jmt.com UTILITY DESIGNATING & LOCATING/SUE Part of a diversified family of solutions

Similar documents
jmt.com PROGRAM & CONSTRUCTION MANAGEMENT Part of a diversified family of solutions

jmt.com PROJECT CONTROLS Part of a diversified family of solutions

Oil & Gas. Capabilities & Qualifications. Part of a diversified family of services. www. jmt.com. An Employee Owned Company

I. Project Overview and Limits. Project Goal

CHAPTER 13. New January 1, 2013 SUE. Subsurface Utility Engineering. Designation and Location. Chapter Contents

jmt.com INNOVATIVE PROJECT DELIVERY Part of a diversified family of solutions

BRIDGE INSPECTION Part of a diversified family of solutions. jmt.com

UTILITY COORDINATION FOR CAPITAL IMPROVEMENTS PROJECTS

Wastewater Capital Projects Management Standard Construction Specification

Excavations and Blind Penetrations into Walls & Floors

Stage 4 Geotechnical Investigations Information Sheet

C. Foundation stabilization for pipe and utility structures.

SECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller.

Gainesville Technical Center 5399 Wellington Branch Drive Gainesville VA Phone (703)

Installation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure

SAMPLE SPECIFICATION for CROSSHOLE SONIC LOGGING (CSL) September 2015

SUPPLEMENTAL TECHNICAL SPECIFICATION

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems.

CEMENT EVALUATION ITS NOT JUST ABOUT A BOND LOG GLEN BENGE SENIOR ADVISOR CEMENTING PRESSURE PUMPING

ComEd Customer Requirements for An Underground Service

Installation Guidelines for Vault Systems (NSBB, Kraken, Water Polisher, & Other)

REQUEST FOR QUALIFICATIONS UTILITY LAYOUT MAPPING AND PLAN OF RECORD AS BUILT DRAWINGS RFQ Q MR ADDENDUM #2 10:00 AM November 18, 2010

Roadrunner Gas Transmission Pipeline. Project Overview

DIG SAFELY NEW YORK OVERVIEW

CONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

Bioreactor Landfill Design

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

ENCAPSEAL Safe-T-Seal Advanced Technology External Sealing ENCAPSEAL. Safe-T-Seal. advanced technology external sealing

Central Washington University

Heavy Equipment Syllabus

SHALE FACTS. Production cycle. Ensuring safe and responsible operations

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL

Member Service Electric Wiring Guidelines

LANDSCAPE RETAINING WALLS

Implementation of this Special Provision requires a complete understanding of the following documents:

Inspection & Maintenance of Concrete Facilities By Cheyenne Wohlford CCS GROUP, LLC

1 Introduction. 2 Office Locations/Map. 3 General Requirements. 4 Structures and Planting. 5 Equipment Crossings. 6 Excavations. 7 Utility Crossings

APPENDIX L: FYFE REPORT ON QCLNG PROJECT SOIL SUBSIDENCE MONITORING SURVEY

Single Post Anchor Part Number Spectrum Lane ~ Missoula MT ~

Excavation Safety Program

Inspection & Maintenance of Concrete Facilities

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

Mustang Pipeline. Project Overview

Gerber M Series Site Requirements

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings

Trenchless Pipeline Crossings

SIDEWALK PROBLEMS AND REPAIR

Non-Destructive Testing of Drilled Shafts Current Practice and New Method

Best Practices. Dennis Clausen Director of Training GOMACO Corporation

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

WELCOME TO JMT. An employer of choice. An Employee Owned Company. jmt.com

Nuclear Services. Put Our Expertise To Work As Your Single Source For Industrial Cleaning And System Maintenance Solutions.

Effect of Spray Quenching Rate on Distortion and Residual Stresses during Induction Hardening of a Full-Float Truck Axle

Contractor s Guide to Applying for Permit to Dig/Excavate

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications

Jobsite Layout Considerations

PERMEABLE INTERLOCKING PAVERS

Veriforce TG CCT 607OP. Training Guide

SIDEWALK REPAIR GUIDE

TOWN OF GREENWICH, CONNECTICUT WILLIAM STREET BALL FIELD REMEDIATION WILLIAM STREET WEST, GREENWICH, CONNECTICUT

Electric Service Handbook

CF50/100 KW TURBINE ACCESS ROAD, CRANE PLATFORM, CONCRETE, AND LIFTING SPECIFICATIONS C&F GREEN ENERGY REVISION PREPARED BY APPROVED BY DATE

YOUR SPLASH PAD RESOURCE

INSTALLATION INSTRUCTIONS

02800 SHADE STRUCTURES

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES

Sustainable Utility Construction: Methods and Techniques

Horizontal Directional Drilling

E. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage.

WOOD POLE SPAN WIRE SIGNAL SYSTEMS

STANDARD SPECIFICATIONS SECTION BORING AND JACKING. A. Section includes requirements for boring and jacking casing pipe.

File No Supplemental November Geotechnical and Environmental Consulting Engineers

2017 Market Research Report on Global Ground Penetrating Radar (GPR) Industry

Destination. D/FW and the world. PRECON is the choice for waterproofing on Dallas/Fort Worth International Airport rail station project

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

Information Bulletin:

SUB-SLAB DEPRESSURIZATION SYSTEM DESIGN AND INSTALLATION

Valmont Newmark is your single source for steel, concrete or hybrid structures for power delivery

Infiltration Guidelines

SepticDesign.ca Gunnell Engineering Ltd.

DIVISION 33 - UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES SECTION UTILITY PIPE BORING AND JACKING

Code Compliance Research Report CCRR-0213

DBM Contractors, Inc. Donald B. Murphy Contractors, Inc. 60 Years of Innovation and Customer Satisfaction

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION IN SOIL BY HORIZONTAL DIRECTIONAL DRILLING

TECHNICAL PROCEDURE TABLE OF CONTENTS

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

SEGMENTAL BLOCK RETAINING WALLS. Comply with Division 1 - General Provisions and Covenants, as well as the following:

Connected Geophysical Solutions Real-Time Interactive Seismic Modeling & Imaging

DUMBWAITERS & LIFT SOLUTIONS THINK INSIDE THE BOX

4-0 Excavation Best Practices

Standard Cut vs. Keyhole

Table of Contents. Section 11,010 - Construction Survey Section Includes Description of Work Submittals 1. 1.

Specifications for Electrical Underground Residential Distribution Systems

GPR Application Case Studies

HILLSBOROUGH COUNTY UTILITY ACCOMMODATION GUIDE AND RIGHTS-OF-WAY USE PROCEDURES MANUAL APPROVED

Transcription:

jmt.com UTILITY DESIGNATING & LOCATING/SUE Part of a diversified family of solutions

Services Records Research Data Management Utility Locating Utility Designating Surveying About Us Johnson, Mirmiran & Thompson (JMT) is a multidisciplined engineering, architectural, and related services firm serving clients throughout the United States since 1971. Our subsurface utility designation and locating department provides clients with the invaluable knowledge of the impacts that existing utilities may have on their projects. Accurately identifying the locations of utilities early in the design phase can greatly minimize costly conflicts and delays in both design and construction. By reducing these conflicts and delays, JMT can help save money and time. 2

Records Research JMT carefully conducts records research of all utility companies, government agencies, and other service providers that may have facilities within the specified project limits. Information obtained may include the size, type, and material to be expected, as well as age, depth, profiles, and proprietorship of the utility. The research phase is the important groundwork for all designating and locating tasks, and JMT has experienced, skillful researchers in charge of conducting this pursuit and evaluating the information obtained. JMT has experienced and skillful utility technicians in charge of locating and evaluating information. 4 5

Data Management JMT can record acquired utility location information onto plans, photography, or topographic mapping using MicroStation or AutoCAD, along with any CADD file standards, including feature tables, parameter files, font libraries, cell libraries, and color tables. JMT will then electronically transmit all design files of the utility designating and locating, and any additional files used in the surveying of the utilities. Utility Designating Utility designating, the surface locating of utilities, entails the use of a variety of instruments, most of which are radio signal-based and can be set to different frequencies depending upon utility type and location. With our wide array of instruments, such as the Radiodetection 4000, MetroTech 810 & 9890, Subsite 950, and the Pipehorn, JMT is able to locate almost any existing utility at frequencies ranging from 512 Hz to 480 khz. The designating phase incorporates geophysical prospecting techniques, including electro-magnetic, magnetic, sonic, and resistivity methods, as well as ground penetrating radar, to horizontally locate utilities. With the combination of utility records, state-of-the-art instruments, and an experienced staff of locators, JMT accurately identifies all utilities within the project limits. Surveying Utility Locating Utility locating consists of verifying the horizontal and vertical location of underground utilities using air-vacuum excavation methods, including our VacMasters System 4000 and Excavac trucks. We always contact the state on-call center prior to any digging. Each utility is surveyed immediately after completion of the designation and location, providing quick and accurate plotting of utilities per specified CADD platform. No time is lost waiting for a survey crew to arrive at the site, since all surveying is done on location by the utility crew. Using air-vacuum techniques, we excavate a 12-inch hole to expose the entire utility. Once exposed, the top of utility elevation is surveyed, and the following information is typically obtained: horizontal and vertical location of utility; elevation of existing grade over utility at the test hole; dimensions of utility; type of utility; surface covering thickness; and overall condition of utility. A color-coded tape is placed in the hole with a temporary surface marker over the centerline of the utility. The test hole is backfilled with the excavated material, and the surface is restored and patched to local governing agency specifications.

Corporate Office 40 Wight Ave. Hunt Valley, MD 21030 P. 410.329.3100 jmt.com Offices strategically located throughout the United States