDGER CARD PERPETUAL INVENTORY SYSTEM - LIFO METHOD FOR THE MONTH OF OCTOBER Date Purchases Issued Balance Units Unit Total Units Unit Total Units Unit Total Oct. 01 1,000 Rs.50 50,000 Oct. 05 500 Rs.51 25,500 1,000 Rs.50 50,000 500 Rs.51 25,500 Oct. 06 (50) Rs.51 (2,550) 1,000 Rs.50 50,000 450 Rs.51 22,950 Oct. 10 450 Rs.51 22,950 850 Rs.50 42,500 150 Rs.50 7,500 Oct. 15 700 Rs.52 36,400 850 Rs.50 42,500 700 Rs.52 36,400 Oct. 20 700 Rs.52 36,400 550 Rs.50 27,500 300 Rs.50 15,000 Oct. 25 800 Rs.53 42,400 550 Rs.50 27,500 800 Rs.53 42,400 Oct. 28 700 Rs.53 37,100 550 Rs.50 27,500 100 Rs.53 5,300 1,950 101,750 2,300 118,950 650 32,800 Net purchases of raw material Rs.101,750. Cost of direct material used Rs.118,950. Cost of raw material ending inventory Rs.32,800. Q.No.4 GENERAL LEDGER AND FACTORY LEDGER Zeenat Co. Ltd. uses general ledger and factory ledger, inventory accounts, a payroll clearing account for factory employees and factory overhead control accounts are kept at factory, plant assets and accounts payable are the part of general office book. The following transactions took place: 11. Purchased material on account Rs.50,000. 12. Material of Rs.46,000 issued to production including indirect material of Rs.8,000. 13. Payroll paid for factory was Rs.100,000 (80% direct and 20% indirect). 14. Prepaid factory insurance was expired by Rs.4,000. 15. Factory depreciation was charged at Rs.10,000. 16. Other factory overhead incurred on account Rs.20,000. 17. Factory overhead is applied @ 110% of direct labour. 18. Jobs were completed to the extent of Rs.130,000. 19. Finished goods ing Rs.110,000 were sold at a gross profit of 40% of. 20. Customer returned goods ing Rs.5,000. REQUIRED Journal entries in the factory books and the general office books. B. C o m II C o s t A c c o u n t i n g 2 0 1 4 ( R e g u l a r ) Page 7

SOLUTION 4 ZEENAT CO. LTD. GENERAL OFFICE BOOK GENERAL JOURNAL Date Particulars P/R Debit Credit 11 Factory ledger 50,000 Voucher payable 50,000 (To record the purchase of raw materials) 12 No entry 13 Payroll 100,000 Accrued payroll 100,000 (To record the factory payroll) 13 Accrued payroll 100,000 Voucher payable 100,000 (To record the voucher prepared for payroll) 13 Voucher payable 100,000 Bank 100,000 (To record the payment of payroll) 13 Factory ledger 100,000 Payroll 100,000 (To close the payroll account) 14 Factory ledger 4,000 Prepaid insurance 4,000 (To record the factory insurance expired) 15 Factory ledger 10,000 Allowance for depreciation 10,000 (To record the depreciation charged on factory) 16 Factory ledger 20,000 Voucher payable 20,000 (To record the factory overhead incurred on account) 17 No entry 18 No entry 19 Cost of goods sold 110,000 Factory ledger 110,000 (To record the of goods sold) 19 Accounts receivable (110,000 x 140%) 154,000 Sales 154,000 (To record the goods sold on account) 20 Sales return and allowance 7,000 Accounts receivable (5,000 x 140%) 7,000 (To record the goods returned by customer) 20 Factory ledger 5,000 Cost of goods sold 5,000 (To record the of goods returned by customer) B. C o m II C o s t A c c o u n t i n g 2 0 1 4 ( R e g u l a r ) Page 8

ZEENAT CO. LTD. FACTORY BOOK GENERAL JOURNAL Date Particulars P/R Debit Credit 11 Raw material 50,000 General ledger 50,000 (To record the purchase of raw materials) 12 Work in process 38,000 Factory overhead 8,000 Raw material 46,000 (To record the raw material consumed) 13 Work in process (100,000 x 80%) 80,000 Factory overhead (100,000 x 20%) 20,000 Accrued payroll 100,000 (To record the labour assigned to production) 13 Accrued payroll 100,000 General ledger 100,000 (To record the payroll sent to general office) 14 Factory overhead 4,000 General ledger 4,000 (To record the factory insurance expired) 15 Factory overhead 10,000 General ledger 10,000 (To record the depreciation on factory) 16 Factory overhead 20,000 General ledger 20,000 (To record the factory overhead incurred) 17 Work in process (80,000 x 110%) 88,000 Factory overhead applied 88,000 (To record the applied factory overhead) 18 Finished goods 130,000 Work in process 130,000 (To record the of goods completed) 19 General ledger 110,000 Finished goods 110,000 (To record the of goods sold) 20 Finished goods 5,000 General ledger 5,000 (To record the of goods returned by customer) Q.No.5 JOB ORDER COSTING Samsam Company had the following inventories for September 2014: September 1 September 30 Materials Rs.10,000 Rs.38,000 Work in process? Rs.110,000 Finished goods Rs.50,000 Rs.145,000 During September, the of material purchased was Rs.138,000 and factory overhead of Rs.90,000 was applied at the rate of 50% of direct labour. September of goods sold was Rs.205,000. B. C o m II C o s t A c c o u n t i n g 2 0 1 4 ( R e g u l a r ) Page 9

REQUIRED (a) Prepare T accounts for inventories showing the flow of the of goods manufactured and sold. (b) Assuming that the inventory of work in process at September 30 was consisted of Rs.32,000 of materials, determine the of direct labour and factory overhead. SOLUTION 5 (a) Computation of Work in Process Beginning Inventory: Cost of goods sold 205,000 Add: Finished goods ending inventory 145,000 Finished goods available for sale 350,000 Less: Finished goods beginning inventory (50,000) Cost of goods manufactured 300,000 Add: Work in process ending inventory 110,000 Total work in process during the period 410,000 Less: Manufacturing Cost: Raw material beginning inventory 10,000 Add: Purchases of raw material 138,000 Raw material available for use 148,000 Less: Raw material ending inventory (38,000) Direct material used 110,000 Add: Direct labour (90,000 x 100/50) 180,000 Prime 290,000 Add: Factory overhead 90,000 Total manufacturing (380,000) Work in process beginning inventory Rs.30,000 Raw Material Sep. 1 Balance 10,000 Work in process 110,000 Purchases 138,000 Sep. 30 Balance c/d 38,000 148,000 148,000 Oct. 1 Balance b/d 38,000 Work in Process Sep. 1 Balance 30,000 Finished goods 300,000 Raw material 110,000 Sep. 30 Balance c/d 110,000 Accrued payroll 180,000 Factory overhead 90,000 410,000 410,000 Oct. 1 Balance b/d 110,000 Finished Goods Sep. 1 Balance 50,000 Cost of goods sold 205,000 Work in process 300,000 Sep. 30 Balance c/d 145,000 350,000 350,000 Oct. 1 Balance b/d 145,000 B. C o m II C o s t A c c o u n t i n g 2 0 1 4 ( R e g u l a r ) Page 10

SOLUTION 5 (b) Computation of Conversion Cost in Work in Process Ending Inventory: Work in process ending inventory 110,000 Less: Raw material (32,000) Conversion Rs.78,000 Direct labour : Factory overhead 100% : 50% 2 : 1 Computation of Direct Labour Cost in Work in Process Ending Inventory: Direct labour (work in process ending) = Conversion x 2/3 Direct labour (work in process ending) = 78,000 x 2/3 Direct labour (work in process ending) = Rs.52,000 Computation of Factory Overhead Cost in Work in Process Ending Inventory: Factory overhead (work in process ending) = Conversion x 1/3 Factory overhead (work in process ending) = 78,000 x 1/3 Factory overhead (work in process ending) = Rs.26,000 Compiled & Solved by: Sameer Hussain Q.No.6 LABOUR COSTING Mr. Akbar is working 8 hours a day and 5 days a week under straight piecework plan in Feroz Microchip Company Ltd. The normal rate per hour is Rs.450 and the standard time is 20 seconds per unit. The daily production of Mr. Akbar during the week is as under: Monday Tuesday Wednesday Thursday Friday 1,400 1,450 1,480 1,500 1,490 REQUIRED Calculate earnings of Mr. Akbar for the week. SOLUTION 6 Computation of Piece Rate per Unit: Standard time per unit = 20 seconds. Therefore 3 units produced in 1 minute. Units produced per hour = 3 x 60 = 180 units per hour Piece rate per unit = Rate per hour Units per hour Piece rate per unit = 450 180 Piece rate per unit = Rs.2.50 per unit FEROZ MICROCHIP COMPANY LTD. EARNING SCHEDULE OF MR. AKBAR Days Unit Produced Rate per Unit Earnings Monday 1,400 Rs.2.50 Rs.3,500 Tuesday 1,450 Rs.2.50 Rs.3,625 Wednesday 1,480 Rs.2.50 Rs.3,700 Thursday 1,500 Rs.2.50 Rs.3,750 Friday 1,490 Rs.2.50 Rs.3,725 Total 7,320 Rs.2.50 Rs.18,300 B. C o m II C o s t A c c o u n t i n g 2 0 1 4 ( R e g u l a r ) Page 11

Q.No.7 PROCESS COSTING The AB and Co. produces a chemical which requires processing in three departments. The following data relate to the operation of department III for September, 2014: Units in process at start 50% completed as to material and conversion 5,000 units Units received from department II 40,000 units Units transferred to finished store room 35,000 units Balance of units are in process:? (100% completed as to material and 50% as to conversion ) Cost of beginning inventory Rs.25,000 Cost transferred from department II Rs.30,000 Cost Added in Department III: Material Rs.8,800 Conversion Rs.16,200 REQUIRED Prepare of production report of department III by FIFO ing. SOLUTION 7 Computation of Work in Process Ending Units: Beginning units in process 5,000 Add: Units received from department II 40,000 Total units in process 45,000 Less: Units completed and transferred out (35,000) Ending units in process 10,000 AB AND CO. EQUIVALENT PRODUCTION UNITS DEPARTMENT III FOR THE MONTH OF SEPTEMBER 2014 Particulars Material Equivalent Units Units completed & transferred out 35,000 35,000 Add: Work in process (ending): Direct material (10,000 x 100%) 10,000 Conversion (10,000 x 50%) 5,000 Work in process during the period 45,000 40,000 Less: Work in process (opening): Direct material (5,000 x 50%) (2,500) Conversion (5,000 x 50%) (2,500) Equivalent production in units 42,500 37,500 AB AND CO. COST OF PRODUCTION REPORT DEPARTMENT III Conversion Cost Equivalent Units FOR THE PERIOD ENDED 30 SEPTEMBER 2014 Particulars Department III Quantity Schedule: Goods in process opening inventory 5,000 Units received from Department II 40,000 45,000 B. C o m II C o s t A c c o u n t i n g 2 0 1 4 ( R e g u l a r ) Page 12

Units completed and transferred out 35,000 Units still in process 10,000 45,000 Cost Charged to the Department - III: Total Cost Unit Cost Goods in process opening inventory 25,000 Cost received from department II (30,000/40,000) 30,000 Rs.0.750 Cost Added by Department III: Material (8,800/42,500) 8,800 Rs.0.207 Conversion (16,200/37,500) 16,200 Rs.0.432 Total added 25,000 Rs.0.639 Total to be accounted for 80,000 Rs.1.389 Cost Accounted for as Follows: Goods in process opening inventory 25,000 Add: Cost Added in September: Material (5,000 x 50% x 0.207) 518 Conversion (5,000 x 50% x 0.432) 1,080 Total of 5,000 units 26,598 Add: Cost of remaining units (30,000 x 1.389) 41,672 Total of units completed and transferred out 68,270 Cost of Work in Process Ending Inventory: Cost from Department II (10,000 x 0.750) 7,500 Material (10,000 x 100% x 0.207) 2,070 Conversion (10,000 x 50% x 0.432) 2,160 Total of work in process ending inventory 11,730 Total accounted for Rs.80,000 Q.No.8 DEPARTMENTALIZATION OF FACTORY OVERHEAD Ahsan Mining Corporation has producing department A and B, and service department C, D and E. it is company s policy that once a service department s have been distributed, no from other service department are to be distributed to it. The information given below pertains to the month just ended. Cost of service departments are distributed as follows: Department C on the basis of number of employees. Department D on the basis of investment in equipment. Department E on the basis of floor space. Department Cost Square Feet Employees Investment in Equipment A Rs.15,000 2,000 40 Rs.170,000 B Rs.12,000 3,000 30 Rs.80,000 C Rs.14,000 4,000 20 Rs.130,000 D Rs.8,000 2,000 30 Rs.70,000 E Rs.2,000 1,500 20 Rs.50,000 Total Rs.51,000 12,500 140 Rs.500,000 REQUIRED Distribute the overhead of service department. B. C o m II C o s t A c c o u n t i n g 2 0 1 4 ( R e g u l a r ) Page 13

SOLUTION 8 AHSAN MINING COMPANY FACTORY OVERHEAD DISTRIBUTION SHEET Particulars Total Producing Department Service Department A B C D E Overhead before allocation 51,000 15,000 12,000 14,000 8,000 2,000 Allocation of Service Departments Cost: Department C 4,667 3,500 (14,000) 3,500 2,333 Department B 6,517 3,066 --- (11,500) 1,917 Department D 2,500 3,750 --- --- (6,250) Overhead after allocation 51,000 28,684 22,316 --- --- --- Distribution of Cost of Department C: Department A = 14,000 x 40/120 = 4,667 Department B = 14,000 x 30/120 = 3,500 Department D = 14,000 x 30/120 = 3,500 Department E = 14,000 x 20/120 = 2,333 Distribution of Cost of Department D: Department D = 8,000 + 3,500 = 11,500 Department A = 11,500 x 170,000/300,000 = 6,517 Department B = 11,500 x 80,000/300,000 = 3,066 Department E = 11,500 x 50,000/300,000 = 1,917 Distribution of Cost of Department E: Department E = 2,000 + 2,333 + 1,917 = 6,250 Department A = 6,250 x 2,000/5,000 = 2,500 Department B = 6,250 x 3,000/5000 = 3,750 B. C o m II C o s t A c c o u n t i n g 2 0 1 4 ( R e g u l a r ) Page 14