Presentation and Company Update 7 July 2016 Dr Chris Giles, Managing Director. Cash flow from gold sales New project developments Exploration success

AGM - Lorena Gold Project

ASX Release ASX Code: YTC

Georgian Mining Corporation / EPIC: GEO / Sector: Natural Resources

PROUDLY POSITIONED AS AN AUSTRALIAN MINER ASX:MLX. November 2017 AGM Presentation

Azure Minerals Ltd ASX Code:

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

For personal use only

WPG TO ENTER THE IRON ORE INDUSTRY

Developing High Grade Projects in Mexico

EXCO S PROJECT PIPELINE

Second drill rig to accelerate major drilling program at Productora

Australia s leading explorer in Mexico

ABM Hits 3000 Ounce Target from Trial Mining

For personal use only

Confidence in Carrapateena project grows

Maiden Inferred Iron Ore Resources for Gum Flat

PATRICK SCOTT - DIRECTOR TIN CONFERENCE BEER & CO - SECOND ANNUAL WEDNESDAY, 5 NOVEMBER, 2014

For personal use only

Strong open pit drilling results boost plan to grow Paulsens' production to 100,000ozpa

Fresh drilling and metallurgical results advance plan to establish 100,000ozpa operation at Ashburton Project

2014 MINERAL RESOURCES AND ORE RESERVES

RESULTS OF XSTRATA EXPLORATION AT ROSEBY IN 2011

Corvus Gold Receives Sulfide Gold Recovery of +90% Using AAO Process at the North Bullfrog Project, Nevada

121 MINING INVESTMENT CONFERENCE HONG KONG

For personal use only

Gum Creek Gold Project Free Milling Scoping Study

EXCO S PROJECT PIPELINE. Unlocking the Value

Low-cost, rich, DRC copper

ASX ANNOUNCEMENT 12 MAY 2016

209 million 36.1% Fe

For personal use only

Sconi and Flemington: Two near-production cobalt-nickel-scandium deposits. ASX: AUZ October 2017

Activities Report Quarter Ended 31 st March 2015

MAIDEN RESOURCE STATEMENT FOR TCM COAL PROJECT, INDONESIA

Australia s leading explorer in Mexico

For personal use only

THIRD QUARTER REPORT 14 OCTOBER 2014

OMITIOMIRE OXIDE COPPER FEASIBILITY STUDY

For personal use only

On The Road To Silver & Gold Mining In Mexico

For personal use only

Ban Houayxai Project Approved operation to produce over 100,000 ounces of gold and 700,000 ounces of silver per annum

Non-IFRS performance measure. Refer to the Non-IFRS Performance Measures contained in the Q Management s Discussion and Analysis.

Geology and mineral resources of the Kylylahti Mine

ASX ANNOUNCEMENT 13 December 2011 ASX Code: BDR TUCANO GOLD PROJECT CONSTRUCTION AND MINING UPDATE

PRELIMINARY OXIDE HEAP LEACH TESTWORK DELIVERS EXCELLENT RESULTS AT THE SOUTH HOUNDÉ PROJECT

Valence Industries Australia s Only Graphite Producer

For personal use only. Minerals Explorer in South Korea

Forward Looking Statements. Forward looking statements in these materials speak only at the date of issue. Subject to any

For personal use only

PROUDLY POSITIONED AS AN AUSTRALIAN MINER ASX:MLX. Corporate Update

RESOURCE GOLD PTY. LTD.

For personal use only

For personal use only

For personal use only

QUARTERLY REPORT March 2011

White Dam Gold Project Dump Leach

Diversified Australian Producer

23 July Half-Year Trading Update Petropavlovsk PLC ( Petropavlovsk, the Company or, together with its subsidiaries excluding IRC Limited

Mt Morgans Australia s next 200kozpa gold producer

TERRAMIN AUSTRALIA LIMITED. Annual General Meeting

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

Valence Industries Australia s Only Graphite Producer

BUILDING AN EMERGING RESOURCE COMPANY UPDATE ON ACQUISITION OF COAL AND MANGANESE ASSETS IN INDONESIA

Golpu Pre-Feasibility Study and Reserve Announcement (all figures in United States dollars and in 100% terms unless stated otherwise)

MCINTOSH STAGE 1 PRE-FEASIBILITY STUDY UPDATE

Kibali Mine Development

Tri-K feasibility study update

Haoma Mining NL A.B.N

PILOT SOLAR EVAPORATION PONDS COMMISSIONED AT LAKE WELLS POTASH PROJECT, WA

Developing the +1.2Moz Pilbara Gold Project. Investor Presentation November Pilbara Gold Project Unlocking Shareholder Value

AVINO SILVER & GOLD MINES LTD.

Joyce Lake update, the new DSO zones at Lac Le Fer to Iron Arm Range

For personal use only

For personal use only. Cummins Range Rare Earths Project

TRANS-SIBERIAN GOLD PLC

For personal use only

Australasian Code for Reporting of Mineral Resources and Ore Reserves

For personal use only

For personal use only

Investor Presentation Jogjakarta Iron Sands Project

Estimating and Reporting of

Mineral Processing by Bioheapleaching at The Talvivaara Nickel Mine in Sotkamo, Finland. Jukka Pitkäjärvi General Manager Talvivaara Exploration Ltd

The New Leader in Global Copper

Major Capital Cost Reductions Reposition Wa Gold Project, Ghana

DRILLING INTERSECTS SIGNIFICANT COAL SEAMS AT TCM COAL PROJECT, KALIMANTAN, INDONESIA

For personal use only

The declining discovery rate what is the real story?

Evaluation of Grade Engineering using Enterprise Optimization. Michael Scott, Nick Redwood

Windimurra Vanadium Plant Project Update. Investor Presentation August 2011

NOLANS RARE EARTHS PROJECT: MAIDEN JORC ORE RESERVE

For personal use only

ASX QUARTERLY RELEASE

BUCHANS MINERALS SUCCESSFULLY PRODUCES HIGH PURITY MANGANESE ELECTROLYTE FOR THE PRODUCTION OF ELECTROLYTIC MANGANESE METAL

Corporate Presentation London December, 2011

Massawa gold project January 2016

For personal use only

For personal use only

For personal use only. Australian gold producer with exceptional growth opportunity

Transcription:

Horseshoe Metals Limited (HOR) March 2013 Grant Craighead Research Manager gcraighead@breakawayinvestmentgroup.com Nick Raffan Research Analyst nraffan@breakawayinvestmentgroup.com Company Information ASX Code Directors Substantial Share Holders Company Details 1 Year Price Chart Price ($) 0.350 0.300 0.250 0.200 0.150 0.100 0.050 Source: Bloomberg HOR Share Price A$0.17 Ord Shares 75.9m Options 22.0m Estimated MCAP A$12.5m Cash (March 13) A$0.7m Total Debt - Enterprise Value Non-Ex. Chairman Managing Director Non-Executive Director Non-Executive Director A$11.8m J. Shervington Neil Marston Michael Fotios Stuart Hall Investmet Limited 18.0% Azure Capital Limited 5.3% Directors 4.9% Wyllie Group 1.5% Address Unit 6/11, Colin Grove West Perth WA 6005 Phone +618 9481 5866 Web www.horseshoemetals.com.au 0.000 Mar May Jul Sep Nov Jan Volume (m) 35 30 25 20 15 10 5 0 HOR is advancing towards a critical mass to evaluate development options for Horseshoe Lights Company Update Key Points Recommendation: Speculative BUY Maiden resource of 0.84Mt at 1.3% Cu for the Rinaldi deposit, lifting the Company s global copper resource to 101,600t Horseshoe Lights resource being updated following 2012 drilling Planned 2013 drilling at Horseshoe to focus on deeper Cu-Au zones 2013 drilling at Kumarina to focus on dolerite sill/fault zone, with Kumarina Deeps also being tested Soil geochemistry identified new targets at Kumarina Geophysics expected to identify new targets at Horseshoe Lights HOR has announced a Maiden Mineral Resource 10,600t at its Rinaldi Prospect within the Kumarina Project located 108km NE of Horseshoe Lights. Most of the Rinaldi resource is in the Measured and Indicated categories and is less than 120m from the surface. The mineralisation remains open at depth. Rinaldi is one of many targets within the Kumarina Project and the exploration potential is very high for adding significant copper resources. Quantification of Rinaldi has boosted the Company s global copper resource to 101,600t, which is approaching critical mass for potential development. Investment Thesis HOR s tenements are located within the highly prospective Bryah Basin, which was formed from strike-slip tensions in a back-arc setting. Key characteristics of the basin are eruption of tholeiitic lavas and formation of gold and/or copper deposits. Historical production from Horseshoe Lights was 54,000t of Cu and 313,000oz of gold. There are numerous copper workings in the Kumarina Project where very high grades of copper are recorded. There has been considerable drilling at Horseshoe Lights but historically most historical holes have been shallow (less than 100m). At Horseshoe Lights, high-grade copper extends below the pit floor. HOR has already defined a resource of 8.6Mt at 1.06% Cu and 0.13g/t Au. At the historic open cut mine, high-grade copper mineralisation extends below the pit floor and the Company has embarked on systematic drilling, in conjunction with modern geophysics, to better delineate this mineralisation and find new zones. Overall, the Company is working towards a critical mass that would justify reopening mines at Horseshoe Lights and Kumarina. Exploration continues at both projects and positive news flow is expected throughout 2013.

Company Update Kumarina Project Extensive old mine workings bode well for deeper discoveries. Copper deposits were discovered at Kumarina in 1913, and intermittently worked until 1973. Mine workings extend over 3km with most production from underground, but at shallow depth; with 100m drives off the lower level of the Kumarina Copper Mine at a depth of 49m below surface. The delineation of an initial mineral resource of 835,000t at 1.3% copper at the Rinaldi Prospect (see Figures 1 and 2), is an excellent start. Mineralisation generally occurs as chalcopyrite and pyrite as blebs and veinlets within quartz veins hosted within the fault zone. Less common copper minerals are chalcocite and bornite. Figure 1: Very encouraging drilling results from the 2011 and 2012 drilling programmes that probed the Rinaldi Prospect Fault Zone. Figure2: Map showing the prospective areas identified from soil geochemistry within Kumarina Project, some of which are along strike from Rinaldi. Drill programmes testing extension of known mineralisation and testing new anomalies should provide positive news flow through 2013. Figure 1 shows the cluster deposits over a strike length of 50kms. Key points t During 2012, the Company drilled seven diamond drill holes with each drill hole intersecting visible copper and individual one-metre assay results of up to 15.2% copper being recorded The work program during 2013 will test for extensions of this mineralisation along the host north-south fault zone. A small number of drill holes have intersected copper in a dolerite sill. Future drilling will probe the faulted contact between the sill and fault zone as a preferential site for mineralisation. A recently completed soil sampling survey over most of the licence area has identified several anomalies some of which are co-incident with north-south faults as shown in Figure 2. The company plans to drill test some of these anomalies during 2013.

The Kumarina Deeps Prospect shown in Figure 2 is an interesting exploration target which HOR will drill test in the coming months once site access clearances are in place. Armed with results from soil sampling surveys and images produced from modern geophysics, the 2013 field season should be very efficient with a large number of well-defined targets to follow-up with reconnaissance drilling. Horseshoe Lights Project Revised resource statement due soon-significant upward revision expected. At the Horseshoe Lights deposit, shoots of high-grade copper and gold ore occur as co-products in a sub-vertical pattern of zonation. The current resource is mainly JORC inferred. With 0.6Mt of Measured and Indicated resources, the result of the 2012 drill programmes will see an increase in the confidence level for defined resources. Assay results from the 2012 65-hole drill programme, diamond and RC; have not been incorporated into the current resource. A resource upgrade is due within weeks and is expected to provide positive news for shareholders. The potential to extend mineralisation at depth and significantly increase resources is shown in the figures below. Figure 3: Cross Section at Horseshoe Lights showing Main Zone mineralisation. In the Main Zone high-grade direct-shipping chalcocite mineralisation passed into pyrite-chalcopyrite ore. Figure 4: In the late 1980s chalcocite was dug from the pit floor for direct shipment to a smelter. As can be seen from this long section, high-grade copper extends below and laterally from the pit. Potential for oxide copper in waste and low-grade stockpiles. In addition to the hard rock resources that represent mineralised extensions of the historic open cut deposit, there are a number of potential resources locked up in the existing tailings dam and low-grade stockpiles. This material was regarded as too low grade for treatment at the time of mining. In 1995 it was estimated that 1.95Mt of tailings and stockpiles contained some 12,500t of copper. Any oxidised copper mineralisation in the tailings dam or low-grade stockpiles may now be recoverable through leaching at relatively low operating cost.

Recent testwork has demonstrated that the copper tailings readily leach, demonstrating the potential for a relatively low cost operation to commence on site. Continuing exploration at Horseshoe Lights during 2013 has the potential to create significant value for shareholders. The prospectivity of the region is high and a paucity of deep drilling, the meaningful level of historic production, the presence of large structures and excellent exploration results enhance the likelihood of positive results. Figure 5 and 6 illustrate some of the better results from the 2012 drilling campaign, as well as new targets generated in the immediate mine environs. Figure 5: Plan of near surface high-grade copper drill results. Note the extensive area of mineralisation projected to surface north of the pit.

Figure 6: Multi factor defined drilling targets. One thing in common with all four targets is a paucity of drilling at depth. The Future Potential for early cash flow from copper leaching. An initial copper production of 10-20,000tpa is a reasonable target. Economic Assessment in 1H- 2013. The resource upgrade will also enable management to refine its development options. There are likely a number of these options available - perhaps starting with a modest copper leaching facility treating oxide ore, tailings and stockpile material. This option has potential for generating early cash flow in an affordable, low risk manner. A typical production figure for a junior copper miner is output of 10,000 to 20,000 tonnes of contained copper per annum. On this basis, HOR seems well placed to work towards delineating three to five years of production from tank or heap leaching. The process would possibly incorporate a SX/EW circuit to produce premium value cathode copper. At the same time, it might be possible for HOR to strike a deal with a third party to toll treat primary sulphide ore; Sandfire Resources NL (SFR) with its DeGrussa processing facility just 75km away comes immediately to mind. Following the revision in JORC resources, the company will complete a Mining Study as a cornerstone of a Preliminary Economic Assessment (PEA) during 1H-2013. Should the PEA be suitably encouraging the company will begin a Feasibility Study in 2H-2013. 2013 is shaping up to be a watershed year for HOR. By the end of this year, the Company will have a strong understanding of the opportunity for the Horseshoe Lights and Kumarina Projects to be advanced through the Feasibility Study and mine development processes.

Analyst Verification We, Grant Craighead and Nick Raffan, as the Research Analysts, hereby certify that the views expressed in this research accurately reflect our personal views about the subject securities or issuers and no part of analyst compensation is directly or indirectly related to the inclusion of specific recommendations or views in this research. Disclosure Breakaway Investment Group (AFSL 290093) may hold direct and indirect shares in the Image Resources. It has also received a commission on the preparation of this research note. Disclaimer Any observations, conclusions, deductions, or estimates of figures that have been made by Breakaway Research and the Breakaway Investment Group in this report should not be relied upon for investment purposes and the reader should make his or her own investigations. This publication has been issued on the basis that it is only for the information and exclusive use of the particular person to whom it is provided. Any recommendations contained herein are based on a consideration of the securities alone. In preparing such general advice no account was taken of the investment objectives, financial situation and particular needs of a particular person. Before making an investment decision on the basis of this advice, investors and prospective investors need to consider, with or without the assistance of a securities adviser, whether the advice is appropriate in light of the particular investment needs, objectives and financial circumstances of the investor or the prospective investor. Although the information contained in this publication has been obtained from sources considered and believed to be both reliable and accurate, no responsibility is accepted for any opinion expressed or for any error or omission that may have occurred therein Breakaway Investment Group AFSL 290093 ABN 84127962387 T+61292621363 F+61292792727 PO Box H116 Australia Square Sydney, NSW 2001 Suite 505, 35 Lime Street, Sydney, NSW 2000