City of Branson APPLICATION FOR CONSTRUCTION PERMIT

Similar documents
Residential Electrical Upgrade Permit Revised: 11/15/17

Basic Service. This Section provides information regarding a. Introduction

Residential Sewer Backup Prevention Program

(Condensed from National Electric Code)

2013 R-1 Building Permit Package For Additions, Decks, Fences & Garages

Article 10 - ADMINISTRATIVE SECTION

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

Commercial Remodel Permit

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

4. Number of drawings required: ( ) Locations of nearest streets

Effective June, Eaton-Durham Model # UTRS223ACH. Siemens, Model # SUAS877-PG. (or Landis & Gyr # UAS877-PG) Milbank. Model # U1980-O.

UNDERGROUND SERVICES (RESIDENTIAL) SINGLE FAMILY RESIDENTIAL, DUPLEXES, OR TOWNHOUSES

RESIDENTIAL FIRE SERVICE METERS Addendum #1

Section 2: Underground

Electric Service Handbook

Large Basic Service. This Section applies to members requiring new. Introduction. Service Types

APPLICATION FOR PORCH / DECK PERMIT

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

GUIDE TO WATER SERVICE APPLICATIONS

EFFECTIVE DATE: November 1, 2011, unless a later date is cited at the end of a section. [ NMAC - Rp,

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

The following is required for a complete permit submittal for each unit.

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

EFFECTIVE DATE: July 1, 2008, unless a later date is cited at the end of a section. [ NMAC - Rp,

The following is required for a complete permit submittal for each unit.

WIRING RULES AND REGULATIONS OF TOMBIGBEE ELECTRIC POWER ASSOCIATION

CITY OF CRANSTON RESIDENTIAL PERMIT PROCEDURE BASEMENT RENOVATION

NY State Unified Solar Permit

RESIDENTIAL BUILDING PLAN REQUIREMENTS

Application Requirements for obtaining a Building Permit

Village of Arlington Heights. Sewer Back-up Rebate Program

Welcome! Thank you for your interest in upgrading your service with Great Lakes Energy Cooperative (GLE).

Electric Service Handbook

CURRENT NORTH LAS VEGAS ADDENDA

City of Roman Forest

FENCE PERMIT APPLICATION

The City of Universal City, Texas 2150 Universal City Blvd Universal City, Texas Tel: (210) Fax: (210)

Section 3. Applications. A separate application shall be made and a separate meter shall be installed for each premise, defined as follows:

Specifications for Residential Overhead Electric Service Installation

NASSAU COUNTY ELECTRICAL PERMIT APPLICATION FOR CONTRACTORS

Building Codes in Effect: 2010 California Building, Residential, Fire, Energy and Electrical Codes, including Article 690.

PIKES PEAK REGIONAL BUILDING DEPARTMENT

UNDERGROUND SERVICES - GENERAL SERVICE AND MULTI-UNIT RESIDENTIAL

Installation of sanitary sewers, storm sewers and water piping requires the issuance of a Building Permit prior to commencement of installation.

TIMBERLAKE IMPROVEMENT DISTRICT Jones Rd, Suite 120, Houston, Texas Phone Number (281)

PROPOSED CONSTRUCTION BUILDING CODES FOR TURF AND LANDSCAPE IRRIGATION SYSTEMS

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE

Gainesville Technical Center 5399 Wellington Branch Drive Gainesville VA Phone (703)

Residential Accessory Structure Application Packet (Carport, Shed, Garage, Pool)

Madison County Property Improvement Check List

EARLY START PERMITS. Site cleaning, including removal of any existing asphalt, and/or concrete slab, Excavation work under the building footprint,

Office Hours: 9 a.m. to 5 p.m. Kristal Bachman Community Development Administrator. Jaclynn Workman Inspections Coordinator

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

Water Service Connection/Alteration Permit Application

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

ELECTRICAL SERVICE UPGRADE RESIDENTIAL AND COMMERCIAL QUICK INFORMATION REFERENCE

BOARD OF PUBLIC UTILITIES SCHEDULE OF WASTEWATER RATES PROVISIONS APPLICABLE TO ALL CONSUMERS

Welcome to Douglas County PUD

MEMPHIS LIGHT, GAS AND WATER DIVISION Application for Utility Services for Apartment Complexes

PRIMARY LINE EXTENSION

7. EXCAVATION IN PUBLIC STREETS The E-Permit & U-Permit

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

City of Jacksonville Development Guide Building Permits

Application for a Sewage System Permit

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

All service lines shall conform to the following requirements:

TYPICAL INSTALLATION INSTRUCTIONS

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

Specifications for Residential Underground Electric Service Installation

Installation of CSST Gas Piping Systems

MUNICIPAL OFFICES 1481 EAST COLLEGE AVENUE, STATE COLLEGE, PA TELEPHONE: FAX:

Parkland Light & Water Co. WATER SERVICE REQUEST AND STANDARDS

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

WARWICK TOWNSHIP Dept. of Planning & Zoning

SWIMMING POOL PERMIT AND INSPECTION REQUIREMENTS

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES

OVERHEAD SERVICES - RESIDENTIAL & GENERAL SERVICE. See Chapter 3, Section 3.01 for more information about point of entrance (POE).

Training Certification Categories

ZONING ADMINISTRATOR AGENDA

ELECTRIC METERING GENERAL

Last Updated March 15, 2016

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements

B U I L D I N G P E R M I T A P P L I C A T I O N

HATFIELD TOWNSHIP DECK/PATIO PERMIT PROCEDURES

TORONTO MUNICIPAL CODE CHAPTER 851, WATER SUPPLY. Chapter 851 WATER SUPPLY

CHAPTER 5 CONSTRUCTION CODES

Repair or replace section of driveway, approach, or sidewalk that are a trip hazard.

CUSTOMER INSTALLATION STANDARDS FOR GAS SERVICE

Building/Zoning Permit Fee Structure

Residential Building Permit & Inspection Procedures

Addition to Section 4 - Special Use Regulations

MATERIAL ALLOWANCES AND UNIT PRICES

GRAY WATER SYSTEMS FOR RESIDENTIAL BUILDINGS

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

NOTICE OF INTENT TO USE THE GENERAL PERMIT FOR CONSTRUCTION OF WATER MAIN EXTENSIONS FOR PWSs

City of Bullhead City Development Services/Public Works. Permit Submittal Requirements FENCES

Commercial Permit Process

Transcription:

110 W. Maddux St., Ste. 215 Branson, MO 65616 417 337 8549 Fax 417 334 2391 Project Project 911 Name Address Owner City of Branson licensed contractor Missouri registered architect/engineer Residential project: Commercial project: Will it be a rental property? Square feet # of seats # of rooms City of Branson APPLICATION FOR CONSTRUCTION PERMIT No Yes Nightly Monthly Requires 2 wetseal drawings, 5 copies by a Missouri registered design professional, and the information filled in below: Occupancy load # of employees Brief description of work: Estimated construction value of project: Original signature of applicant I hereby certify I am the owner or duly authorized owner's agent, I have read this application and all information is correct. I further certify I have read, understand, and will comply with all the provisions outlined hereon. I also certify the plot plan submitted is a complete and accurate plan showing any and all existing and proposed structures on the subject property. PROVISIONS: The issuance of a permit shall not be construed to release the owner or owner s agents from the obligation to comply with the provisions of all laws and ordinances, including federal, state, and local jurisdictions, which regulate construction and performance of construction. A permit will become null and void if the construction work authorized has not begun within 180 days from the date of issuance or if work is suspended or abandoned for 180 days prior to the final inspection. Office Use Only Permit number Date applied Fee dues Project type category # of sets of plans submitted Plans in file Rolled plans Other documents submitted Roof/deck Application Signature Date Electrical Service Code cycle year Hazard type Construction type Use group Sprinkler system Structural Eng. report New construction Existing structure If project is related to existing structure, check all applicable boxes below: Print name This Section For Office Use Only Application reviewed and approved by: Date Floodplain dev. app. Repair Alteration Addition Solar panel Building Mechanical only Plumbing only Electrical only Engineering/Public Works Re Roof Deck New electrical service Is the property in a floodplain? If you checked either of the 3 boxes to the left, please complete and attach a Re Roof, Deck, or New electrical service installation worksheet Yes If you checked Yes, please complete and attach a No Floodplain Development Application Form Fire Health Landscaping/Planning Utilities 5/2018

ELECTRICAL SERVICE INSTALLATION WORKSHEET Project Address Permit # Office Use Contractor or Owner Name Service Provider (check a box): Empire Electric White River Electric Electrical Service Upgrade (check a box): Residential Commercial Please provide the following information. 1. Current size of service: amp. 2. Current grounding system: ground rod grounding ring concrete encased electrode plate metal water service 3. Proposed size of service upgrade: amp. 4. Proposed grounding system update: ground rod grounding ring concrete encased electrode plate 5. Current service: overhead underground 6. Proposed service: overhead underground Per Branson Municipal Code (BMC) Section 18-47: The service disconnecting means shall be installed at a readily accessible location outside of a building or structure. This requirement shall apply when replacing an electric panel and when replacing a service disconnect not in a readily accessible location outside of a building or structure. Where an owner is doing work on OWNERS personal residence, all wiring from the point of utility connection into the structure shall be of copper conductors. Per National Electric Code (NEC) 2014: The combination meter/main service disconnect enclosure to be installed shall be rated as a NEMA 3R. Service Grounding Conductors shall be sized accordingly as per 250.66 and Service Conductors as per 310.15.(B) (6) and properly identified. Connection of the Main Bonding Jumper as per 250.28 Disconnect enclosures shall be properly/permanently identified, not located above stairs, properly bonded. Service riser conduit is to be of Schedule 80 if PVC, properly secured and clearances observed. If a metal sweep is used less that 18 below grade, it is to be bonded with the grounding conductor. Page 1 of 2 110 W. Maddux Street, Suite 215 ǀ Branson, Mo 65616 ǀ 417.337.8549 ǀ 417.337.8505 (Inspection Line) ǀ BransonMo.Gov 7/2017

CITY OF BRANSON ELECTRICAL SERVICE INSTALLATION WORKSHEET Note: If a new service is replacing a combination disconnect/breaker panel that is located on the inside of the building, separate grounding and grounded buss terminals will be required and all conductors appropriately located. In addition, if this electric service installation is for new construction in multi-unit buildings, the drywall in the immediate area of the breaker panel and a GFIC must be installed (1-per floor). The panel cover must also be available for immediate installation after inspection. After obtaining a permit and initiating the install, call the inspection line at 417-337-8505 for a rough in inspection to inspect any/all of the following: trench conductor applications riser mounting/attachment bonding and grounding electrode placement/connections If approved, an orange Approved sticker will be placed on the enclosure and the Service Provider can be contacted for service activation. A final inspection is required. Please call the inspection line. In the space below, or on a separate attached sheet, please diagram an overhead view, (site plan), showing the current and proposed service locations as well as any trenching and setback dimensions which will be incorporated into the work. SITE PLAN Page 2 of 2 110 W. Maddux Street, Suite 215 ǀ Branson, Mo 65616 ǀ 417.337.8549 ǀ 417.337.8505 (Inspection Line) ǀ BransonMo.Gov 7/2017

Utilities Plan Review original Water Distribution 1 copy Finance 1 copy WATER CONNECTION APPLICATION Property Owner s Name: Property Owner s Mailing Address: Monthly Water Billing Address: Property Owner s : Date: Installed Water Meter Billing Name, Address & Number (If Different Than Above): Meter Location & Address: Size(S) & Intended Service of Meter(S) or Tap(S): Domestic (Qty) (Size) Irrigation (Qty) (Size) Fire Tap (Qty) (Size) Ordinance #2013-0178 - Branson Municipal Code Section 90-26: For Any Installation Of New Meter Service, The Applicant Shall Pay All City Costs For The Installation Including Meter, Parts, Materials, Labor And Equipment. A Deposit Will Be Required Prior To Water Being Turned On! Water Pressure Reducing Valve or Regulator: where water pressure within a building exceeds 80 psi static, an approved water pressure reducing valve conforming to ASSE 1003 with strainer shall be installed (by the property owner s plumbing contractor) to reduce the pressure in the building water distribution piping to 80 psi static or less. Exceptions to this requirement are service lines to sill cocks and outside hydrants, and main supply risers where pressure for the mains is reduced to 80 psi or less at individual fixtures. Date of installation may vary depending on availability of parts. Please allow for up to eight (8) weeks for installation. I do hereby agree that the above billing address is the responsible party for payment of meter invoices. All payments are due and delinquent after 30 days of invoicing. (Signature) 7/1/2017

DATE: SEWER CONNECTION APPLICATION Name: Driver s License #: #: Date of Birth: Mailing Address: Sewer Connection 911 Address: Is the Sewer Connection Address Located Within the City Limits: Yes No Property Owner s Name: #: (If Different Than Above) Property Owner s Mailing Address: (If Different Than Above) Is the Sewer Service at the Location for: Primary Home Vacation Home Rental Residence Business Other/ Explain: Name of Water Company that Serves this Property: Contractor Name: #: City of Branson Building Sewer Specifications and Requirements 1. Customer shall pay for all costs associated to connection of sewer service to city sewer main including all construction cost, permit fees, inspection fees and sewer system connection charges. 2. Connections must be completed in accordance with the International Plumbing/Residential Code and all city specifications and requirements listed in chapter 90 of the Municipal Code. 3. Contractor or owner shall deposit a bond of $500 with the Finance Department and contractors shall have a valid Contractor s License through the City of Branson before a permit will be issued. 4. Call 1-800-dig-rite for locates on utilities prior to excavation. 5. Call the Utilities Department (417-243-2731) at least 24 hours prior for all inspections and testing. I do hereby agree to comply with all of the above city specifications and requirements and to pay all charges for water and/or sewer service at the above address as long as said service remains in my name. I will notify the city of branson in the event I discontinue service in my name at the above address and will submit a new forwarding mailing address at that time. Applicant Name (Print): Applicant Signature: Starting Date of Service: (Office Use Only) 7/1/2017