ENVIRONMENTAL MONITORING AT LANDFILLS

Similar documents
Bioreactor Landfill Design

SANITARY LANDFILL INSPECTION CHECKLIST

Erosion & Sedimentation Control Policy

CLOSURE AND POST-CLOSURE CARE PLAN JAMES RIVER POWER STATION UTILITY WASTE LANDFILL CITY UTILITIES OF SPRINGFIELD, MISSOURI

Soil Treatment Facility Design and Operation for Bioremediation of Hydrocarbon Contaminated Soil. Version 1.0

Alamogordo Desalination Project

LAWS AND RULES FOR SEWAGE TREATMENT, AND DISPOSAL SYSTEMS

Application For Waste Regulation (Check all that apply)

2008 ANNUAL ENGINEERING INSPECTION REPORT

Leachate Management Leachate Control and Collection

APPENDIX F NON-ROUTINE SERVICES

1 Exam Prep Chapter 64E -6 Questions and Answers

POST CLOSURE PLAN. CFR (d) GERS Landfill. Pirkey Plant Hallsville, Texas. October, 2016

OHIO ENVIRONMENTAL PROTECTION AGENCY L PE RMIT-TO4 N STALL t

CONSTRUCTION AND DEMOLITION DEBRIS DISPOSAL SITE GUIDELINES

Methane concentrations are measured using portable gas detection instruments, usually a methane meter or explosimeter which has a readout in either

Table of Contents. Attachments Attachment A Photos Attachment B Inspection Map. Pages 3 of 10

SECTION 10. WASTE TIRE FACILITIES and WASTE TIRE HAULERS Standards for Tire Retailers, Wholesalers and Fleet Service Facilities

The Impact of Elevated Leachate Levels on LFG Generation and Recovery at MSW Landfills in Asia

CISTERN & DRY-HYDRANTS

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Frequently Asked Questions

SANITARY LANDFILL FACILITY PERMIT

Ordinance No Lot Surface Drainage

Landfill Gas Systems

Table of Contents. Attachments Attachment A Photos Attachment B Site Map. Pages 3 of 9

FOUR CORNERS POWER PLANT POST-CLOSURE PLAN (d) LINED DECANT WATER POND (LDWP) FC_PostClosPlan_009_

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

FOUR CORNERS POWER PLANT POST-CLOSURE PLAN (d) LINED ASH IMPOUNDMENT (LAI) FC_PostClosPlan_008_

(Instructions and explanations of bid items and sources of unit costs are provided on the back of this page.)

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Written Post-Closure Plan. Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado

4.8. Subsurface Infiltration

Property Owner's Name: Telephone #: Mailing Address: System Address (if different): Directions to location of installation:

Vapor Extraction / Groundwater Extraction (VE/GE) System Initial Report

The exam is enclosed with this correspondence. This test emphasizes standard requirements for installing gravity-fed septic systems.

STORMWATER AND EROSION CONTROL PERMIT

Existing System Evaluation Report for Onsite Wastewater Systems

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

MARYLAND DEPARTMENT OF THE ENVIRONMENT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

Extended Detention Basin Maintenance Plan for [[== Insert Project Name ==]]

Niagara Falls Storage Site Safety Measures During Remediation

4.8. Subsurface Infiltration

CHAPTER 110 SEWAGE DISPOSAL

SOLID WASTE DISPOSAL FACILITY PERMIT

INSTRUCTIONS FOR SUBMITTING A COMMERCIAL SEWAGE DISPOSAL PERMIT APPLICATION

Chapter 21 Stormwater Management Bylaw

2016 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

TYPES OF SEWAGE PUMPS. Solids Handling Pumps: Grinder Pumps: Effluent Pumps:

Private Sewage Systems Standard of Practice Proposed Revisions

Solid Waste for the Environmental Advisory Council

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

GRAY WATER SYSTEMS FOR RESIDENTIAL BUILDINGS

High Density Polyethylene (HDPE) Lined Evaporation Ponds

RULE 68. DISPOSAL OF NATURALLY OCCURRING RADIOACTIVE MATERIALS (NORM) ASSOCIATED WITH THE EXPLORATION AND PRODUCTION OF OIL AND GAS

CLOSURE PLAN. CFR (b) Fly Ash Reservoir 1 Landfill Cardinal Plant Brilliant, Ohio. September, 2016

WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS. GENERAL WATER POLLUTION CONTROL PERMIT Permit Number: GP-WV-1-07

SPECIAL CONDITIONS GENERAL PERMIT NUMBER WMGR089

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN

STORM WATER PLAN (SWP) GUIDANCE TEMPLATE

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES

In-Situ Remediation of Chlorinated Solvent Source Zone using ZVI-Clay Treatment Technology

NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION REGION 1 50 CIRCLE ROAD STONY BROOK, NY 11790

GRAY WATER RECYCLING SYSTEMS

Private Side Sewer Inspections for Sources of Inflow & Infiltration Frequently Asked Questions

and the term landfill generically refers to all landfills, including the above types, unless specified otherwise.

Industrial Solid Waste Landfill Daily Log of Operations {as required by O.A.C (E)(10)} Yearly Cover Sheet (Form 1)

GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter 16 and 16A) Revised: 6/11/14

11.0 HANDLING AND STORING AGRICULTURAL INPUTS

Infiltration Guidelines

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

Leachate Recirculation and Biogas Collection Methodologies in Bioreactors

SECTION UNCLASSIFIED EXCAVATION AND GRADING

Underground Piping for Private Hydrants & Sprinkler Supply Line

E. STORMWATER MANAGEMENT

NEW HAMPSHIRE CODE OF ADMINISTRATIVE RULES. CHAPTER Env-Wq 2100 WATER CONSERVATION; USE REGISTRATION AND REPORTING

High Density Polyethylene (HDPE) Lined Produced/Frac Flowback Water Evaporation Ponds

Public Health STARK COUNTY HEALTH DEPARTMENT

Application for Gas Exploration and Production

Constructed Wetland Use in Nonpoint Source Control

LOT GRADING GUIDELINES

Section SNOW DISPOSAL SITE DESIGN CRITERIA

MUNICIPAL SOLID WASTE LANDFILL FACILITY Permit No

Additional criteria for approval of sanitary landfill facility permit to install applications.

Solid Waste Management Facility Permit Shamrock Environmental Landfill Action: PER004

Pesticide Mixing-Loading Facility 1

Management of PCBs Under the MCP

APPENDIX B Construction Surface Water Management Plan PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER PROJECT INVITATION TO BID ITB NO.

901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT

LOT GRADING GUIDELINES

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN:

GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT SOLID WASTE DEPARTMENT LICENCE L-005

WASTE MANAGEMENT OF NEW YORK CHAFFEE FACILITY WESTERN LANDFILL EXPANSION 6 NYCRR PART 360 SOLID WASTE MANAGEMENT PERMIT MODIFICATION APPLICATION

Closure Plan Brame Fly Ash Pond

Code of Practice for Land Treatment of Soil Containing Hydrocarbons

H 7033 SUBSTITUTE A AS AMENDED ======== LC003107/SUB A ======== S T A T E O F R H O D E I S L A N D

Transcription:

ENVIRONMENTAL MONITORING AT LANDFILLS September 7, 2017 George Schuman Permit Section Manager, Solid Waste Bureau New Mexico Environment Department

Environmental Monitoring at 2 SWB considers three activities to be environmental monitoring at landfills: Groundwater monitoring Landfill gas monitoring Leachate monitoring These monitoring activities are required by the NM Solid Waste Rules, 20.9.2 through 20.9.10 NMAC

Groundwater Monitoring at Permitted 3 Required at municipal and special waste landfills (20.9.9.8.A NMAC), not required at C&D landfills, scrap tire monofills, and asbestos waste monofills (20.9.9.8.B NMAC) GW monitoring performed in accordance with approved Groundwater Monitoring System Plan/Groundwater Monitoring Plan Three GW sampling phases: Detection monitoring Assessment monitoring Corrective measures

Groundwater Monitoring at Permitted 4 Detection monitoring: Semi-annual sampling Specified list of constituents to be tested for per 20.9.9.20.A and C NMAC ( Subsection A and C ) Possible amendments to detection monitoring program: Alternate parameter list (reduction in number of constituents to be tested for) after background concentrations approved (20.9.9.11.A(1) and (2) NMAC) Annual sampling frequency after first year (20.9.9.11.A(3) NMAC)

Groundwater Monitoring at Permitted 5 Assessment monitoring: Required if constituent concentration exceeds 50% of the groundwater protection standard (i.e., drinking water MCL or NMWQCC GW standard) GW sampling for expanded list of constituents per 20.9.9.20.B NMAC ( Subsection B ) Subsection B detections: added to detection monitoring constituents list Exit assessment monitoring and return to detection monitoring when all constituents are less than 50% of groundwater protection standards

Groundwater Monitoring at Permitted 6 Corrective measures: Required if constituent concentration exceeds 100% of the groundwater protection standard Assessment of Corrective Measures: determination of nature and extent of GW contamination; evaluation of potential remedies Public meeting following completion of Assessment of Corrective Measures

Groundwater Monitoring at Permitted 7 Corrective measures: Submission of proposed remedy Public hearing on proposed remedy Hearing outcome = selection of remedy Remedy implementation Exit corrective measures when all constituents are less than 100% of groundwater protection standards

Groundwater Monitoring at Closed 8 Requirements vary depending upon date of closure Category 1 landfills: Closed between 4/11/1974 and 5/14/1989 Subject to 1974 NM Solid Waste Management Regulations, which did not address GW monitoring However GW monitoring and assessment may be required by NMED Ground Water Quality Bureau pursuant to NMWQCC Regulations

Groundwater Monitoring at Closed 9 (Closed) Category 2 landfills: Stopped receiving waste between 5/14/1989 and 10/9/1993 GW monitoring per Part 9 of current Solid Waste Rules, but GW sampling constituents limited to those approved in the Closure/Post Closure Plan (20.9.9.8.A(3) NMAC)

Groundwater Monitoring at Closed 10 (Closed) Category 3 landfills: Began operations before 10/9/1993 and continued to operate after this date, but now closed GW monitoring per Part 9 of current Solid Waste Rules and must perform GW monitoring per approved Groundwater Monitoring System/Groundwater Monitoring Plan (20.9.9.8.A(2) NMAC)

Groundwater Monitoring at Closed 11 Important note for closed Category 2 and 3 landfills: Closure/Post-Closure Care Plans approved under regulations preceding the 2007 Solid Waste Rules remain in effect until they are suspended, revoked, or otherwise modified (20.9.2.21.A NMAC) GW monitoring subject to requirements of approved Closure/Post-Closure Care Plans, may not be required

Landfill Gas Monitoring at Permitted 12 Municipal landfills, special waste landfills, and monofills (20.9.5.9.B and C NMAC): Monitoring frequency: Quarterly Methane concentration must not exceed 100% lower explosive limit (LEL) at facility boundary Methane concentration must not exceed 25% LEL inside facility structures

Landfill Gas Monitoring at Permitted 13 Municipal landfills, special waste landfills, and monofills (20.9.5.9.B and C NMAC): If regulatory limits are exceeded, must: Take immediate steps to ensure protection of public health, welfare, and environment Develop and implement and approved remediation plan within 60 days of detection

Landfill Gas Monitoring at Permitted 14 Reduced monitoring frequency may be approved if: Waste receipts less than 20 tons per day, annual average (no operating LFs meet this threshold) or Monofill (asbestos waste or scrap tires)

Landfill Gas Monitoring at Permitted 15 C&D debris landfills (20.9.5.10.C NMAC): Methane concentration must not exceed 100% lower explosive limit (LEL) at facility boundary Methane concentration must not exceed 25% LEL inside facility structures But: Monitoring frequency is not specified by Solid Waste Rules Monitoring frequency: As approved by solid waste facility permit

Landfill Gas Monitoring at Closed 16 Municipal landfills, special waste landfills, and monofills (20.9.6.9.A(3)(h)(ii) NMAC): Implement a methane monitoring plan meeting requirements for operating LFs: Quarterly monitoring Methane must not exceed 100% LEL at facility boundary Methane must not exceed 25% LEL inside facility structures

Landfill Gas Monitoring at Closed 17 Reduced monitoring frequency at most closed landfills: Waste receipts usually less than 20 tons per day for closed LFs Semi-annual to annual monitoring frequency typically approved by SWB

Leachate Monitoring at Permitted 18 Disposal cells must be constructed with leachate collection systems (20.9.4.15 NMAC) Leachate collection system design and construction requirements (20.9.4.15.A and B NMAC): Maintain less than one-foot depth of leachate on liner Maintain a minimum 2% slope throughout system Materials must withstand chemical attack from waste and leachate Materials must withstand damage from load and stresses due to overlying waste

Leachate Monitoring at Permitted 19 Leachate management plan is required (20.9.4.15.C NMAC): Means of leachate analysis Treatment method, if necessary Disposal methods

Leachate Monitoring at Permitted 20 Leachate measurement is required (20.9.5.9.K NMAC): Measure leachate head on liner Quarterly records of leachate generation and treatment

Leachate Monitoring at Permitted 21 Leachate disposal is typically accomplished by: Evaporation in lined impoundments Spraying onto waste at working face to aid compaction (recirculation) Spraying over lined cells for dust control

Leachate Monitoring at Closed 22 Not required as closed landfills lack leachate collection systems One exception: Smith Lake Landfill Operated from 1992 to 1995 Lined landfill Leachate gravity drains to evaporation pond

Issue: Landfill Gas Generation at Closed 23 Most closed LFs show little or no methane in shallow subsurface at facility boundary However, several closed LFs have problems with methane generation Common factor: water infiltration into waste mass

Issue: Landfill Gas Generation at Closed 24 Old Silver City Landfill LEL exceedances at numerous LF gas monitoring probes Excessive erosion of final cover

25 Issue: Landfill Gas Generation at Closed Final cover erosion Final cover erosion

Issue: Landfill Gas Generation at Closed 26 Old Silver City Landfill Repairs to final cover and storm water control improvements made late 2011-early 2012 Result: Methane concentrations have dropped substantially, typically only one monitoring location shows LEL exceedance (probe installed into waste) Additional benefit: Construction of baseball and soccer fields over portion of closed landfill (synthetic turf)

Issue: Landfill Gas Generation at Closed 27 South Broadway Landfill Closed in 1989 25-year post-closure care period in accordance with 1989 Solid Waste Management Regulations Between 1996 and 2002: Water tank constructed adjacent to landfill 2004: Approval granted for construction of road across landfill to provide additional access to concert venue (currently Isleta Amphitheater) on adjacent parcel

Issue: Landfill Gas Generation at Closed 28 Northern portion of South Broadway LF - Image date: April 2017 Isleta Amphitheater Access road Water tank

Issue: Landfill Gas Generation at Closed 29 South Broadway Landfill January 2015: SWB staff conducted post-closure care inspection Evidence of water flowing from water tank across closed disposal cells in vicinity of access road Found high levels of methane in shallow subsurface adjacent to access road Area adjacent to access road used for concert parking and related activities

Issue: Landfill Gas Generation at Closed 30 Image date: November 2012 Approx. area of elevated subsurface methane (red) Parking area Isleta (blue) Amphitheater Access road Water tank

Issue: Landfill Gas Generation at Closed 31 South Broadway Landfill Response: Locked gates installed at each end of access road (road use restricted to event staff only) Signs and fencing along access road to prohibit parking Cease discharges from water tank onto closed disposal cell

Issue: Leachate Monitoring at Permitted 32 Varying volumes of leachate reported by landfills of comparable size and operation Several landfills: 150,000 to 200,000 gallons of leachate pumped per year Other landfills: Zero to a few thousand gallons of leachate pumped per year Reasons: Lack of correct information on leachate riser construction, and/or Compromised leachate collection systems

Issue: Leachate Monitoring at Permitted 33 Sand Point Landfill 1995-2010: 3,000 gallons pumped in 1998 13,000 gallons pumped in 2002 Zero gallons pumped in other years Required evaluation of leachate collection system during permit renewal process (2013-2014) Video inspection conducted in August 2014

Issue: Leachate Monitoring at Permitted 34 Sand Point Landfill Video inspection findings: Riser length, Cells 1/2 = 114 feet Leachate level, Cells 1/2 = 86 feet Leachate head on liner, Cells 1/2 = approximately 4 feet Riser length, Cells 3/4 = 63 feet Leachate level, Cells 3/4 = 12 feet Leachate head on liner, Cells 3/4 = approximately 9.5 feet Regulatory limit: No more than 1 foot of leachate head on liner

Issue: Leachate Monitoring at Permitted 35 Leachate in riser for Cells 1/2 riser Isleta Amphitheater Access road Water tank

Issue: Leachate Monitoring at Permitted 36 Bottom of riser/sump depth, Cells 1/2 Isleta Amphitheater Access road Water tank

Issue: Leachate Monitoring at Permitted 37 Smaller diameter pipe in riser for Cells 1/2 at approx. 18 feet Isleta Amphitheater Access road Water tank

Issue: Leachate Monitoring at Permitted 38 Leachate in riser for Cells 3/4 riser Isleta Amphitheater Access road Water tank

Issue: Leachate Monitoring at Permitted 39 Near bottom of riser, Cells 3/4 Isleta Amphitheater Access road Water tank

Issue: Leachate Monitoring at Permitted 40 Bottom of riser/sump depth, Cells 3/4 Isleta Amphitheater Access road Water tank

Issue: Leachate Monitoring at Permitted 41 Sand Point Landfill Leachate monitoring protocol at time of video inspection: Seven 10-foot sections of threaded PVC well casing (2-inch diameter) used to measure depth to leachate Portable pump with 20-foot hose Insufficient length of well casing to measure leachate in Cells 1/2 Pump hose too short to maintain leachate at one foot of head in either system

Issue: Leachate Monitoring at Permitted 42 Sand Point Landfill Landfill operators did not have the necessary as-built information to monitor leachate effectively Response: Construct new headwalls at leachate risers Dedicated pumps with pressure transducers, control panels As-built information posted on control panels Occasional manual measurements Pumped 814,000 gallons (Nov. 2013-April 2015)

Issue: Leachate Monitoring at Permitted 43 New headwall, Cells 1/2 Isleta Amphitheater Access road Water tank

Issue: Leachate Monitoring at Permitted 44 New pump control panel, Cells 1/2 Access road

Issue: Leachate Monitoring at Permitted 45 Otero-Greentree Regional Landfill 2004-2014: Cells 1-4: No leachate reported Required evaluation of leachate collection system during permit renewal process Inspection conducted with plumbing rodder in June 2014, subsequent video inspection

Issue: Leachate Monitoring at Permitted 46 Otero-Greentree Regional Landfill Inspection findings: Cell 1: Obstruction at 84 feet, unable to advance rodder; subsequent video inspection showed sediment blockage Cell 2: Obstruction at 40 feet; subsequent video inspection revealed riser collapse at approximately 30 feet Cell 3: Leachate present at about 88 feet, calculated to be approximately 0.7 feet of leachate head on liner Cell 4: Leachate present at about 70 feet, calculated to be approximately 5.7 feet of leachate head on liner

Issue: Leachate Monitoring at Permitted 47 Cell 1 riser filled with sediment Isleta Amphitheater Access road Water tank

Issue: Leachate Monitoring at Permitted 48 Pipe separation or collapse, Cell 2 riser Isleta Amphitheater Access road Water tank

Issue: Leachate Monitoring at Permitted 49 Otero-Greentree Regional Landfill Response: Early final closure of Cells 1 and 2 after issuance of renewed permit On-going monitoring of Cells 3 and 4 with accurate as-built information obtained from video inspection Pumped 135,000 gallons (2014-June 2017) Weekly leachate pumping continues (still more than 1 foot of head on liner)

Final Plug for Video Inspection of Leachate Collection Systems 50 Strange objects might be lurking in leachate collection systems

Final Plug for Video Inspection of Leachate Collection Systems 51 Appears to be some type of object in the riser pipe Isleta Amphitheater Access road Water tank

Final Plug for Video Inspection of Leachate Collection Systems 52 Ball? Isleta Amphitheater Access road Water tank

Final Plug for Video Inspection of Leachate Collection Systems 53 Basketball floating in leachate Isleta Amphitheater Access road Water tank

Final Plug for Video Inspection of Leachate Collection Systems 54 Another object in riser pipe? Isleta Amphitheater Access road Water tank

Final Plug for Video Inspection of Leachate Collection Systems 55 Plastic bottle floating in leachate Isleta Amphitheater Access road Water tank