Application Document Submittal for AISC Certification - Fabricators and Manufacturers

Similar documents
INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES

AWS D1.1 Structural Welding Code: You Specify It- Do You Know What It Really Says?

Transitioning to the New Erector Standard from a Checklist

Certification Standard for Steel Fabrication and Erection, and Manufacturing of Metal Components

ACCREDITATION CRITERIA FOR FABRICATOR INSPECTION PROGRAMS FOR STRUCTURAL STEEL AC172. April 2017 (Effective June 1, 2017) PREFACE

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015

AASHTO/AWS D1.5M/D1.5:2008. Table of Contents

Certified Welding Fabricator (CWF) Program Information

Washington Association of Building Officials. Standard 1702 Steel Fabricator Registration Program

Quality Control and Quality Assurance for Installation of Steel Deck

ACCREDITATION OF FITTING MANUFACTURERS

DIVISION: METALS SECTION: STRUCTURAL STEEL FRAMING REPORT HOLDER: CAST CONNEX CORPORATION

PREFABRICATED STEEL TRUSS SPECIFICATIONS

AISC Certification Program for Bridge and Highway Metal Component Manufacturers

JOHN WOOD UNCONTROLLED COPY: THE JOHN WOOD COMPANY PO BOX HIGHLAND AVENUE OAKS, PENNSYLVANIA 19456

Canadian Welding Bureau Comparative Review AWS D1.1 vs CSA W47.1 & CSA W59

1. Cast-in-place concrete is specified in Section

STEEL FABRIC ATION QUALITY SYSTEMS GUIDELINE I NSTI TU T C AN ADI E N DE L A C ONS T R UC T I ON E N AC I E R

SECTION STRUCTURAL STEEL

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT

QUALITY ASSURANCE SPECIFICATION WELDING HEAT TREATMENT PAGE 1 OF 6

METHOD STATEMENT FOR PIPE WELDING WORKS

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014

Facilities Planning and Construction (FP&C)

UNIFIED FACILITIES GUIDE SPECIFICATIONS

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26

MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK

INS QA Programme Requirements

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

LAGUARDIA COMMUNITY COLLEGE - CUNY August 3, 2009

Quality Assurance in the Amusement Industry CLARK WESTERFIELD

ASME B31.3 Process Piping

COMPLETE REVISION February Process Industry Practices Structural. PIP STS05120 Structural and Miscellaneous Steel Fabrication Specification

Presented by: Gary Scribner Manager of Technical Services. August The National Board of Boiler and Pressure Vessel Inspectors

GUIDE FOR ASME REVIEW TEAMS FOR REVIEW OF APPLICANTS FOR ASME RP CERTIFICATE OF AUTHORIZATION. The American Society of Mechanical Engineers

QA/QC Program Overview. November, 2015

Statement of Special Inspections Michigan Building Code 2012 (MBC 2012)

CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE

Manufacture of welded products - Welding workshop

A. Types of lightgauge metal framing units include the following: 1. C-shaped structural steel studs Uniform Building Code.

INSPECTION OF FIELD WELDING

QM-001(Rev. 1) 1.0 INTRODUCTION. 1.1 Scope

DOT-FHWA QA/QC Plan Sample Selected pages (not a complete plan)

Project Address: Name of Person Completing Form:

Guide for AWS Visual Weld Inspection

SECTION CONTRACTOR QUALITY CONTROL

CORPORATE QUALITY SYSTEM PROCEDURE

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

NTPEP Evaluation of Plain and Laminated Elastomeric Bridge Bearings

Guideline of the European Committee for Welding of Railway Vehicles - ECWRV ( ) - PART 2 Technical Interpretation of EN 15085

Welding Performance Qualification Test Administrators GUIDE FOR APPLICANTS

SECTION PREFABRICATED PIPE BRIDGE(s)

PRESSURE VESSEL INSPECTION AUTHORITIES SABS 0227: 2000

QUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A

Evaluation of Highway Guardrail Manufacturers

Page 1 / 11. Version 0 June 2014

Item 448 Structural Field Welding

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

SCOPE OF SERVICES TRAFFIC SIGNAL MAST ARMS & HIGH MAST LIGHT POLE INSPECTIONS IN MIAMI DADE COUNTY

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Pressure Piping Construction Requirements

Flooring Contractor QA/QC Plan Sample Selected pages (not a complete plan)

Pressure Control Supplier Quality Requirements Raw Materials Forgings and Wrought Forms SQ-12 Rev: 1.1

Conformity Assessment. Dan Cheetham Welding and NDE 4/12/16

Today s AISC Live Webinar

Presented by: Gary Scribner Manager of Technical Services. Shanghai April The National Board of Boiler and Pressure Vessel Inspectors

Critical Structures Construction Issues

Conformity Assessment. Dan Cheetham BPV Topics of Interest 2016 Certification 360

Section 906. STRUCTURAL STEEL

A. Section Metal Decking. (05300 in MF95) B. Section Cold Formed Metal Framing. (05400 in MF95)

North Atlantic ENGINEERING STANDARD SPECIFICATION 1/7 REV. QUALITY SLAG BOWL WELDING AND QUALITY REQUIREMENTS. Approved by.

Originally Issued: 09/28/2017 Valid Through: 09/30/2018

AS/NZS 5131:2016. Australian/New Zealand Standard. Structural steelwork Fabrication and erection AS/NZS 5131:2016

Special Inspections Instructions

D. All distributors shall be reviewed and approved as per company procedure.

SECTION DECORATIVE METAL AND GLASS RAILING

Quality Management System

QUALITY MANUAL W.R. Larson Rd. P. O. Box San Antonio, Texas San Antonio, Texas (830) (210) FAX

SQAR-1. SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018

DBI-SALA Uni 8 Overhead Horizontal Lifeline Cable System SECTION HORIZONTAL FALL PROTECTION - OVERHEAD CABLE

PROJECT: TULSA COMMUNITY COLLEGE BOOKSTORE RENOVATION PROJECT NUMBER: ISSUE: CONSULTANT: SEAL: SHEET NUMBER: GENERAL NOTES

Conformity Assessment. Dan Cheetham BPV Requirements 4/12/16

I-94/I-69 Interchange Bridge Construction

Specification for Welding Earthmoving, Construction, and Agricultural Equipment

SECTION 552 HELICAL ANCHORS AND HELICAL PILES

Form Fit & Function Engineering, LLC 350 Seminole Drive Spartanburg, SC Supplementary Quality Assurance Clauses

I. In-Plant Quality Control Manual Specifics

INTEGRATING ISO 9000 METHODOLOGIES WITH PROJECT QUALITY MANAGEMENT

GUIDE SPECIFICATIONS CURA ADJUSTABLE REROOF FRAMING SYSTEMS SECTION REROOFING ADJUSTABLE FRAMING SYSTEM

Division MEDICAL EQUIPMENT SUPPORT SYSTEMS PART 1 GENERAL

REINFORCING STEEL. Delete every occurrence of ASTM A 706 and replace with AASHTO M 31, Type W.

The Impact Testing Enigma A Review of ASME Section VIII, Division 1, Subsection C, Part UCS, Impact Testing Requirements

SECTION QUALITY REQUIREMENTS

VIRGINIA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION MEMORANDUM. Charles A. Babish, PE State Materials Engineer Approved:

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.

Correlation matrices between ISO 9001:2008 and ISO 9001:2015

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications

SECTION PRE-ENGINEERED MEMBRANE STRUCTURE

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Transcription:

This document submittal checklist applies to Building Fabricators, Bridge Fabricators, Hydraulic Fabricators and Metal Component Manufacturers. The Fracture Critical endorsement is only available to Bridge Fabricators and Metal Component Manufacturers. Please submit the following through electronic media. Maximum file size shall not exceed 20 MB: A copy of your Quality Manual and the documented procedures as outlined in s 1.5 through 1.19 of the Certification for Steel Fabrication and Erection, and Manufacturing of Metal Components (the ) A copy of this completed checklist. You must include the corresponding Procedure number, Quality Manual section number, or the Document name in the () column. Please refer to the AISC Certification Program Requirements for Fabricator, Erector and Manufacturer Certifications, and the applicable Supplemental Program Requirements. Documents Required to be Submitted Quality Policy A written quality policy including a commitment to quality, a commitment to meet contract requirements, and establishing quality goals per 1.5.1 of the. Quality Goals Written, measurable quality goal(s) per 1.5.1 of the. Organizational Chart An organizational chart showing all key personnel positions that affect quality, including Quality Assurance, Quality Management, and Quality Control positions. All supervisory position titles must be shown and must match titles in the biographical information required below. The chart must show formal reporting relationships and informational (dotted line) relationships between positions pertaining to quality. Refer to 1.5.7 of the. Job/Position Descriptions Descriptions must define reporting responsibilities, position responsibilities and authorities related to the quality management system. Include the qualifications required in 1.5.4 of the and describe the abilities necessary to successfully perform the functions assigned to the description. Refer to 1.5.7 of the. Biographical Information The biographical data must show title(s) of the position held. That title must match a title on the organization chart or facility organization description. Information must be included relating to the individual s qualifications for the responsibilities of the position(s) filled, which may be illustrated by education, training, certifications or experience. Include the management of quality assurance, quality control and the key individual responsible for the quality management system (Management Representative for Quality). Refer to 1.5.4.1 of the. Effective Date: May 1 2018 Page 1 of 7

Internal Audit A record of an internal audit that has been conducted, showing that all sections of the Quality Management System have been evaluated. The format for this record is not restricted and can be any system or form that allows your facility an effective means to evaluate compliance and performance of your quality management system in accordance with 1.19 of the. Record of a Management Review Meeting A record of a management review meeting that has been conducted, addressing at a minimum, the criteria in 1.5.2 of the. Project information Required to be Submitted Project Description and Example A description and example of the type of work fabricated/manufactured at the facility to be certified, which includes: Identifying the type of materials used. Refer to 2 of the AISC Code of Practice. A list of the ASTM specifications for the materials used. Shop drawing examples for at least one project completed within the last two years. The number of drawings should be adequate to represent the type of work for which you are seeking certification. Do not submit complete sets of drawings. Project Schedule A schedule of upcoming projects for the next six months. The schedule must include: The Owner s name The project contract number and name Approximate tonnage and person-hours, and A brief description of the work to be performed. Quality Manual/Quality System Procedures Required to be Submitted See 1.5.7 for description of Quality Manual and documented procedures. Refer to the Glossary in the for the definition and requirements for a Documented Procedure. (Do not submit detailing standards required in 1.7.1 of the. Detailing standards will be evaluated during the onsite audit.) Title 1.6 Procedure for Construction Document Review and Communication 1.7 Procedure for Detailing that includes: 1.8 1.7.2 Checking 1.7.3 Approval of Approval Documents and Release for Fabrication 1.7.4 Shop Drawings Supplied by Others Procedure for Control of Mgmt System Documents and Project Documents that includes: Effective Date: May 1 2018 Page 2 of 7

1.8.1 Management System Documents 1.8.1.1 Quality Management System Documents 1.8.1.2 Review and Approval 1.8.1.3 Revision Control 1.8.1.4 Access 1.8.1.5 Communication 1.8.2 Project Documents 1.8.2.1 Tracking 1.8.2.2 Revision Control 1.8.2.3 Access 1.8.2.4 Communication 1.9 Procedure for Maintenance of Quality Records that includes: 1.9.1 Retention 1.9.2 Storage 1.9.3 Retrieval 1.10 Procedure for Purchasing that includes: 1.10.1 Purchasing Data 1.10.2 Selection of Subcontractors and Suppliers 1.10.3 Verification of Purchased Product, Materials and Services 1.10.4 Control of Customer-Furnished Material 1.11 Procedure for Material Identification 1.12 Procedure for Process Controls that includes fabrication processes and: Welding: A documented procedure for welding that addresses the development and management of: WPS s Preheat requirements PQR s (when required) Storage (including ovens) and consumables identification Welder, welding operator, and tack welder qualifications and qualification test records in accordance with appropriate AWS 1.12.1 requirements Welder, welding operator, and tack welder performance records to provide objective evidence that the period of effectiveness has not been exceeded and satisfactory performance is consistently achieved. Traceability of welds to the welders who produce them Please submit: one current WPS and PQR (if required) in compliance with the applicable AWS welding Code Effective Date: May 1 2018 Page 3 of 7

one current Welder Performance Qualification Record (WPQR) in compliance with the applicable AWS welding Code Bolt Installation: A documented procedure, including reference to the latest version of the RCSC Specification, including storage, pre-installation 1.12.2 verification, installation, and inspection of fastener assemblies for snug-tightened, pretensioned and slip-critical joint types. 1.12.3 Material Preparation for Application of Coatings 1.12.4 Coating Application 1.12.5 Equipment Maintenance 1.13 Procedure for Inspection and Testing including: 1.13.1 Assignment of QC Inspections and Monitoring 1.13.2 In-Process Inspection 1.13.3 Final Inspection 1.13.4 Inspection Records 1.14 Procedure for Calibration of Inspection, Measuring and Test Equipment 1.15 Procedure for Control of Nonconformances including: 1.15.1 Control of Nonconformance with the Quality Management System 1.15.2 Nonconforming Product and Work 1.16 Procedure for Corrective Action 1.18 Training Records 1.19 Procedure for Internal Audit 3.7.8 4.5.4.1 4.7.8 4.12.2 Additional Submittal Requirements for Bridge and Highway Metal Component Manufacturers Detailing Design Procedure (where component design is provided by the Manufacturer) Additional Submittal Requirements for Steel Bridge Fabricators Personnel a documented procedure for certifying and updating NDT personnel. Detailing a documented procedure for Preparation of Shop Drawings and Erection Drawings Bolt Installation the documented procedure for bolting shall also meet the requirements in Report FHWA-SA-91-031 High-Strength Bolts for Bridges for Rotational Capacity Testing, or of Chapter 15, Part 3, of AREMA Manual for Railway Engineering, as applicable Additional Submittal Requirements for Intermediate Bridge Fabricators 4.I Documentation supporting experience in fabricating plate girder spans with field splices in the last five years OR Effective Date: May 1 2018 Page 4 of 7

4.I.12.6 4.A 4.A 4.A.6 4.A.12.1 4.F 4.F.5.7 4.F.10.1 4.F.11 4.F.12.1 Documented training for the purpose of communicating intermediate bridge work functions to the work forces. A documented procedure for laydown and shop assembly of field connections. Additional Submittal Requirements for Advanced Bridge Fabricators Documentation supporting experience in fabricating Advanced Bridges for highway or railroad applications in the last five years OR Documentation supporting experience fabricating intermediate bridges for highway or railroad use, AND Records of documented training for the purpose of communicating advanced bridge work functions to the work forces, AND Demonstration of capability to fabricate advanced bridges. A documented procedure for laydown and shop assembly of field connections. Construction Document Review and Communication - a documented procedure for communications regarding special fabrication-related requirements for advanced bridges. Welding - a documented procedure for welding that includes a distortion control program Additional Submittal Requirements for the Fracture Critical Endorsement Documentation supporting experience in fabricating Fracture Critical members in accordance with AWS D1.5 in the last five years - OR Records of documented personnel training of Fracture-Critical (FC) work functions per AWS D1.5, clause 12, AND Demonstration of capability to fabricate fracture-critical members. A written fracture control plan (FCP) meeting the requirements in AWS D1.5, Clause 12 that includes provisions for: straightening, curving and cambering tack welds and temporary welds preheat and interpass control fracture-critical consumable requirements postweld thermal treatments Purchasing Data - The written purchasing documents shall identify material to be used for fracture-critical applications. Material Identification: A documented procedure for identification of material and for material traceability that includes provisions for maintaining heat and MTR identity of fracture-critical material throughout the fabrication process. Procedure for fracture-critical welding that includes: PQRs for fracture-critical WPSs Effective Date: May 1 2018 Page 5 of 7

4.F.13 4.F.15.2 4.5.4.1 4.7.8 4.12.2 4.A 4.A.6 4.A.12.1 4.F 4.F.5.7 Fracture-critical provisions for welding procedure qualification, preheat, and storage of consumables. Please submit: one current fracture-critical WPS and PQR, and one current Welder Performance Qualification Record (WPQR) for fracture critical welding Inspection and Testing - a documented procedure that includes provisions for inspection of fracture-critical welds. Nonconforming Product - A documented procedure that includes provisions for critical and noncritical repairs of fracture-critical welds in accordance with AWS D1.5, Clause 12. Additional Submittal Requirements for Fabricators of Hydraulic Steel Structures Personnel a documented procedure for certifying and updating NDT personnel. Detailing a documented procedure for preparation of shop drawings and installation drawings that include: Bills of material that include provisions for the material used in fracture-critical applications, and Shop and installation drawings defining the manner of identifying fracture-critical welds Bolt Installation the documented procedure for bolting shall also meet the requirements of Report FHWA-SA-91-031 High-Strength Bolts for Bridges for Rotational Capacity Testing. Documentation supporting experience in fabricating Hydraulic Steel Structures in the last five years OR Documentation supporting experience fabricating intermediate bridges for highway or railroad use, AND Records of documented training for the purpose of communicating work functions for Hydraulic Steel Structures to the work forces, AND Demonstration of capability to fabricate Hydraulic Steel Structures. Construction Document Review and Communication - a documented procedure for communications regarding special fabrication-related requirements for Hydraulic Steel Structures. Welding - a documented procedure for welding that includes a distortion control program Documentation supporting experience in fabricating Fracture Critical members in accordance with AWS D1.5 in the last five years - OR Records of documented personnel training of Fracture-Critical (FC) work functions per AWS D1.5, clause 12, AND Demonstration of capability to fabricate fracture-critical members. A written fracture control plan (FCP) meeting the requirements of AWS D1.5, Clause 12 that includes provisions for: straightening, curving and cambering tack welds and temporary welds preheat and interpass control Effective Date: May 1 2018 Page 6 of 7

4.F.10.1 4.F.11 4.F.12.1 4.F.13 4.F.15.2 fracture-critical consumable requirements postweld thermal treatments Purchasing Data - The written purchasing documents shall identify material to be used for fracture-critical applications. Base metal requirements shall include, in accordance with the AWS D1.5, Clause 12 : Required toughness requirements Fine-grain practice Prohibition of mill repairs Material Identification: A procedure for identification of material and for material traceability that includes provisions for maintaining heat and MTR identity of fracture-critical material throughout the fabrication process. Procedure for fracture-critical welding that includes: PQRs for fracture-critical WPSs Fracture-critical provisions for welding procedure qualification, preheat, and storage of consumables. Please submit: one current fracture-critical WPS and PQR, and a fracture-critical WPS for repair welding, and one current Welder Performance Qualification Record (WPQR) for fracture critical welding Inspection and Testing - a procedure that includes provisions for: inspection of fracture-critical welds, including repair welds Inspector qualification requirements, including Lead QC and QA Inspectors NDT technicians NDT requirements for various types of welds Nonconforming Product - A documented procedure that includes provisions for critical and noncritical repairs of fracture-critical welds in accordance with AWS D1.5, Clause 12. Checklist to be completed by Management Representative / Certification Contact Date (Print name) (Signature) Effective Date: May 1 2018 Page 7 of 7