A Study on the Design of Xinghuo Maintenance Workshop for Beijing-Shenyang Passenger High-speed Rail

Similar documents
Original Publication: International Journal of High-Rise Buildings Volume 1 Number 3

Section 4 - Design and Construction Overview

Zoning Supporting Design of Deep Foundation Pit Based on Controlling Deformation of Surrounding Buildings

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1%

SCREEN PORCHES 101 DEVELOPMENT RESOURCES, INC Permit Requirements

The New Incremental Launching Construction Technology of Jiubao Bridge Long-span Hybrid Arch-girder Structure

DIVISION 04 MASONRY CAST STONE. A. Design Considerations. 1. Cast stone shall comply with ASTM C1364, Standard Specification for Cast Stone.

The Chinese Performance-based Code for Fire-resistance of Steel Structures

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

Application Study on Elastomer Expansion Joint in Heavy Haul Railway

HOTEL NORTHEAST U.S. JORDAN RUTHERFORD STRUCTURAL OPTION FACULTY ADVISOR DR. THOMAS BOOTHBY AE SENIOR THESIS APRIL 8, 2013

One and Two Family Additions

Vienna International Airport Renovation of Checkin

AASHTOWare BrD 6.8. BrR and BrD Tutorial. PS7-3 Stem PS Bridge Example

Façade Improvement Specifications: 221 S. Lafayette, Greenville, MI. General Section:

Sustainable evaluation of urban buildings for safety in environment management: the case of the Taiwan 921 earthquake

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

Study on Performance-based Safety Design of Chemical Facility Layout

ArcelorMittal Europe - Long Products Sections and Merchant Bars. Office Building ArcelorMittal in Esch Alzette

January 14, 2006 Structural Thesis Proposal: Structural and Breadth Redesign Options

RESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST

SECTION STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM

DICTATOR Lift Shaft System

Mr. ammar alimam Tele : Green Environmental Protection Energy Conservation

FDA CDRH Laboratory Silver Spring, Maryland. Executive Summary: Timothy Mueller Structural Option Walter Schneider

DIVISION 05 METALS Commissioning of Metals STRUCTURAL METAL FRAMING Structural Steel Framing

Structural System. Design Criteria Fire Resistance Concrete designed for 2 HR rating (worst case) Geotechnical Report Allowable Bearing Capacity

Inspection of New One- and Two- Family Dwellings

GREENHOUSE ENGINEERING PREFABRICATED HOUSES

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Thermal Environment of Chinese Residential Buildings with Different Thermal Insulation Materials in Hot-Summer-and-Cold-Winter Zone of China

Custom fabrication in two weeks or less, guaranteed.

SPECIFICATIONS FOR THE CONSTRUCTION OF NEW PASSENGER EQUIPMENT CARS PREFACE

one structural behavior, systems and design Course Description Course Description Syllabus & Student Understandings statics mechanics of materials

Variants of shaping tall building construction and their impact on elevation energy functionality

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

Expert System Applied to High-Speed Railway Track Circuit Coding and Its Simulation

Building Design Data

Structural assessment of the integrated steel fly-overs widening the historic multiple-arch concrete viaduct over the Pede valley

EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire

Jing-Jin-Ji Air-Rail Intermodality System Study Based on Beijing New Airport

See the IRC for additional information. See CPD-DS Information Bulletin 100 for Requirements for 1 & 2 Family Dwelling plan submittals.

7. MATERIALS AND TECHNICAL INVESTIGATION

Seismic Analysis of Truss Bridges with Tall Piers

AASHTOWare BrR/BrD 6.8 Reinforced Concrete Structure Tutorial RC5 Schedule Based Tee Example

CHAPTER 26 PLASTIC SECTION BC 2601 SECTION BC 2603 GENERAL FOAM PLASTIC INSULATION

COURSE OUTLINE. Course Number Course Title Credits. ARC 134 Building Construction Systems 3. Co- or Pre-requisite. none

Corium Brick Rainscreen System Specifications

Totaling approximately 617,000

Selection, installation and USage of HatcHeS

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

HOW TO: INSULATE YOUR HOME AND UNDERSTAND U-VALUES GTEC THERMAL BOARD WITH PLASTERBOARD

Research and Application Study on Accident-Based 3D Power Station Simulation Technology

Statement of Special Inspections Michigan Building Code 2012 (MBC 2012)

PRESCRIPTIVE COMPLIANCE METHOD

ASSESSMENT OF AFS STRUCTURAL WALL SYSTEM FOR CBPA NSW, FEBRUARY 2008

Introduction to Structural Analysis TYPES OF STRUCTURES LOADS AND

Construction Techniques of The 3 rd Bosphorus Bridge in Istanbul, Turkey

HOW TO OBTAIN A BUILDING PERMIT

Table of Contents.2. Introduction...3 Gravity Loading and Deflections..4. Existing Structural System..8

THE FORENSIC MEDICAL CENTER

Energy-saving Potential Study on Telecommunication Base Station Free Cooling With a Thermosyphon Heat Exchanger in China

A. Types of lightgauge metal framing units include the following: 1. C-shaped structural steel studs Uniform Building Code.

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures

Residential Building Inspections

REINFORCED EARTH. Risk Mitigation

Project s fiche INOV. Frisomat Case study project's fiche INOV

MULTI-LEVEL FORTIFICATION INTENSITIES SEISMIC PERFORMANCE ASSESSMENT FOR REINFORCED CONCRETE FRAME- SHEAR WALL STRUCTURE WITH VISCOUS DAMPERS

buildings. design of post-frame gyms and multipurpose

SECTION PLATE CONNECTED WOOD TRUSSES

Construction of Bridges

Non-welded Concrete Filled -Bilateral Steel Plate Composite Shear Walls Using Bolt Connection: Theoretical Analysis of Deformation

RESIDENTIAL BUILDING PLAN REQUIREMENTS

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

REPAIR OF DISPLACED SHIELD TUNNEL OF THE TAIPEI RAPID

Research on the Influence of Infill Walls on Seismic Performance of Masonry Buildings with Bottom Frame-Shear Walls

2003 International Residential Building Code

ALLOWABLE STRESS DESIGN OF CONCRETE MASONRY LINTELS. TEK 17-1C Structural (2009) Related TEK: Uniform load. Triangular load. Concentrated loads

PARAMETRIC STUDIES OF BOX CULVERTS

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

SECTION B Steel Frame Wall Systems. Contents. Steel Stud Selection Tables. Introduction. Design Considerations. Installation.

Available online at ScienceDirect

Building Codes and Ordinances ARC 227

GUIDE SPECIFICATION EXETER VERSA SHIELD SECURITY SCREEN SYSTEM

A/E REVIEW CHECKLIST STRUCTURAL

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features

Residential Inspector s Guide: Building and Energy based on the 2009 International Residential Code Chapters 1-11

Residential Inspector s Guide: Building and Energy based on the 2009 International Residential Code Chapters 1-11

EXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD

For all your Building, Aluminium and Glazing Requirements

Table of Contents. Page Title

Truss Heel Heights and Energy Code Requirements. Overview Revised 2/17/2017

HISTORICAL OVERVIEW OPN ARCHITECTS. Home Office Building of The Bankers Life Building, 1940

Measuring Walls in Accordance with ARM4 - An Introductory Demonstration

Structural Comparison between Pan Joist Concrete and Steel Frame Systems for UMCP Student Housing Building B

Signature Series 5 Lap SECTION ALUMINUM WINDOWS

Structural Technical Report 1 Structural Concepts / Existing Conditions

Thesis Proposal. Nasser Marafi. Center & Facility Service Building. St. Joseph Hospital of Orange Patient Care. Proposal

Structural Assessment Live Fire Training Building. FSCJ South Campus Jacksonville, Florida. Florida State College at Jacksonville

Transcription:

International Journal of Architecture, Arts and Applications 2017; 3(5): 68-72 http://www.sciencepublishinggroup.com/j/ijaaa doi: 10.11648/j.ijaaa.20170305.11 ISSN: 2472-1107 (Print); ISSN: 2472-1131 (Online) A Study on the Design of Xinghuo Maintenance Workshop for Beijing-Shenyang Passenger High-speed Rail Zhang Jialu 1, Zhang Changrui 2, *, Sun Liang 3, Tian Yong 2 1 Department of Design, China Railway Design Corporation, Tianjin, China 2 School of Architecture & Art Design, Hebei University of Technology, Tianjin, China 3 Department of Design, China Railway Shanghai Design Institute Group Company Limited, Tianjin, China Email address: * Corresponding author To cite this article: Zhang Jialu, Zhang Changrui, Sun Liang, Tian Yong. A Study on the Design of Xinghuo Maintenance Workshop for Beijing-Shenyang Passenger High-speed Rail. International Journal of Architecture, Arts and Applications. Vol. 3, No. 5, 2017, pp. 68-72. doi: 10.11648/j.ijaaa.20170305.11 Received: May 6, 2017; Accepted: August 26, 2017; Published: September 26, 2017 Abstract: This paper makes an in-depth analysis on the design of the super large-scale maintenance workshop for Beijing-Shenyang Passenger High-speed Rail maintenance workshop of Beijing-Shenyang Passenger High-Speed Rail, and demonstrates its important position in industrial architecture referring to the significant status of Beijing-Shenyang Passenger High-speed Rail in China's railway construction. Through the study on the design process of architecture, structure and construction of the maintenance workshop, and the research on the fireproof performance, this thesis provides a useful reference value and academic significance for the design and construction of the super large maintenance workshop for high-speed rail in China. Keywords: Beijing Shenyang High-Speed Railway, High-Speed Railway Maintenance Workshop, Engineering Design 1. General Condition Beijing-Shenyang Passenger High-speed Rail ( Rail in short below) is one of the important rails on building. In the future, it will undertake main passenger distribution function between Bohai economic zone and the northeast industrial base and become transportation links in North China, East China, South China and Northeast Economic Zone. The whole line runs through three provinces and cities, from the capital Beijing, extending to the northeast through Chengde City, Chaoyang City, Jinzhou City and Fuxin City, and ultimately reaches its provincial capital, Shenyang. The Rail dedicated line is an important part of the "four vertical and four horizontal [1]" (Railway Planning) network China, and will become the important traffic artery connecting Shanhaiguan and abroad. Based on such an important high-speed railway project, large maintenance facilities are also very important. The newly built Beijing-Shenyang Passenger High-speed Rail Xinghuo Maintenance Workshop is the largest maintenance base for rail. The total construction area of the project is 50,697m 2, which can provide inspection and repair services for 10 lines and 20 trains at the same time. Xinghuo Maintenance Workshop consists of three parts, in addition to the main span (column spacing of central main space) of maintenance workshop, both sides across have logistics space with the auxiliary function. The construction area of maintenance workshop base is 39,644 m 2, the construction area of two side span is 11,053 m 2, and the height of main building is 14.6m. The main span of maintenance workshop is the bent frame structure. Arched steel roof of reinforced concrete rectangular column bearing to achieve the spatial design of large span and the side span structure with reinforced concrete frame system, enhance the function of the stability and maintenance of structure integration. Along the direction of the track, the main span length of 468.0m can meet the requirement of maintenance for two 8-section rails [2]. On the vertical direction, the main

69 Zhang Jialu et al.: A Study on the Design of Xinghuo Maintenance Workshop for Beijing-Shenyang Passenger High-speed Rail space is divided into three spans: 33.0m+33.0m+18.0m, each side of the span is 9.0m, where 10 sets of rails can park at the same time. (See Figure 1, 2) Figure 1. The plant of the train check library. Figure 2. East and west elevation of the train check library. The main span of the maintenance workshop is a monolayer space, and the track elevation is + 0.000 m. The main building cornice elevation is 10.9m, and the highest point of the skylight roof elevation is 14.6 m. The elevation of roof structure on both sides is 8.5 m and 6.75 m respectively. The span of"10 lines" maintenance workshop is divided into three spans, within which the adjacent track spacing is 8.5m and 7.0m, and the net spacing between track and structural column is 5.0 m. (See Figure 3) Figure 3. Section of the train check library-1. 2. Design of Architecture in Detail 2.1. Roof Construction Practices The main roof of the maintenance workshop adopts light steel roof truss on its base, with 0.65mm-thick profiled steel liner on it, the polyolefin coating of spun bonded polyethylene film of not less than 0.25mm as a vapor barrier layer, insulating layer with 100mm thick glass wool insulation board, waterproof and water vapor permeable layer adopts 0.49mm thick spun bonded polyethylene and polypropylene film, roof surface layer thickness of 0.8mm YX70-468 type fluorocarbon spraying aluminum zinc plate. (See Figure 4).

International Journal of Architecture, Arts and Applications 2017; 3(5): 68-72 70 Figure 4. Section of the train check library-3. 2.2. Construction Practice of Repair Ditch The design of the maintenance ditch of the rail adopts the independent "Y" type of reinforced concrete foundation bearing, the bottom thickness of the foundation is 1m, the double row reinforced cast-in-place casting. Flank is the "L" type 300mm-thick reinforced concrete cast-in-place trench wall. 700mm-high track pier is erected on the base, foot board installed in the waist of the bridge pier for convenient maintenance, tracks laid on the top of the bridge. (see Figure 5) Figure 5. Sectional view of entrance of maintenance channel.

71 Zhang Jialu et al.: A Study on the Design of Xinghuo Maintenance Workshop for Beijing-Shenyang Passenger High-speed Rail 3. The Research on the Fireproof Strategy of Maintenance Workshop In the design process, according to the "Code for Fireproof Design of Railway Engineering" (TB 10063-2007) (Ed. 2012) [3] standard, the fire risk of maintenance workshop is set to class C workshop, the fireproof grade is second. Fire extinguishing system is installed in maintenance workshop, according to the code fireproof code for architectural design (GB 50016-2014) [4] maximum fireproof zone should be controlled within the range of 16,000 m 2, and the safe evacuation length is 80.0m. In the main span range, when maintenance operations on the rails, due to rail auxiliary room, personnel in the vertical direction have evacuation difficulties, and extended track evacuation distance is too long, how to reconcile the conflict between graphic design and the national standard is an important subject in fire safety strategy research. So, in order to judge the feasibility of this design, the researchers need to carry out additional proof of the project about the lack of fireproof code. 3.1. Introduction of Fireproof Design When analyzing fireproof issue, the aim of "fireproof design plan [5] "is to guarantee the following situations: first, the prevention of fire; two, find fire in time; three, sensitive trigger alarm system; four, orderly evacuation of personnel; five, control and elimination of fire. Therefore, when the requirements of "Fireproof Code of Architecture Design [6]" cannot be meet by "design plan of fireproof", problems will be divided into several technical plan modules, which can not only ensure the safety of personnel evacuation but also control the fire, and the losses will be reduced to a minimum and the safety of the structure can be quaranteed [7]. 3.2. Judgment of Personnel Evacuation Safety The ultimate goal for the study on the fireproof performance of building is to ensure the safe evacuation of personnel, to make sure the whole building system (covering fire system) can provide sufficient time for all personnel to escape from the fire and the damage related. The researchers use parameter magnitude-tescape [8] to indicate the time needed for personnel evacuation, and parameter magnitude-trisk [9] to the time beyond human tolerance limit with fire development. And the third parameter magnitude-ts, indicating the changing relationship between the two, is the safety margin for personnel evacuation in fireproof design. Then the researchers can get a parameters formula about safe evacuation when fire happens: Tescape + Ts + Trisk (1) The time dimension of Tescape can be divided into three stages: awareness of the fire, evacuation operations, evacuation operations to reach the security area. In the fire accident, Ts represents a safety factor that is needed to eliminate the uncertainty of the fire. In the analysis of the hypothesis of the fire scenario, the researchers will locate the typical fire location in the A to F point, as shown in Figure 8, the six virtual fire points covering the most unfavorable evacuation point in the entire maintenance space. If fire starts from any one of the six points mentioned above (possibility of fire on multi points is considered negligible) [10], by calculating the evacuation (Tescape) the longest time is 476s, and that in the premise of automatic fire extinguishing device failure, the shortest time (Trisk) for the fire danger area is 1200s by measuring, which is far beyond the longest time required for evacuation. According to the analysis above, at any point of large space in the maintenance workshop, fire safety evacuation has sufficient safety margin (Ts). (see Figure 6). Figure 6. Parameter Analysis of Fire Development and Personnel. 3.3. Fire Partition Settings In view of the analysis above, the researchers have identified the following criteria for the inspection of the overall fireproof area partition: (1) The space between the main workspace and the two sides which has no evacuation condition is incorporated into an expanded fireproof area.

International Journal of Architecture, Arts and Applications 2017; 3(5): 68-72 72 (2) In the first layer, the space with no independent evacuation entrance will be divided into independent fireproof space, which should be isolated from main workshop space with no less than 3.0h fireproof wall, and the open holes should be set up with A-class fire doors and windows. (3) In the expanded fireproof zone, the auxiliary workshop and spare parts storage space, with higher fire risk should be equipped with no less than 2.0h fireproof wall, A-class fireproof doors, windows. (4) In the second layer, the office space is set up with fireproof areas according to the current code. Between main workshop and these areas, no less than 2.0h fireproof wall, A-class fireproof doors, and windows should be equipped with. 4. Conclusion Through the introduction of the design of Xinghuo Maintenance Workshop for Beijing-Shenyang Passenger High-speed Rail, this thesis analyzes the design of super-large space and the strategy of fireproof of 10-line high-speed rail workshop from the engineering point of view. From the professional perspective of the railway construction, this thesis makes an in-depth analysis on the configuration of space function and fireproof strategy of the maintenance workshop from a professional perspective, and provides a reference model for the design of maintenance space for multi-line rail. It is hoped that this thesis can make some contributions to effectively promote the engineering efficiency of national infrastructure construction in the present era of high-speed rail. References [1] http://baike.baidu.com/link?url=iyzmxrvkvudyhuhz5xph x4ztpwuwowtpskwuloeszeplhsty01lmm8nbaa6pp2f XBHlg8ZGmLwSyaLxkq6Zg72tj_bvX9kWK7c1Ocf0dO6t57 fp5bwl1srkhrl3y2wovple29wvodgwo7ugm5y094cqtz30 c9j4xsf80syyoofidlwkwckbyktqwaghpxn_vhrio2ztps ZBAY0ZfnsrPBHkparKAk3jcKiny5RUW2fW [2] Tienan Guo, Chinese fire handbook, Shanghai Science and Technology Press, Volume III, 2006.12, P. 726. [3] China Railway Administration, Code for fire protection design of railway engineering (TB 10063-2007), (2012 edition). [4] Tianjin Fire Research Institute, Architectural design code for fire protection (GB 50016 2014), (2005 edition). [5] Research Progress and Development Direction of Steel Structure Fireproof Coatings [J]. Geng Hezhong. Fire Fighting Technology and Product Information. 2007 (10). [6] Study on Performance Design of Building Fire [J]. Tu Jiapeng, Dong Weixin, Zhou Ming. Low Temperature Construction Technology. 2016 (10). [7] Australian Building Codes Board, FCRC Fire Engineering Guidelines(2006 edition). [8] Application of Fireproof Performance Design in Buildings [J]. Wang Yan-shan. Technology Innovation and Application. 2016 (32). [9] The fire test method for full-size model fire protection of external thermal insulation system [J]. Ji Guangqi, Zhu Chunling, Zhang Lequn. [10] Study on Human Evacuation Method in Building Fire [J]. Xiao Guoqing, Liao Guangxuan. Chinese Journal of Safety Science. 2006 (02).