FUKUSHIMA DAIICHI BWR REACTOR SPRAY AND FEED WATER SYSTEMS EVALUATION FOR EARLY FAILURE Dean Wilkie

Similar documents
Preliminary Lessons Learned from the Fukushima Daiichi Accident for Advanced Nuclear Power Plant Technology Development

AP1000 European 19. Probabilistic Risk Assessment Design Control Document

Isolation Condenser; water evaporation in the tank and steam into the air. Atmosphere (in Severe Accident Management, both P/S and M/S)

Westinghouse Small Modular Reactor. Passive Safety System Response to Postulated Events

Study on Severe Accident Progression and Source Terms in Fukushima Dai-ichi NPPs

NSSS Design (Ex: PWR) Reactor Coolant System (RCS)

AP1000 European 15. Accident Analysis Design Control Document

Major Influential Issues on the Accident Progressions of Fukushima Daiichi NPP

NPP Simulators Workshop for Education - Passive PWR NPP & Simulator Overview

Ensuring Spent Fuel Pool Safety

Radiation Control in the Core Shroud Replacement Project of Fukushima-Daiichi NPS Unit #2

Verification of the MELCOR Code Against SCDAP/RELAP5 for Severe Accident Analysis

The 2011 Tohoku Pacific Earthquake and Current Status of Nuclear Power Stations

Nuclear Power Volume II - Nuclear Power Plants

Post-Fukushima Assessment of the AP1000 Plant

The ESBWR an advanced Passive LWR

SMR/1848-T03. Course on Natural Circulation Phenomena and Modelling in Water-Cooled Nuclear Reactors June 2007

Joint ICTP-IAEA Essential Knowledge Workshop on Deterministic Safety Analysis and Engineering Aspects Important to Safety. Trieste,12-23 October 2015

The Westinghouse AP1000 : Passive, Proven Technology to Meet European Energy Demands

CANDU Safety #6 - Heat Removal Dr. V.G. Snell Director Safety & Licensing

RELAP 5 ANALYSIS OF PACTEL PRIMARY-TO-SECONDARY LEAKAGE EXPERIMENT PSL-07

NUCLEAR POWER NEW NUCLEAR POWER PLANTS IN 2012

Summary. LOCA incidents: Gas and liquid metal cooled reactors. List of LOCA incidents: 3-4

Module 05 WWER/ VVER (Russian designed Pressurized Water Reactors)

HPR1000: ADVANCED PWR WITH ACTIVE AND PASSIVE SAFETY FEATURES

RELAP5/MOD3.2 INVESTIGATION OF A VVER-440 STEAM GENERATOR HEADER COVER LIFTING

Concepts and Features of ATMEA1 TM as the latest 1100 MWe-class 3-Loop PWR Plant

The Westinghouse Advanced Passive Pressurized Water Reactor, AP1000 TM. Roger Schène Director,Engineering Services

Shutdown and Cooldown of SEE-THRU Nuclear Power Plant for Student Performance. MP-SEE-THRU-02 Rev. 004

Application for Permission to Extend the Operating Period and Application for Approval of Construction Plans of Unit 3 at Mihama Nuclear Power Station

Nuclear Service Valves

Status report Chinese Supercritical Water-Cooled Reactor (CSR1000)

Safety design approach for JSFR toward the realization of GEN-IV SFR

Risks Associated with Shutdown in PWRs

Nuclear Power Plant Safety Basics. Construction Principles and Safety Features on the Nuclear Power Plant Level

Experiences from Application of MELCOR for Plant Analyses. Th. Steinrötter, M. Sonnenkalb, GRS Cologne March 2nd, 2010

ACR-1000: ENHANCED RESPONSE TO SEVERE ACCIDENTS

Spent Fuel and Spent Fuel Storage Facilities at Fukushima Daiichi

Module 06 Boiling Water Reactors (BWR)

Frequently Asked Questions: Japanese Nuclear Energy Situation

CRFA System B BASES

Preparedness at PFBR Kalpakkam to meet the challenges due to Natural events Prabhat Kumar, Project Director, PFBR, Director construction BHAVINI

Nuclear Power A Journey of Continuous Improvement

Research Article Extended Station Blackout Coping Capabilities of APR1400

Assessing and Managing Severe Accidents in Nuclear Power Plant

Advanced LWRs Jacopo Buongiorno Associate Professor of Nuclear Science and Engineering

Small Modular Reactors: A Call for Action

OVER VIEW OF ACCIDENT OF FUKUSHIMA DAI-ICHI NPSs AND FUTURE PLANNING TOWARD D&D

Side Event of IAEA General Conference. Severe Accident Analyses of Fukushima-Daiich Units 1 to 3. Harutaka Hoshi and Masashi Hirano

Main Steam & T/G Systems, Safety

Safety Design Requirements and design concepts for SFR

OPERATING EXPERIENCE REGARDING THERMAL FATIGUE OF UNISOLABLE PIPING CONNECTED TO PWR REACTOR COOLANT SYSTEMS

Lessons Learned from Fukushima Daiichi Nuclear Power Station Accident and Consequent Safety Improvements

Passive Cooldown Performance of Integral Pressurized Water Reactor

Regulatory Actions and Follow up Measures against Fukushima Accident in Korea

ASTEC Model Development for the Severe Accident Progression in a Generic AP1000-Like


CONTAINMENT STRUCTURES

The Materials Initiative NEI Overview

Analysis of a Station Black-Out transient in SMR by using the TRACE and RELAP5 code

IV. Occurrence and Development of the Accident at the Fukushima Nuclear Power Stations

NuScale SMR Technology

Module 06 Boiling Water Reactors (BWR) Vienna University of Technology /Austria Atominstitute Stadionallee 2, 1020 Vienna, Austria

Implementation of Lessons Learned from Fukushima Accident in CANDU Technology

P Boiling Water Reactor Vessel and Internals Program (BWRVIP)

EXPERIMENTS ON THE PERFORMANCE SENSITIVITY OF THE PASSIVE RESIDUAL HEAT REMOVAL SYSTEM OF AN ADVANCED INTEGRAL TYPE REACTOR

THREE MILE ISLAND ACCIDENT

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C August25, 2016

The DENOPI project: a research program on SFP under loss-of-cooling and loss-of-coolant accident conditions

VALIDATION OF RELAP5/MOD3.3 AGAINST THE PACTEL SBL-50 BENCHMARK TRANSIENT ABSTRACT

AGEING MANAGEMENT PROGRAM TO REACTOR PRESSURE VESSEL INTERNALS COMPONENTS IN A BWR NUCLEAR POWER PLANT

Contents of summary. 1. Introduction

Design of Traditional and Advanced CANDU Plants. Artur J. Faya Systems Engineering Division November 2003

The design features of the HTR-10

Safety Implication for Gen-IV SFR based on the Lesson Learned from the Fukushima Dai-ichi NPPs Accident. Ryodai NAKAI Japan Atomic Energy Agency

Risks of Nuclear Ageing

Improvements Needed in Nuclear Power Plant Probabilistic Risk Assessments: Lessons Learned from Fukushima

DEVELOPMENT AND APPLICATION OF PROBABILISTIC SAFETY ASSESSMENT PSA IN DAYA BAY NUCLEAR POWER STATION

Unit 2 Primary Containment Vessel Internal Investigation

Review Article Analyses of the OSU-MASLWR Experimental Test Facility

Post-Fukushima Actions in Korea

PLANT VOGTLE UNITS 3 AND 4

SEVERE ACCIDENT FEATURES OF THE ALTERNATIVE PLANT DESIGNS FOR NEW NUCLEAR POWER PLANTS IN FINLAND

Chapter 3 Accident of Fukushima Daiichi Nuclear Power Plant: Sequences, Fission Products Released, Lessons Learned

LBLOCA AND DVI LINE BREAK TESTS WITH THE ATLAS INTEGRAL FACILITY

Pressurized Thermal Shock Potential at Palisades

Calculate the Costs of Piping System Elements

CAREM: AN INNOVATIVE-INTEGRATED PWR

The Westinghouse AP1000 Advanced Nuclear Plant Plant description

What Nuclear Reactor Companies Need

Appendix B. Aging Management Programs and Activities

INVESTIGATION OF CRITICAL SAFETY FUNCTION INTEGRITY IN CASE OF STEAM LINE BREAK ACCIDENT FOR VVER 1000/V320

GENERAL CONTENTS SECTION I - NUCLEAR ISLAND COMPONENTS

C. ASSE 1013 Performance Requirements for Reduced Pressure Principle Backflow Preventers.

Downsizing a Claus Sulfur Recovery Unit

OPG Proprietary Report

BWR Safety Improvement as a Lesson Learned from Fukushima Accident

PDHonline Course E438 (3 PDH) Nuclear Accidents. Charles A. Patterson, P.E. PDH Online PDH Center

EPR: Steam Generator Tube Rupture analysis in Finland and in France

Transcription:

FUKUSHIMA DAIICHI BWR REACTOR SPRAY AND FEED WATER SYSTEMS EVALUATION FOR EARLY FAILURE Dean Wilkie The BWR reactor vessel spray(core spray) and feed water spray systems are designed to inject water into the spray header loops which encircle the inside of the reactor vessel at two different levels. The feed water injects water into the feed water spray loop at an elevation just above the shroud head. The vessel spray water injects water into the spray loop just below the top of the reactor shroud. Each system is independent of the other and operates at different pressures to cover high and low pressure conditions in the reactor vessel as well as varying vessel water level. Each spray system injects water into spray spargers which then direct the flow to the loops within the vessel that have multiple spray heads attached to direct the flow to the reactor core. (see figures later in paper) CORE SPRAY SPARGER Two independent core spray loops (core spray and feed water spray) are installed in the vessel above the upper core grid (top guide) and within the core shroud. The loops are connected to the Core Spray System which is used for core cooling under loss of coolant accident conditions. THE FEED WATER SPRAY SPARGER The feedwater spargers are mounted to the reactor vessel wall in the upper part of the downcomer or annulus region. The spargers, each supplied by one of the two feedwater nozzles, complete a half, circle of the vessel interior and discharges water radially inward. A number of 1 inch holes in each sparger permits the cooler feed water to mix with downcomer recirculation flow before coming in contact with the vessel. THE CORE SPRAY SYSTEM The Core Spray System: Is a low pressure system which supplies cooling water after reactor pressure is reduced to 285 psig (1.96 MPa) Will prevent the reactor from overheating following intermediate or, large break Accommodates some intermediate to small pipe breaks when feedwater is not available, the automatic depressurization system (ADS) will depressurize the reactor thus permitting the Core Spray System to provide core cooling The Core Spray System consists of two identical loops. Each loop contains: Two main pumps, a spray sparger, and associated piping, instrumentation and controls

Pumps rated at 3400 gpm full flow capacity. Two booster pumps Two sets of parallel isolation valves, one set inside and the other outside the drywell Water is supplied to the system from the suppression pool. The Fire Protection System is connected to each of the core spray loops to provide a backup supply of water. Each loop has a test recirculation line to the suppression pool for full flow testing without discharging into the reactor vessel. The piping up to the test valve is carbon steel, designed for 400 psig (2.75 Mpa) and 350 F (177 C). From the injection isolation valves to the reactor vessel, the piping is stainless steel designed for 1250 psig (2.75 Mpa and 575 F (302 C). A core spray filling system maintains the Core Spray System at full capacity to preclude any danger of water hammer when the system goes in operation. The discharge from each of the main pumps flows through a check valve to a common header that supplies water to the booster pumps and a bypass line around the booster pumps. The booster pumps discharge piping contains motor operated isolation valves outside the drywell and air operated testable check valves inside the drywell. Flow from each loop is directed from the pumps through two parallel normally closed motor operated valves, a single line at the containment penetration, two parallel check valves, one locked open manually operated valve and then into the sparger. Both Core Spray systems and their diesel generators will automatically start upon the detection of one high drywell pressure, or one low reactor vessel water level condition. These conditions generally indicate a pipe break. The system can also be manually initiated by the control room operators.

HIGH PRESSURE CORE SPRAY (HPCS) This system provides high pressure emergency core cooling for small, intermediate, and large line breaks. It is a single loop system and consists of: o A suction shutoff valve o One motor drive pump o Discharge check valve o Motor operated injection valve o Minimum flow valve o Full flow test valve to the suppression pool o Two high pressure flow test valves to the condensate storage tank o Discharge sparger and o Associated piping and instrumentation. o HPCS takes suction from the condensate storage tank or suppression pool The HPCS behaviors: Pumps the water into a sparger located on the upper core shroud Spray nozzles mounted on the sparger are directed at the top of the fuel assemblies to remove decay heat following a loss of coolant accident (LOCA) The suppression pool is the alternate source of Water for the HPCS system Normal power for the HPCS is provided by Standby Power System division 3 Diesel Generator The HPCS initiates automatically on high pressure in the drywell or low water level in the reactor vessel (level 2) FIGURES

Core spray loops and position relative to the shroud for the vessel spray line Feedwater sparger attachment and distribution header

Reactor vessel Cutaway with component labeling

Reactor vessel cutaway with component labeling

CORE SPRAY LINE ISSUES http://www.ndt.net/article/v07n05/plis/plis.htm The feedwater inlet nozzle on some boiling water reactor (BWR) vessels contains a stainless steel cladding over its carbon steel base material, the combined total being approximately 6" (15 cm) thick. Significant thermal stresses on the inner radius of such nozzles have in some cases caused in service thermal fatigue cracking of the cladding, having the potential to propagate into the base material. This problem was first defined in 1975 by the US Nuclear Regulatory Commission (NRC) and associated BWR suppliers. Two remedies were proposed, one being the removal of the cladding and the other being a modification to the feedwater nozzle sparger or both. At this time, cracks were identified at a given BWR plant using penetrant and ultrasonic testing (PT & UT) and removed. Grind outs to remove the cracks resulted in divots in the cladding. Mock up of the BWR reactor vessel penetration nozzle for the feed lines to the spray systems. OBSERVATION As newer systems are developed for testing for these stress related cracks more refined data can reveal not only existing, but also potential crack formation. These nozzles are assumed to undergo the normal stresses for reactor operation and not the extreme temperature and stress conditions that existed at the Fukushima reactors during the course of the accidents. Potential piping degrading is likely to happen not only on the feed water but also the internal spray lines for each core spray system.

These spray lines were counted on by TEPCO at the Fukushima reactors to deliver water critical to ensuring the reactor pressure vessel (RPV) and fuel remained cooled. TEPCO made connections to the feed water lines which ultimately would reach the feedwater and core spray spargers and onto the loop nozzles. There has been no confirmation that these feedwater lines were still intact outside or inside the reactor vessel or in containment. Accident analyses for severe accidents often treat the normal components in the BWR reactor such as the steam separator and dryer as general core material. http://www.diva portal.org/smash/get/diva2:224035/fulltext01.pdfand The analyses for severe accidents including meltdown and fuel dry out conditions assume the fuel melt temperature levels increase to a point where these excessive temperatures heat the core material to extreme levels which can act to deform or melt. The conditions at the Fukushima reactor units 1 3 resulted in this very melt condition and as a result have likely deformed or melted the internal piping and spray loops which have been borne out by leakage further down to the torus room as well as water running out of the MSIV doorway on unit 3. TEPCO has kept water flowing through both the core spray and feedwater lines since they initially hooked up these temporary systems. They have claimed that the reactor vessel and systems have been kept cool however, there is no known instrumentation other than that of the reactor vessel walls which can be reliably counted on to demonstrate sufficient cooling. TEPCO has used selected temperature instrument readings to claim that units 1 3 are in a cold shutdown mode. Stating this condition is illogical because cold shutdown mode consists of many other factors other than temperature to declare the reactor has entered into the cold shutdown official mode. DISCUSSION http://www.tepco.co.jp/nu/fukushima np/plant data/f1_2_chart3.pdf Paper tape recordings were checked on Units 1 3 and they don't show any flow for either core sprayer. The units are in 50 liters/second. Mind you that what Tepco injects would only be about 1 liter/s and below the resolution of the tape recordings. So if the gauge worked and any water was injected through the core sprays at all, the rate must have been much less than anticipated when the recordings were dimensioned. (quote from simplyinfo.org member)

http://www.nks.org/scripts/getdocument.php?file=111010111119613 Since the structure temperatures close above the core were high (T=l100 K...1700 K) prior to lower head dryout http://www.sci.kth.se/polopoly_fs/1.424080!/menu/general/column content/attachment/cla udiotorregrosa_mss_thesis.pdf (Note: the report is talking about the injection systems that were not available at normal capacity at the Fukushima reactors 1 3) In the event that any of these injection systems is available and core cooling is not regained, the water level in the vessel is expected to be below the core lower plate but still filling the reactor lower plenum. The uncovered fuel rods and reactor core materials (including reactor internal structures, control rods, instrumentation tubes, etc.) will overheat, melt and drain by gravity to the lower plenum http://atomicinsights.com/what does a melted nuclear core look like/ This link contains video footage of the inside of the TMI 2 reactor for initial inspection as well as preparations and fuel debris removal. The footage shows melting of structural components just above the reactor core as well as other peripheral structural melting during the accident. TMI was able to, in time, restore water to the core thus preventing more significant damage as that incurred at the Fukushima reactor unit 1 3.

image capture from TMI video

image capture from TMI video

image capture TMI video COMMENTS and CONCLUSIONS TEPCO, in the haste and crisis reactions knew they needed to get some sort of water fed into the reactor vessels of Units 1 3. In their desperation they set up portable and temporary systems as they chose locations to tie into the reactor core spray and feedwater systems. This decision, with no knowledge of the statues of the systems within the reactor building including the reactor vessel was the best they thought could be done at the time. Since these temporary hookups were made there have been varying claims, although not proven, that the water is somehow keeping the core and melted fuel cooled. Final Thoughts: The spray and feedwater lines at units 1 3 may be feeding water toward the reactor nozzles but very likely have s suffered damage from the earthquake and explosions to the point of developing leakage outside the reactor vessels. The core internal materials associated with the separators and core spray lines have

degraded, slumped or melted and are not delivering water sufficient to cool as designed. The upper portion of the steam separator and reactor feedwater spray loops have also degraded, slumped partially and have reached levels of cracking or failure although not as severe as the lower areas including the core spray lines. Water delivery through the spray nozzles in the feed water system has been minimized to less that designed Neither of the systems are providing design flow and are operating in a very degraded state at low pressure.