Building Department. Building Permits A Homeowner s Guide

Similar documents
BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

HOW TO OBTAIN A BUILDING PERMIT

A Guide to Building Permits for Home Owners / Renovators

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

A homeowners/applicants guide to understanding and making application for a building permit.

BUILDING DEPARTMENT GUIDE TO RESIDENTIAL BUILDING PERMITS

District of Barriere A GUIDE TO BUILDING PERMITS

The Homeowner s Building Application Checklist for Constructing a Residential Addition

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

BUILDING PERMIT APPLICATION

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

Town of Pittstown. Office of the Building Inspector / Code Enforcement Officer

SUBSTANTIAL IMPROVEMENT

Application for Commercial Plan Review and Building Permit. Address:

All new construction, mobile home placement & additions.

PROCEDURE FOR REQUESTING A BUILDING PERMIT

BUILDING PERMIT APPLICATION PACKAGE

BUILDING PERMIT APPLICATION

A HOMEOWNER S GUIDE TO ACCESSORY DWELLING UNITS

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

BUILDING PERMIT APPLICATION

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

City of Centerville Building, Zoning & Code Enforcement Department

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule.

Zoning- check the zoning on the property you are planning to build on, this can be done at the municipal office.

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements

BUILDING CODES & DESIGN CRITERIA

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements

Detached Garages and Building Permits. 1 and 2 Family Dwellings

Residential Building Permit & Inspection Procedures

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

Home Building Planner

Building/Zoning Permit Fee Structure

City of Donnelly. Permit Application Information and Instructions

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS

Commercial Remodel Permit

TOWN OF WINDSOR CONSTRUCTION GUIDELINES

Applying for Permits to build a new house in Linn County

BUILDING PERMIT APPLICATION TYPE OF PERMIT: NEW CONSTRUCTION ADDITION ALTERATION HUD HOME MODULAR HOME OTHER:

Inspection Report. 1 of 8

Residential Building Permit Application

THE CORPORATION OF THE TOWNSHIPSHIP OF ADELAIDE METCALFE

APPLICATION FOR PORCH / DECK PERMIT

Dave Harper, Building Official (509) Susan Davis, Administrative Secretary (509)

Plainfield Township Building and Zoning Department P.O. Box 247 Hale, MI PH(989) FX(989) Authority: P.A. 230 of 1972 As Amended

Last Updated March 15, 2016

BUILDING PERMIT PROCEDURE PLEASE READ CAREFULLY AND FILL OUT COMPLETELY TO ASSURE QUICK AND ACCURATE SERVICE

BUILDING PERMIT GUIDELINES - RESIDENTIAL

BUILDING PERMIT APPLICATION GUIDE FOR HOMEOWNERS

OWNER S REPONSIBILITIES AND PREPARATION INSTRUCTIONS. Schedule "C"

Building Permit Application Instructions INFORMATION REQUIRED FOR ISSUANCE OF A BUILDING PERMIT

BASEMENT FINISH CONSTRUCTION

The following is required for a complete permit submittal for each unit.

II. IDENTIFICATION A. OWNER OR LESSEE ADDRESS (number, street, P. O. Box, Apt., etc.)

CITY OF CRANSTON RESIDENTIAL PERMIT PROCEDURE BASEMENT RENOVATION

Office Hours: 9 a.m. to 5 p.m. Kristal Bachman Community Development Administrator. Jaclynn Workman Inspections Coordinator

CITY of COLDWATER. Requirements for Obtaining Building Permits City of Coldwater, Michigan

RESIDENTIAL BUILDING PERMIT PROCEDURES

TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX

RESIDENTIAL CONSTRUCTION PERMIT FEES

Guide to Residential Permits and Inspections

An Applicant s Guide to Residential Building Permits.

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

Project #1139 Budget #82. $ Budgeted $ Billed to Date $ Paid to Date $ Due 210, , , ,158.50

The following materials and documents are required in order for you to obtain a Building Permit:

RESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST

Town of Greater Napanee. Development Services Handbook. Town of Greater Napanee Development Services Department

INFORMATIONAL PACKAGE ACCESSORY RESIDENTIAL BUILDINGS (INCLUDING DETACHED GARAGES, STORAGE BUILDINGS & WORKSHOPS)

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings

Basement Renovation Guide For Residential Dwellings

BUILDING PERMIT APPLICATION

City of Milford, Connecticut Information Regarding Permits

Each proposed project will be reviewed for compliance with the following codes as applicable.

THE CONSTRUCTION SUPERVISOR

Single Family Detached home submittal Workbook

Building Permit Requirements Custom Built Homes

Procedure for an Application for an Garage, Gazebo, Sauna, Pump House, Shed

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

TOWN OF BEDFORD BUILDING DEPARTMENT 55 CONSTITUTION DR. BEDFORD, NH FEES, POLICIES & REQUIREMENTS CURRENT CODES

SCREEN PORCHES 101 DEVELOPMENT RESOURCES, INC Permit Requirements

Residential New Home Requirements 200 South Main Blue Ridge, Texas

TOWN OF PORT ROYAL BUILDING CODES DEPARTMENT Building Permit Submittal Requirements

Detached Garage Construction Information

The following is required for a complete permit submittal for each unit.

START RIGHT A G U I D E T O L + I S E R V I C E S

DEPARTMENT OF CODE ENFORCEMENT CITY OF NIAGARA FALLS, NEW YORK FEE SCHEDULE

COMMUNITY DEVELOPMENT

Davis Frame Co., Inc. Construction Budget Considerations

RESIDENTIAL BUILDING PERMIT INFORMATION

Truth in Sale of Housing Disclosure Report NOTICE - Read Entire Report Carefully. This is not a Buyer's Inspection!

Toronto Community Housing Executive Summary 2016/2017. BCA Report. Sample House High FCI

Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782

City Planning & Development - Development Services (CPD-DS) 414 E. 12th Street 5 th Floor Kansas City, Missouri Telephone (816)

City of Bullhead City Development Services/Public Works. Permit Submittal Requirements FENCES

PIKES PEAK REGIONAL BUILDING DEPARTMENT

Continuing Certificate of Occupancy Pre-Inspection Checklist

AGREEMENT CONCERNING EXISTING AS BUILT CONSTRUCTION

DOUGLAS COUNTY BUILDING PERMIT APPLICATION

The Inspection Process. Waxhaw N.C.

Transcription:

Building Department Building Permits A Homeowner s Guide

BUILDING PERMITS A homeowner s guide Whether you are planning on building a simple shed to a large addition on your house you will have many of the same questions. Do I need a Building Permit? What do I need to submit to get a permit? How long will it take? Why do I need a permit? This guide has been developed to assist you with understanding the Building Permit process and what information you will need to provide to the Town along with your Building Permit application. This guide is designed as a basis to assist you in not only obtaining your Building Permit but with completing your project, however, since each project is unique and some of the external agency (e.g., Conservation Authorities, Niagara Escarpment Commission, etc) requirements that may apply to your property are different, you should contact the Building Section for the specific requirements that apply to your property. 2

Why is a Building Permit Required? Obtaining a Building Permit will help ensure that the work being constructed is in accordance with both the Ontario Building Code and the Town s Zoning By-Law. The Ontario Building Code contains the minimum construction standards that have been developed to ensure that the health, safety and welfare of both inhabitants and users of buildings are protected. What is a Building Permit? A Building Permit is a document which grants legal permission from the Town to begin construction of a building project, it also includes a set of approved plans which have been reviewed and approved by the Building Department for compliance with both the Ontario Building Code and the Zoning By-Law. Please remember that even though a Building Permit may not be required, compliance with the Zoning By-Law or other regulations (e.g., Conservation Authorities, Niagara Escarpment Commission, Oak Ridges Moraine, etc.) may apply. Please check with the Planning & Development Department for confirmation on the applicability of the Zoning By-Law or other regulations to your project. * A deck which is less than 60 cm (24 inches) above grade does not require a Building permit regardless of the size. Please note that all applicable Zoning By-Laws are still applicable to these decks. What types of construction projects require a Building Permit? Under the Building Code Act, a Building Permit is required for the construction, alteration or renovation of any structure over 10 m² (108 ft²) in area. Some typical projects that do require a permit include: new houses additions to houses garages (either detached or attached carports decks* plumbing, heating/air conditioning work sheds or other types of accessory structures that are greater than 10 m² (108 ft²) in area. new or repairs/alterations to sewage (septic) systems 3

Types of construction projects that do not require a Building Permit Not all new construction, alterations or renovations will require a Building permit. Some typical projects that do not require a permit include: air conditioning units or heat pumps added to existing systems pool heaters painting or decorating landscaping fences re-shingling of roofs eavestrough kitchen cupboards satellite dishes minor masonry repairs a building or any accessory structure that does not exceed 10 m² (108 ft²). contractor, then there is no independent review by a third party for the homeowner to help ensure that work is being done correctly and your insurance may not cover any claims that may arise as a result of faulty construction. It is also a violation of the Building Code Act to carry out work for which a Building Permit is required. Failure to comply with the Building Code Act could result in charges being laid and penalties being assessed to the property owner or other responsible persons. Please remember that even though a Building Permit may not be required, compliance with the Zoning By-Law or other regulations (i.e., Conservation Authorities, Niagara Escarpment Commission, Oak Ridges Moraine) may apply. Please check with the Planning & Development Department for confirmation on the applicability of the Zoning By-Law or any other regulations that may apply to your project. What if I do the work without getting a Permit? If the work does not comply with either the Ontario Building Code or the Town s Zoning By-Law, costly work may be needed to correct any infractions or the removal of the work may be required. Also any future legal transactions of the property (e.g., mortgage renewal, selling, etc.) may be significantly impacted by the illegal construction work. If the work is being done by a 4

What if I live in an area regulated by a Conservation Authority, the Niagara Escarpment Commission or the Oak Ridges Moraine Act? If your property is in an area that is regulated by a Conservation Authority, Niagara Escarpment Commission or subject to the Oak Ridges Moraine Act and the work you are proposing is either new construction or work that is not wholly contained within an existing building, then you may require a permit from one of the Conservation Authorities, the N.E.C. or Site Plan Approval for the Oak Ridges Moraine. In order to determine if you require this additional approval, staff in the Planning & Development Department can advise of this and how to apply for these approvals. Please note that you may still apply for a Building Permit prior to obtaining this approval (if necessary), however, a Building Permit cannot be issued until such approval is obtained. HWY 9 MONO MILLS AIRPORT RD PALGRAVE OAK RIDGES MORAINE CONSERVATION PLAN AREA HWY 50 ALBION MELVILLE NIAGARA ESCARPMENT PLAN AREA CALEDON EAST ALTON CALEDON MONO ROAD SANDHILL CATARACT BRIMSTONE HWY 10 OLD BASE LINE RD BOLTON WILDFIELD BELFOUNTAIN INGLEWOOD CLAUDE CAMPBELLS CROSS VICTORIA MAYFIELD RD TULLAMORE CHELTENHAM MAYFIELD WEST TERRA COTTA HWY 9 MONO MILLS PALGRAVE AIRPORT RD HWY 50 TRCA ALBION MELVILLE HWY 10 BOLTON ALTON CALEDON CALEDON EAST MONO ROAD CATARACT BRIMSTONE CVC OLD BASE LINE RD SANDHILL WILDFIELD BELFOUNTAIN INGLEWOOD CLAUDE CAMPBELLS CROSS VICTORIA MAYFIELD RD TULLAMORE CHELTENHAM MAYFIELD WEST TERRA COTTA 5

What is needed to get a Permit? A Building Permit application form along with 2 sets of the following drawings are required to be submitted to the Building Section along with the necessary Building Permit fees*: Site Plan (this does not apply if the proposed work is confined to the interior of the building) Floor Plans Elevation Drawings of each side of proposed construction (this does not apply if the proposed work is to the interior of the building only) A roof framing plan or truss layout (including truss drawings) Mechanical drawings including Heat Loss/ Heat Gain calculations if a H.V.A.C. system is being installed or altered Number and type of Plumbing fixtures being installed (i.e., 2 sinks, bathtub, laundry room sink, toilet, etc.) Septic System information If the property is under the jurisdiction of a Conservation Authority or the Niagara Escarpment Commission, then proof of approval from these authorities is required. If you have a good working knowledge of construction you may wish to design your own project, however, you may also wish to hire a designer to develop your plans. If you do hire a designer then please be aware they must have the appropriate qualifications and/or registration as a designer as required by the Building Code Act. Please speak to a representative of the Building Section for further clarification. Determining the specific requirements for your application can speed up the approval process and save you time and money. *Please contact the Building Section to determine your Building Permit fee prior to visiting the Town to submit your application. The following table indicates the drawings required for various types of projects. Samples of these different drawing types follow on pages 7 to13. Application for: Site Plan Foundation or Basement Plan Cross Section Partial Floor Plan Complete Floor Plan Elevations (View of EACH side) Pg 7 Pg 8 Pg 10 Pg 8 9 Pg 9 Pg 11-12 Carports Yes Yes Yes Yes No Yes Detached garages and accessory buildings Additions and attached garages Wood burning stoves, fireplaces and chimneys Porches and decks Basement Walkouts Yes Yes Yes No Yes Yes Yes Yes Yes No Yes Yes Yes No Yes Yes No No Yes Yes Yes Yes No Yes Yes Yes Yes Yes No Yes 6

Site Plan A site plan identifies buildings and other structures or features in relation to property boundaries. The site plan should identify your existing house and any proposed changes. Most or all of the information required for a site plan can be found on your property survey. You may have received one when you bought the property. If not you may have to hire a surveyor. The following information should be shown on a site plan: 1) Title and scale 2) Legal description 3) Street name 4) North arrow 5) Property lines with dimensions 6) Setbacks to all property lines from existing and proposed structure(s) 7) Proposed construction (shaded) 8) Overall building dimensions 9) Right-of-way(s) and easements 10) Grading ** SAMPLE SITE PLAN ** Note: For a residential unit being constructed within a plan of subdivision, the developer s engineer must certify that the lot conforms to the overall grading plan. 7

Floor Plans Floor plans provide a bird s eye view of the different floors of your house. They show scaled dimensions of the rooms, halls and stairs on each floor, as well as the size, direction and spacing of structural members (e.g., joists, beams and lintels). The following information should be shown on a floor plan: 1) Title and scale 2) Room names 3) Interior and exterior dimensions, including door and window sizes 4) Structural members and lintels, including their sizes 5) The materials used and the extent and size of both the new and existing structure(s) 6) Cross-section symbols 7) Location of plumbing fixtures SAMPLE FLOOR PLAN 8

Floor Plans (con t) 9

Cross Sections A cross-section presents a view of a building along an imaginary cut, showing the structural elements of the building and exposing what is hidden behind the walls. Cross-sections through the proposed and existing structure(s) may be required to show building materials and how they relate to one another. The location of a cross-section is shown by the cross-section symbol on the floor plans. The following information should be shown on a cross-section: 1) Title and scale 2) Room names 3) Heights and dimensions of doors and windows 4) Size and type of materials and finishes 5) Finished floor level and grades 6) Existing house and proposed addition(s) More detailed drawings may be necessary to fully explain a particular aspect of your project which varies from conventional construction practices. Typical detailed sections are available at the Building Section counter. SAMPLE CROSS SECTION 10

Elevations Elevations show all exterior side views of a building. Elevation drawings may be required for any project which would alter the exterior view of your house. The following information should be shown on an elevation: 1) Title and scale 2) Heights and dimensions of existing and new window and door openings 3) Exterior finishes and materials 4) Finished floor levels and grade 5) Extent of proposed addition and existing house 6) Overall height of buildings 7) Slope/pitch of new roofs SAMPLE ELEVATION DRAWING 11

Elevations (con t) SAMPLE ELEVATON DRAWINGS 12

Private On-Site Sewage (Septic) Systems In areas with municipal sewers, the disposal of sewage is not something property owners often think about. However, in areas without municipal sanitary sewers, sewage disposal is the responsibility of each property owner. Residential property owners must treat and dispose of both sanitary sewage and waste water on their property. Factors affecting Sewage System design There are several factors that affect the size and location of the sewage system which also may ultimately impact on the location and size of your house. These factors are as follows: Number of bedrooms in house Size of house Number of plumbing fixtures Soil type Location of other structures on property (e.g., sheds, decks, garages, etc.) Location of wells, watercourses, and property lines What information must be submitted? 2 sets of a Site Plan showing the sewage system, any structures on the property, wells, watercourses, property lines, etc. and measurements to those features (see page 14 for a sample site plan) along with a soils analysis showing the percolation capacity of the soil. If you are hiring a designer or contractor then you should be aware that the Building Code Act requires that all designers & contractors must have the required qualifications as stipulated in the Ontario Building Code. 13

Septic Plans SAMPLE SEPTIC SYSTEM PLAN 14

What happens once I apply? Once an application is submitted to the Town it is reviewed by a Zoning Plans Examiner along with a Structural/Architectural Plans Examiner and a Mechanical Plans Examiner. Once each Plans Examiner has completed their review and if there is additional information required, then they will contact the applicant in writing or by phone and advise them of this. Once all of the requirements are met including the payment of all fees*, then the application is approved and a Building Permit is issued. Now that I have my Building Permit, what s next? Once you have been issued a Building Permit you may now legally begin the construction of your project. During the course of your project there are several different stages of construction that must be inspected by the Town s Building Inspector and/or Mechanical Inspector (for a complete listing of these mandatory inspections please refer to page 16 of this guide). These inspections are legally required and are in place to ensure that the health, safety and welfare requirements of the Ontario Building Code have been met. These inspections are also a good way for either the do-it-yourselfer or the professional you ve hired to utilize the expertise and experience that the Inspector can offer in helping to resolve any technical difficulties that may arise during the course of the project. Please note that these inspections do not happen automatically. It is your responsibility to ensure that either you or your contractor contacts the Town to request an inspection at least 24 hours prior to the actual inspection. This will ensure that your project proceeds as approved and with minimal delays. To book an inspection please call (905) 584-2272 Ext. 4174 Please note that the owner or representative of the owner (e.g., contractor) must be present during any mandatory inspection. Before you dig: Remember to call the appropriate utilities before you dig: Bell Canada and Enbridge Gas at 1-800-400-2255 Hydro One at 1-888-664-9376 Region of Peel Water & Sewer locate at (905) 791 7800 Ext. 3400 Once the project is finished what do I do? Upon completion of the project, the Inspector s must conduct one final inspection and upon successful review the Building Permit is officially signed-off as being complete. This signing-off is your assurance that everything has been inspected and approved and found to be in compliance with both the Ontario Building Code and the Town s Zoning By-Law. *All Building Permit fees must be paid at the time the Building Permit application is submitted and all Development Charges must be paid prior to permit issuance. 15

Contacts Town of Caledon Building & Support Services (905) 584-2272 Ext. 2233 Development Approval & Planning Policy (905) 584-2272 Ext. 7338 Public Works (905) 584-2272 Ext. 4328 Committee of Adjustment (905) 584-2272 Ext. 4265 Mailing Address: 6311 Old Church Road Caledon East ON L7C 1J6 Office Hours: Monday Friday 9:00am to 4:30pm Other Agencies Credit Valley Conservation Authority 1255 Derry Road West Mississauga On L5N 6R4 (905) 670-1615 Toronto Region Conservation Authority 5 Shoreham Drive North York On M3N 1S4 (416) 661-6600 Niagara Escarpment Commission 232 Guelph Street Halton Hills On L7G 4B1 (905) 877-5191 Region of Peel 10 Peel Centre Drive Brampton On L6T 4B9 (905) 791-7800 Mandatory Inspections Structures: 1. FOOTINGS (prior to pouring concrete) 2. FOUNDATION AND WEEPERS (Backfill) 3. EXTERIOR DRAINS/WATER SERVICE 4. INTERIOR DRAINS 5. PLUMBING ROUGH-IN 6. H.V.A.C. ROUGH-IN 7. FRAMING (Prior to insulating) 8. INSULATION & VAPOUR BARRIER 9. PLUMBING FINAL 10. H.V.A.C. FINAL 11. BUILDING INTERIOR/FINAL (as per 2.4.3.2 OBC) Sewage Systems: 1. READINESS TO CONSTRUCT SEWAGE SYSTEM 2. COMPLETION OF TILE BED (Prior to backfill) 3. COMPLETION OF SEWAGE SYSTEM * Please note that the owner or a representative of the owner (e.g., contractor) must be present during any mandatory inspection. 16