Engineering Consultancy Services Punjab (Pvt.) Limited Work Experience

Similar documents
LIST OF BRANCHES TO REMAIN OPENED ON SATURDAYS SR # BRANCH NAME BRANCH CODE

ARSENIC CONTAMINATION OF GROUNDWATER AND ITS MITIGATION IN THE PROVINCE OF PUNJAB (PAKISTAN) IN THE LIGHT OF THE SITUATION IN SOUTH ASIA

Proposal for Cash on Delivery Services For Online Merchants Submitted to Hassan

CROP BULLETIN CONTENT

Research Output in Natural Sciences and Agriculture during 2010 ( ***revised 9/12/2011) University Name

GOVERNMENT OF THE PUNJAB MTDF DEVELOPMENT PROGRAMME

Pre-Feasibility Study. (Injection Molding Plastic Products)

Flood Related Activities:

153(4) (ORDER TO GRANT / REFUSE REDUCED RATE OF WITHHOLDING ON SUPPLIES / SERVICES / CONTRACTS) (FOR PARTIES ADDITION)

COMMUNITY PARTICIPATION IN DEVELOPMENT, OPERATION AND MAINTENANCE OF WATER SUPPLY AND SEWERAGE SERVICES

Water and Sanitation Situation in Pakistan

ISSUES & FUTURE PROSPECTS

Prefeasibility Wise List of Experts/ Consultants / Institutions from Private Sector

ANNEX 11 WATER SUPPLY, SANITATION AND SOLID WASTE MANAGEMENT

EIC Climate Change Technology Conference 2013

Crape silk embroidered shirt with diamante and pearls GP01

INFRASTRUCTURE PROJECTS IN PIPELINE

PAKISTAN STANDARDS AND QUALITY CONTROL AUTHORITY

CHAIRMAN S MESSAGE AT A GALANCE OUR TRADEMARK

EMPLOYMENT STRATEGY AND EQUITABLE GROWTH: A SOCIAL CAPITAL PERSPECTIVE FOR KPK

CHAIRMAN S MESSAGE AT A GALANCE OUR TRADEMARK

Quaid-e-azam solar park

SANGUINE TECHNO - COMMERCIAL SOLUTIONS

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name

Lahore Garment City Company A Project of the Ministry of Textile Industry Government of Pakistan 132 P, Gulberg II, Lahore Phone: Fax:

List of Allied Bank Branches Open on Saturday

PRE-FEASIBILITY REPORT

Pakistan Development Forum. Presentation by

ECER Secretariat. Level 22, Menara 3, Kuala Lumpur City Centre, Kuala Lumpur. Tel : / 22 Fax :

LIST OF SOME MAJOR PROJECTS

PAKISTAN RAIN/FLOOD 2011

List of Branches Authorized for Same Day Clearing (Annexure - I) Sr. # Branch Code Branch Name City Name Branch Address

Post Crisis Needs Assessment (PCNA)

CORPORATE QUALITY MANUAL ISO 9001:2008 INTRODUCTION

Workshop on enabling Inclusive Cities ADB 29 October PAKISTAN: Karachi Mass-Transit Project (KMTP)

MUHAMMAD ASHFAQ, JAVARIA NASIR, ASAD NASEER, TAYYABA HINA, IRFAN AHMAD BAIG, ASIF NAQVI & ASHFAQ AHMAD

The principal Investment Promotion Agency of the province of Sindh to facilitate Foreign & Local Businesses

DEMAND FOR DISTRIBUTED RENEWABLE ENERGY GENERATION IN PAKISTAN

Design-Build Capital Infrastructure Project

The Effect of Developing the Health Centers at Small Towns on the Economy of the Country: A case Study of District Muzaffargarh

Study of Arsenic Concentration Levels in Pakistani Drinking Water

SITE IDENTIFICATION REPORT

Rainwater Management. Dr. Iftikhar Ahmad. College of Earth and. University of The Punjab Lahore

Careers List Professional Careers in Construction

IVCC ENGINEERING (PVT) LTD. SUMMARY OF CIVIL WORKS COMPLETED

Measuring Water Poverty Index in Urban Areas of Punjab

FIELD BASED ASSESSMENT OF RICE BACTERIAL LEAF BLIGHT IN MAJOR RICE GROWING ZONES OF PAKISTAN

XI. Thornton Planning Area

Component-Sharing: Up-Scaling Demand-Responsive Approaches in Rural Water Supply and Sanitation Sector in Pakistan

Khyber International (Communication and IT division)

Niagara s Transportation Strategy 1. Introduction:

2059 PAKISTAN STUDIES

NATIONAL SANITATION POLICY

Pakistan: Monsoon Floods

SECURED LAND RIGHTS, HOUSEHOLD WELFARE AND AGRICULTURAL PRODUCTIVITY: EVIDENCE FROM RURAL PAKISTAN

Lower San Joaquin River Feasibility Study PLAN FORMULATION ADDENDUM

Appendix VII Bank Wise ATMs Locations As on 31st December 2008

EMPLOYMENT RESEARCH BRIEF EMPLOYMENT IMPACT OF INFRASTRUCTURE INVESTMENTS IN MOROCCO

Quality Workmanship. Safely. On Time. Within Budget.

GOVERNMENT OF THE PUNJAB MTDF VOL-I DEVELOPMENT PROGRAMME

Pakistan International Freight Forwarders Association (PIFFA ) Country report

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

PROJECT PROPOSAL. Drinking Water Supply Project for village Ganderi Ditt Charsadda KP. Submitted to: Association for Development of Pakistan

Project Type: Drainage and Storm Systems

Nova Scotia Lands Inc. Crown Corporation Province of Nova Scotia Business Plan

Pakistarn Sustainable Transport Project (PAKSTRAN) Annual Review Report January December 2012

Lessons [being] learnt 2016 Flood in Cedar Rapids. Sandy Pumphrey Project Engineer II Flood Mitigation

Federal Gas Tax Reporting Data Requirements 2017 Annual Expenditure Report

The Development of a Master Plan for Public Transport: The Riyadh Example

CDM in Urban Railway Sector and JICA s Cooperation

PAKISTAN RAIN/FLOOD 2011

Pre-Feasibility Study-Guava Pulping & Squash Making Unit

5.3 Flood Protection Plan

PRECAST CEMENT PRODUCTS

Summary of Preparatory Study

AN OVERVIEW OF FORESTS IN PAKISTAN

International Bank for Reconstruction and Development International Development Association

THERMAL AND NUCLEAR POWER

Alberta Transportation Gas Tax Fund and Public Transit Fund Outcomes Report December 2009

Name of the Bank Address City Alpha Numeric Branch ID on Eid-ul-Fitr 2017 Al Baraka Bank Ltd East Circular Road,Fawara Chowk D.I.

Prospectives and Limits of Groundwater Use in Pakistan

Factors Affecting Cotton Production in Pakistan: Empirical Evidence from Multan District

Challenges of Sustainable Infrastructure AAEES UCI

Pre-Feasibility Study

Developing Infrastructure in Bihar

FY CAPITAL IMPROVEMENT PROGRAM MID-YEAR STATUS REPORT

WATER AND ENERGY INPUTS FOR WHEAT PRODUCTION UNDER PERMANENT RAISED BEDS

APPENDIX VIII. Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

Delhi Mumbai Industrial Corridor (DMIC) Project

BACKGROUND INFORMATION DEVELOPMENT COST CHARGE BYLAW REVIEW & UPDATE

Study on performance evaluation of. sustainability

Pre-Feasibility Study

Circular No. 10/2013/TT-BXD of July 25, 2013, on construction quality management THE MINISTRY OF CONSTRUCTION

PROJECT FEASIBILITY REPORT

Three Gorges Project. A Project with Tremendous Benefits and in Favour of Environmental Improvement. By Cao Guangjing May 22, 2004

PROPOSED STORMWATER PROJECT IMPLEMENTATION PLAN. o Execution of New and Expanded Flood Control Projects o Program Options

We re going to look at why earlier consideration is better.

PAKISTAN POWER SECTOR. A Profile & Opportunities

FLOOD EMERGENCY RECONSTRUCTION AND RESILIENCE PROJECT TABLE OF CONTENTS

Transportation demand management: a case study of Ahmedabad city

Transcription:

1 Clean Drinking Water Program HUD & PHE Construction 2 Activated Sludge Waste Disposal Plant HUD & PHE Not Applicable Study 3 Construction of Metro Bus Service (MBS) along Ferozpur Road (Package I) (Chungi Amar Sidhu to Kalma Chowk) TEPA, LDA 4112.54 Construction 4 Construction of 4 Nos. Medical Colleges in Gujranwala, DG Khan, Sahiwal & Sialkot C&W Deptt., Govt of 810, 810, 810, 650 Construction 5 Third Party Validation of roadside railing along canal bank, Lahore. C&W Deptt., Govt of Third Party Validation 6 Construction of Widening of Road from Ferozpur Road to Defence Road along Hadiara Drain City District Government Lahore 279 Vetting of Design & Construction 7 Consultancy Services for Design and Construction of Dual Carriageway Approach Road from Barki Road to Ashiana Housing Scheme, Lahore City District Government Lahore 241 Design & Construction 8 Feasibility studies for Development of Car Parking Facilities at General Bus Stand, Lower Topa and Bansara Gali, Murree C&W Deptt., Govt of 1040 Approx. Feasibility Studies 9 Construction of Churr Chowk Improvement and Misrial Bridge Extension, Rawalpindi C&W Deptt., Govt of 320 Construction 10 Consultancy Services for Design & Construction of Road Along Khaira Distributary from Package 17 of Lahore Ring Road to Ferozpur Road, Lahore Lahore Ring Road Authority 424.7 Design & Construction 11 Consultancy Services for Construction of Commercial Cum Car Parking Plaza at Moon Market, Allama Iqbal Town, Lahore TEPA, LDA 607.691 Construction 12 Consultancy Services for Third Party Validation / Top of District Development Schemes in Sheikhupura City District Government Sheikhupura 1133.7 Third Party Validation 13 Design of Remedial Measures for Dewal Landslides and Reconstruction of RMK Road Murree C&W Deptt., Govt of PC-ll cost 20.722 Design 14 Consultancy Services for Re-Engineering / Re-alignment of Underpass including ancillary components at Jail Road and Design Review of 9 No. Junctions planned/designed by TEPA TEPA, LDA 4.5 Design

15 Strengthening/reinforcement of foundation of five bridges, Provincial Highway Circle, Rawalpindi C&W Deptt., Govt of Proposal Stage Design 16 Consruction Services for Construction of Sports Complex on Plot # 455 D2 to 466 D2, Johar Town, Lahore TEPA, LDA 75.056 Construction 17 Construction Services on Construction of Hockey Stadium at Johar Town, Lahore TEPA, LDA 46 Construction 18 Construction Services on Rehabilitation / Imprevement of PECO Road (PECO Round About to Lahore Bridge, Ferozpur Road), Lahore TEPA, LDA 134.5 Construction 19 Consultancy Services for Third Party Validation of Steel Silos at Multan Food Department, Govt of Third Party Validation 20 Construction of Metro Bus Service (MBS) along Ferozpur Road (Package 2A & 2B), Lahore TEPA, LDA 2A=499.80 2B=4285.65 Construction 21 Construction of Metro Bus Service (MBS) along Ferozpur Road (Package VII) TEPA, LDA 859.26 Construction 22 Improvement / Widening of Sultan Ahmad Road from Naqsha Stop Wahdat Road to Malik Chowk, PP-148 City District Government Lahore 72 Design Review & Construction 23 Construction of Metro Bus Service (MBS) along Ferozpur Road (Package III & IV) TEPA, LDA lll=4002.26 lv=3026.37 Construction 24 Construction of Roads Network at Finance & Trade Centre, Johar Town, Lahore TEPA, LDA 330 Construction 25 Establishment of Fruit & Vegetable Market, Katcha, Lahore Administrator, Market Committee, Kot Lakhpat, Lahore 1039.49 Prepration of PC-l, Detailed Design of Road & WASA Componants, Resident 26 III Party audit of desilting work already done and III party monitoring of current desilting work of drains & sewers of WASA WASA Not Applicable Third Party Validation 27 III Party monitoring & validation of desilting work during rainy season in Lahore Lahore Waste Management Company Not Applicable Third Party Validation 28 Planning, Design & Construction of Ashiana-e-Iqbal, Lahore PLDC 16.2 Billion Design & Construction 29 Design & Construction supervision of Parking Plaza, Gujranwala CDG, Gujranwala 489.455 Design & Construction

30 Construction of Metro Bus Service (MBS) along Ferozpur Road (Package V) TEPA, LDA 2142.94 Construction 31 Construction of Metro Bus Service (MBS) along Ferozpur Road (Package VIII) TEPA, LDA 1737.62 Construction 32 Designing of Bridge over Haria Drain on Mandi Bahauddin-Malikwaal Road C&W Deptt., Govt of Not Applicable Design 33 Topographic Survey of Miani Sahib Graveyard CDG, Lahore 0.176 Survey Consultancy 34 Safety Assessment of Existing Shoring System & Design of Rehabilitation Measures at Mubarak Centre, Ferozpur Road, Lahore Taavun (Pvt) Limited 3.99 Design 35 Muhammad Nawaz Sharif Kidney Hospital, Swat, KPK Health Department, GOPB 230 Design & Construction 36 Design of Bridges on Buddi Nala & Huda Drain, Sargodha C&W Deptt., Govt of Not Applicable Design 37 Improvement / Rehabilitation of Circular Road, Lahore CDG, Lahore 3.84 Design 38 Construction of Flyover at Peshawar Road, Near Pirwdahi, Rawalpindi C&W Deptt., Govt of 1076.927 Construction 39 Widening & Improvement of Road from Bahawalpur Bypass to Chungi # 9 (Length 5.21 km) AND Multan City Section # 9 Khanewal Adda (Length 1.21 km Phase 1) C&W Deptt., Govt of 148.36 Construction 40 W/I Tibba Sultan Laddan Road via Mitroo km No. 9.39 to 43.40 & 44.80 to 65.25=54.50 km in Distt. Vehar C&W Deptt., Govt of 212.34 Construction 41 Dualization of Arifwala to Bahawalnagar Road (Length 16.93 km) C&W Deptt., Govt of 10.045 Construction 42 Dualization of different packages/groups (G- 1 to G-5) between Bahawalpur to Hasilpur (Length 11.92 km) C&W Deptt., Govt of 757.72 Construction 43 Widening & Improvement of road from Chishtian to Daharanwala - Fort Abbas Road (Length 20 km) C&W Deptt., Govt of 242.55 Construction 44 Widening & Improvement of Alipur to Muzaffargarh Road, Section Alipur Shehar Sultan) (Length 21 kms) C&W Deptt., Govt of 854.91 Construction

45 Widening & Improvement of road from Qaziabad MM Road to Nawakot Length 33.07 km (G-II from 17 km to 33 km) C&W Deptt., Govt of 239.64 Construction 46 Widening & Improvement of Kalarkahar to Choa Saidan Shah Road (Length 30.50 kms) C&W Deptt., Govt of 612 Construction 47 Rehabilitation of Gujranwala - Hafizabad Road (Length 41.80 kms) C&W Deptt., Govt of 1721.78 Construction 48 III Party Monitoring & Evaluation of Implementation of M&R Works F.Y 2012-15 Irrigation Deprtment 10 Billion Third Party Validation 49 MBS Bus Depot TEPA, LDA 1026.19 Construction 50 Detailed Design of Construction of Flyover on GT Road, Gujranwala C&W Deptt., Govt of 4170.36 Survey & Mapping Geo tech investigation 51 Verticle Expansion of TEPA Head Office Building, Lahore TEPA, LDA Construction 52 Resident for the Traffic Circulation plan at Lalpul intersection through widening and improvement of Canal Bank Road TEPA, LDA 56.345 Construction 53 Construction of Road & Bridge (Length 900 RFT) Between District Mianwali and Jand (District Attock), Length of Approach Road on Attock Side = 5.0 KM C&W Deptt., Govt of 500 Construction 54 Resident of Construction of Flyover on G.T Road, Gujranwala C&W Deptt., Govt of 3618.5 Construction 55 MBS along Ferozpur Road Lahore(Kalma Chowk Vehicals Underpass) TEPA, LDA 1400 Construction 56 Construction of Esclators and PSD works at Bus Rapid Transit System (BRTS) along Ferozpur Road Lahore TEPA, LDA 3034.31 Construction 57 Construction of Road Between District Mianwali and Jand (District Attock), Length of Approach Road on Mianwali Side = 26.5 KM C&W Deptt., Govt of 806 Construction 58 Construction of Rehabilitation/Improvement of M.M.Alam Road (From Hussain Chowk to Main Bouleverd Gulberg Lahore) TEPA, LDA 230 Construction 59 Widening & Improvement of Metalled Road from Rawalpindi to Kahuta, Rawalpindi District (Length 15.26 km) C&W Deptt., Govt of 425 Construction

60 Construction of Road E-Block to Doctors Hospital, Southern By pass along Khamba, (Flower Shop) to campus canal, al-madina Road from Barket Chowk TEPA, LDA 133, 110, 90, 161 Construction 61 Establishment of Institute of Urology & Transplatation at Rawalpindi C&W Deptt., Govt of 700 Design of Electrical System & Construction 62 Third Party Validation of Sewerage Scheme Rahim Yar Khan City with Treatment Plant HUD & PHE Not Applicable Third Party Validation 63 Restoration of Landslides at Jhika Gali, Murree C&W Deptt., Govt of Design 64 Third Party Validation of Different Schemes Including In The District Development Programme Gujranwala 2012-2013 CDG, Gujranwala 237.58 Third Party Validation 65 Resident of Rehabilitation of Sewerage System Along Metro Bus System (MBS) Route TEPA, LDA 160 Construction 66 Third Party Validation of Centre of excellence for Development of Sahiwal & Exotic Breed Livestock and Dairy Development Board 230 Third Party Validation 67 Third Party Validation of Infrastructure works at New Lahore City Zaitoon Group Third Party Validation 68 Design of 50 Thousand Gallons Over Head Water Reservoir in New Fruit And Vegetable Market at Katcha, Lahore ASK Construction 8.36 Design 69 Closing of Road Cuts and Relocation of U- turns on Lahore-Kasur Road from Elite Town to Kamal Chisti Lahore Ring Road Authority 168.35 Design 70 Preliminary Master Planning of Knowledge Park at Rakh Dera Chahal, Lahore Higher Education Department, Government of Design 71 Consultancy Services for Exploration of Water Sources and Design of Water Supply Scheme for Transportation of Water from Distant Sources of Supply to the Project Area Chakri Road, Rawalpindi Fatima Jinnah Women University, Rawalpindi Not Applicable Study 72 Execution of Rehabilitation/Strengthening measures at Mubarak Centre Ferozepur Road, Lahore Taavun (Pvt) Limited 130 Analysis and Design 73 Construction of bridge on River Ravi at Qutab Shahana, District Sahiwal C&W Deptt., Govt of 636.76 Construction

74 Resident of Rehabilitation of Sewerage System Along Metro Bus System (MBS) Route Segment - I (Gajjumata to Qartaba Chowk) TEPA, LDA Top 75 Resident of Rehabilitation of Sewerage System Along Metro Bus System (MBS) Route Segment - II (Qartaba Chowk to Shahdara) TEPA, LDA Top 76 Design & Resident of renovation works of "Information Technology University of " at Arfa Software Technology Park TEPA, LDA 61 Construction 77 Third Party Audit of Desilting already done and Verification of Current Desilting WASA Not Applicable Third Party Validation 78 Detailed Design of Dualization of Road along Cantt. Drain from LOS Ferozepur Road to Multan Road, Lahore TEPA, LDA 4581 Design 79 Construction of Dualization of Road along Cantt. Drain from LOS Ferozepur Road to Multan Road, Lahore TEPA, LDA same as above Construction 80 Preparation of Master Plan, Feasibility Study and PC-I for Development and Infrastructure of Quaid-e-Azam Solar Park, Lalsohanra Bahawalpur, Including Tender Documents For 100 MW Solar Power Plant Energy Department, Govt. of 150 Billion Design 81 Construction of Metaled Road from Bahawalpur - Hasilpur Road to Quaid-e- Azam Solar Park Lal Sohanra via Chak No.5/BC (Length 9.00 KM) District Bahawalpur 82 Construction of Signal Free Junctions at Azadi Chowk Lahore C&W Deptt., Govt of 301.972 Construction TEPA, LDA 2599 Construction 83 Construction of Signal Free Junctions at Qainchi, Ghazi Road and Khaira on Ferozpur Road Lahore TEPA, LDA 3709 Construction 84 Consultancy Services for Feasibility Study of Athmuqam - Sharda - Kel - Taobat Section (118 Km) of Neelum Valley Road, Azad Jammu & Kashmir NHA 8100 Feasibility Study 85 Resident of Water Supply Scheme for Quaid-e-Azam Solar Park at Noor Sar, Cholistan, District Bahawalpur (Phase-1) HUD & PHE 82.608 Construction 86 Construction of Alternate Route to Circular Road from New Azadi Chowk to Masti Gate TEPA, LDA 2599 Construction 87 Design of Overhead Water Tank and Apartments at Finance and Trade Centre, Johar Town, Lahore M/S Alam Khan & Brother 200 Design

88 Reconstruction Works in Raja Bazar, Rawalpindi Engineering Consultancy Services (Pvt.) Limited C&W Deptt., Govt of 313 Construction 89 Construction of Desiltation of 1100 No. Tobas in 7 No. Union Councils in Cholistan Area of District Bahawalpur and Rahim Yar Khan Cholistan Development Authority 465 Construction 90 Construction of RCC Precast Boundary Wall, Admin Building, Labor Residence, Overhead Tank and Warehouse at Quaid-e-Azam Solar Park, Cholistan Industrial Estate 57.655 Construction 91 Design of Cold Storage on Plot No. 5 at Fruit & Vegetable Market, Katcha, Ferozpur Road, Lahore Mr. Sameeuddin 22 Design 92 Design of Cold Storage on Plot No. 4 at Fruit & Vegetable Market, Katcha, Ferozpur Road, Lahore Mr. Malik Mohsin Abbas 20 Design 93 Police Integrated Command, Control & Communication Center Police Department 9 Billion Preparation of Bidding Documents (RFP/PQ/EOI), of Civil/Electro- Mechanical Works 94 Construction of Access Road to Newly Developed Apparels Park, Sheikhupura LDA 34 Construction 95 Third Party Audit / Verification of Current Desilting WASA Third Party Validation 96 Solarization of 50 Government Offices Energy Department, Govt. of 29.315 Bid Evaluation & Evaluation Report Preparation 97 Third Party Validation of Establishment of Emergency Services at 12 Tehsil in Emergency Services (Rescue 1122) 15 Third Party Validation 98 2.5 MWp SPV Power Plant for Islamia University, Bahawalpur Energy Department, Govt. of 456.845 Review/Preparation of Bidding Documents, Evaluation of Bids 99 Construction of Rawalpindi- Islamabad Metro Bus Service (MBS) (Package 5) Rawalpindi Development Authority (RDA) 2274 Construction 100 Elevated Expressway Along with Metro Bus Service from Main Boulevard Gulberg/Jail Road to Motorway (M-2) Lahore LDA 33.281 Billion Design & Construction 101 Lahore Orange Line Metro Train Project The Metrobus Authority (PMA), Government of the 163.2 Billion Evaluation of Bids & Award of Contract 102 Third Party Monitoring & Validation Consultancy Services for Solid Waste Collection, Transportation Within the Borders of Zone I & II of City Lahore Lahore Waste Management Company 33.6 Billion Third Party Validation

103 Third Party Validation of Provincial and District Roads in District Sheikhupra Planning and Development Department, Govt of 2.938 Third Party Validation 104 Third Party Post Completion Evaluation of Quality of Construction Civil/Electrical and Allied Works of Murree Biodiversity Park (MBP) Environment Protection Agency 2.7 Third Party Validation 105 Third Party Assessment and Validation of Flood Rehabilitation Works in Faisalabad Division (Package-II) Planning and Development Department, Govt of 5387 Third Party Validation 106 Third Party Assessment and Validation of Flood Rehabilitation Works in Dera Ghazi Khan, Multan and Bahawalpur (Package- IV) Planning and Development Department, Govt of 1632 Third Party Validation 107 Environmental Impact Study for 300 MW Local Coal Fire Thermal Power Plant at Lillah-Pind Dadan Khan Road M/S China Machinery Engineering Corporation (CMEC) 3 Environmental Study 108 Preparation of Feasibility Reports of Cable Car System at Murree Tourism Development Corporation of (TDCP) Feasibility Study 109 Consulting Services for 50 MW Solar Power (PV) Plant at Chakwal Siddique Sons Feasibility Study 110 Technical Services for 100 MW Solar Bahawalpur, Pakistan (Block AB) Appollo Solar Development 13.52 Billion Feasibility Study 111 Technical Services for 100 MW Solar Bahawalpur, Pakistan (Block CD) Best Green Energy 13.52 Billion Feasibility Study 112 Technical Services for 100 MW Solar Bahawalpur, Pakistan (Block EF) Crest Energy Pakistan 13.52 Billion Feasibility Study 113 Technical Services for 100 MW Solar Bahawalpur, Pakistan (Block NP) Elbel Green Energy Pakistan 13.52 Billion Feasibility Study 114 Technical Services for 100 MW Solar Bahawalpur, Pakistan (Block QS) Flare Solar Development Pakistan 13.52 Billion Feasibility Study 115 Technical Services for 100 MW Solar Bahawalpur, Pakistan (Block RT) Golden Eye Solar Development Pakistan 13.52 Billion Feasibility Study 116 Technical Services for 100 MW Solar Bahawalpur, Pakistan (Block U1U2) High Flying Solar Development Pakistan 13.52 Billion Feasibility Study 117 Technical Services for 100 MW Solar Bahawalpur, Pakistan (Block U3U4) Indigo Solar Development 13.52 Billion Feasibility Study

118 Technical Services for 100 MW Solar Bahawalpur, Pakistan (Block U5U6) King Rider Solar Development 13.52 Billion Feasibility Study 119 Consultancy Services for Environmental Impact Assessment (EIA) for Industrial Coal Mining in Salt Range, M/S China Machinery Engineering Corporation (CMEC) 20 Billion Environmental Impact Assessment 120 Third Party Validation of the New Block of Central Police Office (CPO) complex in Lahore Police Department, Govt. of 27.795 Third Party Validation 121 Saaf Pani Project Package II (Bahawalpur, Bahawalnagar, Lodhran & Rahim Yar Khan) Saaf Pani Company 5000 Feasibility Study, Detailed Engineering Design & Construction 122 Third Party Validation of Development Scheme of Prison Department Prison Department 10180 Third Party Validation 123 Verification of data for new/extended rating areas included in urban immovable property tax Information Technology Board - Survey 124 Khadim-e- Road Programme C&W Deptt., Govt of 1360.579 Construction 125 Resident Construction of Roads (Tribal area development project D.G.Khan) Project Management Unit 1710 Construction 126 Resident Construction of Annual Development Program 2014-15 (New Scheme) in Provincial Highway Division Sahiwal C&W Deptt., Govt of Construction 127 Feasibility Study for Construction of Solar Plant for WASA Faisalabad WASA, Faisalabad 11.98 Feasibility Study 128 Topographic Survey, Geotechnical Investigation, Initial Environmental Examination (IEE) and Grid Connection studies of 100 MWp Solar Power Plant in QA Solar Park Bahawalpur, Pakistan Storm Harbour 13.52 Billion Feasibility Study 129 Identification and Reconstruction of Dangerous Schools Buildings in Province School Education Department, Govt. of 9 Billion Survey 130 Third Party Validation of Flood Rehabilitation Works in Faisalabad Division Planning and Development Department, Govt of 1297 Third Party Validation 131 Third Party Validation of Flood Rehabilitation Works in Dera Ghazi Khan, Multan and Bahawalpur Division Planning and Development Department, Govt of 412 Third Party Validation 132 Geotechnical Investigations and Initial Environmental Examination (IEE) for Block (G&J) 100 MWp Solar Power Plant in QA Solar Park Bahawalpur, Pakistan Solution de Energy (Pvt.) Ltd Geotechnical Investigations & Initial Environmental Examination for Feasibility Study

133 Third Party Validation of Feasibility Study for Provision of Extension of Water Supply in Cholistan including Evaluation of 04 No. Existing Pipe Line Engineering Consultancy Services (Pvt.) Limited Cholistan Development Board 641.71 Third Party Validation 134 Master Planning, Architectural and Structural Design of New Schemes of Sports and Youth Affairs Department/Sports Board Sports Board, Govt. of 1792.41 Master Planning & Design 135 Consultancy Services for Preparation of Environment Impact Assessment (EIA) Report for Solid Waste Transfer Station & Recycling of Construction & Demolition waste at Thokar Niaz Baig, Lahore Lahore Waste Management Company 60 Environmental Impact Assessment 136 Master Planning and Detailed Design of Infrastructure Development Works for the establishment of Quaid-e-Azam Apparel Park, District Sheikhupura,, Pakistan Industrial Estates Development and Management Company (PIEDMC) 28 Billion Master Planning & Detailed Design 137 Third Party Validation of Works for Aitchison College, Lahore Aitchison College, Lahore Not Applicable Third Party Validation 138 Solid Waste Landfill Site at Bhinda Dakhli, Bahawalpur Bahawalpur Waste Management Company 8 Billion Environmental Assessment 139 Prequalification of 1000-1500 MW Regasified Liquefied Natural Gas (RLNG) based Combined Cycle Power Plant at Bhikki, Quaid-e-Azam Thermal Power Co. Ltd. (QATPL), Govt. of 56.16 Billion Evaluation of EOI 140 Prequalification of 1000-1200 MW Regasified Liquefied Natural Gas (RLNG) based Combined Cycle Power Plant at Balloki & Haveli Bahadur Shah National Power Parks Management Company Limited (NPPMCL), Govt. of Pakistan 118.56 Billion Evaluation of EOI 141 Rehabilitation of Building Defects of Malala Yousafzai Daanish School, Jand Daanish School Authority 57 Rehabilitation Works 142 Retainer Consultancy Services for Mubarak Center, Lahore Taavun (Pvt) Limited 0.812 Retainership Consultancy Services 143 Third Party Monitoring & Validation for Solid Waste Management Services of Collection, Storage and Transportation of Waste, Mechanical Sweeping and Washing Outsourced to Turkish Companies in Lahore Lahore Waste Management Company 33.6 Billion Third Party Monitoring & Validation 144 Design of Bank Building at Fruit & Vegetable Market, Katcha, Ferozpur Road, Lahore Mr. Sameeuddin 19 Design 145 Design of Cold Storage on Plot No. 1 at Fruit & Vegetable Market, Katcha, Ferozpur Road, Lahore Mr. Naseer Ahmad 22 Design 146 Third Party Validation of Works for Reconstruction of Dangerous School Buildings & Providing Missing Facilities in Schools Project School Education Department, Govt. of 4906 Third Party Validation

147 Environmental & Social Impact Assessment for Diamer Basha Dam Project - Senior Transportation Engineering Services MWH Americas, Inc. (USAID) 0.48 Transportation Engineering 148 Construction of Roads in Highway Circle, D.G. Khan under KPRRP, Phase-II(Part-B) Project C&W Deptt., Govt of 4587 Construction 149 Consultancy Services for Design Review & Construction of New Islamabad International Airport Connecting Road Network NHA 2300 Design Review & Construction 150 Engineering Design and Construction of Bansara Gali Forest Park, Murree Building Department 125 Design & Construction 151 Feasibility Study For: 1) Construction of Flyover at G.T. Road from Sarwar Shaheed College to Gulyana Morr Tehsil Gujar Khan District Rawalpindi 2) Construction of Underpass at GT Road Dina District Jhelum Provincial Highway Circle Rawalpindi 11.82 Feasibility Study 152 Implementation for Screening / Viability of Road for Khadam-e- Rural Roads Program, Phase-II (Part-B) in Bahawalpur Division for the Year 2015-16 C&W Deptt., Govt of Not Applicable Verification for Viability & Necessity 153 Resident Construction of Development of Playfields in District Lahore Sports Board, Govt. of 1792.4 Construction 154 Implementation for Screening / Viability of Road for Khadam-e- Rural Roads Program, Phase-II (Part-B) in Dera Ghazi Khan Division for the Year 2015-16 C&W Deptt., Govt of Not Applicable Verification for Viability & Necessity 155 Updation of Pre-Feasibility Study, Hydraulic Model Study and Riverine Survey for Construction of 4-Lane Bridge, Approach Roads (2 Lane) and Riverine Training Works Across River Indus Connecting Kallur Kot Downstream (D/S) or Upstream (U/S) with D.I. Khan 156 Resident Construction of Khadim- e- Rural Road program (Phase-III) in Provincial Highway Circle, Faisalabad. C&W Deptt., Govt of 24.27 Updation of Pre-Feasibility Study C&W Deptt., Govt of 2503 Construction 157 Desilting of Drains & Sewers WASA, Lahore Not Applicable Third Party Monitoring 158 Resident Construction of Khadim- e- Rural Road program (Phase-III) in Provincial Highway Circle, Sahiwal. C&W Deptt., Govt of 1377.3 Construction 159 Third Party Audit/Verification of Current Desilting during the period from April 15, 2016 to June 15, 2016 WASA, Faisalabad 2 Third Party Validation 160 Consultancy Services as Assistant to Employer's Representative AER for Peshawar - Karachi Motorway PKM Sukkur - Multan Section (392 KM) NHA 3056 Construction

161 Environmental Approval for Operation phase of First Three Projects, each of 100MW Solar PV Project, QASP, Lal Sohanra, Bahawalpur Appollo Solar Development, Zonergy, Best Green, Crest Energy Environmental Monitoring 162 Consultancy Services to Assist Office of CEP for the Selection, Quality Assurance and Installation of the Contractor for the Project "Solar Solution For 24/7 Type BHU's In " 163 Owners's Consultants to Assist Client to Execute Design, Supply, Installation and O&M Contracts of Khadim-e- Saaf Pani Program in Rural Areas of Province, Pakistan 164 Construction of Khadim-e- Bahria Model School and College (KBMS&C), Gwadar, Balochistan Energy Department, Govt. of Saaf Pani Company School Education Department, Govt. of Owner's Consultant 170 Design 165 Feasibility Study, Design & Construction of Flyover From Kanju Bridge to Mingora District Swat Pakhtunkhwa Highway Authority, Govt. of Khyber Pakhtunkhwa Feasibility Study & Construction 166 Resident of Development Schemes of Counter Terrorism Department (CTD), Construction of Regional Office CTD, Sheikhupura 167 Resident of Development Schemes of Counter Terrorism Department (CTD), Construction of Regional Office CTD, D.G Khan Counter Terrorism Department (CTD), Government of the, Lahore Counter Terrorism Department (CTD), Government of the, Lahore 269 Construction 270 Construction 168 Resident Construction of Annual Development Program in Provincial Highways Circle, Rawalpindi Provincial Highway Circle, Communication & Works Department Rawalpindi 5096 Construction 169 The Design, Resident Construction and Technical Consultancy for Operationalizing Laboratories and of Agriculture, Food and Drug Laboratories for Agriculture, Food and Drug Authority Infrastructure Development Authority of Design Review & Construction 170 Testing and Investigation of 512 Multistoreyed Residential Flats in Faisalabad Workers Welfare Board 2.98 Third Party Validation 171 Resident Construction of Khadim-e- Rural Roads Programme (Phase-IV) Highway Circle D.G. Khan C&W Deptt., Govt of Construction 172 The Health Sector Reforms process (Hospitals Reform Program in ) Health Initiative Management Company (PHIMC) 173 Safety Audit of Lahore Ring Road (Southern Loop) Transport Department, Govt.of Safety Audit 174 Police Integrated Command, Control and Communication (PPIC3) Centres at Multan, Rawalpindi, Sargodha, Bahawalpur, Faisalabad and Gujranwala (MRSBFG) Safe Cities Authority (PSCA), Govt. of Overall Coordination & Construction

175 Resident of Enabling Works and Boundary Wall of Quaid-e-Azam Apparel Park, Sheikhupura Industrial Estates Development and Management Company (PIEDMC) Construction 176 Consultancy Services of Third Party Validation for Water Supply & Sewerage Schemes of PHED (South Zone) Costing from Rs. 10 million to Rs. 200 million (Group-IV PHE Circle Bahawalpur) HUD & PHE Third Party Validation 177 Consultancy Services of Third Party Validation for Sewerage Scheme Rahim Yar Khan with Treatment Plant Construction of Intermediate Sewerage Pumping Station near Niazi Colony and Installation of Force Main (South Zone) HUD & PHE Third Party Validation 178 Consultancy Services for Top of Water Supply & Sanitation Schemes of PHED (South Zone) Costing from Rs. 10 million to Rs. 200 million (Group-IV PHE Circle Bahawalpur) HUD & PHE Top 179 Geological and Geotechnical Studies for Construction of Fazaia Inter College, Lower Topa, Murree Fazaia Directorate of Schools & Colleges Air Headquarters, Peshawar 288 Geological & Geotechnical Studies 180 Engineering Management Consultancy for Implementation of Khadim-e- Saaf Pani Program in Rural Areas of, Pakistan Saaf Pani Company North Design 181 Development of Infrastructure Works of Quaid-e-Azam Apparel Park (QAAP) Industrial Estates Development and Management Company (PIEDMC) Engineering Management Consultancy 182 Survey of Schools for Khadim-e- Ujala Program Project Management Unit-Khadime- Ujala Program (Energy Department) Survey 183 Feasibility Study, Planning & Design of Pak- Italy University of Engineering and Technology Lahore Knowledge Park Company 184 Third Party /Validation & Verification for Desilting of Sewers and Drains WASA, Lahore WASA, Lahore Third Pary Validation 185 Third Party Validation for Desilting of Sewers and Drains WASA, Faisalabad WASA, Faisalabad Third Pary Validation 186 Third Party /Validation & Verification for Desilting of Sewers and Drains WASA, Gujranwala WASA, Gujranawala Third Pary Validation 187 Third Party Validation for Desilting of Sewers and Drains WASA, Multan WASA, Multan Third Pary Validation 188 Design Review Consultancy Services For (Dualization of Khanewal - Lodhran Road) in Highway Circle, Multan C&W Deptt., Govt of Design Review

189 Third Party Validation of WASA Laboratory, Lahore WASA, Lahore Third Pary Validation 190 Third Party Validation of WASA Laboratory, Faisalabad WASA, Faisalabad Third Pary Validation 191 Third Party Validation of WASA Laboratory, Gujranwala WASA, Gujranawala Third Pary Validation 192 Third Party Validation of Desilting of Sewers and Drains WASA, Rawalpindi WASA, Rawalpindi Third Pary Validation