BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

HOW TO OBTAIN A BUILDING PERMIT

The Homeowner s Building Application Checklist for Constructing a Residential Addition

A homeowners/applicants guide to understanding and making application for a building permit.

District of Barriere A GUIDE TO BUILDING PERMITS

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

Applying for Permits to build a new house in Linn County

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

Zoning- check the zoning on the property you are planning to build on, this can be done at the municipal office.

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

One and Two Family Additions

Residential Building Permit Application

10/23/2011. Plan Examination. Plan ExaminationPurpose. Catch problems in advance of construction.

2010 National Building Code Adoption and Associated Process Changes

BUILDING PERMIT APPLICATION PACKAGE

RESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST

BUILDING DEPARTMENT GUIDE TO RESIDENTIAL BUILDING PERMITS

Administrative Changes

BUILDING PERMIT APPLICATION

Commercial Remodel Permit

Civic Address (Street No. & Name):

Basement Renovation Guide For Residential Dwellings

Each proposed project will be reviewed for compliance with the following codes as applicable.

BUILDING CODES & DESIGN CRITERIA

Town of Pittstown. Office of the Building Inspector / Code Enforcement Officer

AGREEMENT CONCERNING EXISTING AS BUILT CONSTRUCTION

ORDINANCE. APPROVED EMERGENCY: (Yes) (No) VETOED: Date

Building Permit Application Instructions INFORMATION REQUIRED FOR ISSUANCE OF A BUILDING PERMIT

RESIDENTIAL BUILDING PLAN REQUIREMENTS

Last Updated March 15, 2016

Application for Commercial Plan Review and Building Permit. Address:

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

Building a Detached Garage

4. Number of drawings required: ( ) Locations of nearest streets

All new construction, mobile home placement & additions.

INFORMATIONAL PACKAGE ACCESSORY RESIDENTIAL BUILDINGS (INCLUDING DETACHED GARAGES, STORAGE BUILDINGS & WORKSHOPS)

BUILDING PERMIT APPLICATION

CITY OF CRANSTON RESIDENTIAL PERMIT PROCEDURE BASEMENT RENOVATION

GUIDE FOR APPLYING FOR A BUILDING PERMIT

RESIDENTIAL BUILDING PERMIT PROCEDURES

BUILDING PERMIT PROCEDURE PLEASE READ CAREFULLY AND FILL OUT COMPLETELY TO ASSURE QUICK AND ACCURATE SERVICE

Residential Accessory Structures & Room Additions

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018)

Building Guide. Colorado Chapter of the International Code Council

COMMUNITY DEVELOPMENT

An Applicant s Guide to Residential Building Permits.

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements

Single Family Detached home submittal Workbook

A HOMEOWNER S GUIDE TO ACCESSORY DWELLING UNITS

City of Donnelly. Permit Application Information and Instructions

Woodstoves, Fireplaces, Chimneys & Outdoor Solid Fuel Combustion Appliances

Truth in Sale of Housing Disclosure Report NOTICE - Read Entire Report Carefully. This is not a Buyer's Inspection!

CITY of COLDWATER. Requirements for Obtaining Building Permits City of Coldwater, Michigan

Building Department. Building Permits A Homeowner s Guide

Detached Garages and Building Permits. 1 and 2 Family Dwellings

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1%

Detached Garage Construction Information

PRE-FABRICATED HOUSING

BUILDING PERMIT GUIDELINES - RESIDENTIAL

SCREEN PORCHES 101 DEVELOPMENT RESOURCES, INC Permit Requirements

CITY OF CRANSTON PLANS MUST BE APPROVED BY THE FIRE DEPARTMENT BEFORE SUBMITTING TO OUR OFFICE FOR REVIEW.

Zoning- check the zoning on the property you are planning to build on, this can be done at the municipal office.

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

MONROE COUNTY ZONING OFFICE

Required Information for Permit Issuance

THE CORPORATION OF THE TOWNSHIPSHIP OF ADELAIDE METCALFE

BUILDING PERMIT BASICS

2003 International Residential Building Code

HATFIELD TOWNSHIP DECK/PATIO PERMIT PROCEDURES

The Inspection Process. Waxhaw N.C.

BUILDING AND DEVELOPMENT AUTHORIZATION ACT

NEW HOME CONSTRUCTION June 2017

BUILDING PERMIT APPLICATION

Repair or replace section of driveway, approach, or sidewalk that are a trip hazard.

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

City Planning & Development - Development Services (CPD-DS) 414 E. 12th Street 5 th Floor Kansas City, Missouri Telephone (816)

BUILDING PERMIT SUBMITTAL REQUIREMENTS LIMITED AGRICULTURAL BUILDINGS

Building/Zoning Permit Fee Structure

Residential New Home Requirements 200 South Main Blue Ridge, Texas

Minimum Requirements For One & Two Family Structures FBC 6 th Edition (2017)

APPLICANT / CONTACT:_

Residential Building Inspections

THE STRATA UNIT May 25, 2008

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures

Residential Development & Building Application - ADDITIONS / ALTERATIONS / DEMOLITIONS -

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS

City of Jacksonville Development Guide Building Permits

RESIDENTIAL BUILDING PERMIT

Home Energy Assessment Rebate Guide

Village of Glencoe 675 Village Court, Glencoe, Illinois

B U I L D I N G P E R M I T A P P L I C A T I O N

Property Condition Assessment

City of Hughson Building Safety Division 7018 Pine Street Hughson, CA (209)

CONSTRUCTION CODE PERMIT INFORMATION

Copyrighted Home Plan 2011 Natural Element Homes, LLC

Transcription:

Permit Application # Building Permit # Building Project Type: A. Project Information Lot: Plan: District Lot: Legal: PID: Site Address: Project Square Area (Ft 2 or M 2 ) Project Construction Value $ B. Purpose of Application: New Build Addition/Renovation/Repair Plumbing/Water Service Demolition Additional Information: C. Owner Information Last name Mailing Address: BUILDING PERMIT APPLICATION First name INSPECTION SERVICES 1450 KLO Rd., Kelowna, B.C.V1W 3Z4 Phone: 250-469-6211 Fax: 250-762-7011 email: inspection@cord.bc.ca E-mail: Fax: D. Agent/Contractor Information Company Name: Telephone: Mobile Phone: Contact Person Business Mailing Address: Business License Number E-mail: Fax: Telephone: Mobile Phone: E. Declaration of Applicant 1) I acknowledge that if I am granted a building permit pursuant to this application that I am responsible for compliance with the current edition of the Code, Regional District of Central Okanagan Building Bylaw and any other applicable enactment, code, regulation or standard relating to the work in respect of which the permit is issued, whether or not the said work is undertaken by me or by those whom I may retain or employ to provide design and/or construction services. 2) I acknowledge that neither the issuance of a permit under the Regional District of Central Okanagan Building Bylaw, nor the acceptance or review of plans, specifications, drawings or supporting documents, nor inspections made by or on behalf of the Region constitute a representation, warranty, assurance or statement that the current edition of the British Columbia Code, the Building Bylaws of the Regional District of Central Okanagan or any other applicable enactment, code, regulation or standard has been complied with. 3) Where the Region requires that Letter of Assurance be provided by a registered professional pursuant to Section 9.8 of the Regional District of Central Okanagan Building Bylaw and Section 290 of the Municipal Act, I confirm that I have been advised in writing by the Region that it relied exclusively on the Letter of Assurance of Professional Design and Commitment for Field Review prepared by (insert name of registered professional or attach list) in reviewing the plans, drawings, specifications and supporting documents submitted with this application for a building permit. 4) I confirm that I have relied only on the said registered professional for the adequacy of plans, drawings, specifications and supporting documents submitted with this application. 5) I understand that I should seek independent legal advice in respect of the responsibilities I am assuming upon the granting of a permit by the Region pursuant to this application and in respect of the execution of this acknowledgement. 6) I hereby apply for a building permit in accordance with the submitted documents and this application. 7) As Owner of the above noted property, I authorize Agent/Contractor as identified in Section D to make application on my behalf: Owner Signature Owner/Authorized Agent Signature: X Date _

REQUIRED INFORMATION FOR NEW BUILDINGS / ADDITIONS / ACCESSORY BUILDINGS/GARAGES/CARPORTS Completed application form Energy Efficiency Data (to be completed by Consultant or Insulation Contractor) Domestic water availability documentation (if applicable) Public sewer connection or public health sewage disposal permit (if applicable) Geotechnical details and Schedules B1 & B2 (if applicable) Structural details and Schedules B1 & B2 (if applicable) Driveway access from the Ministry of Highways (if on HWY, Westside Rd, or Commercial) Wildfire Covenant registered on Title (if applicable) HPO - Homeowner Protection Act documentation (if applicable and must be submitted prior to issuance of Building Permit) TWO SETS OF DRAWINGS MUST BE PROVIDED INCLUDING: Site Plan, drawn to a scale of 1:200 (1/16 = 1.0 ) showing: legal description, North arrow, all existing & proposed buildings & their uses on property, building setbacks (front, sides, and rear), lot dimensions, driveway location, driveway grade, easements, right-of-ways, water, sanitary sewer and storm sewer connection locations, septic tank location (if applicable), surface drainage, retaining walls (including material & height), property corners geometric elevation (grade), proposed basement elevation (grade), proposed basement elevation Foundation Plan: include building dimensions, min. footing size, chimney footings, point loads, expanded footings, foundation wall thickness, max wall height, drain tile, connection and or drywell, if retaining wall is >1.5m in height, apply for Development Variance Permit and Building Permit Basement Plan: include radon gas controls, columns, beams, bearing walls, partition walls, doors, windows, stairs, rough-in plumbing, water/sewer service lines (including size of service line), floor drains, and clean-outs, location of water heater (floor drain pan location), location and type of heating system (indicate whether an HRV unit is being installed or not), air conditioning and ventilating equipment Floor Plans (of each level): engineered floor systems layout, location of all smoke alarms and Carbon Monoxide detectors, exhaust fans, size and swing of doors, size and opening of windows, location and description of all plumbing works and number of plumbing fixtures, all appliances, location and dimensions of all stairs (handrail locations and details, guardrail locations and details), label the function of all rooms, room sizes, total finished floor area, total unfinished floor area, attic and crawl space access (complete with dimensions), wood stoves and wood fireplaces to CSA standards, and Manufactured roof truss, floor joist and beam details inclusive of floor joist spans. Where necessary, schematic drawings that show the size and location of every pipe and trap in the drainage system of the project Cross sections and details: existing and finished grades, wall, roof, floor, ceiling, and deck assembly (insulation, sheathing, interior finish, exterior finish, roofing material, roof slope), height of each floor, height of the entire building, stair detail, roof venting), slab details, radon gas controls, foundation perimeter drain, backfill heights basement walls, foundation walls and footing, deck construction details and slope Building elevations for each side showing: spatial separation, building height, finished grade roof slopes, exterior finishes, doors, windows, type of roofing

THE FOLLOWING MAY BE REQUIRED DUE TO THE SIZE AND COMPLEXITY OF THE PROJECT (to be advised at plan check stage): Development permit, development variance permit, environmentally sensitive area development permit (ESADP), (IE. Auqatic, Terrestrial, Wildfire, Slope) Development cost charges Subdivision servicing and development bylaw requirements Agricultural land commission approval Referral to the local fire department Referral to the public health department REQUIRED INFORMATION FOR ADDITIONS (ie. Decks, Pools, Retaining Walls) DECKS: TWO SETS OF DRAWINGS(TO SCALE) MUST BE PROVIDED INCLUDING: Site Plan: include all existing & proposed buildings & their uses on property, lot dimensions, driveway location, driveway grade, building setbacks (front, sides, and rear), easements, rightof-ways, septic tank location (if applicable), surface drainage, retaining walls (including material & height), property corners geometric elevation (grade) Deck Plans Homeowner Authorization, Agency Agreement (if applicable) POOLS: TWO SETS OF DRAWINGS(TO SCALE) MUST BE PROVIDED INCLUDING: Site Plan: include all existing & proposed buildings & their uses on property, lot dimensions, driveway location, driveway grade, building setbacks (front, sides, and rear), easements, rightof-ways, septic tank location (if applicable), surface drainage, retaining walls (including material & height), property corners geometric elevation (grade) Pool Plans (pool information) Geotechnical Report (if applicable) Homeowner Authorization, Agency Agreement (if applicable) RETAINING WALLS: TWO SETS OF DRAWINGS(TO SCALE) MUST BE PROVIDED INCLUDING: Site Plan: include all existing & proposed buildings & their uses on property, lot dimensions, driveway location, driveway grade, building setbacks (front, sides, and rear), easements, rightof-ways, septic tank location (if applicable), surface drainage, retaining walls (including material & height), property corners geometric elevation (grade) Retaining Wall Plans (including material & height) Engineering drawings if wall greater than 5 Geotechnical Report (if applicable) Homeowner Authorization, Agency Agreement (if applicable)

WOOD STOVE: Wood Stove manufacturer specifications, wood stove to be CSA approved Building/Inspections requires combustion air and Carbon Monoxide detector in same room (Inspection after installation) WETT Certification (after installation) DEMOLITION: Homeowner Authorization, Agency Agreement (if applicable) RENOVATION: Two sets of drawings (TO SCALE) (include any changes, i.e. grades, additions, deletions) Homeowner Authorization, Agency Agreement (if applicable) Internal Notes: Conditions of Permit: COW _ COE _ Zoning _ALR Fire Protection Planning: Project Value $ x.012 Fee $ _ Environmental: Plumbing Fixture Count: @ $10.00 Fee $ DP: Fire / Slope / Aquatic /Terrestrial / Form Character/Concept Dev _ Paid Application Fee Surcharge Fee $ _ Engineering: Sewer Service (yes no ) Fee $ Water Service (yes no ) Fee $ Total Permit Fees: Initial: Date:

Email: inspection@cord.bc.ca Dec 11, 2014 This bulletin is for informational purposes only. Please be sure to consult the relevant RDCO bylaw. PURPOSE To inform, staff, building contractors and the general public of changes to the British Columbia Building Code (BCBC) regarding the Energy Efficiency of homes. BACKGROUND Effective December 19, 2014 all building permit applications must address the requirements of Section 9.36 Energy Efficiency of the BCBC. These changes will require additional information at time of permit application. Upon submission it will be necessary to outline: proposed heating/cooling systems building ventilation as per 9.32 (is a heat recovery ventilator being used HRV) location and type of air barrier and vapour barrier detailed wall/ceiling/floor assemblies including Effective Insulation Values of all components U ratings of proposed windows and doors Previously, the BCBC has relied on nominal insulation values when considering building insulation. Section 9.36 will change this requirement to Effective Thermal Resistance (ETR). To achieve the required rating the entire cross-section of the wall/floor/ceiling will be used to calculate the RSI or R value. Each component of an assembly carries a rating (see attached table Thermal Resistance Values of Common Building Materials ). There are now three available options that can be used to attain the necessary compliance. Applicants can follow the prescriptive requirements of Section 9.36, and use simple tradeoffs as outlined in Article 9.36.2.11 or supply performance modeling completed by a Certified Energy Advisor (CEA). A list of CEA are available on the Canadian Home Builders Association website or by clicking here. 1

Email: inspection@cord.bc.ca Energy Efficiency Requirement for an SFD Prescriptive Method Prescriptive Method with simple trade offs Performance Method Without an HRV With an HRV Without an HRV With an HRV Supply design and computer modeling determined by CEA Use tables in 9.36 to determine the required ETR for assemblies Use HRV tables in 9.36 to determine the required ETR for assemblies Use tables in 9.36 to determine the required ETR for assemblies Use HRV tables in 9.36 to determine the required ETR for assemblies Onsite installation is to be reviewed by CEA and monitored by the B.I. Any changes are to be submitted and approved prior to installation Any changes are to be submitted and approved prior to installation Apply simple tradeoff methods as outlined in 9.36.2.11 Apply simple tradeoff methods as outlined in 9.36.2.11 Inspection by B.I. and verification of compliance from CEA Onsite inspections Onsite inspections Any changes are to be submitted and approved prior to installation Any changes are to be submitted and approved prior to installation Occupancy permit issued Occupancy permit issued Occupancy permit issued Onsite inspections Onsite inspections Occupancy permit issued Occupancy permit issued 2

Email: inspection@cord.bc.ca CONCLUSION The Regional District of Central Okanagan provides the following tables to aid designers, builders, owners and other parties with achieving compliance with the new Energy Efficiency requirements. These tables are not intended to address all possible construction assemblies. It is intended to act as a guideline and it is the owner s responsibility to ensure full compliance with all BCBC requirements. Additional information can be obtained from the Canadian Wood Council or by clicking here. The required ETR ratings from the BCBC for Zone 5 which includes the Regional District of Central Okanagan and surrounding areas are as follows: Buildings without a Heat-recovery Buildings with a Heat-recovery Ventilator Ventilator Assembly RSI R Assembly RSI R Ceilings below attics 8.67 49.23 Ceilings below attics 6.91 39.23 Cathedral ceilings and flat roofs 4.67 26.52 Cathedral ceilings and flat roofs 4.67 26.52 Walls 3.08 17.49 Walls 2.97 16.86 Floors over unheated spaces 4.67 26.52 Floors over unheated spaces 4.67 26.52 Foundation 2.98 16.92 Foundation walls walls 2.98 16.92 Unheated floors* Unheated floors below frost line Uninsulated Uninsulated below frost line Uninsulated Uninsulated above frost line 1.96 11.13 above frost line 1.96 11.13 Heated floors 2.32 13.17 Heated floors 2.32 13.17 Slabs-on-grade with an integral footing 1.96 11.13 Slabs-on-grade with an integral footing 1.96 11.13 * Where an unheated floor assembly falls into both categories the entire floor shall be insulated as required for above frost line. 3

The following tables are to be completed by the Architect or Insulation Contractor and submitted with all SFD permit applications Is an HRV unit to be used? YES NO (APP# ) Outside air film Roofing Strapping Sheathing membrane Sheathing Insulation above trusses Truss spacing Bottom cord height Vapour barrier Gypsum (mm) Interior air film Typical Ceiling Assembly Material RSI R Outside air film Cladding Strapping Sheathing membrane Sheathing Stud wall Insulation Vapour barrier Gypsum (mm) Interior air film Typical Wall Assembly Material RSI R 4

5

Interior air film Flooring material Underlay Sheathing Air barrier Vapour barrier Joist spacing Insulation Gypsum (mm) Outside air film Typical Floor Assembly Material RSI R Outside air film Insulation Damp proofing Concrete Interior air film Typical Foundation Wall Assembly Material RSI R 5

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. Typical Additional Assembly Material RSI R 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. Typical Additional Assembly RSI R 6