CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING, NETWORK SYSTEMS SECTION

Similar documents
Facility Interconnection Requirements

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING TOOLS AND STRUCTURES

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

Transmission Interconnection Requirements. Table of Contents

Standard EOP System Restoration from Blackstart Resources

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

Technical Requirements for Distributed Generation Connection

Standard of Practice - Campus Electrical Distribution System

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999

POTOMAC ELECTRIC POWER COMPANY

Sample Written Program. for. Control of Hazardous Energy (Lockout/Tagout) OSHCON

Proposals and Process 2017 National Electrical Code

Network Safeworking Rules and Procedures

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

Member Service Electric Wiring Guidelines

Trico Electric Cooperative, Inc. Interconnection Requirements. For. Distributed Generation

APC by Schneider Electric APC SYMMETRA MW 400 kw to 1600 kw Multi-Module Uninterruptible Power Supply

Procedure UE PR Access to the United Energy Electricity Network. Document UE PR 0001

ELECTRIC METERING GENERAL

THE POTOMAC EDISON COMPANY Electric P. S. C. Md. No. 53 Fifth Revision of Original Page No. 28 Canceling Fourth Revision of Original Page No.

ELECTRICAL INSPECTION BULLETIN (Effective )

Rule 21 Sheet 1 GENERATING FACILITY INTERCONNECTIONS

Requirements for Transmission System Interconnections to Generation, Transmission and End-User Facilities Revised June 10, 2014

NEW JERSEY BOARD OF PUBLIC UTILITIES N.J.A.C. 14:4-9 Net Metering and Interconnection Standards for Class I Renewable Energy Systems

Standards Summary Sheet

Introduction to Substation Design TADP 542

Service plans enhance the benefits of preventive maintenance programs

FCX Department of Occupational Health and Safety Policy

Temporary Wiring Practices And Guidelines For NECA. National Electrical Contractors Association Omaha, Nebraska

Public Utility District Number 1 of Snohomish County

ENMAX POWER CORPORATION. Requirements for Distribution Wires Access

Standard TPL Transmission System Planning Performance Requirements

MANUFACTURER'S RESPONSIBILITIES AND REQUIREMENTS FOR FACTORY TESTS

Emergency, Legally Required, and Optional Standby Power Systems

Overview of Common Mode Outages In Power Systems

SUMMARY OF ATSRAC RECOMMENDATIONS TO FAA

Electrical Networks Principles and Performance

Medium Voltage Service Maintenance and refurbishment

Draft. 1. For grade crossing warning devices, see Manual Part Recommended Guidelines for Grade Crossing Warning Devices.

ELECTRICITY SUPPLY - POWER SYSTEM MAINTENANCE Carry out routine inspection and servicing on high voltage minimum oil circuit breakers

Distribution Information Exchange Code

GUIDE TO SUPPLY AND METERING ARRANGEMENT ON CUSTOMER S INTERNAL DISTRIBUTION SYSTEM

GEK B Instructions. Test Cabinet. for Power/Vac Vacuum Circuit Breakers

Daker DK kva. Parallel installation quick start. Part. LE08927AA-09/15-01 GF

VPL-3200B Residential Vertical Platform Lift Technical Specifications

GE Energy. GE Switchboards. Experience the future with the next generation of GE switchboards

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Carry out routine inspection and servicing on high voltage bulk oil circuit breakers

COUNTY OF RIVERSIDE BUILDING AND SAFETY DEPARTMENT PHOTOVOLTAIC PERMITTING GUIDELINES

2017 NEC Changes for Renewable Energy Systems Session one by Christopher LaForge

AGREEMENT FOR CONNECTION TO [EASTERN /LONDON / SOUTH EASTERN] POWER NETWORKS PLC S DISTRIBUTION SYSTEM

LOAD DISPATCHER, 5233 SENIOR LOAD DISPATCHER, 5235 CHIEF LOAD DISPATCHER, 5238

SCHEDULE SS STANDBY SERVICE

Installation, Inspection and Maintenance of Dry Type Transformers

Hazards. Hazards. Hazards. Effects on the Body. GA Tech Electrical Safety Presentation

Analysis of distribution system reliability and outage rates

Wolverine Power Supply Cooperative, Inc. Senior Transmission System Operator

Public Utility District Number 1 of Snohomish County. Facility Connection Requirements February 9, 2018

Committee on 99 M E M O R A N D U M. NFPA Technical Committee on Electrical Systems

TABLE OF CONTENTS 1.0 SUMMARY SCOPE REGULATIONS AND POLICIES DEFINITIONS RESPONSIBILITIES... 2

B Improvements on High Voltage Electrical Substations to face the new Brazilian Legislation. G. M. Bastos (*) R. C. Valente E.

UNMIK REGULATION NO. 2004/22 ON THE PROMULGATION OF A LAW ADOPTED BY THE ASSEMBLY OF KOSOVO ON ELECTRICITY

SECTION LOW-VOLTAGE SWITCHGEAR

SECTION BASIC ELECTRICAL REQUIREMENTS

Canadian Electrical Code, Part I Full Impact Assessment

Fundamentals of Transmission Operations

CONSTRUCTION SECTOR STANDARDIZATION GUIDANCE DOCUMENT

UFGS (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS

Information Document Protection System Information ID# R

Distributed Generation. Technical Requirements and Interconnection Agreements

Gas-insulated medium-voltage switchgear. for wind parks. Answers for energy.

Definition of Adequate Level of Reliability

STATE OF SOUTH CAROLINA Employee Performance Management System

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Lifting Appliances of Ships and Offshore Installations

PLANT MAINTENANCE ELECTRICIAN (PME) ON THE JOB TRAINING

Distributed Generation (DG) Connection Standard

Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan)

Standard Development Timeline

Logic Units to ensure safety functions

Systems Commissioning Table of Contents

Lockout/Tagout. Company Policy

ExISTING SubSTATION INfORmATIONON

Lyon-Lincoln Electric Cooperative 607-SAFETY, RELIABILITY, AND SERVICE QUALITY

Network Safeworking Rules and Procedures

SBC Long Distance, LLC Original Page 1 d/b/a AT&T Long Distance Effective March 4, 2010 DATA PRODUCT REFERENCE AND PRICING GUIDEBOOK

DOMESTIC ELECTRICAL INSTALLATION PERIODIC INSPECTION REPORT (FOR A SINGLE DWELLING) B ADDRESS AND DETAILS OF THE INSTALLATION Address: SPECIMEN

Visualization for Shipboard Power Systems

ELECTRICAL SAFE WORK PRACTICES

Read and understand this manual for safely usage.

What Are the Qualifications to Conduct Arc Flash Studies? Where Do You Begin?

FOUR FOLD DOORS-WITH SINGLE OVERHEAD MTD OPERATOR

SERVICE ENTRANCE SPECIFICATIONS FOR RESIDENTIAL AND COMMERCIAL

INTERCONNECTION APPLICATION AND AGREEMENT

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 5/12/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

M3 Group System. General. In This Section

IMP/001/914 Code of Practice for the Economic Development of the 132kV System

Type FLX Freezer Floor Frost Heave Protection DESIGN GUIDE

Transcription:

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING, NETWORK SYSTEMS SECTION SPECIFICATION EO-2113 REVISION 4 DECEMBER, 2012 TRANSFER OF LOAD FROM COMPANY'S SUPPLY TO CUSTOMER'S EMERGENCY GENERATORS FILE: APPLICATION AND DESIGN MANUAL FIELD MANUAL TARGET AUDIENCE ENERGY SERVICES, REGIONAL ENGINEERING CUSTOMER SERVICE ENGINEERING NESC REFERENCE 2012 NESC SECTIONS: Paragraph 5.1 2005-2012 Consolidated Edison Co. of New York, Inc. Paper copies of procedures and instructions are uncontrolled and therefore may be outdated. Please 1/7 consult Distribution Engineering Intranet Site Distribution Engineering or http://distribution for the current version prior to use.

TABLE OF CONTENTS Paragraph Description 1.0 PURPOSE 3 2.0 REGIONS APPLICABLE. 3 3.0 APPROVED SYSTEMS.. 3 4.0 THE TRANSFER SWITCH 3 5.0 TRANSFER SWITCH CHARACTERISTICS.. 4 6.0 THE AUTOMATIC TRANSFER SWITCH 4 7.0 THE BYPASS/ISOLATION SWITCH 4 8.0 SHORT-CIRCUIT DUTY. 4 9.0 APPROVED INTERLOCK. 4 10.0 SERVICE DISCONNECT DEVICE. 5 11.0 COMPANY'S REVIEW OF CUSTOMER'S INSTALLATION 5 ATTACHMENT Specification Revision Rev Effective 2/7

TRANSFER OF LOAD FROM COMPANY'S SUPPLY TO CUSTOMER'S EMERGENCY GENERATORS 1.0 PURPOSE This specification gives the requirements and characteristics of the transfer switch used with a customer owned low-voltage (600V or less) emergency generator. The operation of the transfer switch is such as to prevent the accidental paralleling of the emergency generator with the Con Edison secondary system. 2.0 REGIONS APPLICABLE Applicable to all Regions. 3.0 APPROVED SYSTEMS Transfer of load from the Company's supply to the customer's emergency generator can be accomplished using a transfer switch or an interlock system. The preferred method is to use an automatic transfer switch. 4.0 THE TRANSFER SWITCH A transfer switch is a device that transfers load from one supply to another supply either manually or automatically. 5.0 TRANSFER SWITCH CHARACTERISTICS 5.1 Construction, ratings and performance of automatic or manual transfer switches shall be in accordance with ANSI/UL 1008-1988, and the National Electrical Safety Code (NESC). 5.2 A transfer switch shall be three-phase, load break, double throw (break-beforemake), as shown in the Attachment. The customer load is permanently connected to the blades of the switch. The Company supply and the Specification Revision Rev Effective 3/7

customer's emergency generator are connected to stationary contacts at opposite sides of the switch. Blades of all three phases shall move simultaneously when transferring load to either the Company or customer emergency generator supply 6.0 THE AUTOMATIC TRANSFER SWITCH An automatic transfer switch must be capable of automatically transferring a customer load from the normal supply to a stable alternate supply in the event of failure of the normal supply. Also, it must be capable of manually returning the load to the normal supply, after the normal supply has been restored and has become stable. A minimum time interval of five minutes must be allowed before returning the load manually to the normal supply. An automatic transfer switch must also be capable of manual operation if its automatic operation Malfunctions. 7.0 THE BYPASS/ISOLATION SWITCH (See Attachment) 7.1 A manually operated, three-phase, double throw load break bypass/isolation switch can be used with each transfer switch to provide means of bypassing and isolating the transfer switch, thus, permitting its maintenance and repair. 7.2 A mechanical interlock shall be provided between the transfer switch and the bypass switch to prevent the operation of the transfer switch whenever the bypass switch is used. 8.0 SHORT CIRCUIT DUTY The transfer switch and its isolating bypass switch, if provided, shall have the ability to withstand the available fault current at the location where the switches are installed. 9.0 APPROVED INTERLOCK The Company power supply and the customer emergency generator may both be connected to a common switchboard main bus, provided that their paralleling to the Specification Revision Rev Effective 4/7

main bus is prevented by means of a key interlock circuit breaker system or a combination of electrical and key interlock system using circuit breakers. 10.0 SERVICE DISCONNECT DEVICE A service disconnect device is required for both transfer switch and interlock type systems. 11.0 COMPANY'S REVIEW OF CUSTOMER'S INSTALLATION Before the customer's emergency equipment is installed, the customer shall submit for Company review, 11.1 A one-line electrical diagram showing the proposed installation, its interconnection to the electrical service and the means used to prevent parallel operation. The Company reserves the right of field inspection to ensure compliance. 11.2 A written statement signed by the customer stating that the emergency facilities will be used only during an interruption of the Company's electrical service, or a Company announced voltage reduction, and for necessary testing purposes. Customers using emergency generating equipment under other than the above specified circumstances will be required to take service under the appropriate service classification that permits parallel operation. Specification Revision Rev Effective 5/7

D. Sammon/DPSa Revision 4 General review and update Revision : 12/31/2016 Elie A. Chebli (Signature on File) Elie A. Chebli Department Manager Network Systems Distribution Engineering Department File: and Field Manual Specification Revision Rev Effective 6/7

Specification Revision Rev Effective 7/7