Application for Commercial Plan Review and Building Permit. Address:

Similar documents
Commercial Remodel Permit

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

BUILDING PERMIT APPLICATION

PROCEDURE FOR REQUESTING A BUILDING PERMIT

BUILDING CODES & DESIGN CRITERIA

The Homeowner s Building Application Checklist for Constructing a Residential Addition

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

ORDINANCE. APPROVED EMERGENCY: (Yes) (No) VETOED: Date

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

PERMIT APPLICATION REQUIREMENTS NEW COMMERCIAL BUILDING/CONSTRUCTION CODES USED: CURRENT ADOPTED FLORIDA BUILDING CODE AND NEC

Residential Building Permit & Inspection Procedures

PERMIT APPLICATION REQUIREMENTS INTERIOR RENOVATIONS/BUILD OUTS CODES USED: ADOPTED FLORIDA BUILDING CODE & NEC

City of Jacksonville Development Guide Building Permits

BUILDING PERMIT BASICS

Residential New Home Requirements 200 South Main Blue Ridge, Texas

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

The following is required for a complete permit submittal for each unit.

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

All new construction, mobile home placement & additions.

MONROE COUNTY ZONING OFFICE

Application Requirements for obtaining a Building Permit

RESIDENTIAL BUILDING PLAN REQUIREMENTS

The following is required for a complete permit submittal for each unit.

HOW TO OBTAIN A BUILDING PERMIT

Zoning- check the zoning on the property you are planning to build on, this can be done at the municipal office.

RESIDENTIAL BUILDING PERMIT PROCEDURES

4. Number of drawings required: ( ) Locations of nearest streets

Ordinance No Lot Surface Drainage

BUILDING PERMIT PROCEDURE PLEASE READ CAREFULLY AND FILL OUT COMPLETELY TO ASSURE QUICK AND ACCURATE SERVICE

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements

RESIDENTIAL BUILDING PERMIT

TOWN OF WINDSOR CONSTRUCTION GUIDELINES

Last Updated March 15, 2016

Residential Building Permit Application

BUILDING DEPARTMENT GUIDE TO RESIDENTIAL BUILDING PERMITS

Construction Application for Permit (CAP) Instructions

City Planning & Development - Development Services (CPD-DS) 414 E. 12th Street 5 th Floor Kansas City, Missouri Telephone (816)

Village of Arlington Heights. Sewer Back-up Rebate Program

AGREEMENT CONCERNING EXISTING AS BUILT CONSTRUCTION

BUILDING PERMIT APPLICATION PACKAGE

Truth in Sale of Housing Disclosure Report NOTICE - Read Entire Report Carefully. This is not a Buyer's Inspection!

APPLICATION FOR PORCH / DECK PERMIT

BUILDING PERMIT APPLICATION

APPLICATION FOR CONTRACTOR REGISTRATION AND RENEWAL OF REGISTRATION INSTRUCTIONS AND CHECKLIST

TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX

COMMUNITY DEVELOPMENT

CITY of COLDWATER. Requirements for Obtaining Building Permits City of Coldwater, Michigan

Single Family Detached home submittal Workbook

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

The following materials and documents are required in order for you to obtain a Building Permit:

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

B U I L D I N G P E R M I T A P P L I C A T I O N

STORMWATER AND EROSION CONTROL PERMIT

PIKES PEAK REGIONAL BUILDING DEPARTMENT

RESIDENTIAL BUILDING PERMIT INFORMATION

HATFIELD TOWNSHIP DECK/PATIO PERMIT PROCEDURES

Residential Accessory Structure Application Packet (Carport, Shed, Garage, Pool)

RESIDENTIAL CONSTRUCTION PERMIT FEES

Property Condition Assessment

Fill out all sections or mark with N/A (not applicable)

Office Hours: 9 a.m. to 5 p.m. Kristal Bachman Community Development Administrator. Jaclynn Workman Inspections Coordinator

BUILDING A STRUCTURE IN THE FLOODPLAIN. IMPORTANT REQUIREMENTS Of Warren County Floodplain Management Ordinance

District of Barriere A GUIDE TO BUILDING PERMITS

City of Bullhead City Development Services/Public Works. Permit Submittal Requirements FENCES

Residential Electrical Upgrade Permit Revised: 11/15/17

BUILDING PERMIT SUBMITTAL REQUIREMENTS LIMITED AGRICULTURAL BUILDINGS

BUILDING PERMIT APPLICATION TYPE OF PERMIT: NEW CONSTRUCTION ADDITION ALTERATION HUD HOME MODULAR HOME OTHER:

City of Branson APPLICATION FOR CONSTRUCTION PERMIT

Fast Track Re-Roof Permit Checklist

Application for Zoning Certificate and/or Building Permit

RESIDENTIAL BUILDING PERMIT CHECKLIST FOR THE CITY OF SANTA ROSA

CITY OF CRANSTON RESIDENTIAL PERMIT PROCEDURE BASEMENT RENOVATION

Applying for Permits to build a new house in Linn County

One and Two Family Additions

THE FOLLOWING INFORMATION IS REQUIRED TO OBTAIN A CITY OF OTHELLO COMMERCIAL BUILDING PERMIT:

Repair or replace section of driveway, approach, or sidewalk that are a trip hazard.

Inspection Report. 1 of 8

Basement Renovation Guide For Residential Dwellings

2013 R-1 Building Permit Package For Additions, Decks, Fences & Garages

Commercial Permit Applications and Forms City of Alpharetta. Commercial Building Permit Applications and Forms

City of Donnelly. Permit Application Information and Instructions

GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW

GUIDE FOR APPLYING FOR A BUILDING PERMIT

Building Permit Submittal Requirements

BUILDING PERMIT APPLICATION GUIDE FOR HOMEOWNERS

The Inspection Process. Waxhaw N.C.

TOWN OF PORT ROYAL BUILDING CODES DEPARTMENT Building Permit Submittal Requirements

A HOMEOWNER S GUIDE TO ACCESSORY DWELLING UNITS

WARWICK TOWNSHIP Dept. of Planning & Zoning

Building/Zoning Permit Fee Structure

Town of Pittstown. Office of the Building Inspector / Code Enforcement Officer

A/E Design Deliverable Checklist

COMMERCIAL PLANS SUBMITTAL CHECKLIST For Commercial and Multi-family (3 or more units) Building Permit Applications

A homeowners/applicants guide to understanding and making application for a building permit.

Transcription:

City of Warrenton 200 West Booneslick Warrenton, MO 63383 : 636-456-3535 Fax: 636-456-1336 www. war r ent o n- mo.org Application for Commercial Plan Review and Building Permit PERMIT# Purpose: Commercial Building Number of Units: Applicant E-mail: Commercial: of Business: Type of Business or Service: : : Owner : : City: State: Zip: : Square Ft.: Estimated Date of Occupancy: of Shopping Center or Plaza: Any signs proposed? If yes, a Sign Permit Application must be submitted. General Contractor An Occupational License for all contractors and/or subcontractors performing any work within the scope of the permit is required prior to the issuance of the permit. : : City: State: Zip: : : : Engineer : : City: State: Zip: : Architect : : City: State: Zip: : Project Zoning: Use Group Type Construction: Estimated Cost of Construction: $ Is building site in floodplain? Yes No If yes, Floodplain Development Permit is required. Has property been surveyed? Yes No Surveyor: Notes: I hereby certify that the proposed work is authorized by the owner of record and that I have been authorized by the owner to make this application as his authorized agent and agree to conform to all applicable laws of this jurisdiction. The applicant further warrants the truthfulness of all information in the application and if any information provided is incorrect, or if the permit was issued wrongfully, the permit may be revoked. I understand that a commercial occupancy is required to file a business license application with the City Clerk s Office. Signature of Applicant Applicant s (Printed) Date Approval: Public Works Zoning Officer Building Commissioner 1 REV. 7/21/2015 jab

Applicant s Plan Submittal Checklist Meets Zoning Requirements Building Site in floodplain? If yes, Floodplain Development Permit is required Application filled out completely Sub-Contractor List: Excavation: Foundation: Framing: Plumbing: Electrical: HVAC: Drywall: Painting: Siding: Site Plan Soils Report Design Drawings Subcontractor List (See Below) REV. 7/21/2015 jab 2

Other: Other: Other: Notes: 3

200 West Booneslick Warrenton, MO 63383 : 636-456-3535 Fax: 636-456-1336 www.warrenton- mo.org COMMERCIAL CONSTRUCTION GUIDELINES References: City of Warrenton Municipal Code 2009 International Building Code (IBC)" 2008 National Electrical Code (NEC)" These guidelines have been prepared to assist in planning and construction of commercial buildings, including residential buildings for three or more families which are in compliance with city codes. Nothing contained in these guidelines is intended to replace or supersede the regulations contained in the City of Warrenton Municipal Code. Revised 10/22/14 4

COMMERCIAL GUIDELINES The information contained herein is intended to be used as guidance only and does not cover every requirement governing commercial construction. These guidelines address everything except residential which includes one-family, and two-family dwellings, both detached and attached, and townhouses no more than three stories high, where each has an independent means of egress and are separated by two hour fire separation assemblies. Should questions arise please refer to the appropriate sections in City of Warrenton Municipal Code (hereafter referred to as the City Code ) and the City Building Commissioner. 1. Zoning Requirements - Before submitting an application to build, you must determine the zoning requirements for the piece of property on which you plan to build. The Planning and Zoning Officer can help you with this and can guide you through the annexation, rezoning, site plan, and conditional use processes as appropriate. Specific zoning requirements are contained in Title IV- Land Use, of the City Code and are summarized below. 2. Floodplain Requirements - Some areas within the City limits of Warrenton fall within floodplains as defined by the Federal Emergency Management Agency (FEMA). If the proposed construction site falls in one of these areas a Floodplain Development Permit Application must be submitted with the application for a building permit. (See Chapter 415 of the City Code.) A FEMA Flood Insurance Rate Map (FIRM) for the City of Warrenton is available at Warrenton City Hall for use in determining if these requirements apply to your project. The Building Commissioner has been designated as the Floodplain Administrator for the City and is available to assist you in this process. 3. Building Codes - Commercial construction in the City of Warrenton is governed by the code requirements contained in the documents listed on the front cover of these guidelines. Commercial in this case includes everything except one and two family residential, which are covered in the Residential Guidelines, published separately. Please contact the Building Commissioner if you have questions. 4. Building Permit Application - Once all zoning issues have been addressed and the necessary approvals have been obtained from the Planning and Zoning Commission and the Board of Alderman and the design is complete, fill out and submit an application for plan review and building permit. Supporting documentation and information to be submitted with the application include the following: Site Plan - This plan must show the metes and bounds (property lines), setback, and easement requirements for the property on which construction is to take place. The proposed location of the structure must be clearly shown and should consider potential drainage conditions, structure design, parking, and vehicle and accessibility requirements. Site plans should be drawn to scale, 1" = 20'-0" (min) and show the name, address and phone number of the person(s) who prepared the document. Please indicate the size and location of all structures to be located on the property. Great care should be taken with this step to avoid costly mistakes. A.DX file is required. Design Drawings SECTION 500.110: AMENDMENTS TO INTERNATIONAL BUIDING CODE 106.1 Submittal documents. Construction documents, special inspection and structural observation programs and other data shall be submitted in one (1) or more sets with each application for a permit. The construction documents shall be prepared, signed and sealed by a registered design professional licensed and registered in the State of Missouri. Where special conditions exist, the Building Commissioner is authorized to require additional construction documents to be prepared by a registered design professional. Soils Report - A soils report, prepared by a qualified geotechnical engineer, may be required. Utilities - Plans must also clearly show the size electric service specified, water source, sewage disposal system, and gas service. the Warrenton Public Works Department at 636-456-3535 for further details on requirements, tap fees, rates, and inspections. Subcontractor List - A list containing the business name, address, phone number, and contact name for each subcontractor to be used to perform work on the project shall be submitted with the application. In cases where selections or changes are made after the application is submitted please provide the subcontractor information to the Building Commissioner as soon as possible. An Occupational License for all contractors and/or subcontractors performing any work within the scope of the permit is required prior to the issuance of the permit. Plan Review - Upon receipt of the completed application and supporting documentation the Warrenton Building Department will review and evaluate the plans to determine if they are compliant with all City and Building Codes. Every effort will be made to complete this process in a timely manner. Incomplete submittals may delay the process and approval of a Building Permit. Storm Water Review - Each building site will be evaluated by city officials for proper storm water drainage during the site plan review and approval process. This review may result in a requirement for erosion control provisions during construction and final grading requirements prior to project completion. Please be advised that work on the building site may not commence until an approved 5

Building Permit is issued. Design Review - All drawings and other design information provided will be examined with respect to current building codes and city ordinances for compliance and completeness. If design information is incomplete or missing it will be requested as soon as discovered and could delay the approval of the Building Permit. Issue Permit - Once the review process is complete an approved Building Permit will be issued and may be picked up from the cashier at Warrenton City Hall. Construction must begin within 180 days of the permit issue date or the Building Permit becomes void. Fees See Warrenton Municipal Code Section 405.400 and Section 500.040 www.warrenton-mo.org Permit Fee: Estimated Cost X.0040 Plan Review Fee: Estimated Cost X.0015 Minimum Fee: $25.00 Inspections - Planned inspections are as follows: (additional inspections may be required) Excavation - When the excavation is complete an inspection will be made to examine soil conditions and plans for abating the effects of plastic clay or any other condition that can affect the stability of a foundation. This inspection will be conducted prior to placement of material required to mitigate the effects of local soil conditions, even when a soils report has been prepared for the property by a design professional. Please submit a copy of such reports to the Building Commissioner for filing with permit and inspection records. If a base rock is to be placed an additional inspection is required. Footing - This inspection will be made when the footings have been formed and the reinforcing steel has been laid out and ready for placement to verify compliance with the approved blue-print. Plumbing sleeves and sump pit must be in place if soil conditions have been mitigated with rock fill. Plumbing Ground Rough - This inspection will be made prior to placing the concrete floor in a basement or grade level floor. Sanitary sewer lines, water lines, drain lines, sump pits, and any other below floor facilities will be inspected. Open Wall - This inspection will be made prior to insulating and closing up walls and ceilings. Plumbing, electrical, HVAC, exhaust venting (dryers, vent fans, etc.) to the outside, fire blocking, framing, attic ventilation, and any other special provisions will be inspected at this time. Note: Truss plans not submitted with the application documents are to be submitted prior to this inspection. Electrical Meter Base - This inspection is required before Ameren UE will connect active service to a building. A disconnect at the meter base is required for installations where the inside circuit breaker panel is located more than fifteen (15) feet from the meter base. Entrance approaches and Sidewalks Entrance Approaches shall be built in accordance with WMC410.130, Sidewalks must be built in accordance with WMC 410.140. An inspection by City Staff is required prior to placing material for the entrance or sidewalk. Final A final inspection is required before Certificate of Occupancy will be issued. Prior to a final inspection the Record or As Built digital plan file must be submitted and approved prior to a Certificate of Occupancy being issued. All electrical, plumbing, smoke detection, exhaust vent, and HVAC systems will be inspected for proper operation. Gutters, down spouts, sump drains, and lot grading and exterior elements will be inspected for proper drainage and compliance with the approved site plan. Exterior finish, including siding, windows, doors, masonry, roofs, soffits, sidewalks, driveways, painting, electrical fixtures and outlets, plumbing fixtures, decks, steps, porches, etc. will be inspected. The Public Works Department will also do a final inspection at this time to insure that all water shut off valves, sewer lines and clean outs, and manholes (if applicable) are in proper working order. Finally, each dwelling must have the correct address displayed clearly on the front of the building. Certificate of Occupancy - Once the final inspection has been completed the Building Department will issue either a Temporary Certificate Occupancy or a final Certificate Occupancy. A Temporary Certificate Occupancy can be issued if there is no structural, health or safety related conditions existing and the owners wish to occupy the dwelling before all open items, such as incomplete grading due to weather conditions, have been completed. The person(s) to whom the permit is issued is responsible for arranging access to the building and scheduling the specific time for a re-inspection upon full completion of the Permit requirements. A final Certificate of Occupancy is required by the City of Warrenton to complete the Building permit. Stop Work Order- A stop work order may be issued when unsafe conditions are discovered, unauthorized work is being performed, or work is being performed by contractors or subcontractors that are not registered with the City of Warrenton. 6