PILOT PLANT PRODUCTION OF FERRONICKEL FROM NICKEL OXIDE ORES AND DUSTS IN A DC ARC FURNACE. Abstract

Similar documents
APPLICATION OF HIGH INTENSITY REFRACTORY COOLING SYSTEMS IN PYROMETALLURGICAL VESSEL DESIGN

ESS Smelting Technology Enabling FeNi Smelting from Limonite

HIGHVELD STEEL PROSPECTUS IRON MAKING PLANT 1

Metallurgical Gas Cleaning System Design for Emissions Control and Energy Efficiency

Furnace energy efficiency at Polokwane Smelter

Electric Furnace Off-Gas Cleaning Systems Installation at PT Inco ABSTRACT

Development of EAF Dust Recycling and Melting Technology Using the Coal-based FASTMELT Process

Laboratory Investigations of the Electrical Resistivity of Cokes and Smelting Charge for Optimizing Operation in Large Ferrochrome Furnaces

Dust Recycling System by the Rotary Hearth Furnace

Development of a CaO-CaF 2 -slag system for high rare earth contents

DC arc smelting of silicon: Is it technically feasible?

Valorisation of Mining and Metallurgical Wastes the Example of Bauxite Residues. Prof. Ioannis Paspaliaris. National Technical University of Athens

THE PERFORMANCE OF A RESISTANCE-BASED FURNACE CONTROL SYSTEM ON A SUBl\fERGED-ARC FURNACE

OXYFINES TM TECHNOLOGY FOR THE RE-MELTING OF FINES, DUST AND SLUDGE

EAF DUST TREATMENT FOR HIGH METAL RECOVERY MICHIO NAKAYAMA *

DC ARC FURNACES PAST, PRESENT, AND FUTURE

By-Products from EAF Dust Recycling and Their Valorisation. Vlad POPOVICI

REDUCTION OF CHROMITE FINES IN SOLID STATE USING A MIXTURE OF GASES CONTAINING NATURAL GAS, HYDROGEN AND NITROGEN

STARVED ACID LEACH TECHNOLOGY (SALT) CONCEPTUAL STUDY. InCoR Holdings Plc MINING AND METALLURGY. April 2014 REPORT Rev. 00 > Internal ref.

EAF Technology and process

NEW EAF DUST TREATMENT PROCESS : ESRF MICHIO NAKAYAMA *

GENARAL INTRODUCTION TO METALLURGY :Std: XI-CHEMISTRY

Sidewall design for improved lining life in a PGM smelting furnace

Energy Saving Measures in. Cement Industry

Ilmenite Smelting at Ticor SA

Treatment of lead and zinc slags in hollow electrode DC-EAF

4th Slag Valorisation Symposium, April Conditioning of Lead and Zinc Slags in Pilot Scale SAF for further Utilization

THE MOST ADVANCED POWER SAVING TECHNOLOGY IN EAF INTRODUCTION TO ECOARC

Manufacture of Iron & Steel. Prepared By: John Cawley

Application of CFB (Circulating Fluidized Bed) to Sewage Sludge Incinerator

EFFECT OF CHROME ORE QUALITY ON FERROCHROME PRODUCTION EFFICIENCY

Lecture 17 Alternative Charge Materials in EAF

Lecture 13 Submerged Arc Welding 13.1 Introduction 13.2 Components of SAW System

Silica Fume in Concrete

EAF REFRACTORY PERFORMANCE AT PACIFIC STEEL NEW ZEALAND

Effect of basicity and reductant amount in the nickel pig iron (NPI) production from Indonesian limonite ore in submerged electric arc furnace (SAF)

EVALUATING AC AND DC FURNACE WATER-COOLING SYSTEMS USING CFD ANALYSIS

MANGANESE FUNDAMENTALS MANGANESE ALLOYS PRODUCTION: IMPACT OF CHEMICAL COMPOSITIONS OF RAW MATERIALS ON THE ENERGY AND MATERIALS BALANCE

Outotec Hydrometallurgical Nickel Plants and Processes

Direct reduction of low grade nickel laterite ore to produce ferronickel using isothermal temperature gradient

The history and development of the pyrometallurgical processes at Evraz Highveld Steel & Vanadium

Center for Advanced Sustainable Iron & Steel Making

Development of Technology for Advanced Utilization of Hydrogen from By-product Gas of Steelmaking Process

5072 CHEMISTRY (NEW PAPERS WITH SPA) TOPIC 9: METALS 5067 CHEMISTRY (NEW PAPERS WITH PRACTICAL EXAM) TOPIC 9: METALS

The HIsarna Ironmaking Process

Welding Processes. Consumable Electrode. Non-Consumable Electrode. High Energy Beam. Fusion Welding Processes. SMAW Shielded Metal Arc Welding

Contribution of Waste to Energy Technology to Global Warming

High-Carbon DRI: the feeding material to improve performances and decrease

Hamm MW Pyrolysis Plant. Integrated Pyrolysis into Power Plant Plant capacity 100,000 t/a Pre-processed Waste Materials

Twinjection Technology Improves Hot Metal Desulphurisation at Corus Scunthorpe Works

ENERGY ANALYSIS OF THE STEEL MAKING INDUSTRY

EXCELLENT NICKEL LEACHING TESTWORK RESULTS

THE DANIELI DANARC PLUS M 2 FURNACE AT ABS MELTSHOP

RAW MATERIALS AND IRONMAKING. Raw materials improvement in the steel industry

Direct Nickel Process Breakthrough Technology. May 2015

Parameters Affecting the Production of High Carbon Ferromanganese in Closed Submerged Arc Furnace

Energy consumption, waste heat utilisation and pollution control in ferro alloy industry

MA ADEN MAGNESITE PROJECT

by WS Steinberg Supervisor: PC Pistorius

Pelletizing technologies for iron ore

MINERAL ADMIXTURES IN CONCRETE

TOWARDS SUSTAINABLE DEVELOPMENT

ADDITION OF RENEWABLE CARBON TO LIQUID STEEL: PLANT TRIALS AT ONESTEEL SYDNEY STEEL MILL

CHAPTER-6: SUMMARY AND CONCLUSIONS

Discussion of the Environmental Impacts of the Solwara 1 Copper Concentration and Smelting Processes

CFD MODELLING OF THE STEEL BELT SINTERING PROCESS

Ilmenite Pellet Production and use at TiZir

Bin Level Indication Applications in Cement Production and Concrete Batching Plants

Carlos Ruiz de Veye. Total recovery of Spent Pot Liner (SPL) using the Befesa process

Realizing a state of the art All Indian Pellet plant by MECON. MECON LIMITED A House of Engineering Excellence

Introduction. 1. MIDREX R process

The effect of magnesia and alumina crucible wear on the smelting characteristics of titaniferous magnetite

Manganese concentrate usage in steelmaking

Waste Acid Recycling Technology by Slag

POLYCOM high-pressure grinding roll.

Chapter 2 Electric Arc Furnace as Thermoenergetical Unit

Fused Magnesia Trends. Global Outlook. Asım Bilge MagForum 2016, Vienna Kümaş Manyezit San. A.Ş.

Installation of Praxair s CoJet Gas Injection System at Sumikin Steel and other EAFs with Hot Metal Charges

EAF Steelmaking in North America An Overview

An Assessment of the Greenhouse Gas Consequences the Proposed Batchelor Magnesium Project

POLLUTION CONTROL IN RECYCLING INDUSTRY

OUTOTEC ROASTING SOLUTIONS

The benefit of separate milling of silicate and chromite particles for chromite-rich UG-2 ores

Melting of platinum group metal concentrates in South Africa

RECYCLING PRACTICES OF SPENT MgO-C REFRACTORIES

Radiochemistry Group of the Royal Society of Chemistry. The Nuclear Fuel Cycle

Effects of Cement Type and Fly Ash on the Sulfate Attack Using ASTM C 1012

Problems and Prospects of Halogen Element Contained Dust Treatment in Recycling

Coupling gasification and metallurgical applications

Direct Nickel Process Breakthrough Technology

GRADE 10: Chemistry 2. UNIT 10AC.2 11 hours. The chemical industry. Resources. About this unit. Previous learning. Expectations

IRISH CEMENT PLATIN INVESTING IN OUR FUTURE

Analysis for Graphite Electrode Unit Consumption in Manufacture System and Use System of Steelmaking EAF

WRAP MDD018/23 WEEE separation techniques Delft University of Technology Kinetic Gravity Separator trial report

On-Line Monitoring of Carbon in Fly Ash for Boiler Control

PROCESSING OF MANGANESE FURNACE DUST: DRYING AND ZINC OXIDE REDUCTION

Copper Cliff Nickel Refinery Complex

FINITE ELEMENT MODELLING OF ELECTRIC CURRENTS IN AC SUBMERGED ARC FURNACES

GMAW (MIG) / FCAW / MCAW

EAF burdening How can EAF burdening best utilise DRI? Rutger Gyllenram Kobolde & Partners

Transcription:

PILOT PLANT PRODUCTION OF FERRONICKEL FROM NICKEL OXIDE ORES AND DUSTS IN A DC ARC FURNACE I.J Kotzé (Pyrometallurgy Division, Mintek, South Africa) E-mail for correspondence: isabelk@mintek.co.za Abstract Laterites and other oxidized nickel ores constitute a very important part of world-wide nickel reserves. The development of nickel oxide ore smelting has drawn heavily on iron and steel metallurgy. In ferronickel production, the nickel oxide and part of the iron oxide are reduced to metal in an electric furnace to form immiscible layers of slag and metal. The crude ferronickel is tapped from the furnace and refined to saleable ferronickel by conventional techniques. Because of the high moisture content (free and chemically bound water) and because water requires so much energy to evaporate and heat up, it is clear that dehydration is required before smelting the ore in an electric furnace. Due to the physical properties of the ores, a large fraction of fines is generated during the pre-treatment stages. In the conventional production of ferronickel from these ores, much fine material is produced which cannot readily be accommodated directly in existing three-electrode or six-in-line AC furnaces. DC-arc furnace technology allows ore particles less than 1 mm in size to be treated directly thereby improving the overall recovery of nickel without the need for expensive agglomeration techniques. Keywords: Pyrometallurgy, Reduction, Oxide ores, Introduction Nickel laterites and other nickel oxide ores constitute a very important part of world reserves of nickel. Oxidic ores of nickel are primarily a product of a chemical concentration process that occurs as a result of lateritic weathering of magnesium iron silicate rock. The type of weathering which dissolves silica and metallic elements from rock to produce limonitic and silicate nickel ores, occurs most frequently in tropical climates with high rainfall and where decomposing vegetation provide organic acids and carbon dioxide in the groundwater. Nickel laterite ores have high moisture contents (typically up to 40%) as well as chemically bonded water in the hydroxide form. Dehydration as a minimum, and some pre-reduction of the ore in a rotary kiln is used to optimize the utilization of electric energy for smelting operations in the conventional submerged-arc furnace process. During the dehydration of the ore, a large fraction of fines is generated. Dust generated during the pretreatment phases (screening, drying and calcining) is unsuitable for smelting in a conventional electric-arc furnace. Utilizing the fines generated involves agglomeration of the dust at considerable expense to the process economics. Dusty materials can be treated directly in a direct-current (DC) arc furnace, without the adverse process problems associated with feeding dust to conventional electric-arc furnaces. Processing lateritic ores using the DC arc furnace process resolves the dust issues, thereby improving the overall recovery of nickel without the need for expensive agglomeration techniques. The chemical and metallurgical diversity of laterite deposits adds to the difficulty of processing the material. Conventional electric-furnace smelting usually operates with a covered or partially covered bath and operation of the furnace is generally limited by the SiO 2 /MgO ratio or iron content. Operation in the conventional electric furnace generally requires a SiO 2 /MgO ratio not greater than 2 and an iron content of not more than 20% to limit slag foaming and operational instability leading to decreased power and production levels. DC-arc ferronickel process development Mintek has been working on the production of unrefined ferronickel from nickel-containing lateritic ores and dust in DC-arc furnaces since 1993. The development and various advantages of the DC-arc furnace technology developed at Mintek has previously been described in detail (Jones et al, 1993 and Lagendijk et al, 1994). In essence, nickel-containing lateritic material, together with a carbonaceous

reducing agent is fed onto the uncovered molten bath of a typical DC-arc furnace. The feed material is preferably pre-treated i.e. dehydrated (drying and calcining) with optional pre-reduction options effecting the optimisation of electrical energy requirements. Small to medium scale testwork, up to a power level of 750kW has been well described previously (Lagendijk et al, 1997). However, since 1997, additional testwork demonstrating the flexibility of the DC-arc ferronickel process was conducted. The aim of this paper is to summarise results from the latest testwork completed at Mintek. Furnace Configuration The DC-arc furnace essentially consists of a cylindrical refractory-lined vessel with water-cooled sidewalls and roof. The refractory lined roof locates the electrode via a single entry port with a dust seal. The electrode is connected to the cathode via a water-cooled clamp connection. The electrode and clamp forms part of a moveable electrode arm. The mechanical arm is electrically isolated from the cathode connection (electrode and clamp) and is used to control the current and voltage ratio by adjusting the arc length i.e. moving the arm up or down. The single graphite electrode (cathode) is positioned above the molten bath, and a multiple-pin anode located in the hearth essentially completes the circuit. The plasma arc forms a conducting path between the graphite cathode and the molten bath. The standard multiple-pin anode design utilised for testwork at Mintek, comprises of multiple steel rods embedded into the hearth refractories. The rods are connected to a steel plate installed in the hearth in contact with the molten bath by means of the pins. The steel plate is connected to the anode bus bars, via radially extended arms to complete the electrical circuit. The furnace is fed through feed ports located in the roof. The feed materials, pre-treated ore and reductant, are fed to the furnace using standard weigh feeder technology and control strategies. Energy and feed ratios are controlled to adhere to specific target temperature for slag and alloy and operational parameters. The gas-cleaning system consists of a water-cooled off-gas pipe, a refractory-lined combustion chamber, water-cooled ducting, a forced-draft gas cooler, a reverse-pulse bag filter, a fan, and a stack. In general approximately 1 to 3% dust and fines could be carried over through the off-gas system depending on the configuration of feed and extraction system. Any dust and fume accumulates in the lower conical section of the bag plant, and is collected and weighed to estimate the dust carry-over. The dust would be recycled back to the furnace in an industrial application. Figure 1: General Testwork DC Arc Furnace Layout

Furnace operation Operating conditions for each test campaign were designed to evaluate the specific feed material with a view to future commercial applications of the DC-arc ferronickel process. The following parameters were evaluated to compare the different test results:! Furnace size (OD) and maximum power (kw)! SiO 2 /MgO ratio of calcined feed material, overall average analyses of test material! Average slag temperatures as measured with optical pyrometers! Nickel losses to slag (assuming that dust losses will be recycled to furnace)! Alloy grade (average alloy grade produced), % nickel in crude ferronickel! Feedrate, energy requirement, carbon addition, average operating voltage The flexible operation of a DC-arc furnace (specifically, the lower dependence on electrical properties of the slag, because of open-arc operation, and the ability to run at an optimum slag temperature, due to the open-bath mode of operation) allowed for the successful treatment of ores with varying SiO 2 /MgO ratios and nickel and iron content. A frozen lining can be maintained between the molten bath and the refractory lining, in order to assist with vessel integrity. Results of furnace testwork at power levels up to 2MW are presented. Experimental results Results for the following testwork campaigns were used. For the larger scale testwork more than one condition of operation was identified as separate test conditions (data samples) in the overall comparison. All feed materials were pre-treated (dehydrated) and the degree of calcination indicated as residual or post-calcination loss on ignition (% LOI).! Test campaign 1: 1m diameter furnace (total calcine processed = 3.3t)! Test campaign 2: 2.5m diameter furnace (total calcine processed = 120t)! Test campaign 3: 2.5m diameter furnace (total calcine processed =183t) Figure 2: Relative Furnace Dimension and Feed Material Processed in the Tests Table 1 and Table 2 show the average operating conditions and general feed material properties for the test campaigns. The feed materials, reductant and calcine, were passed through one or more feed ports in the respective furnace roofs, into the reaction zone. Liquid products, slag and alloy, were tapped intermittently from the furnace, and, in general, nickel extraction from slag exceeded 95%.

Table 1: Test data from Test 1 and Test 2 TEST 1 TEST 2 TEST 2 TEST 2 TEST 2 Overall Overall Period 1 Period 2 Period 3 Furnace OD m 1 m 2.5 m 2.5 m 2.5 m 2.5 m Total Calcine Fed t 3.3 t 120 t 2.2 t 16 t 24 t Slag tapped t 2.3 t 100 t - - - Pre-treatment LOI 2% 40% -1mm 99% - LOI 8% 99% - LOI <0.5% 90% - LOI 8% 90% - LOI 8% 90% - Nickel oxide ore SiO 2 /MgO 1.27 1.55 1.55 1.55 1.55 Avg. nickel in feed % 1.79 2.36 2.36 2.36 2.36 Avg. iron in feed % 11.3 13.0 13.0 13.0 13.0 Reductant type Coal Coal Coal Coal Coal Fixed carbon % 57 57 57 57 57 Volatile % 26 26 26 26 26 Ash % 15 15 15 15 15 Moisture % 2 2 2 2 2 Furnace Operation Avg. slag temperature C 1700 1680 1680 1660 1660 Avg. nickel grade % 25 33 32 32 32 Avg. nickel to slag * % 0.07 0.19 0.09 0.15 0.14 Ni extraction from slag % 98 95 97 95 95 Average feedrate 120 kg/h - 1.0 t/h 1.0 t/h 1.0 t/h Reductant addition 60 kg/t 50 kg/t 50 kg/t 60 kg/t 54 kg/t Avg. feed intensity 280 kg/h.m 2 340 kg/h.m 2 340 kg/h.m 2 320 kg/h.m 2 320 kg/h.m 2 Operating power kw 175 1000 1000 1300 1300 Average voltage V 110 300 300 300 300 Specific energy ** 795 kwh/t - 750 kwh/t 970 kwh/t 910 kwh/t Test 1: As part of an economic feasibility study, 3.3 metric tons of calcined lateritic ore was fed to a 1m OD DC-arc furnace. A high fraction of the ore body, when treated consisted of a fine, dusty material. The objective of the smelting campaign was to illustrate the ferronickel from laterite process via the DC-arc furnace for the specific ore and achieve an average ferronickel alloy grade of 25% nickel. The calcined ore was processed in a DC-arc furnace, without operational problems, over a period of 32 hours. The overall nickel recovery to the alloy was 98% and the residual nickel in the slag was less than 0.07 percent by mass. Test 2: The testwork was completed over a period of 7 days. Approximately 120 metric tons of calcine (rotary kiln product and dust) was processed together with 5.7 tons of South African bituminous coal. The * Residual nickel in discard slag, nickel losses Recovery of Ni or extraction from slag [mass of Ni in feed mass of Ni in slag]/[mass of Ni in feed] Target calcine feedrate to furnace kg reductant per ton calcine, reductant addition to furnace ** Specific energy requirement for smelting, kwh per ton calcine

testwork was conducted to demonstrate operational stability for the specific feed material and extract scale-up parameters required for commercial applications. The overall average residual nickel in slag and average nickel recovery for the test campaign was 0.19 percent nickel and 93.4%, respectively. Pre-treatment included calcining the ore off-site in a rotary kiln. The material was not completely calcined; approximately 8% residual water (based on Loss on Ignition values or LOI=8%) remained. A batch of the same feed material, approximately 2.5 metric tons, was re-calcined to LOI values of less than 0.5% and processed during the testwork in a separate condition (Table 1, Test 2, Period 1). The data collected for this period is given as a separate condition within the overall testwork. Nickel recovery for the period was 97%, compared to the overall recovery of 95%. The residual nickel in slag was less than 0.09 percent nickel, compared to the overall average of 0.19 percent nickel. The three conditions during the test campaign are presented as separate periods of operation. The results are presented in Table 1 together with the overall results for the testwork. Operation and feed material conditions shape the operation of the furnace. Stable operation of the furnace and effective control of variables, model theoretical projections well. Processing of the highly calcined feed (LOI of less than 0.5 percent) improved the stability of operation and recoveries significantly. During this period, the specific energy requirement for smelting was 750kWh/t calcine, which agreed well with predicted theoretical energy requirement. Table 2: Test data from Test 3 TEST 3 TEST 3 TEST 3 TEST 3 Overall Period 1 Period 2 Period 3 Furnace OD M 2.5 m 2.5 m 2.5 m 2.5 m Total calcine fed T 182 t 12 t 49 t 18 t S1ag tapped T 149 t 9 t 41 t 16 t Pre-treatment 99%- 99%- 99%- 99%- Feed Materials SiO 2 /MgO 1.28 1.28 1.30 1.25 Avg. nickel in feed % 2.22 2.15 2.25 2.18 Avg. iron in feed % 14.9 15.5 13.4 16.0 Reductant type Coal Coal Coal Coal Fixed carbon % 59 59 59 59 Volatile % 24 24 24 24 Ash % 14 14 14 14 Moisture % 3 3 3 3 Furnace Operation Avg. slag temperature C 1690 1710 1690 1710 Avg. alloy grade % 24 20 25 20 Avg. nickel to slag % 0.13 0.09 0.12 0.11 Ni extraction from slag % 95 97 96 96 Avg. feedrate - 1.0 t/h 1.5 t/h 1.75 t/h Reductant addition 67 kg/t 71 kg/t 67 kg/t 65 kg/t Feedrate intensity - 350 kg/h.m 2 530 kg/h.m 2 610 kg/h.m 2 Operating power kw - 1200 1500 1800 Average voltage V - 350 350 350 Specific energy 795 kwh/t 815 kwh/t 795 kwh/t 810 kwh/t

Test 3: A 10-day demonstration-scale DC-arc furnace campaign was conducted to demonstrate production of a 25% ferronickel grade at smelting rates of 350kg/h.m 2 to 610kg /h.m 2 while achieving consistent recoveries of nickel. During the test campaign, a total of 183 metric tons of pre-treated calcine was fed to the furnace. The average nickel content of the feed material was 2.2 % by mass. The feed material was calcined in a rotary kiln prior to the test campaign to achieve average LOI values of 1.6%. The overall nickel recovery was more than 95% with periods during the campaign as high as 97%. The average residual nickel in the slag was 0.13 percent nickel with values below 0.10 achieved for significant periods during operation. The average alloy grade produced during the campaign was 24% nickel and 75% iron, approximately 14 tons of metal was tapped. The average reductant addition, as coal, was 67 kg per ton calcine (as carbon: 39.5 kg per ton calcine). The demonstration-campaign processed the feed materials at high smelting intensities whilst also achieving the required recovery of nickel to alloy. Graphite electrode consumption, energy flux and electrical properties of the slag were investigated for scale-up purposes. Figure 3: Photographs of Installation and Operation of Test Furnaces at Mintek s Pilot Plant Conclusions Mintek has been working on the production of unrefined ferronickel from nickel-containing laterite in DC-arc furnaces since 1993. In this process, lateritic material is fed, together with a carbonaceous reducing agent, to the central region of the molten bath of a cylindrical DC-arc furnace. During the late nineties larger scale tests were conducted and as during previous testwork the DC-arc furnace technology was successfully applied to the production of ferronickel from laterite ores and dusts. With the additional tests, primarily on larger scale DC furnaces the next generation of results confirmed all the previous results and highlighted previous claims of high levels of recovery, flexibility and intensity achievable in the DC furnace. The latest pilot plant testwork at Mintek demonstrated that lateritic feed of a wide compositional range can be smelted effectively to produce a wide range of ferronickel grades while still achieving excellent extraction of nickel from slag (i.e. residual nickel in consistently less than 0.2%). Large-scale

confirmed results from previous small scale testwork, and showed that feeding material at high intensities has no adverse effect on operational stability. DC-arc furnace technology provides an alternative process option with considerable flexibility and advantages in the treatment of nickel oxide ores, without the limitations usually associated with conventional electric-furnace smelting. Acknowledgments This paper is published with the permission of Mintek. Thanks is due to colleagues for their contributions and suggestions, and all the shift teams who operated the DC-arc furnaces on the different projects. References Jones R.T., Barcza N.A., and Curr T.R., Plasma Developments in Africa, Second International Plasma Symposium: World progress in plasma applications, EPRI (Electric Power Research Institute) CMP (Center for Materials Production), Palo Alto, California, 9-11 February 1993. Lagendijk H., Schoukens A.F.S., Smith P., and Blom P.W.E., The production of ferronickel from nickel-containing laterite, South African Patent, ZA 94/6071, 12 August 1994. Lagendijk H., Jones R.T., Production of ferronickel from nickel laterites in a DC-arc furnace, Nickel- Cobalt 97, 36 th Annual Conference of Metallurgists, Sudbury, Canada, 17-20 August 1997.