PERMIT APPLICATION REQUIREMENTS INTERIOR RENOVATIONS/BUILD OUTS CODES USED: ADOPTED FLORIDA BUILDING CODE & NEC

Similar documents
PERMIT APPLICATION REQUIREMENTS NEW COMMERCIAL BUILDING/CONSTRUCTION CODES USED: CURRENT ADOPTED FLORIDA BUILDING CODE AND NEC

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

NOTICE TO APPLICANT WARNING TO OWNER AND AFFIDAVIT

HERNANDO COUNTY COMMUNICATION TOWER, ANTENNA & EQUIPMENT CABINET REVIEW REQUIREMENTS

Commercial Remodel Permit

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule.

RESIDENTIAL BUILDING PERMIT PROCEDURES

SUBSTANTIAL IMPROVEMENT

Application for Commercial Plan Review and Building Permit. Address:

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

Re-Roof Permit Checklist

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

Application Requirements for obtaining a Building Permit

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

OWNER S AFFIDAVIT. I, certify that I am the owner of the property described as: ADDRESS: LOT: BLOCK: SUBDIVISION:

COMMUNITY DEVELOPMENT

RESIDENTIAL BUILDING PERMIT

Residential Accessory Structure Application Packet (Carport, Shed, Garage, Pool)

Office Hours: 9 a.m. to 5 p.m. Kristal Bachman Community Development Administrator. Jaclynn Workman Inspections Coordinator

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

Building Permit Documentation Required:

All new construction, mobile home placement & additions.

TOWN OF PORT ROYAL BUILDING CODES DEPARTMENT Building Permit Submittal Requirements

HENDRY COUNTY BUILDING, LICENSING & CODE ENFORCEMENT

BUILDING PERMIT PROCEDURE PLEASE READ CAREFULLY AND FILL OUT COMPLETELY TO ASSURE QUICK AND ACCURATE SERVICE

BUILDING PERMIT APPLICATION

CITY of COLDWATER. Requirements for Obtaining Building Permits City of Coldwater, Michigan

City of Bullhead City Development Services/Public Works. Permit Submittal Requirements FENCES

Residential Building Permit & Inspection Procedures

STORM WATER MANAGEMENT CONTROL PERMIT

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

Required Information for Permit Issuance

Town of Pittstown. Office of the Building Inspector / Code Enforcement Officer

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

PROCEDURE FOR REQUESTING A BUILDING PERMIT

The following materials and documents are required in order for you to obtain a Building Permit:

Residential New Home Requirements 200 South Main Blue Ridge, Texas

COMMERCIAL PLANS SUBMITTAL CHECKLIST For Commercial and Multi-family (3 or more units) Building Permit Applications

CITY OF CRANSTON RESIDENTIAL PERMIT PROCEDURE BASEMENT RENOVATION

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

DEVELOPMENT SERVICES PO Box 1110 Tampa, FL Date: May 12, Interested Parties. John L. Barrios, CBO, Building Official

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements

BUILDING PERMIT APPLICATION TYPE OF PERMIT: NEW CONSTRUCTION ADDITION ALTERATION HUD HOME MODULAR HOME OTHER:

BUILDING PERMIT APPLICATION PACKAGE

BUILDING PERMIT APPLICATION

Residential Electrical Upgrade Permit Revised: 11/15/17

One and Two Family Additions

APPLICATION FOR PORCH / DECK PERMIT

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

RESIDENTIAL BUILDING PERMIT INFORMATION

II. IDENTIFICATION A. OWNER OR LESSEE ADDRESS (number, street, P. O. Box, Apt., etc.)

A homeowners/applicants guide to understanding and making application for a building permit.

INFORMATIONAL PACKAGE ACCESSORY RESIDENTIAL BUILDINGS (INCLUDING DETACHED GARAGES, STORAGE BUILDINGS & WORKSHOPS)

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

STORMWATER AND EROSION CONTROL PERMIT

Plainfield Township Building and Zoning Department P.O. Box 247 Hale, MI PH(989) FX(989) Authority: P.A. 230 of 1972 As Amended

DOUGLAS COUNTY BUILDING PERMIT APPLICATION

AGREEMENT CONCERNING EXISTING AS BUILT CONSTRUCTION

4. Number of drawings required: ( ) Locations of nearest streets

Showing Only Sections Changed 6 th Edition FBC (2017) from 5 th Edition FBC (2015) [changes shown with underline and strike-through]

ORDINANCE. APPROVED EMERGENCY: (Yes) (No) VETOED: Date

BUILDING PERMIT SUBMITTAL REQUIREMENTS LIMITED AGRICULTURAL BUILDINGS

City of Jacksonville Development Guide Building Permits

Fill out all sections or mark with N/A (not applicable)

Building Permit Application Instructions INFORMATION REQUIRED FOR ISSUANCE OF A BUILDING PERMIT

Application for Zoning Certificate and/or Building Permit


Last Updated March 15, 2016

Inspection of New One- and Two- Family Dwellings

RESIDENTIAL BUILDING PLAN REQUIREMENTS

Residential Building Permit Application

SIDING BUILDING PERMIT APPLICATION

Commercial Tax Abatement

HATFIELD TOWNSHIP DECK/PATIO PERMIT PROCEDURES

TOWN OF WINDSOR CONSTRUCTION GUIDELINES

Memo to All Licensed Professionals Regarding Requirements for Site Plans & Surveys

City of Centerville Building, Zoning & Code Enforcement Department

WE MUST HAVE 72 HOURS NOTICE. Phone

TOWN OF DEWITT PLANNING AND ZONING PERMIT REQUIREMENTS FOR DECKS

Ordinance No Lot Surface Drainage

BUILDING/STRUCTURE/TRADE

Building Permit Submittal Requirements

TOWN OF SOUTH KINGSTOWN REQUIREMENTS FOR BUILDING PERMITS RESIDENTIAL SINGLE FAMILY

PERMITS, ADDRESSES, AND INSPECTIONS

New York State Unified Solar Permit Expedited Solar Permit Process for Small-Scale Roof-Mounted Residential and Commercial Solar Electric

CITY OF CRANSTON PLANS MUST BE APPROVED BY THE FIRE DEPARTMENT BEFORE SUBMITTING TO OUR OFFICE FOR REVIEW.

RESIDENTIAL CONSTRUCTION PERMIT FEES

CUSTOMER ASSISTANCE GUIDE BUILDING PERMIT APPLICATION SUBMITTAL REQUIREMENTS COMMERCIAL AND MULTI-FAMILY

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

City of Donnelly. Permit Application Information and Instructions

Commercial Permit Applications and Forms City of Alpharetta. Commercial Building Permit Applications and Forms

City Planning & Development - Development Services (CPD-DS) 414 E. 12th Street 5 th Floor Kansas City, Missouri Telephone (816)

REQUEST FOR BIDDER QUALIFICATIONS

Madison County Property Improvement Check List

District of Barriere A GUIDE TO BUILDING PERMITS

BUILDING DEPARTMENT GUIDE TO RESIDENTIAL BUILDING PERMITS

Fast Track Re-Roof Permit Checklist

MUNICIPAL OFFICES 1481 EAST COLLEGE AVENUE, STATE COLLEGE, PA TELEPHONE: FAX:

COMMERCIAL WINDSTORM MITIGATION INSPECTION REPORT Prepared for: Boca Vista Condominium Association, Inc th Avenue Madeira Beach, FL 33708

Transcription:

PERMIT APPLICATION REQUIREMENTS MANDATORY DOCUMENTS: INTERIOR RENOVATIONS/BUILD OUTS CODES USED: ADOPTED FLORIDA BUILDING CODE & NEC 1. COMPLETED INTERIOR RENOVATIONS/BUILDOUT PERMIT APPLICATION PACKET. ALL APPLICABLE LINE ITEMS MUST BE FILLED OUT. OTHER DOCUMENTS, AS APPLICABLE, DEPENDING ON THE NATURE OF THE PROJECT. 1. TWO (2) SETS OF PLANS and CD: RESIDENTIAL ONE (1) REDUCED SIZE (11x17) & ONE (1) FULL SIZE (24x36) COMMERCIAL TWO (2) FULL SIZE (24x36) All plans shall include foundation, elevation, framing detail, floor plan, etc. NOTE: Load calculations required for sealed drawings along with signed, sealed, Wind Load Letter certification at dry in for sealed drawings. PROJECTS REQUIRING SIGNED AND SEALED DRAWINGS ARE LISTED BELOW PER FLORIDA STATUTE (a) PROJECTS $25,000 OR OVER (b) BUILDING 5,000 SQUARE FOOT AND OVER (may require ICC plan review) (c) BUILDINGS 3 STORIES AND OVER (may require ICC plan review) (d) ALL ASSEMBLY OCCUPANCIES (F.S. 481.229) (SCHOOLS, AUDITORIUMS, AND OTHER PUBLIC USE BLDGS) (e) ELECTRICAL SYSTEMS OVER 800 AMPS OR $125,000 (f) PLUMBING OVER 250 FIXTURE UNITS OR $125,000 (g) MECHANICAL OVER 15 TONS OR $125,000 (h) PRODUCT APPROVAL FOR EXTERIOR DOORS, WINDOWS, SKYLIGHTS, PANEL WALLS, (EIFS) STOREFRONTS, ROOFING PRODUCTS, SHUTTERS, STRUCTURAL COMPONENTS AND NEW EXTERIOR ENVELOPE PRODUCTS. (F.S. 553.842) 2. TWO (2) EACH SCALED SITE PLAN OR SURVEY: ONE (1) REDUCED SIZE (11X17) & ONE (1) FULL SIZE (24X36) CONFORMING TO LAND DEVELOMENT CODE SECTION 2.13.00 AND 2.18.02 GENERAL PLAN REQUIRMENTS. 3. WARRANTY DEED (Home Owner will need to sign owner affidavit if owner/contractor) 4. ENERGY PACKET (F.S.553) (Signed & sealed by Florida registered engineer or architect if exceeds $125,000 or 15 tons) (F.S. 471.003) 5. WATER & SEWER APPROVAL LETTER REQUIRED FROM DESTIN WATER USERS (850)-837-6146. 6. DESTIN FIRE DEPARTMENT APPROVAL LETTER REQUIRED FOR COMMERCIAL PROJECTS (850)-837-8413 7. ALL APPLICABLE CITY, STATE AND FEDERAL PERMITS (RIGHT-OF-WAY, FDEP, DOT, ARMY COE, ETC.) 8. FLORIDA PRODUCT APPROVAL NUMBERS REQUIRED (exterior doors, windows, skylights, panel walls, (EIFS) storefronts, roofing products, shutters, structural components and new exterior envelope products) (F.S. 553.842) 9. RECORDED COPY OF "NOTICE OF COMMENCEMENT" (Florida Statutes 713) NOC must be recorded with Okaloosa County Clerk of the Circuit Court and posted at the job site 10. FEMA FLOOD ELEVATION CERTIFICATE REQUIRED (AE & V zones): for pre-construction, during construction (for foundation finished floor (AE-Zone) or placement of first horizontal structural member (V-Zone)) and final. (Use current FEMA form) Final certificate must be provided prior to Final Inspection. (FEMA MAP) (LDC SECTION 11.04.00).(as applicable) OTHER REQUIREMENTS: a) PORT-O-LET OR BATHROOM FACILITIES MUST BE ON THE JOB PRIOR TO FIRST INSPECTION. b) TRASH AND DEBRIS MUST BE CONTAINED c) ADEQUATE POTABLE WATER MUST BE AVAILABLE. d) MAINTAIN EROSION AND SEDIMENT CONTROL PER LDC 10.03.2(B) DURING CONSTRUCTION OF PROJECT e) CITY IMPACT FEES MUST BE PAID PRIOR TO ISSUANCE OF CERTIFICATE OF COMPLETION

JOB SITE Community Development Department Building Division 4200 Indian Bayou Trail, Destin, Fl. 32541 Phone: (850) 654-1119 Fax: (850) 460-2171 Interior Renovation/Build-Out Permit Application DATE: NAME OF PROJECT: PARCEL ID: LOT: BLOCK: SUBDIVISION: OWNER OF PROPERTY: CONTRACTOR COMPANY NAME: QUALIFIER NAME: CITY, STATE, ZIP: STATE LICENSE #: COMP#: PHONE: FAX: MOBILE/CELL: CITY, STATE, ZIP: FEE SIMPLE TITLEHOLDER (If other than owner): PHONE: FAX: CITY, STATE, ZIP: CONTACT PERSON: MOBILE/CELL: EMAIL: ARCHITECT/ENGINEER: BONDING COMPANY: MORTGAGE LENDER NAME: DESCRIPTION OF WORK TO BE DONE: CATEGORY: Residential (SFD) Multi Family Commercial Height: Story: CURRENT CODE: OCCUPANCY USE: OCCUPANCY LOAD: TYPE OF CONSTRUCTION: I-A I-B II-A II-B III-A III-B IV V-A V-B SPRINKLED / UNSPRINKLED FLOOD ZONE: SOUTH OF CCCL: YES NO TOTAL VALUE (MATERIAL & LABOR): (excluding lot) TOTAL SQUARE FOOT: (including garage, porches, etc.) FINAL INSPECTION IS REQUIRED ON ALL PERMITS-Failure to obtain a final inspection may result in legal action. AS REQUIRED BY FLORIDA STATUTE 553.842 AND FLORIDA ADMINISTRATIVE CODE 9B-72, PLEASE PROVIDE THE INFORMATION AND APPROVAL NUMBERS ON THE BUILDING COMPONENTS IF THEY WILL BE UTILIZED ON THE CONSTRUCTION PROJECT FOR WHICH YOU ARE APPLYING FOR A BUILDING PERMIT. (Product approval specification sheet are available). Applicants Signature: Date: Reviewed by: (Building Div. Permit Officer) Date: Applicants Printed Name: Received By: (initials) Date:

Community Development Department Planning Division 4200 Indian Bayou Trail, Destin, FL 32541 Phone: (850) 837-4242 Fax: (850) 460-2171 INTERIOR REMODEL Building/Construction Permit Application Supplement JOB SITE PARCEL ID(S): FINAL DEVELOPMENT ORDER NO. (If applicable): D.O.- - DESCRIPTION OF WORK (Related to Permit Type): SHORT TERM RESIDENTIAL RENTAL UNIT (less than 180 days per year) Yes No ARE YOU INCREASING THE NUMBER OF BEDROOMS? Yes No.FOR OFFICIAL USE ONLY SOUTH OF COASTAL CONSTRUCTION CONTROL LINE? (Y/N) (If YES, provide a copy of the FDEP permit) FEMA FLOOD ZONE(S) & BASE FLOOD EL.: Received by Planning: Received by Storm water: Planning Review: Storm water Review: Flood Provision Review: Right of Way Review Date: Date: Date: Date;

Project Address: Owner/Project Name: Contractor: Contractor Phone #: PRODUCT APPROVAL SPECIFICATION SHEET As required by Florida Statute 553.842 & Florida Administration Code 9B-72, please provide product approval numbers as applicable to project. Product suppliers should provide approval numbers for purchased items. ****Note whether doors and/or windows are: Impact or Non Impact ****State wide approval products are listed on line at: www.floridabuilding.org Category Manufacturer Product Description (Impact or Non Impact) Model Number EXAMPLE: EXAMPLE: EXAMPLE: EXAMPLE: Windows Capital Single-Hung (Impact) 165 Series, Alum Design Pressure +/- Approval # EXAMPLE: EXAMPLE: +50/-50 FL675 Applicant Signature Date

CITY OF DESTIN - BUILDING DIVISION PERMIT APPLICATION NOTICE TO OWNER / CONTRACTOR JOB SITE NAME OF PROJECT: PARCEL ID: LOT: BLOCK: SUBDIVISION: Application is hereby made to obtain a permit to do the work and installation as indicated. I certify that no work or installation has been commenced prior to issuance of a permit and that all work will be performed to meet all codes, standards and laws governing construction in this jurisdiction. I also certify that all required insurances for me and any trades are in accordance with state laws. I understand that a separate permit must be secured for BUILDING, ELECTRICAL WORK, PLUMBING, MECHANICAL, ROOFING, SIGNS, POOLS and Right of Way (ROW) CONSTRUCTION, etc. OWNER / CONTRACTOR AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning per State and City of Destin. If the direct contract is greater than $2500, the applicant/owner must file a NOTICE OF COMMENCEMENT. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. FINAL INSPECTION IS REQUIRED ON ALL PERMITS-Failure to obtain a final inspection may result in legal action. Must be signed in presence of a Notary Signature Owner or Agent (including contractor) Signature Contractor STATE OF FLORIDA COUNTY OF OKALOOSA Sworn to (or affirmed) and subscribed before me this STATE OF FLORIDA COUNTY OF OKALOOSA Sworn to (or affirmed) and subscribed before me this day of, 20 day of, 20 by. by. Personally known OR Personally known OR Produced Identification Produced Identification Notary Signature as to Owner Notary Signature as to Contractor SEAL: SEAL:

CITY OF DESTIN Building Division MINIMUM REQUIREMENTS FOR INSPECTION INSPECTIONS DUE DATE A certified Notice of Commencement must be posted at the job site. A copy BEFORE 1 ST of the certified notice or an affidavit must be given to the Building Division. INSPECTION 1. TEMPORARY ELECTRIC SERVICE 2. ELECTRICAL GROUNDING 3. FOOTING Minimum size footing for wood frame construction is 10" x 20". Two #5 rebar and vertical steel is required every 8 feet. 4. UNDERGROUND PLUMBING 5. SLAB - MONOLITHIC ***FOUNDATION/SLAB SURVEY IS REQUIRED TO BE REVIEWED PRIOR TO A DRY-IN INSPECTION*** (All Surveys must show finished floor elevation & elevation of centerline of road right-of-way. LDC 20.06.01A/C) 6. SHEATHING Must be nailed every 3" at top, bottom and corners, 12 in field. 7. WINDOW ATTACHMENT 8. BRICK TIES 9. SEWER Windload certification letter from an architect or engineer required for all buildings which have sealed engineered drawings. BEFORE DRY-IN 10. DRY-IN* PLUMBING ROUGH-IN ELECTRICAL ROUGH-IN MECHANICAL ROUGH-IN GAS ROUGH-IN FRAMING 11. INSULATION 12. EARLY POWER FINAL AS-BUILT SURVEY & STORMWATER CERTIFICATION REQUIRED PRIOR TO C.O. SITE INSPECTION Street address posted. BEFORE FINAL Sidewalks installed. BEFORE FINAL Parking completed. BEFORE FINAL Landscaping completed BEFORE FINAL Final Survey BEFORE FINAL Stormwater Certification from engineer BEFORE FINAL Certificate of Termite Treatment BEFORE FINAL 13. FINAL* PLUMBING ELECTRICAL MECHANICAL GAS ROOFING GENERAL CONTRACTOR *All subcontractors and the general contractor must call in before dry-in and final inspections are scheduled.